AF 66 Submittal Register - DRAFT.pdf
PDF 10 MB Posted
- Attached to
- Repair Tank Farm 3 and 4, JBER, Alaska
- Solicitation number
- FA500023B0001
About this file
This pre-solicitation notice provides details for a construction project to repair tank farms 3 and 4 at Joint Base Elmendorf-Richardson in Alaska. The Department of the Air Force is seeking to award a contract between $10-25 million to replace underground storage tanks and buildings at the two tank farms. Bids are due on May 24, 2023. The project scope includes replacing six 50,000 gallon JP-8 underground storage tanks at each farm with new double wall steel tanks, replacing an existing filter building at tank farm 3, and replacing an existing building and canopy at tank farm 4. Additional work includes site improvements, a new 400 square foot fuel station, truck fill stand, product recovery tank, generator pad, and associated signage, paving and utilities. The acquisition will be set aside for 8(a) small businesses and the solicitation is anticipated to be posted on SAM.gov on April 24, 2023. Interested firms must be registered in SAM to be eligible for award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
01 19 30.00 29 SD-05 Design Data
1.7 GTemporary Site Electrical Plan
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 LPreliminary Project Schedule
3.4.2 LInitial Project Schedule
3.6.2 LPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.5.3.1 GPreliminary High Performance
and Sustainable Building Checklist
1.4.1 GSustainability Action Plan
1.5.3.1 GPreliminary Sustainability
eNotebook
SD-11 Closeout Submittals
1.5.3.1 GFinal High Performance and
Sustainable Building Checklist
1.5.3.1 GFinal Sustainability eNotebook
01 35 26 SD-01 Preconstruction Submittals
1.7 GAccident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
Synopsis AF 66 Submittal Register - DRAFT
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 77 PAGES
JBE057/058
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
01 35 26 1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
1.6.1.4Crane Operators/Riggers
1.7.2.2 GStandard Lift Plan
1.7.2.3 GCritical Lift Plan
1.7.2.4 GNaval Architecture Analysis
1.8Activity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
1.12.4Certificate of Compliance
1.14License Certificates
1.14.1 GRadiography Operation Planning
Work Sheet
1.14.1 GPortable Gauge Operations
Planning Worksheet
01 45 04.00 29 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan
01 45 35 SD-01 Preconstruction Submittals
3.1.1 GSIOR Letter of Acceptance
3.1.1 GProject Manual
3.1.1 GProject Manual
3.1.1Written Practices
3.1.3Written Practices
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
01 45 35 3.1.1NDT Procedures and Equipment
Calibration Records
3.1.3NDT Procedures and Equipment
Calibration Records
SD-06 Test Reports
3.1.1Daily Reports
3.1.3Daily Reports
3.1.3Daily Reports
3.1.1Biweekly Reports
3.1.2Biweekly Reports
SD-07 Certificates
2.1Fabrication Plant
2.1AC472 Accreditation
2.1Certificate of Compliance
1.5.10 GSpecial Inspector of Record
1.5 GSpecial Inspector
3.1.1Qualification Records
3.1.3Qualification Records
SD-11 Closeout Submittals
3.1.1Interim Final Report
3.1.3Interim Final Report
3.1.1 GComprehensive Final Report
3.1.3 GComprehensive Final Report
01 57 20.01 29 SD-01 Preconstruction Submittals
