AFREP Current Monitor PWS dtd 24-Nov-25.pdf
PDF 167 KB Posted
- Attached to
- F-15 Cable and LOD Repair Services, Air Force Enhancement Program (AFREP) for Seymour Johnson AFB
- Solicitation number
- A055673
About this file
This is a Performance Work Statement (PWS) for current monitor and antenna repair services at Seymour Johnson Air Force Base under the Air Force Repair Enhancement Program (AFREP), dated 24 November 2025.
The Service Provider must repair F-15E aircraft parts to serviceable condition, specifically F-15E Current Monitors (NSN 6620-01-310-2103) and F-15E Upper UHF Antennas (NSN 5985-01-319-9456). The Service Provider must maintain an approved Source of Approved Repair (SAR) letter certified by MAJCOM AFREP Manager and comply with DAFI 21-101 Para 11.36 (ACC Supplement) and applicable technical orders. Standard repairs must be completed and returned to Seymour Johnson AFB within 40 days of part receipt; Mission Incapable Awaiting Parts (MICAP) items designated by the Contracting Officer must be returned within 20 days. The Service Provider shall furnish all labor, tools, equipment, materials, and supervision at its facility, with all shipping costs included in repair pricing. Repaired parts must appear cosmetically new, meet OEM acceptance test procedures and technical specifications, and be accompanied by written certification that parts are safe and fully qualified for F-15E operational use. The Service Provider must report receipt of all Government Furnished Property using the GFP Module, maintain inspection and repair records, and provide documentation including repair test results and shipping tracking numbers. The Service Provider must also report all labor hours (including subcontractor hours) via Service Contract Reporting on SAM.gov no later than October 31 of each calendar year. Historical workload data indicates typical volumes of 5-10 current monitors annually and 7-10 antennas annually based on recent fiscal years.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Seymour Johnson Air Force Base
Performance Work Statement
Current Monitor and Antenna
Repair Services Air Force Repair Enhancement Program (AFREP)
24 November 2025
Page | 1
Table of Contents
1. SCOPE
2. Description of Services/Introduction
3. Special Qualifications
4. Requirements
4.1. Inspections
4.2. Contractor Inspection Records
4.3. Record of Repairs………………………………………………………………………..…2
4.4 Repair/Shipment Timeframe
4.5 Products/Materials
4.6 Government Furnished Property
4.7 GFP Training………………………………………………………………………………..3
4.8 Quality Control Plan………………………………………………………………………...3
5. Invoicing
6. Warranty
7. Location
8. Manpower Reporting
9. Services Summary
EXHIBIT A, Current Monitors
EXHIBIT B, Antennas
Page | 2
1. Scope: The work consists of furnishing all labor, tools, and equipment necessary to repair F15E parts to serviceable condition in support of the Air Force Enhancement Program (AFREP) and in accordance with technical orders (TO) and special qualifications identified elsewhere in this performance work statement (PWS).
Parts outlined in the performance work statement (PWS) exhibit(s) shall be furnished by 4 MXG/MXQG.
2. Description of Services/Introduction: Service Provider (SP) shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to repair F15E aircraft parts listed in Exhibit A.
3. Special Qualifications: IAW DAFI 21-101 Para 11.36 (ACC Supplement), the SP must have an approved
Source of Approved Repair (SAR) letter certified by MAJCOM AFREP Manager.
4. Requirements: All repairs shall be conducted in accordance with Department of the Air Force Instruction
(DAFI) 21-101, Air Combat Command Supplement, Paragraph 11.36 (available at www.e-Publishing.af.mil) and applicable technical orders. See Exhibit(s) for specific publications applicable to each part.
4.1. Inspections: SP shall perform and document an inspection/functional check upon receipt of part. If unable to repair the part, the SP must return the part at no cost to the Government. After parts have been repaired, an inspection/functional check shall be completed and documented.
4.2. Contractor Inspection Records: Records of inspections shall be kept and made available to the
Government throughout the contract performance period and for the period after contract completion until final settlement of any claims under this contract.
