AFLCMC_LP - Industry Day Slides For Sam.gov.pdf
PDF 2 MB Posted
- Solicitation number
- Not on record
About this file
This document is a presentation slide deck from an Industry Day event hosted by the Air Force Life Cycle Management Center (AFLCMC) Propulsion Directorate regarding the F117 Engine Sustainment Support (ESS) contract opportunity.
The presentation provides an overview of the F117 engine program, current sustainment requirements, and future program needs. Key details include:
- The F117 engine supports the C-17 Globemaster III aircraft, with a fleet of 1,206 engines. The program involves various stakeholders, including Air Mobility Command, Air Force Reserve Command, and international partners.
- Current sustainment requirements focus on maintenance, repair, and overhaul (MRO) capabilities, supply chain management, program management, and engineering support. The government has a public-private partnership with the Oklahoma City Air Logistics Complex to perform a portion of the MRO work.
- Future requirements may include associate contractor agreements or licensing agreements with the engine original equipment manufacturer, as well as the incorporation of parts manufacture approval and designated engineering representative repairs. The presentation also outlines the tentative acquisition schedule, with an industry day in July 2024, a sources sought posting in December 2025, and an RFP release targeted for April 2025.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A F L C M C P R O P U L S I O N D I R E C T O R A T E
G e n e r a t i n g t h e S o u n d o f F r e e d o m , 2 4 / 7 / 3 6 5
F117 Industry Day
Mr. Jerald (JR) Aduddell – Lead Program Manager Mr. Scott Strecker – Lead Engineer
Ms. Alexandra (Lexi) Crothers – Contracting Officer
AFLCMC/LP
7 May 2024
DISTRIBUTION STATEMENT A: Approved for public release, case number AFLCMC-2024-0130
C l a s s i f i c a t i o n
“The classification of the brief is UNCLASSIFIED”
Briefer: Ms. Crothers (LPK)
D i s c l a i m e r
The Government does not intend to award a contract based on the information received at this event
This is for informational purposes only The contents of any future RFP take precedence over anything provided during this briefing and one-on-one sessions Questions and answers will be posted to SAM and are considered public record Costs incurred as a result of this meeting are considered bid and proposal costs and will not be reimbursed by the Government
All information included in this briefing is subject to change
Briefer: Ms. Crothers (LPK)
T e a m I n t r o
Briefer: Ms. Crothers (LPK)
Ms. Samantha Mathis
- Program Management Branch Chief
Ms. Christi Crawley
- F117 Section Chief
Ms. Karen Davis
- LPK Contracting Branch Chief
Ms. Alexandra Crothers
- Contracting Officer
Ms. Jessica Roberson
- Contract Specialist
Mr. Jerald Aduddell
- F117 Program Manager
Mr. Ben Knowles
- Chief Engineer
Mr. Matt Dimaggio
- Lead Engineer
Mr. Scott Strecker
- F117 Lead Engineer
Ms. Toni Kaplan
- Program Manager
I nd u s t r y D a y G r o u nd R u l e s
Briefer: Ms. Crothers (LPK)
No recording devices permitted Silence all cell phones; Virtual participants please stay muted Provide all questions in writing on provided forms or via email to both of the following addresses:
- PCO Alexandra Crothers, alexandra.crothers@us.af.mil
- Buyer Jessica Roberson, jessica.roberson.3@us.af.mil
Government presentations and answers to written questions will be available within 10 days after Industry Day at the following site:
- Sam.gov
All questions asked by industry will be shared publicly with all interested parties.
The Q&A document will be posted to Sam.gov along with the Government response.
The Government provide the same information to all potential sources.
mailto:alexandra.crothers@us.af.mil mailto:jessica.roberson.3@us.af.mil
T e n t a t i v e A c q u i s i t i o n S c he d u l e
Briefer: Ms. Crothers (LPK)
Event Estimated Date
Projected Industry Day July 2024
Projected Industry Day August 2024
Market Research Concludes November 2024
Sources Sought Post on SAM.gov December 2025
RFP Release April 2025
O v e r v i ew
Briefer: Ms. Crothers (LPK)
Propulsion Sustainment Overview F117 Program Overview Current Requirements Overview Engine Removal Overview Future Program Requirements Overview
Propulsion Sustainment Organization Overview
Ms. Samantha (Sam) Mathis
AFLCMC/LPSD
P r o p u l s i o n S u s t a i nm e n t L e a d e r s h i p
Briefer: Ms. Mathis (LPSD)
LPS Program Off ice
Briefer: Ms. Mathis (LPSD)
Roles and Responsibilities Life Cycle Management
Program, financial, and contract management
Operational safety, suitability, and effectiveness (OSS&E)
Policy AFMAN20-116: Propulsion Life Cycle Mgmt for Aerial Vehicles