1.7 GEnvironmental Protection Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
01 57 20.01 29 2.1 GDraft SPCC Plan/Contingency
Plan
2.1 GFinal SPCC Plan/Contingency
Plan
2.1 GADEC Approval
2.1 GEPA Approval
01 74 19 SD-01 Preconstruction Submittals
1.7 GConstruction Waste Management
Plan
SD-06 Test Reports
1.9.2Quarterly Reports
1.9.3Annual Report
SD-11 Closeout Submittals
1.10 SFinal Construction Waste
Diversion Report
01 78 00 SD-03 Product Data
1.6.1Warranty Management Plan
1.6.4Warranty Tags
1.5Spare Parts Data
SD-08 Manufacturer’s Instructions
1.6.1Instructions
SD-10 Operation and Maintenance
Data
3.2 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
01 78 00 3.1 GAs-Built Drawings
01 78 23 SD-10 Operation and Maintenance
Data
1.4 GO&M Database
02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDemolition Plan
1.11Existing Conditions
SD-07 Certificates
1.7Notification
SD-11 Closeout Submittals
3.3.3Receipts
02 65 00 SD-01 Preconstruction Submittals
1.4.4 GWork Plan
1.4.4.2 GSite Safety and Health Plan
1.4.4.3 GExcavation and Material Handling
Plan
1.4.4.4 GField Sampling and Laboratory
Testing Plan
1.4.4.5 GTank and Piping Removal And
Disposal Plan
1.4.4.6 GSpill and Discharge Control Plan
1.4.1 GQualifications
1.4.2 GLaboratory Services
3.10.3State Licensed Hazardous Waste
Transporter
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
02 65 00 3.13Laboratory and Field Testing
Reports
2.1Backfill Material
3.3.2Contaminated Water Disposal
3.8Soil Examination, Testing, and
Analysis
3.9 GBackfilling
SD-11 Closeout Submittals
3.10.4 GSalvage Rights
3.13Tank Closure Report
1.4.4.1 GSite Assessment and Release
Investigation Report (SARI)
1.4.4.1 GSite Characterization Report
02 81 00 SD-03 Product Data
2.1.1Packaging Notifications
3.1 GHazardous Waste Management
Plan
3.2 GOnsite Hazardous Waste
Management
3.3Notices of Non-Compliance and
Notices of Violation
SD-06 Test Reports
3.7 GRecordkeeping
3.7 GException Report
3.8Spill Response
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
02 81 00 1.4.1 GTransportation and Disposal
Coordinator
1.4.2 GTraining
1.4.3Certification
3.3.3 GShipping Documents and
Packagings Certification
3.3.4Security Plan
3.3.5Certificates of Disposal
3.6Waste Minimization
02 82 00 SD-03 Product Data
1.2.2Amended Water
1.3.9Safety Data Sheets (SDS) for All
Materials
2.1Encapsulants
3.1.2.1Respirators
3.1.7Local Exhaust Equipment
3.1.7Pressure Differential Automatic
Recording Instrument
3.1.8Vacuums
3.1.10Glovebags
SD-06 Test Reports
1.5.5 GAir Sampling Results
1.5.6 GPressure Differential Recordings
for Local Exhaust System
3.2.12.4 GClearance Sampling
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
02 82 00 3.3.3.2 GAsbestos Disposal Quantity
Report
SD-07 Certificates
1.3.4 GEmployee Training
1.3.5 GNotifications
1.3.7 GRespiratory Protection Program
1.3.10 GAsbestos Hazard Abatement Plan
1.3.11 GTesting Laboratory
1.3.12 GLandfill Approval
1.3.12 GDelivery Tickets
1.3.12 GWaste Shipment Records
1.3.13 GTransporter Certification
1.3.14 GMedical Certification
1.5.1 GPrivate Qualified Person
Documentation
1.5.2 GDesignated Competent Person
1.5.3 GWorker's License
1.5.4 GContractor's License
1.5.7 GFederal, State or Local Citations
on Previous Projects
2.1Encapsulants
3.1Equipment Used to Contain
Airborne Asbestos Fibers
3.1.3.3Water Filtration Equipment
3.1.8Vacuums