4.3. Record of Repairs: Record of repair will consist of components tested, component serial number (S/N), test procedures used, and technical values compared to engineering specifications.
4.4 Repair/Shipment Timeframe: Standard repairs shall be repaired and returned (physically received by the
Government) within 40 days of part receipt at the SP’s location. If a part is deemed mission critical, the part will be designated as Mission Incapable Awaiting Parts (MICAP) by the Contracting Officer (CO) and/or the
Contracting Officer’s Representative (COR), the part shall be repaired and returned (physically received by the Government) within 20 days of part receipt at the SP’s location. Deviation from these standard timelines shall be approved by the Contracting Officer on a case-by-case basis. NOTE: Additional fee(s) for expedited repair and delivery of MICAP items shall be identified in individual task order as a separate contract line item number (CLINS). For example, a task order for five current monitors in which two are identified as MICAP would have CLIN 0001 for a quantity of five and CLIN 0003 for a quantity of two - CLIN 0003 for the additional fee associated with the expedited service and shipment (i.e. above and beyond the “normal repair” cost for each item already identified in CLIN 0001).
4.4.1. The SP shall provide a shipment tracking number for the return shipment. All shipment costs shall be included in the repair cost, not an additional charge. Shipping documents shall accompany each shipment with the following minimum information:
4.4.1.1. Date shipped
4.4.1.2. List of part(s) by NSN or PN, serial number if applicable, and nomenclature
4.4.1.3. Address shipment to: 4 MXG/MXQG
1305 Hangar Row, BLDG 4518
Seymour Johnson AFB, NC 27531 http://www.e-publishing.af.mil/
Page | 3
4.5. Products/Materials: All parts shall appear cosmetically new after repair. SP shall furnish the repaired product to the Government as the original equipment manufacturer (OEM) intended. The repaired product shall meet acceptance test procedures (ATPs) as intended by the OEM and be completed according to technical data. Prior to returning repaired parts to the Government, the SP shall provide certification that the repaired products are safe and fully qualified as an operational instrument on the F15E with a brief description of the repairs that were performed; certification may be provided electrically to both the CO and COR and shall be provided in writing.
4.6. Government Furnished Property (GFP): The parts supplied under this contract for repair are considered
Government Furnished Property (GFP) IAW DFARS 245.107(1)(i). Therefore, the SP shall use the Property
Transfer capability in the GFP Module to report receipt of all GFP. Use of the GFP Module is an acceptable property management system as required by DFARS clause 252.245-7003 and is considered mandatory under the terms of this contract. The GFP Module is available at the Procurement Integrated Enterprise Environment
(PIEE) at https://wawf.eb.mil/xhtml/unauth/home/login.xhtml.
4.7. GFP Training: Training for the GFP Module is available at https://dodprocurementtoolbox.com/site-pages/gfp-training. Reviewing lessons titled “GFP Property Transfer for Contractors” and “GFP Property
Transfer for Contractors- Extended Scenarios” are highly recommended.
4.8. Quality Control Plan: The Contractor shall establish and maintain a Quality Control (QC) Plan to ensure the requirements of the contract are provided as specified. The Contractor shall provide a QC Plan describing the inspection system for the requested services listed in the PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of unacceptable services. The
Contractor shall update the plan as changes occur, and changes shall be submitted for review and acceptance by the CO. The Contractor’s QC Plan shall contain, as a minimum, the following items:
4.8.1. A description of the inspection system to cover all services. Description shall include specific details as to the areas to be inspected on a scheduled and unscheduled basis, frequency of inspections, and the title and organizational placement of the inspector(s).
4.8.2. A description of the methods to be used for identifying and preventing defects in the quality of service performed.
4.8.3. A description of how the records will be kept. Records must document all inspections and corrective or preventive actions taken.
5. Invoicing: IAW DFARS 252.232-7006, invoice and receiving reports shall be submitted via Wide Area Work
Flow (WAWF) using the Reparable Receiving Report (RRR). This report also initiates the return process, which enables the association of the repair service with the GFP Inventory maintained in the GFP Module. To return parts from multiple task orders in one shipment, the line item from the GFP Inventory shall be populated on the
RRR. When the Government accepts the RRR in WAWF, the GFP Inventory will automatically be updated to remove those parts that have been returned to the Government.