Engineering Processes Safety and Risk Assessments Airworthiness Source Approval Authority
Top Level Processes Leading Health Indicator (LHI) Engine Lifecycle Management Plan (ELMP) Technical Orders (TO) Aerospace Engine Life (AEL) Requirements Review (R2) Propulsion Requirements System (PRS) Supportability Analysis
F117 Program Overview
Mr. Jerald (JR) Aduddell
C - 1 7 O p e r a t i ng L o c a t i o ns ( C O N U S )
Briefer: Mr. Aduddell (LPSD)
F 1 1 7 O r g a n i z a t i o na l S t r u c t u r e
F 1 1 7 O r g a n i z a t i o na l S t r u c t u r e – E x t e r na l S u p p o r t
F 1 1 7 P r o g r a m O v e r v i ew
Briefer: Mr. Aduddell (LPSD)
Description/Background: F117 current fleet size is 1206 engines to support ~240 C-17 A/C
Airframe: C-17 Globemaster III
Using Organization/Stakeholders:
- Air Mobility Command (AMC) – Lead Major Command (MAJCOM)
- Air Force Reserve Command (AFRC)
- Air National Guard (ANG)
- Virtual Fleet Partners
• Kuwait
• India
• Australia
• United Kingdom
• Canada
• Qatar
• UAE
• NATO Airlift Management Program (NAMP)
Vendor Information
- Airframe Original Equipment Manufacturer (OEM): Boeing
- Engine Original Equipment Manufacturer (OEM): Pratt & Whitney
- Performance Location (Depot): Columbus Engine Center (CEC) Columbus, GA; Heavy Maintenance Center (HMC)
Tinker AFB; United Airlines (UAL) San Francisco, CA
F 1 1 7 T e c hn i c a l / E ng i n e L i f e M a na g e m e n t I n f o r m a t i o n
Briefer: Mr. Aduddell (LPSD)
The F117 is a Commercial Derivative Engine
FAA Requirements Compliant holding a FAA type certificate
Maintenance Concept is a Two-Level Maintenance Posture
- Organizational – Unit level LRU replacements only (quick engine change assembly)
- Depot – All other maintenance
Acronyms: FAA – Federal Aviation Administration, LRU – Line Replaceable Unit
Current Program Requirements
Mr. Jerald (JR) Aduddell
F 1 1 7 C u r r e n t P r o g r a m R e q u i r e m e n t s
Briefer: Mr. Aduddell (LPSD)
F117 Engine Sustainment Requirements
- Maintenance Repair and Overhaul (MRO) Capability
• Work scope development & management
• 4400 N1 Cycle build goal
• Turn Around Time: 150 days
- Supply Chain Management
• Material support for all core engine material supporting work scopes required for engines
- Program Management
• Maintain War Readiness Engine (WRE) and Serviceable Propulsion Spares (SPS) levels
- Engineering
• Tech Data Support
• Engineering Services
- Field Service Representatives
- Engine Health Monitoring
- Transportation from MRO to customer-designated location (CONUS)
Briefer: Mr. Aduddell (LPSD)
Associate Contractor Agreements (ACA) with Boeing (C-17 OEM)
- OEM material supports quick engine change requirements at units and current
MROs
- Transportation
• Intra-base
• OCONUS/Virtual Fleet Partners
- Field Level Engine Management
Acronyms: OEM – Original Equipment Manufacturer, Maintenance, Repair, & Overhaul – MRO, OCONUS – Outside Continental United States
Briefer: Mr. Aduddell (LPSD)
Public Private Partnership/Direct Sales Agreement
- Tinker Air Force Base (TAFB), Oklahoma City Air Logistics Complex (OC-ALC), 76th
Propulsion Maintenance Group (PMXG) perform MRO services for the F117 engine
- Capacity: ~60 shop visits per year (33%)
- Capability: technicians, equipment, quality, test cell
Acronym: Maintenance, Repair, & Overhaul – MRO
F117 Engine Removal Overview
Mr. Scott Strecker
F 1 1 7 U np l a nn e d E ng i ne R e m o v a l s
Briefer: Mr. Strecker (LPSD)
Future Program Requirements
Mr. Jerald Aduddell
F 1 1 7 F u t u r e P r o g r a m R e q u i r e m e n t s
24Briefer: Mr. Ruben Marquez (OPBP)
Associate Contractor Agreements and/or Licensing Agreements with Engine OEM
Parts Manufacture Approval (PMA) / Designated Engineering Representative (DER) Repair Incorporation (Excluding LLP)
Product Improvement
Acronym: Original Equipment Manufacturer – OEM
B R E A K O U T S E S S I O N S
Lunch 10:55 -12:00 pm
One–On–One 12:00 pm – 4:00 pm
| Slide Number 1 |
| Classification |
| Disclaimer |
| Team Intro |
| Industry Day Ground Rules |
| Tentative Acquisition Schedule |
| Overview |
| Slide Number 8 |
| Propulsion Sustainment Leadership |
| LPS Program Office |
| Slide Number 11 |
| C-17 Operating Locations (CONUS) |
| F117 Organizational Structure |
| F117 Organizational Structure – External Support |
| F117 Program Overview |
| F117 Technical/Engine Life Management Information |
| Slide Number 17 |
| F117 Current Program Requirements |
| F117 Current Program Requirements |
| F117 Current Program Requirements |
| Slide Number 21 |
| F117 Unplanned Engine Removals |
| Slide Number 23 |
| F117 Future Program Requirements |
| BREAKOUT SESSIONS |
| Slide Number 26 |
File details come from the government source that posted it. Updated .