AFB 2750 -HR Office Rnovation.pdf
PDF 992 KB Posted
- Solicitation number
- IFB1 GJJA 2027000053 1
- Issued by
- El Paso County, Colorado
About this file
Summary
This is an Advertisement for Bids (AFB 2750) issued by Pikes Peak State College (PPSC), a state institution under the State of Colorado, for a design/bid/build HR Office Renovation project (CON 2752). The project scope involves full construction contracting services to renovate existing spaces in the Human Resources Department at PPSC's Centennial Campus in Colorado Springs, Colorado, specifically creating three new offices as outlined in the construction documents. The mandatory pre-bid conference and site tour is scheduled for Friday, November 20 at 10:00 AM at the Centennial Campus (5675 S. Academy Blvd, Colorado Springs, CO 80906, Room C200). Electronic sealed bid submittals are due Wednesday, December 16 at 2:00 PM Mountain Daylight/Standard Time via email to procurement.bids@pikespeak.edu, with a virtual public bid opening via Zoom scheduled for the same date at 2:30 PM. The anticipated award notification is December 17, contract approval January 6, with construction anticipated to begin January 2027 and conclude April 2027. Requests for clarifications must be submitted by Tuesday, November 24, with final addenda anticipated by December 1.
Qualification requirements for bidders include a five-year operating history under the same name, demonstrated general contractor experience on at least two projects each exceeding $400,000 in hard costs utilizing Colorado Office of State Architect policies, bonding capacity up to $255,000, an Experience Modification Rating (EMR) below 1.0, and attendance at the mandatory pre-bid conference. A bid bond of not less than five percent of the total bid is required for projects exceeding $50,000; if the contract value reaches $150,000 or more, performance and payment bonds of at least 50% of contract value are required. Colorado labor must comprise at least 80% of the work performed on this public works project, with preference given to Colorado resident bidders. The bid shall exclude applicable federal excise taxes and state sales and use taxes. Unit pricing is required for change order purposes, and bidders must submit direct labor burden calculations. All submittals become property of the State and will not be returned, with late submittals rejected without consideration.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OSA-AFB-1 pg. 1
REV 7/2025
ADVERTISEMENT FOR BIDS
Design / Bid / Build
State of Colorado Pikes Peak State College
Notice Number: AFB 2750 Project Number: CON 2752 Project Title: HR Office Renovation
NOTICES
1. For all projects with a total dollar value above $150,000 Notice of Final Settlement is required by C.R.S. §38-26-107(1). Final Settlement, if required, will be advertised in the same location as the original solicitation.
2. For State Public Works C.R.S. §8-17-101 - Colorado labor shall be employed to perform at least 80% of the work. Colorado labor means any person who is a resident of the state of Colorado at the time of the Public Works project.
3. All respondents accept the conditions of this AFB, including but not limited to, the following:
a. All submittals shall become the property of the State of Colorado and will not be returned.
b. Late submittals shall not be evaluated.
c. The State reserves the right to reject any or all proposals on the basis of being unresponsive to this AFB or for failure to disclose requested information.
d. The State shall not be liable for any costs incurred by respondents in the preparation of submittals and proposals nor in costs related to any element of the selection and contract negotiation process.
4. The respondent has reviewed Appendix F and by responding has agreed that the terms and conditions of the sample Contractor’s Design/Bid/Build (D/B/B) Agreement (SC-6.21) and General Terms and Conditions of the Contractor’s Design/Bid/Build Agreement (SC- 6.23) are expressly workable without reservation. Any exceptions to the contract must be communicated formally in writing before the bid closes.
5. Preference shall be given to Colorado resident bidders and for Colorado labor, as provided by law.
OSA-AFB-1 pg. 2
6. Per C.R.S. §24-105-201 If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid.
PROJECT OVERVIEW
Introduction
The State of Colorado, through Pikes Peak State College (PPSC), is soliciting bids from qualified contractors for the HR Office Renovation project.
Background
PPSC is a state-supported institution of higher education located in Colorado Springs, Colorado with four (4) campus locations in Colorado Springs; Centennial Campus (CC) on the south side; Rampart Range Campus (RRC) on the north side, the Downtown Campus (DTC) located as the name suggests in downtown; and the Center for Healthcare Education & Simulation (CHES).
PPSC intends to renovate existing spaces in the Human Resources (HR) Department located at the Centennial Campus. This project will create three new offices as outlined in the Construction Documents.