3.1.8Ventilation Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
02 82 00 SD-11 Closeout Submittals
1.3.5 GPermits and Licenses
1.3.5 GNotifications
1.3.7.1Respirator Program Records
1.7.1 GRental Equipment
02 83 00 SD-01 Preconstruction Submittals
1.5.1.1 GCompetent Person
1.5.1.2 GTraining Certification
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.4 GMedical Examinations
1.5.2.8 GLead Waste Management Plan
1.5.4 GLicenses, Permits and
Notifications
1.5.5 GOccupant Protection Plan
1.5.2.2 GLead Compliance Plan
3.1.1.6 GLead Compliance Plan
3.4.1.1 GInitial Sample Results
3.5.2.1 GWritten Evidence of TSD
Approval
SD-03 Product Data
1.6.1Respirators
1.6.4Vacuum Filters
1.6.7Negative Air Pressure System
2.1Materials and Equipment
2.1.1Expendable Supplies
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
02 83 00 3.1.1.5Local Exhaust Equipment
3.1.1.5Pressure Differential Automatic
Recording Instrument
3.1.1.6 GPressure Differential Log
SD-06 Test Reports
1.3.3 GSampling and Analysis
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.3 GSampling Results
1.5.3 GPressure Differential Recordings
For Local Exhaust System
SD-07 Certificates
1.5.1.3 GTesting Laboratory
1.5.1.4 GPrivate Qualified Person
Documentation
3.5.1.1 GClearance Certification
SD-11 Closeout Submittals
3.5.2.1 GHazardous Waste Manifest
3.5.2.1 GTurn-In Documents or Weight
Tickets
02 84 16 SD-07 Certificates
1.8.1 GQualifications of Contractor's IH
1.8.1 GTraining Certification
1.8.2 GPCB and Lamp Removal Work
Plan
1.8.3 GPCB and Lamp Disposal Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
02 84 16 SD-11 Closeout Submittals
3.5.2 GTransporter certification
3.2.4Certification of Decontamination
3.5.2.1 GCertificate of Disposal and/or
recycling
02 84 33 SD-07 Certificates
1.7.1 GTraining Certification
1.7.2 GQualifications of Contractor's IH
1.7.3 GPCB removal work plan
1.7.4 GPCB disposal plan
1.7.5 GNotification
3.8Transporter certification
3.5.4 GCertification of Decontamination
3.5.5Post cleanup sampling
3.8.1 GCertificate of disposal
03 30 00 SD-01 Preconstruction Submittals
1.6.3.1Concrete Curing Plan
1.6.5 GQuality Control Plan
1.6.6 GQuality Control Personnel
Certifications
1.6.6Quality Control Organizational
Chart
1.6.8 GLaboratory Accreditation
3.3.7Maturity Method Data
SD-02 Shop Drawings
1.6.2.1 GReinforcing Steel
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
03 30 00 SD-03 Product Data
2.4.5Joint Sealants
2.4.4Joint Filler
2.1Formwork Materials
2.3.1Cementitious Materials
2.4.6Vapor Retarder
2.4.1Concrete Curing Materials
2.6Reinforcement
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.3.4Admixtures
2.6.2Mechanical Reinforcing Bar
Connectors
2.2.2Waterstops
2.2.3Biodegradable Form Release
Agent
1.6.3.2Pumping Concrete
2.4.2Nonshrink Grout
SD-05 Design Data
1.6.1.1 GConcrete Mix Design
SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
1.6.4.1Aggregates
3.13.2.3 GCompressive Strength Tests
3.13.2.5Unit Weight of Structural
Concrete
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
03 30 00 3.13.2.6Chloride Ion Concentration
3.13.2.4 GAir Content
3.13.2.1 GSlump Tests
2.3.2Water
SD-07 Certificates
2.6.1Reinforcing Bars
1.6.3.3VOC Content for Form Release
Agents, Curing Compounds, and
Concrete Penetrating Sealers
1.6.3.4Safety Data Sheets
1.6.6.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.4.5Joint Sealants
