Typical_Drawings.pdf

PDF 1 MB Posted

Attached to
Portage Bay Washout Bridge Repair Project
Solicitation number
AG-0109-S-16-0021
Issued by

About this file

Project Drawings

View the file

Other files

File Type Posted
amendment_003_.doc DOC document
amendment_002_.doc DOC document
amendment_001_.doc DOC document
Washout_photos.pdf PDF
Bridge_Site_Photos.pdf PDF
4-WD_AK160006.pdf PDF
RFP-AG-0109-S-16-0021final.rtf RTF text file
Portage_Bay_Map.pdf PDF
FSSS.docx DOCX document
Worklist.pdf PDF
SF-1442_AG-0109-S-16-0021.rtf RTF text file
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STORMPROOFED CULVERT

PLAN VIEW

1. STORMPROOFING MAY BE SHIFTED ALONG THE ROADGRADE AS DESIGNATED

BY THE CO, TO MAINTAIN REQUIRED CULVERT COVER.

2. STORMPROOFING SHALL BE SUFFICIENT TO CARRY STREAM FLOWS EQUAL TO

CULVERT HYDRAULIC CAPACITY

3. A DITCHBLOCK SHALL BE CREATED BY PLACING EXCAVATED MATERIAL ON

ROADWAY AND IN THE DITCHLINE AGAINST THE CUTBANK (IF ANY) ON THE

DOWNGRADE SIDE OF WATERBAR ONLY.

4. EXCAVATED MATERIAL SHALL BE PLACED AS SHOWN ON THE DRAWINGS. IT IS

PERMISSIBLE TO FILL THE DOWNSLOPE DITCH. MATERIAL WHICH CAN NOT BE

PLACED AS SHOWN ON THE DRAWINGS SHALL BE LOADED, HAULED, AND

DISPOSED OF AS DIRECTED BY THE CO. ALL SLOPES SHALL BE CONSTRUCTED

AS DRAWN.

5. ALL DISTURBED AREAS SHALL BE SEEDED AND FERTILIZED AS SPECIFIED IN THE

CONTRACT.

GENERAL NOTES

PROJECT TITLE STORMPROOFED CULVERT

??? DISTRICT

Q. SMITH 05/11/12

Q. SMITH 05/11/12

X. XXXXXXXXXX XX/XX/XX

XX/XX/XX

XX/XX/XX XXXXXXXXXXXXX X.XXXXXX

XX/XX/XX XXXXXXXXXXXXX X. XXXXXX

ACAD.DWG

X XX

USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -

DESIGNED: DATE:

DATE:DRAWN:

REVIEWED: DATE:

DATE: REVISION: BY:

PLOT ON 11"X17" PAPER

TONGASS

ENGINEERING & RECREATION TNFTYP:09/04

File details come from the government source that posted it. Updated .