Affidavit_of_Wages_Paid.pdf
PDF 111 KB Posted
- Attached to
- G-80 Well POD-10 and POD-11 Drilling and Testing
- Solicitation number
- ITB-2704
- Issued by
- San Juan County, New Mexico
About this file
This is an Affidavit of Wages Paid form required by the State of New Mexico for public works construction projects, specifically related to the G-80 Well POD-10 and POD-11 Drilling and Testing project for the City of Gallup located in McKinley County, New Mexico. The form must be completed and submitted to the contracting agency upon project completion and captures information from the general contractor, subcontractors, and any subsequent tier subcontractors involved in the work. The affidavit requires documentation of all contractor and subcontractor entities performing work on the project, including their company information, contact details, work completion dates, and authorized signatures certifying compliance with prevailing wage requirements.
The form serves as a certification mechanism for compliance with New Mexico's Prevailing Wage Laws as administered by the Department of Workforce Solutions, Labor Relations Division. All contractors and subcontractors must attest that workers employed on the public works project were paid no less than the prevailing wage rates established for the specific State Wage Decision Number applicable to the project. The form explicitly references that violations of prevailing wage laws—including incorrect job classification, improper payment of prevailing wages, or overtime violations—subject contractors to debarment procedures and liability for back wages owed to workers under the Public Works Minimum Wage Act (13-4-11 through 13-4-18, NMSA 78) and implementing regulations (11.1.2 NMAC).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AFFIDAVIT OF WAGES PAID
To Be Completed After Construction Is Complete
All FIELDS ARE REQUIRED
FORM MUST BE SENT TO THE CONTRACTING AGENCY
General Contractor Information Company Name:
Address:
City: State: Zip:
Phone: Fax: E-Mail:
Estimated Completion Date: State Wage Decision Number:
Project Title:
Project Physical Address:
Print Name:
General Contractor Signature:
Sub Contractor Information
Date you completed work on this project:
Company Name:
Address:
City: State: Zip:
Phone: Fax: E-Mail:
Sub Contractor Signature:
2nd, 3rd, etc. Tier Sub Contractor Information
Date you completed work on this project:
Company Name:
Address:
City: State: Zip:
Phone: Fax: E-Mail:
Tier Signature:
I hereby certify that the above information is correct and that all workers I employ on this public works project were paid no less than the Prevailing Wage Rate(s) as determined by the Department of Workforce Solutions, Labor Relations Division for this project as identified by the State Wage Decision Number. I understand that contractors who violate Prevailing Wage Laws (i.e., incorrect job classification, improper payment of prevailing wages, and/or overtime, etc.), are subject to debarment procedures and shall be required to pay any back wages due to workers. (Ref. Labor Relations Division Public Works Minimum Wage Act Policy Manual (11.1.2 NMAC) & Public Works Minimum Wage Act (13-4-11 through 13-4-18, NMSA 78)).
Contractor’s Signature Date
(Revised 08/23/13)
INSTRUCTIONS FOR COMPLETING AFFIDAVIT OF WAGES PAID
GENERAL CONTRACTOR
1. Enter general contractor information and provide signature.
2. Enter State Wage Decision Number as listed in bid documents. (Example: BE 13-0123 B)
3. Enter project title - listed in bid documents.
4. Enter project physical address - exact location of project (job site).
5. Enter completion date of project.
6. All Affidavits’ must be sent to the Contracting Agency.
SUB CONTRACTOR
1. Enter general contractor information, but general contractor signature is not needed.
2. Enter sub contractor information as indicated and provide signature.
3. Enter sub contractor completion date.
NOTE: A separate signed form is needed for each contractor.
2ND, 3rd, etc TIER SUB CONTRACTOR
1. Enter sub contractor information, subcontractor signature is not needed.
2. Enter 2nd tier sub contractor information and provide signature.
3. Enter 2nd tier contract completion date.
(Revised 8/23/13)
File details come from the government source that posted it. Updated .