2.4.1Curing Compound
05 12 00 SD-01 Preconstruction Submittals
1.4.1.1 GErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.4.2 GFabrication Drawings
SD-03 Product Data
2.4.1Welding Electrodes and Rods
2.3.2.3Direct Tension Indicator Washers
2.4.2Non-Shrink Grout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
05 12 00 2.3.3Tension Control Bolts
SD-06 Test Reports
2.3Bolts, Nuts, and Washers
3.6.1.2Weld Inspection Reports
3.6.2.1Direct Tension Indicator Washer
Inspection Reports
3.6.3.1Bolt Testing Reports
3.6.4Embrittlement Test Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
2.5Galvanizing
1.4.3.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
3.6.1.1Certified Welding Inspector
3.6.1.2NDT Technician
3.4Welding Procedure Specifications
(WPS)
05 50 13 SD-02 Shop Drawings
2.3 GFloor Gratings
2.4 GAngles and Plates
SD-03 Product Data
2.3 GFloor Gratings
2.1 GCertified Mill
05 51 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
05 51 00 2.1 GSteel Shapes, Plates, Bars, and
Strips
2.2.1 GMetal Stair System
SD-03 Product Data
2.4.1 GStructural-Steel Plates, Shapes, and Bars
2.4.2 GStructural-Steel Tubing
2.2.4 GProtective Coating
2.2.2 GSteel Stairs
SD-07 Certificates
1.3.1 GWelding Procedures
1.3.1 GWelder Qualification
05 51 33 SD-02 Shop Drawings
2.3Ladders
SD-03 Product Data
2.3Ladders
SD-07 Certificates
1.3Fabricator Certification for Ladder
Assembly
05 52 00 SD-02 Shop Drawings
2.1 GSteel Shapes, Plates, Bars and
Strips
2.1 GMetal Railing System
SD-03 Product Data
2.2.1 GStructural-Steel Plates, Shapes, and Bars
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
05 52 00 2.2.2 GStructural-Steel Tubing
2.1.2 GProtective Coating
2.2.5 GSteel Handrails
2.2.4 GFastening Systems
SD-07 Certificates
1.3.1 GWelding Procedures
1.3.2 GWelder Qualification
05 59 10 SD-01 Preconstruction Submittals
2.6.2 GAssembly Tests
3.3 GAcceptance Testing
SD-02 Shop Drawings
1.4.3 GDetail Drawings
SD-03 Product Data
2.1.7 GWheel Assemblies
1.4.3 GMaterials List
2.4 GWelding
2.4.2 GWelding of Aluminum
2.4.4 GSteel Welding Repairs
SD-07 Certificates
1.4.1Welder Qualifications
2.4.2Welding of Aluminum
06 41 16.00 10 SD-02 Shop Drawings
2.9Shop Drawings
3.1Installation
SD-03 Product Data
2.1Wood Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
06 41 16.00 10 SD-04 Samples
2.2Plastic Laminates
2.5Cabinet Hardware
SD-07 Certificates
1.5Quality Assurance
3.1Laminate Clad Casework
SD-11 Closeout Submittals
1.3LEED Documentation
07 11 13 SD-07 Certificates
1.3Materials
07 27 10.00 10 SD-02 Shop Drawings
2.1 GAir Barrier System Shop
Drawings
SD-03 Product Data
2.1 GAir Barrier System Product Data
SD-06 Test Reports
3.1.2 GTesting and Inspection
07 41 63 SD-01 Preconstruction Submittals
1.4.1 GQualification of Manufacturer
1.4.1 GQualification of Installer
1.4.1Qualifications for Welding
1.4.1Work Plan
1.4.1 GOn-Site Inspection and
Acceptance Procedure
SD-02 Shop Drawings
1.4.1 GRoofing Panels
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
07 41 63 1.4.1Flashing and Accessories
SD-03 Product Data
1.4.1Sustainable Acquisition
1.4.1Coil Stock
1.4.1Factory Color Finish
1.4.1Closure Materials
1.4.1Insulation
1.4.1Pressure-Sensitive Tape
1.4.1Sealants and Caulking
1.4.1Accessories
SD-04 Samples
2.5.1Metal Closure Strips
1.4.1 GManufacturer's Color Charts and
Chips
SD-05 Design Data
