Affidavit_of_Wages_Paid.pdf
PDF 111 KB Posted
- Attached to
- New Sunshine Substation Site Preparation Specifications (Civil Grading & Drainage Phase) Re-Bid
- Solicitation number
- 2025-ITB-009
- Issued by
- Pierce County, New Mexico
About this file
The document is an Affidavit of Wages Paid form from the Department of Workforce Solutions, Labor Relations Division, designed to be completed after construction is finished. The form requires detailed information from general contractors, subcontractors, and subsequent tier subcontractors, including company details, project information, and confirmation of prevailing wage compliance. Contractors must enter their company name, address, contact information, project title, physical address, State Wage Decision Number, and completion date, with each contractor required to submit a separate signed form.
The form serves as a legal certification that all workers on the public works project were paid no less than the prevailing wage rates determined by the Department of Workforce Solutions. Contractors who violate prevailing wage laws risk debarment procedures and may be required to pay back wages. The document references specific legal frameworks, including the Labor Relations Division Public Works Minimum Wage Act Policy Manual (11.1.2 NMAC) and the Public Works Minimum Wage Act (13-4-11 through 13-4-18, NMSA 78). The form was last revised on 08/23/13 and includes detailed instructions for completion by general contractors, subcontractors, and subsequent tier subcontractors.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AFFIDAVIT OF WAGES PAID
To Be Completed After Construction Is Complete
All FIELDS ARE REQUIRED
FORM MUST BE SENT TO THE CONTRACTING AGENCY
General Contractor Information Company Name:
Address:
City: State: Zip:
Phone: Fax: E-Mail:
Estimated Completion Date: State Wage Decision Number:
Project Title:
Project Physical Address:
Print Name:
General Contractor Signature:
Sub Contractor Information
Date you completed work on this project:
Company Name:
Address:
City: State: Zip:
Phone: Fax: E-Mail:
Sub Contractor Signature:
2nd, 3rd, etc. Tier Sub Contractor Information
Date you completed work on this project:
Company Name:
Address:
City: State: Zip:
Phone: Fax: E-Mail:
Tier Signature:
I hereby certify that the above information is correct and that all workers I employ on this public works project were paid no less than the Prevailing Wage Rate(s) as determined by the Department of Workforce Solutions, Labor Relations Division for this project as identified by the State Wage Decision Number. I understand that contractors who violate Prevailing Wage Laws (i.e., incorrect job classification, improper payment of prevailing wages, and/or overtime, etc.), are subject to debarment procedures and shall be required to pay any back wages due to workers. (Ref. Labor Relations Division Public Works Minimum Wage Act Policy Manual (11.1.2 NMAC) & Public Works Minimum Wage Act (13-4-11 through 13-4-18, NMSA 78)).
Contractor’s Signature Date
(Revised 08/23/13)
INSTRUCTIONS FOR COMPLETING AFFIDAVIT OF WAGES PAID
GENERAL CONTRACTOR
1. Enter general contractor information and provide signature.
2. Enter State Wage Decision Number as listed in bid documents. (Example: BE 13-0123 B)
3. Enter project title - listed in bid documents.
4. Enter project physical address - exact location of project (job site).
5. Enter completion date of project.
6. All Affidavits’ must be sent to the Contracting Agency.
SUB CONTRACTOR
1. Enter general contractor information, but general contractor signature is not needed.
2. Enter sub contractor information as indicated and provide signature.
3. Enter sub contractor completion date.
NOTE: A separate signed form is needed for each contractor.
2ND, 3rd, etc TIER SUB CONTRACTOR
1. Enter sub contractor information, subcontractor signature is not needed.
2. Enter 2nd tier sub contractor information and provide signature.
3. Enter 2nd tier contract completion date.
(Revised 8/23/13)
File details come from the government source that posted it. Updated .