Scope of Services
The scope of services will include full Construction Contracting Services for the project specified during the process of construction and warranty period to the State as per the Advertisement for Bid. Specific tasks to be performed by the Contractor include those generally performed by the construction community where the Contractor is the prime vendor to the State. Bidders shall reference the drawings, specifications, and supporting documents in the Appendices for an understanding of the entire scope of the project.
Per C.R.S. §38-26-106, if a contract amounts to $150,000 or more, the awarded contractor shall provide payment and performance bonds not less than 50% of the value of the contract. The costs associated with this bond are to be included in the contractor’s bid.
MINIMUM REQUIREMENTS
Notice is hereby given to all interested parties that all firms will be required to meet all minimum requirements to be considered for this project. Interested bidders should be prepared to show evidence of the following to be considered as qualified, as a minimum:
1. Not previously terminated by the State for non-performance on a State Buildings contract or procurement.
OSA-AFB-1 pg. 3
2. The bidding contractor must have been in the same business, under the same name for the last five (5) years.
3. Demonstrated specific contracting experience as a general contractor in projects of similar scope and complexity for at least two (2) projects each in excess of $ 400,000.00 (hard costs), utilizing Colorado Office of State Architect policies and procedures; and
4. Demonstrated bonding capability up to $ 255,000.00 for an individual project coincidentally with current and anticipated workloads; provide letter from surety that affirms this capacity.
5. Respondents must provide safety record from their insurance company indicating Experience Modification Rating (EMR) below 1.0
6. Attended and signed in at the Mandatory Pre-Bid Conference
Firms meeting the minimum requirements may obtain the bidding documents on the website accompanying this advertisement.
At http://colorado.gov/vss
MANDATORY PRE-BID CONFERENCE AND SITE TOUR
A mandatory Pre-Bid Meeting will be held at:
Building Address: Pikes Peak State College, Centennial Campus 5675 S. Academy Blvd, Colorado Springs, CO 80906 Room: C200 Date/Time Friday, November 20 @ 10:00AM
SCHEDULE
The following is a tentative schedule of events for the Bid Submittal process and an outline of the schedule for the balance of the project. All dates are subject to change and changes in the schedule will be issued via addendum.
Advertisement for Bids Issued Friday, Nov 13 Mandatory Pre-Bid Conference and Site Tour Friday Nov 20 – 10:00 AM Request for Clarifications Due Tuesday, Nov 24 Final Addendum Issued (anticipated) Tuesday, Dec 1 Bid Submittals Due (date and Time) Wednesday Dec 16 - 2:00 PM Public Bid Opening Wednesday Dec 16 - 2:30 PM Award Intent Notification (anticipated) Thursday Dec 17 Contract Approval (anticipated) Wednesday Jan 6 Anticipated Construction Start January 2027 Anticipated Construction Finish April 2027
The above schedule is tentative. Responding firms shall be notified of revisions in a timely manner by email or posted on the ColoradoVSS website. Respondents may
OSA-AFB-1 pg. 4 elect to verify times and dates by email, but no earlier than 36 hours before the scheduled date and time.
QUESTIONS, CLARIFICATIONS AND ADDENDA
Owner initiated changes to this AFB will be issued under numerically sequenced addenda.
Owner initiated changes to this AFB will be posted in the form of addenda on ColoradoVSS.
Questions and requests for clarifications regarding this project shall be submitted before the deadline listed in the above Schedule.
Communication regarding the project during the procurement, outside of this submission process or scheduled procurement milestones is not permitted.
POINT OF CONTACT/CLARIFICATION
Name: James Gellenbeck Agency: Pikes Peak State College Email Address: procurement.bids@pikespeak.edu Phone: 719-502-2008
BIDDING
Bids shall be submitted on the required bid form as indicated on the Information for Bidders document (SBP-6.12) in Appendix A.
An electronic copy of the sealed bid submittal is due Wednesday, December 16 and shall be received no later than 2:00 PM (MD/ST), and shall be submitted/accepted via email, as described in the Information for Bidders (SBP-6.12).
Bid Forms and Appendices to be included with bid submittal:
Bid Form (SBP-6.13) Bid Bond (SBP-6.14) Unit Pricing (SBP-6.133)
Late bid submittals will be rejected without consideration. The State of Colorado assume no responsibility for costs related to the preparation of bid submittals.
