Statement of Work For AFLCMC/WA Furniture Order

Title: Procurement, Delivery and Set-up of Office Furniture Document Date: 11 Jan 2021

1. Scope: The scope of this statement of work (SoW) covers the procurement of products requested by the government to include delivery, set-up and clean-up.

1.1 Background: AFLCMC/WA is requesting furniture to outfit (4) spaces in an area we utilize for work.

2. Applicable Documents: N/A 3 Requirements/Salient Characteristics:

Furniture Requirements

(24 Count) - 72” (exact) x 24” (min) desks that can support 3 monitors, 2 keyboards and 2 phones. The desks must be able to roll on carpet.

Reference Example

(57 Count) Computer Monitor (Arm Mounts) that are compatible with the desk listed above

(7 Count) 36” “Heavy Duty” racks for the support of computer/technology hardware

(3 Count) Storage Locker

(1 Count) Wall Mounted White Board (96” x 48”)

(3 Count) Wheeled White Board

Installation Requirements

Room 1:

· 10 Desks

· 3 Racks

· 2 Cabinets

· 2 Wheeled White Boards

· 18 Monitor Arm Mounts (Wall Desks Only)

Room 2:

· 5 Desks

· 2 Racks

· 15 Monitor Arm Mounts (All Desks)

Room 3:

7 Desks 2 Racks 1 Wheeled Whiteboard 21 Monitor Arm Mounts (All Desks)

Room 4:

2 Desks 1 Whiteboard 6 Monitor Arm Mounts (All Desks)

Installation Requirement: Installation should include delivery, unpacking, assembly and placement of purchased furniture. Furniture shall be ready for government use upon completion.

Desk Configuration Requirement: Desks shall have monitor arms configured to support 2 separate computer systems with monitor arms attached in a 2 monitor; 1 monitor configuration that adheres to DoD separation standards.

Clean-Up Requirement: Packing materials and other materials generated from the delivery, unpacking and assembly of the purchased furniture shall be removed and disposed of by the contractor.

Timeline: Delivery/Installation of furniture should be accomplished in no more than 45 days from the order date.