1.4.1Wind Design Analysis
1.4.1Seismic Design Analysis
SD-06 Test Reports
3.4.1.2 GLeakage Tests
1.4.1 GFire Rating Test Report
3.1Coatings and Base Metals of
Metal Roofing
1.4.1Factory Finish and Color
Performance Requirements
1.4.1Wind Uplift Test Report
1.4.1Seismic Test Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
07 41 63 SD-07 Certificates
1.4.1Coil Stock
1.4.1Safety Data Sheets
2.4.3Coating Physical Properties:
SD-08 Manufacturer’s Instructions
1.4.1Installation of Roof Panel
Assemblies
SD-11 Closeout Submittals
1.7Warranty
1.7.120-year 'No-Dollar-Limit' warranty for labor and materials
3.3.5 GInformation Form and Placard
3.4.2Manufacturer's Field Inspection
Reports
1.4.1Application Instructions
07 42 63 SD-01 Preconstruction Submittals
1.5.3Qualification of Manufacturer
1.5.4Qualification of Installer
1.5.4.1Qualifications for Welding Work
SD-02 Shop Drawings
1.5.1Fabrication and Installation drawings
1.5.1Wall Panel Assemblies
1.5.1Flashing and Accessories
1.5.1Anchorage Systems
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
07 42 63 1.5.1sustainable acquisition
1.5.1Manufacturer's catalog data
1.5.1Factory Color Finish
1.5.1Sub-girts and Formed Shapes
1.5.1Closure Materials
1.5.1Insulation
1.5.1Pressure Sensitive Tape
2.4.4.1Sealants and Caulking
1.5.1Rated Wall Assembly
1.5.1Galvanizing Repair Paint
1.5.1Accessories
SD-04 Samples
1.5.1Wall Panel Assemblies
1.5.1Fasteners
1.5.1Metal Closure Strips
1.5.1Insulation
1.5.1manufacturer's color charts and chips
SD-05 Design Data
1.5.1Wind Design Analysis
SD-06 Test Reports
3.7.2Leakage Tests
1.3.2Wind Load Tests
1.3.2Seismic Tests
1.5.1Factory Color Finish
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
07 42 63 1.5.1Fasteners
1.5.1Galvanizing Repair Paint
1.5.3Qualification of Manufacturer
1.5.4Qualification of Installer
1.5.1wall system assembly wind load and fire rating classification listings
SD-08 Manufacturer’s Instructions
1.5.1Installation of Wall Panels
SD-11 Closeout Submittals
1.5.1Instructions
1.5.1Safety Data Sheets
1.5.120 year 'No-Dollar-Limit' Warranty
1.8 GWarranty
07 60 00 SD-01 Preconstruction Submittals
1.4.3 GQuality Control Plan
SD-02 Shop Drawings
2.2.1Exposed Sheet Metal
3.1.13Flashing at Roof Penetrations and Equipment Supports
3.1.10 GDrip Edges
3.1.11 GEave Flashing
2.1 SRecycled Content
SD-04 Samples
1.4.2 GFinish Samples
SD-08 Manufacturer’s Instructions
1.4.3 GInstructions for Installation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
07 60 00 1.4.3 GQuality Control Plan
SD-10 Operation and Maintenance
Data
1.4.3 GCleaning and Maintenance
07 84 00 SD-02 Shop Drawings
2.1 GFirestopping System
SD-03 Product Data
2.2 GFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SD-07 Certificates
1.5.2Inspector Qualifications
2.2Firestopping Materials
1.5.1 GInstaller Qualifications
07 92 00 SD-03 Product Data
2.1 GSealants
2.2 GPrimers
2.3 GBond Breakers
2.4 GBackstops
3.1 GField Adhesion
SD-07 Certificates
2.1.1 SIndoor Air Quality For Interior
Sealants
2.1.3 SIndoor Air Quality For Interior
Floor Joint Sealants
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
07 92 00 2.5 SIndoor Air Quality For Interior
Caulking
08 11 13 SD-02 Shop Drawings
2.1Doors
2.1Doors
2.5Frames
2.5Frames
2.3Accessories
2.6Weatherstripping
SD-03 Product Data
2.1Doors
2.5Frames
2.3Accessories
2.6Weatherstripping