BID OPENING
Opening of the bid submittals will be a virtual public bid opening via Zoom Meeting platform.
Virtual public bid opening will take place at the date and time identified in Schedule.
OSA-AFB-1 pg. 5
APPENDICES:
Appendix A: Information for Bidders (SBP-6.12) Appendix B: Bid Form (SBP-6.13) Appendix B2: Unit Pricing (SBP-6.133) Appendix B3: Bid Bond (SBP-6.14) Appendix C: Sample: Direct Labor Burden Calculation (SBP-6.18)
SBP-6.12
Rev 7/2025
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
INFORMATION FOR BIDDERS
Institution or Agency:
Project No./Project Name:
1. BID FORM: Bidders are required to use the Bid form attached to the solicitation.
Each bidder is required to bid on all alternates and indicate the time from the date of the Notice to Proceed to Substantial Completion in calendar days. In addition, the bidder is required to indicate the period of time to finally complete the project from Substantial Completion to Final Acceptance, in calendar days.
Bids indicating times for Substantial Completion and Final Acceptance in excess of the number of days indicated in the Advertisement for Bids for completion of the entire Project may be found non-responsive and may be rejected. The bid shall not be modified or conditioned in any manner. Bids and applicable bid security shall be submitted according to the following instructions:
2. INCONSISTENCIES AND OMISSIONS: Bidders may request clarification of any seeming inconsistencies, or matters seeming to require explanation, in the bidding documents at least three (3) business days prior to the time set for the opening of Bids. Decisions of major importance on such matters will be issued in the form of addendum.
3. APPLICABLE LAWS AND REGULATIONS: All work under this Contract shall comply with the provisions of all state and local laws, approved state building codes, ordinances and regulations which might in any manner affect the work to be done or those to be employed in or about the work. Labor for work shall be governed by the provisions of Colorado law which are hereinafter set forth in Articles 27 and 52 of the General Conditions. This includes the requirements for apprenticeship and prevailing wage on Public Projects. The bidder should be aware that reporting of embodied carbon emissions of eligible materials shall be governed by the provisions of Colorado State Law. This includes the requirements for Environmental Product Declarations (EPDs) that meet the maximum acceptable Global Warming Potential (GWP) limits as established by the Office of the State Architect.
4. BID SECURITY: A bid security of not less than 5% of the bid price is required when the price is estimated to be $50,000 or more. The security shall be a bond by a surety company, the equivalent in cash, or otherwise supplied in a form
SBP-6.12
satisfactory for the State. Noncompliance requires the bid to be rejected as nonresponsive.
5. TAXES: The Bid submitted shall exclude all applicable federal excise or manufacturers’ taxes and all state sales and use taxes as hereinafter set forth in Article 9.3 of the GENERAL CONDITIONS.
6. OR EQUAL: The words “OR EQUAL” are applicable to all specifications and drawings relating to materials or equipment specified. Any material or equipment that will fully perform the duties specified, will be considered “equal”, provided the bid submits proof that such material or equipment is of equivalent substance and function and is approved, in writing. Requests for the approval of “or equal” shall be made in writing at least five (5) business days prior to bid opening. During the bidding period, all approvals shall be issued by the Architect/Engineer in the form of addenda at least two (2) business days prior to the bid opening date.
7. ADDENDA: Owner/architect initiated addenda shall not be issued later than two
(2) business days prior to bid opening date. All addenda shall become part of the Contract Documents and receipt must be acknowledged on the Bid form.
8. METHOD OF AWARD - LOWEST RESPONSIBLE BIDDER: If the bidding documents for this project require alternate prices, additive and/or deductible alternates shall be listed on the alternates bid form provided by the Principal Representative.
Bidders should note the Method of Award is applicable to this Bid as stated below.
A. DEDUCTIBLE ALTERNATES: The lowest responsible Bid, taking into account the Colorado resident bidder preference provision of Colorado law, will be determined by, and the contract will be awarded on the base bid combined with deductible alternates, accepted in numerical order as listed in the Bid Alternates Form provided by the Principal Representative. The subtraction of alternates shall result in a sum total within available funds. If this bid exceeds such amount, the right is reserved to reject all bids. An equal number of alternates shall be subtracted from the base bid of each bidder within funds available for purposes of determining the lowest responsible bidder.