6. Warranty: SP’s standard commercial warranty.
7. Location: W ork is to be accomplished at the SP’s facility and returned to Seymour Johnson AFB at the address indicated in paragraph 4.4.1.
8. Manpower Reporting: The SP shall report ALL SP labor hours (including sub-SP labor hours) required for performance of services provided under this contract via a secure data collection site. The SP is required to completely fill in all required data fields using Service Contract Reporting (SCR) on SAM.gov https://wawf.eb.mil/xhtml/unauth/home/login.xhtml https://dodprocurementtoolbox.com/site-pages/gfp-training https://dodprocurementtoolbox.com/site-pages/gfp-training
Page | 4
8.1. Reporting inputs will be for the labor executed during the period of performance during each
Government fiscal year (FY), which runs from October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year.
SPs may direct questions to the help desk at SCR on SAM.gov.
Page | 5
9. SERVICES SUMMARY
SS# Performance Objective
PWS
Section Performance Threshold
Quality
Repaired part shall meet acceptance test procedures as intended by the OEM and technical data
4 All repairs must meet this performance objective
SP shall certify the repaired products are safe and fully qualified as an operational instrument on the F15E
SP shall provide written certification with every return shipment for all parts contained in the shipment
All parts shall appear cosmetically new after repair, as intended by the OEM 4 All parts shall appear cosmetically new after repair, as intended by the OEM
Accurate and routine use of the GFP
Module Property Transfer capability to report receipt of GFP
All GFP transferred from the Government to the
Service Provider must be reported using the GFP
Module
Schedule
5 Timely repair and return of parts 4
Standard repairs completed and physically received by the Government within 40 days of receipt.
MICAPs (as designated by the COR) completed and physically received by the Government within 20 days of receipt
Management
Perform warranty repairs timely
(40 days/20 days MICAPs) IAW SP’s standard commercial warranty
Warranty work completed accurately, on time and hassle-free
Other Areas
7 Documentation: Repair and Test 4 Record of repair and test results provided with the return of each part
8 Documentation: Shipping 4
SP provided shipping tracking number for return shipments and include the date shipped, list of items identified by NSN or part number and nomenclature and serial number
The Contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via SCR (SAM.gov)
The Contractor shall completely fill in all required data fields. All data shall be reported no later than
October 31 of each calendar year
Page | 6
EXHIBIT A CURRENT MONITORS
1. Parts List: F15E Current Monitors, NSN: 6620-01-310-2103
2. Applicable Publications: SP shall perform work IAW the following regulations. SP is required to furnish and maintain current publications.
a. IAW DAFI 21-101 Para 11.36.4.3 (ACC Supplement), available at www.e-Publishing.af.mil
b. OEM Specifications
3. Historical Workload Data
Note: Typical workload is 5-10 monitors per year. The below data reflects accumulation. Quantity of repairable current monitors is set to increase since change in ERRC Code to XF3.
NSN Description Timeframe Qty
6620-01-310-2103 Current Monitors FY21 0
6620-01-310-2103 Current Monitors FY22 0
6620-01-310-2103 Current Monitors FY23 0
6620-01-310-2103 Current Monitors FY24 0
6620-01-310-2103 Current Monitors FY25-Present 0
Page | 7
EXHIBIT B
Antennas
1. Parts List: F15E Upper UHF Antennas, NSN: 5985-01-319-9456
2. Applicable Publications: SP shall perform work IAW the following regulations. SP is required to furnish and maintain current publications.
a. OEM Specifications
b. IAW AFI 21-101 Para 11.36.4.3 (ACC Supplement); available at www.e-Publishing.af.mil
3. Historical Workload Data:
Fiscal Year Quantity
FY23 0
FY24 10
FY25-Present 7
File details come from the government source that posted it. Updated .