08 53 00 SD-02 Shop Drawings
2.2.1 GWindows
2.2.1 GWindows
SD-03 Product Data
2.2.1 GWindows
2.4.8Fasteners
2.4.4Hardware
2.4.6Screens
2.4.5Weatherstripping
2.4.9Accessories
2.2.5Adhesives
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
08 53 00 2.2.1 GWindows
SD-10 Operation and Maintenance
Data
2.2.1 GWindows
08 71 00 SD-02 Shop Drawings
1.5 GManufacturer's Detail Drawings
1.5Verification of Existing Conditions
1.7Hardware Schedule
2.7Templates
2.10Keying Schedule
SD-10 Operation and Maintenance
Data
1.7Hardware Schedule
SD-11 Closeout Submittals
1.8.1Key Bitting
08 81 00 SD-03 Product Data
2.3Insulating Glass
1.3Glazing Accessories
2.4.3.1Sealants
SD-04 Samples
2.3Insulating Glass
2.4.2Glazing Compound
2.4.5Tape
2.4.5Sealing Tapes
SD-07 Certificates
2.3Insulating Glass
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
08 81 00 SD-08 Manufacturer’s Instructions
2.4Setting and Sealing Materials
3.2Glass Setting
SD-11 Closeout Submittals
1.7.1Insulated Glass Units
09 22 00 SD-02 Shop Drawings
2.1 GMetal Support Systems
SD-03 Product Data
2.1Metal Support Systems
2.1 SRecycled Content for Metal
Support Systems
09 29 00 SD-03 Product Data
2.1.4Cementitious Backer Units
2.1.3Glass Mat Water-Resistant
Gypsum Tile Backing Board
2.1.2Water-Resistant Gypsum Backing
Board
2.1.7Accessories
2.1.1Gypsum Board
2.1.1 SRecycled Content for Gypsum
Board
2.1.1 SRecycled Content for Paper
Facing and Gypsum Cores
2.1.5 SVOC Content of Joint Compound
SD-07 Certificates
2.1 GAsbestos Free Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
09 29 00 2.1.1 SIndoor Air Quality for Gypsum
Board
09 30 10 SD-02 Shop Drawings
3.2Detail Drawings
SD-03 Product Data
2.1.1Glazed Wall Tile
2.2Setting-Bed
2.4Mortar, Grout, and Adhesive
SD-04 Samples
2.1Tile
2.1Accessories
2.1Transition Strips
2.6Transition Strips
2.4.3Grout
SD-07 Certificates
1.3.1Indoor Air Quality
SD-08 Manufacturer’s Instructions
3.7Maintenance Instructions
SD-10 Operation and Maintenance
Data
3.2Installation
SD-11 Closeout Submittals
2.1.1Recycled Content for Glazed Wall
Tile
2.4Indoor Air Quality for Adhesives
2.4.7Indoor Air Quality for Sealants
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
09 90 00 SD-03 Product Data
2.1 GCoating
SD-04 Samples
1.10 GColor
SD-07 Certificates
1.4Applicator's Qualifications
1.5.1.2 GQualification Testing
2.1Indoor Air Quality for Paints and
Primers
2.1Indoor Air Quality for
Consolidated Latex Paints
SD-08 Manufacturer’s Instructions
3.5.2Mixing
1.8.2Manufacturer's Safety Data
Sheets
SD-10 Operation and Maintenance
Data
2.1 GCoatings
09 96 00 SD-01 Preconstruction Submittals
1.3Equipment List
SD-03 Product Data
2.2.1Epoxy Coatings
SD-04 Samples
1.3Color Chips
SD-07 Certificates
2.2.1Epoxy Coatings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
09 96 00 3.1.4Manufacturer's Printed
Instructions
09 97 13.15 SD-05 Design Data
1.4.4.1Environmental Control System
SD-06 Test Reports
1.4.5.1Coatings Qualification Inspection
Reports
1.4.5.4 GNon-metallic Abrasive
Qualification Test Reports
1.4.5.2Metallic Abrasive Qualification
Test Reports
3.1.3Coating Sample Test Reports
3.1.4Abrasive Sample Test Reports
3.10.2.2Inspection Report Forms
3.10.2.3Daily Inspection Reports
1.4.5.3Recycled Metallic Abrasive Field
Test Reports (Daily and Weekly)
SD-07 Certificates
1.4.1Contract Errors, Omissions, and
Other Discrepancies