B. ADDITIVE ALTERNATES: The lowest responsible Bid, taking into account the Colorado resident bidder preference provision of Colorado law, will be determined by and the contract will be awarded on the base bid combined with additive alternates in numerical order in as listed in the Bid Alternates Form provided by the Principal Representative. The addition of alternates shall result in a sum total within available funds. If this bid exceeds such amount, the right is reserved to reject all bids. An equal number of alternates shall be added to the base bid of each bidder within funds available for purposes of determining the lowest responsible bidder.
C. DEDUCTIBLE AND ADDITIVE ALTERNATES: Additive alternates will not be used if deductible alternates are used and deductible alternates will not be used if additive alternates are used.
9. NOTICE OF CONTRACTOR’S SETTLEMENT – Agencies/institutions must indicate in the initial Solicitation where settlement will be advertised in electronic media.
SBP-6.13
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
BID FORM
Institution or Agency: Pikes Peak State College / GJJA
Project No./Project Name:
Bidder Acknowledges Receipt of Addenda Numbers:
(See 3a below for the next 3 items)
Bidder Anticipates Services outside the United States or Colorado:* No Yes
Bidder will comply with 80% Colorado Labor on project above $500,000 No Yes
Bidder is a Service-Disabled Veteran Owned Small Business:* No Yes
Bidder understands that proof of meeting minimum requirements will be required for award:
No Yes
Base Bid $
Bidder’s Time of Completion
Time Period from Notice to Proceed to Substantial Completion:
Time Period from Substantial Completion to Final Acceptance:
Total Time of Completion of Entire Project (a + b):
1. BID: Pursuant to the advertisement by the State of Colorado dated the undersigned bidder hereby proposes to furnish all the labor and materials and to perform all the work required for the complete and prompt execution of everything described or shown in or reasonably implied from the Bidding Documents, including the Drawings and Specifications, for the work and for the base bid indicated above. Bidders should include all taxes that are applicable.
2. EXAMINATION OF DOCUMENTS AND SITE: The bidder has carefully examined the Bidding Documents, including the Drawings and Specifications, and has examined the site of the Work, so as to make certain of the conditions at the site and to gain a clear understanding of the work to be done.
3. PARTIES INTERESTED IN BID: The bidder hereby certifies that the only persons or parties interested in this Bid are those named herein, and that no other bidder or prospective bidder has given any information concerning this Bid.
a. If the bidder anticipates services under the contract or any subcontracts will be performed outside the United States or Colorado, the bidder shall provide in a written statement which must include, but need not be limited to the type of services that will be performed at a location outside the United States or Colorado and the reason why it is necessary or advantageous to go outside the United States or Colorado to perform such services. (Does not apply to any project that receives federal moneys) *
b. For State Public Works projects per C.R.S. 8-17-101, Colorado labor shall be employed to perform at least 80% of the work. Colorado Labor means any person who is a resident of the state of Colorado at the time of the Public Works project.
Bidders indicating that their bid proposal will not comply with the 80% Colorado Labor requirement are required to submit written justification along with the bid submission. (Does not apply to any project that receives federal moneys) *
c. A Service-Disabled Veteran Owned Small Business (SDVOSB) per C.R.S. 24-103-211, means a business that is incorporated or organized in Colorado or maintains a place of business or has an office in Colorado and is officially registered and verified by the Center for Veteran Enterprise within the U.S. Department of Veteran Affairs.
Attach proof of certification along with the bid submission. *
d. Projects estimated to be $1 million or more that do not receive federal funds are required to comply with the State Apprenticeship Utilization requirements C.R.S.
24-92-115
e. Projects estimated to be $500,000 or more that do not receive federal funds are required to comply with the State Prevailing Wage requirements C.R.S. 24-92-201 through 210.
4. BID GUARANTEE: This Bid is accompanied by the required Bid Guarantee. Per C.R.S. §24- 105-201 If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid. You are authorized to hold said Bid Guarantee for a period of not more than thirty (30) days after the opening of the Bids for the work above indicated, unless the undersigned bidder is awarded the Contract, within said period, in which event the Office of the State Architect, may retain said Bid Guarantee, until the undersigned bidder has executed the required Agreement and furnished the required Performance Bond, Labor and Material Payment Bond, and Insurance Policy.
