AFB _ B9501_027 (8_14_2025).pdf
PDF 288 KB Posted
- Attached to
- Water System Improvements
- Solicitation number
- PE-66133-NONST-2026-000000006
- Issued by
- Burke County, Georgia
About this file
This is an Advertisement for Bids document for the City of Butler's Water System Improvements project, issued by Carter & Sloope, Inc. in August 2025. The project involves constructing water system infrastructure, including approximately 13,555 linear feet of 12" PVC water main, 1,083 L.F. of 8" water main, 167 L.F. of 6" water main, and various jack and bore steel casing installations in Norfolk Southern and GDOT rights-of-way. The project also includes installing fire hydrants, pressure reducing valves, water service transfers, valves, and plugging existing water mains. Sealed bids will be received until September 15th, 2025 at 11:00 AM at Butler City Hall, with a 300-consecutive calendar day completion timeline and a project completion date of October 31, 2026.
The project will be funded in whole or part with American Rescue Plan funds administered by the Governor's Office of Planning and Budget State Fiscal Recovery Fund (SFRF) grant program. Bidders must provide a bid bond or certified cashier's check for 10% of the base bid and must be licensed as a Georgia "Utility Contractor" with a "Utility Manager" certification holder. Performance and payment bonds each equal to 100% of the contract price will be required. Relevant permits from the Georgia Department of Transportation and Norfolk Southern are currently in progress. Bidders must also comply with the Georgia Security and Immigration Compliance Act, including participation in the E-Verify program, and meet all applicable federal requirements outlined in Appendix II of 2 CFR 200.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 00100-1
ADVERTISEMENT FOR BIDS
SECTION 00100
PART 1. GENERAL
1.1 COMPETITIVE COST SEALED BIDS
Sealed bids for construction of the Water System Improvements project will be received until Monday, September 15th, 2025 at 11:00 AM at Butler City Hall, 12 Cedar
Street, Butler, Georgia 31006, at which time and place they will be publicly opened and read aloud. Any bid received after said time and date will not be considered by the
Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days except as specifically may be provided in the Instructions to
Bidders and/or by State law.
1.2 SCOPE OF WORK
Work to be done shall include furnishing all products and equipment and performing all labor necessary to construct the following: installation of approximately 13,555 L.F. of
12" PVC Water Main, +/- 1,083 L.F. of 8" Water Main, +/- 167 L.F. of 6" Water Main, +/- 100 L.F. of Jack & Bore 20" Steel Casing to be installed in Norfolk Southern Right-of-Way, +/- 328 L.F. of Jack & Bore 18" Steel Casing in GDOT Right-of-Way, +/- 62
L.F. of Jack & Bore 12" Steel Casing in GDOT Right-of-Way, installation of new fire hydrants, pressure reducing valve, water service transfers, valves, plugging and abandonment of existing water mains, and all other appurtenances necessary to complete the project in accordance with the Technical Specification and Construction Drawings.
This project will be awarded in one (1) contract. Project must be completed by October
31, 2026.
Time allotted for completion of work is 300 consecutive calendar days. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract.
1.3 PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS
Complete digital specifications and contract documents are available at www.cartersloope.com/outforbid. Bidders may view the digital plan documents for free by creating a Quest account and entering the Quest project number 9815707 on the website’s project search page. Bidders can download the digital documents for a fee of
$250.00 for PDF file payable through the website. Please contact QuestCDN customer support at 952-233-1632 or info@questcdn.com for assistance in membership registration, downloading and working with digital project information. All other questions may be directed to the issuing office, Carter & Sloope, Inc., 6310 Peake Road, Phone: 478-477-3923.
City of Butler Water System Improvements
C&S Project No.: B9501.027 August 2025 http://www.cartersloope.com/outforbid mailto:info@questcdn.com
SECTION 00100-2
1.4 CONTRACTOR LICENSE
The Scope of Work as described herein is defined as “utility contracting” in accordance with O.C.G.A 43-14-2(17) so the Contractor performing the work must provide proof of a valid license by the State of Georgia as a “Utility Contractor” and must also employ a
“Utility Manager” certification holder who will have oversight of all utility work. See
Instruction to Bidders for additional bidding requirements.
1.5 BONDS
Bids shall be accompanied by a bid bond or certified cashier’s check in an amount not less than 10% of the base bid. All bonds shall be by a surety company licensed in
Georgia with an “A” minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of “Best’s Key
Rating Guide Property Liability”. Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful bidder if contract is awarded. Each Bond shall be accompanied by a “Power of Attorney” authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond.
1.6 PERMITS
The status of Federal, State, and /or Local permits for this project are as follows:
PERMITS/AGENCIES STATUS
A. Georgia Department of Transportation In Progress
B. Railroad – Norfolk Southern In Progress
C. Land Disturbance Permit N/A
D. GA Environmental Protection Division Submitted
E. Stormwater (GAR100001) In Progress
1.7 EASEMENTS & RIGHTS-OF-WAY
All easements and rights-of-way for permanent installations have been obtained or will be obtained by the Owner prior to issuing the Notice to Proceed.
1.8 GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT AFFIDAVIT
All qualifying Contractors and Subcontractors performing work with the City of Butler must register and participate in the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, to verify the work eligibility information of new employees. In order for a Bid to be considered, it is mandatory that the Bidder’s Affidavit of Compliance with O.C.G.A. §13-10-91 be completed and submitted with the Bid.
1.9 FUNDING SOURCES
This project will be funded in whole or in part with American Rescue Plan funds
City of Butler Water System Improvements
C&S Project No.: B9501.027 August 2025
SECTION 00100-3
administered by the Governor’s Office of Planning and Budget (OPB) State Fiscal Recovery
Fund (SFRF) grant program. This project will be required to comply with all applicable
Federal requirements, including those outlined in Appendix II of 2 CFR 200, as well as existing State public works construction requirements. Applicable Federal Requirements are included in the Contract Documents.
1.10 RESERVATION OF RIGHTS
Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner.
CITY OF BUTLER
OWNER
END OF SECTION
City of Butler Water System Improvements
C&S Project No.: B9501.027 August 2025