1.4.2.1Corrective Action Procedures
1.4.2.2Implement Corrective Action
1.4.3Coating Work Plan
1.4.6.11Coating Materials
1.4.6.12Non-metallic Abrasive
1.4.6.13Metallic Abrasive
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
09 97 13.15 1.4.6.1Qualifications of Certified
Industrial Hygienist (CIH)
1.4.6.5Qualifications of Individuals
Performing Abrasive Blasting
1.4.6.6Qualifications of Individuals
Applying Coatings
1.4.6.7Qualifications of Individuals
Operating Plural Component
Equipment
1.4.6.2Qualifications of Certified
Protective Coatings Specialist
(PCS)
1.4.6.3Qualifications of Coating
Inspection Company
1.4.6.4Qualifications of QC Specialist
Coating Inspector
1.4.6.8Qualifications of Testing
Laboratory for Coatings
1.4.6.9Qualifications of Testing
Laboratory for Abrasive
1.4.6.10Qualifications of Coating
Contractors
1.4.7Protective Coating Specialist
(PCS)
1.4.8Pre-Application Meeting
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
09 97 13.15 1.5.1Coating System Instructions
SD-11 Closeout Submittals
3.7.6 GDisposal of Used Abrasive
3.10.2.4 GInspection Logbook
09 97 13.27 SD-05 Design Data
1.4.4.1Containment System
SD-06 Test Reports
1.4.5.1Joint Sealant Qualification Test
Reports
1.4.5.2Coatings Qualification Test
Reports
1.4.5.3Metallic Abrasive Qualification
Test Reports
3.2.3Coating Sample Test Reports
3.2.4Abrasive Sample Test Reports
3.9.2.2Inspection Report Forms
3.9.2.3Daily Inspection Reports
1.4.5.4Recycled Metallic Abrasive Field
Test Reports (Daily and Weekly)
SD-07 Certificates
1.4.1Contract Errors, Omissions, and
Other Discrepancies
1.4.2.1Corrective Action Procedures
1.4.3Coating Work Plan
1.4.6.1Qualifications of Certified
Industrial Hygienist (CIH)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
09 97 13.27 1.4.6.5Qualifications Of Individuals
Performing Abrasive Blasting
1.4.6.2Qualifications of Certified
Protective Coatings Specialist
(PCS)
1.4.6.3Qualifications of Coating
Inspection Company
1.4.6.4Qualifications of QC Specialist
Coating Inspector
1.4.6.6Qualifications of Testing
Laboratory for Coatings
1.4.6.7Qualifications of Testing
Laboratory for Abrasive
1.4.6.8Qualifications of Coating
Contractors
1.4.6.9Joint Sealant Materials
1.4.6.10Coating Materials
1.4.6.11Coating System Component
Compatibility
1.4.6.12Non-metallic Abrasive
1.4.6.13Metallic Abrasive
SD-08 Manufacturer’s Instructions
1.5.1Joint Sealant Instructions
1.5.2Coating System Instructions
SD-11 Closeout Submittals
3.6.6Disposal of Used Abrasive
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
09 97 13.27 3.9.2.4 GInspection Logbook
10 14 00.10 SD-02 Shop Drawings
3.1Approved Detail Drawings
SD-03 Product Data
2.1Modular Exterior Signage System
3.1Installation
1.2Exterior Signage
SD-04 Samples
1.2Exterior Signage
SD-10 Operation and Maintenance
Data
3.1.2Protection and Cleaning
10 28 13 SD-03 Product Data
2.1.2 GFinishes
2.2 GAccessory Items
2.1 SRecycled content for stainless
steel toilet accessories
SD-04 Samples
2.1.2 GFinishes
2.2Accessory Items
SD-07 Certificates
2.2Accessory Items
10 44 16 SD-02 Shop Drawings
2.1.1Fire Extinguishers
2.1.4Accessories
2.2.1Wall Brackets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
10 44 16 SD-03 Product Data
2.1.1Fire Extinguishers
2.1.1Manufacturer's data
2.1.4Accessories
2.2.1Wall Brackets
3.2.1Replacement Parts List
SD-04 Samples