5. TIME OF COMPLETION: The bidder agrees to achieve Substantial Completion of the Project from the date of the Notice to Proceed within the number of calendar days entered above, and in addition, further agrees that the period between Substantial Completion and Final Acceptance of the Project will not exceed the number of calendar days noted above. If awarded the Work, the bidder agrees to begin performance within ten (10) days from the date of the Notice to Proceed subject to Article 46, Time of Completion and Liquidated Damages of the General Conditions of the Contract, and agrees to prosecute the Work with due diligence to completion. The bidder represents that Article 7D of the Contractor’s Agreement (SC-6.21) has been reviewed to determine the type and amount of any liquidated damages that may be specified for this contract.
6. EXECUTION OF DOCUMENTS: The bidder understands that if this Bid is accepted, bidder must execute the required Agreement and furnish the required Performance Bond, Labor and Material Payment Bond, Insurance Policy and Certificates of Insurance within ten (10) days from the date of the Notice of Award, and that the bidder will be required to sign to acknowledge and accept the Contract Documents, including the Drawings and Specifications.
7. ALTERNATES: Refer to the Information for Bidders (SC-6.12) for Method of Award for Alternates and use State Form SBP-6.13.1 Bid Alternates form to be submitted with this bid form if alternates are requested by the institution/agency in the solicitation documents.
8. Submit wage rates (direct labor costs) for prime contractor and subcontractor as requested by the institution/agency in the solicitation documents.
9. The right is reserved to waive informalities and to reject any and all Bids.
*Does not apply to projects for Institutions of Higher Education that have opted out of the State Procurement Code.
SIGNATURES: If the Bid is being submitted by a Corporation, the Bid shall be signed by an officer, i.e., President or Vice-President. If a sole proprietorship or a partnership is submitting the Bid, the Bid shall so indicate and be properly signed.
Dated this Day of , 20
THE BIDDER:
By Company Name Address
Phone Number
City, State Zip Code
By Name (Print) and Title Signature
SBP-6.131
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
UNIT PRICING FORM
Institution or Agency: Pikes Peak State College
Project No./Project Name: CON2752 / HR Office Renovation
INSTRUCTIONS:
1. The unit prices below shall be used to determine adjustment to the contract sum when changes in the work involving said items are deemed necessary.
2. Unit Prices shall apply until the date of contract completion established on the Notice to Proceed.
3. All unit prices shall include the pro-rata share of all costs of materials, equipment and disposal required to complete the work item. Overhead, profit and bond will be calculated on a Change Order Proposal (SC-6.312).
UNIT PRICING
Number Description Unit of Measure Unit Price
U1 per bag of floor leveler >3/8” Bag $
U2 $
U3 $
U4 $
U5 $
U6 $
U7 $
U8 $
U9 $
THE BIDDER
BY_________________________________________________________________
Company Name
BY__________________________________________________________________
Signature Date over 10'
SBP-6.14
STATE OF COLORADO
STATE BUILDINGS PROGRAM
BID BOND
Institution or Agency: Pikes Peak State College / GJJA
Project No./Project Name: CON 2752 / HR Office Renovation
KNOW ALL MEN BY THESE PRESENTS:
WHEREAS, hereinafter called the “PRINCIPAL”, is submitting a PROPOSAL for the above described project, to the STATE OF COLORADO, hereinafter called the “OBLIGEE”.
WHEREAS, the Advertisement for Bids has required as a condition of receiving the Proposals that the Principal submit with the PROPOSAL GUARANTY in an amount not less than five per cent (5%) of the Proposal, which sum it is specifically agreed is to be forfeited as Liquidated Damages in the event that the Principal defaults in his obligation as hereinafter specified, and, in pursuance of which Requirement, this Bid is made, executed and delivered.
NOW THEREFORE, the Principal and a corporation of the State of , duly authorized to transact business in Colorado, as Surety, are held and firmly bound unto the Obligee, in the sum of five per cent (5%) of the Principal’s total bid price, lawful money of the United States for the payment of which sum, well and truly to be made to the Obligee, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
FURTHER THAT, a condition of the obligation that the Principal shall maintain his Proposal in full force and effect for thirty (30) days after the opening of the proposals for the project, or, if the Principal’s Proposal is accepted, the Principal shall, within the prescribed time, execute the required Agreement, furnish the required Performance Bond, Labor and Material Payment Bond, Insurance Policy, Certificates of Insurance and Certification and Affidavit Regarding Illegal Aliens, then this obligation shall be null and void, otherwise it shall remain in full force and effect, and subject to forfeiture upon demand as Liquidated Damages.
IN WITNESS WHEREOF said Principal and Surety have executed this Bond, this ____ day of ________________________, A.D., 20 .
(Corporate Seal) THE PRINCIPAL
Company Name
ATTEST _________________________________________________
Address
City, State Zip Code
By ________________________________________ _________________________________________________
Name (Print) Signature
Name (Print) and Title
SBP-6.14
If the “Principal” is doing business as a Corporation, the Bid Bond shall be signed by an officer, i.e., President or Vice President. The signature of the officer shall be attested to by the Secretary and properly sealed.
If the “Principal” is an individual or a partnership, the Bid Bond shall so indicate and be properly signed.
(Corporate Seal) THE SURETY
____________________________________________ By_________________________________________________
Secretary Attorney-in-Fact
THIS BOND MUST BE ACCOMPANIED BY POWER OF ATTORNEY, EFFECTIVELY DATED.
FAILURE TO PROVIDE A PROPERLY EXECUTED BID BOND WITH A PROPERLY EXECUTED POWER
OF ATTORNEY WILL RESULT IN THE BIDDER’S PROPOSAL BEING DEEMED NON-RESPONSIVE.
State Form SBP–6.18 Issued 8/2023
STATE OF COLORADO
STATE BUILDINGS PROGRAM
DIRECT LABOR BURDEN CALCULATION
Institution/Agency: Pikes Peak State College / GJJA Project No./Name: CON 2752 / HR Office Renovation
This form is required to be submitted for review prior to execution of a construction agreement.
List items below by the percentage of what makes up the total labor overhead; Items include benefits that a contractor pays to employees on their payroll. Examples include taxes, pension cost, health and dental insurance etc. The Labor Burden percentage must be agreed to by both the contractor and Principal Representative and will be included in the contract as part of Exhibit A and will be used in the calculation of any future Change Order Proposals (SC-6.312) Line 2.
Major sub-contractors defined as electricians, plumbers, mechanical contractors, excavators, millwork, concrete, block layers etc. Please provide one (1) Labor Burden Calculation Sheet per contractor and for each sub-contractor. These labor burdens shall be used in the calculation of any future Change Order Proposals (SC-6.312) Line 10.
State reserves the right to require back-up confirmation of all information included in this calculation.
Contractor/Subcontractor Name:
Percent of Salary Paid
Payroll Taxes Pension Costs Health Insurance Dental Insurance Life Insurance Other (Specify) Description: _________________________ Other (Specify) Description: _________________________
Total Labor Burden Percentage: 0%
| SBP-6.13 Bid Form_HR Offices.pdf |
| THE BIDDER: |
| ADP9FE3.tmp |
| KNOW ALL MEN BY THESE PRESENTS: |
| ADP53F2.tmp |
| STATE OF COLORADO |
| OFFICE OF THE STATE ARCHITECT |
| DIRECT LABOR BURDEN CALCULATION |
| Pikes Peak State College / GJJA |
| CON 2752 / HR Office Renovation |
| TextInput: |
| 136: Pike Peak State College / GJJA |
| 182: CON2752 / HR Office Renovation |
Submission Instructions: Send an email to procurement.bids@pikespeak.edu, attaching the bid as a zip folder. Bids sent by other methods will not be accepted. The Zip folder must be titled with the Advertisement for Bids (AFB) Number, AFB Title, and the Offeror’s name as noted below:
Insert AFB number here_ Insert AFB Title here_ Company Name
| Project NoProject Name: CON2752/ HR Office Renovation |
| Bidder Acknowledges Receipt of Addenda Numbers: |
| undefined_2: |
| Time Period from Notice to Proceed to Substantial Completion: |
| Time Period from Substantial Completion to Final Acceptance 1: |
| Time Period from Substantial Completion to Final Acceptance 2: |
| 1 BID Pursuant to the advertisement by the State of Colorado dated: |
| Group1: Off |
| Group2: Choice2 |
| Group3: Choice2 |
| Group4: Choice2 |
| Day of: |
| 20: |
| Company Name: |
| Phone Number: |
| Name Print and Title: |
| undefined_3: |
| Address: |
| City State Zip Code: |
File details come from the government source that posted it. Updated .