2.1.1Fire Extinguisher
2.2.1Wall Brackets
2.1.4Accessories
SD-07 Certificates
2.1.1Fire Extinguishers
2.1.1Manufacturer's Warranty with
Inspection Tag
3.1Manufacturer's Warranty with
Inspection Tag
13 34 19 SD-01 Preconstruction Submittals
1.6.3 GManufacturer's Qualifications
SD-02 Shop Drawings
1.2.1.7 GDetail Drawings
1.6.1 GDetail Drawings
1.2.10 GErection Plan
SD-03 Product Data
1.6.1 GManufacturer's Catalog Data
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
13 34 19 2.4.3 GManufacturer's Color Charts and
Chips
SD-05 Design Data
1.6.1 GManufacturer's Descriptive and
Technical Literature
1.6.1 GManufacturer's Building Design
Analysis
SD-06 Test Reports
1.6.1 GTest Reports
2.4.3 GCoatings and Base Metals
2.4.3 GFactory Color Finish Performance
SD-07 Certificates
1.4 GSystem Components
2.1.8 GCoil Stock
2.4.4 GAluminized Steel Repair Paint
2.4.4 GGalvanizing Repair Paint
2.4.4 GEnamel Repair Paint
1.6.1 GQualification of Manufacturer
1.6.1 GQualification of Erector
SD-08 Manufacturer’s Instructions
1.6.2 GInstallation of Roof and Wall
panels
1.7 GShipping, Handling, and Storage
SD-11 Closeout Submittals
3.14.1 GManufacturer's Warranty
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
13 34 19 3.14.2 GContractor's Warranty for
Installation
22 00 00 SD-03 Product Data
2.5Fixtures
2.5.2Flush Valve Water Closets
2.8 GWater Heaters
3.8.1Plumbing System
SD-06 Test Reports
3.8Tests, Flushing and Disinfection
SD-07 Certificates
1.3Materials and Equipment
2.2.1Bolts
SD-10 Operation and Maintenance
Data
3.8.1 GPlumbing System
SD-11 Closeout Submittals
2.1.1 SWater-Efficient Products
2.1.2 SEnergy-Efficient Water Heaters
23 00 00 SD-02 Shop Drawings
1.4.5 GDetail Drawings
SD-03 Product Data
2.9.2Louvers
2.10.1.1Centrifugal Fans
2.10.1.2In-Line Centrifugal Fans
1.4.6Test Procedures
1.2.1.2 GDiagrams
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
23 00 00 SD-06 Test Reports
3.10 GPerformance Tests
1.4.3Ozone Depleting Substances
SD-08 Manufacturer’s Instructions
3.3Manufacturer's Installation
Instructions
3.12.2Operation and Maintenance
Training
SD-10 Operation and Maintenance
Data
3.12.1 GOperation and Maintenance
Manuals
2.10.1.1 GCentrifugal Fans
2.10.1.2 GIn-Line Centrifugal Fans
SD-11 Closeout Submittals
2.1.1 SEnergy Efficient Equipment
2.1.2 SReduce Volatile Organic
Compounds (VOC)
3.1 SIndoor Air Quality During
Construction
2.1.3 SOzone Depleting Substances for
Refrigerants
23 05 93 SD-01 Preconstruction Submittals
1.5.1TAB Agency and Personnel
Qualifications
1.3.2Design Review Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 77 PAGES
Tank Farm #3 and #4 Reconstruction, JBER, Alaska
23 05 93 1.5.6.1TAB Firm
SD-03 Product Data
1.5.5Calibration
SD-06 Test Reports
1.5.8.1TAB Report
1.5.3.1TAB Pre-Field Engineering
Report
1.5.4Instrument Calibration
Certificates
23 07 00 SD-02 Shop Drawings
3.3Duct Insulation Systems
2.3.1 SRecycled content for insulation
materials
SD-04 Samples
2.2.1.2 GThermal Insulation
3.1.1 GDisplay Samples
SD-07 Certificates
2.2.1 SIndoor air quality for adhesives
SD-08 Manufacturer’s Instructions
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
23 09 53.00 20 SD-02 Shop Drawings
1.6.1 GControl System Diagrams
1.6.2 GLadder Diagram
1.6.3 GOperating Parameters
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DA…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .