SPECIAL CONDITIONS
FEDERAL OCCUPATIONAL SAFETY AND HEALTH ACT
All Contractors shall comply with the Federal Occupational Safety and Health Act of 1970.
Each Contractor and all subcontractors pursuant to the Contract shall at all times comply with all applicable Federal, State and Local laws, provisions, and policies governing Safety and Health, including the Federal Register Chapter XVII, Part 1926 of title 29 code of Federal Regulations, Occupational Safety and Health Regulations for Construction, and all subsequent republications updating these regulations.
Each Contractor and all subcontractors pursuant to the contract shall have the sole responsibility to take any and all needed action as reasonably necessary to protect the life, health, and general occupational welfare of all personnel on the job, as well as the general public in and around the construction site.
TECHNICAL SPECIFICATIONS AND SPECIAL PROVISIONS
This project shall be constructed in accordance with PennDOT Publications 72M and 408, latest editions, UNLESS OTHERWISE NOTED OR MODIFIED IN THE TECHNICAL
SPECIFICATIONS AND SPECIAL PROVISIONS. These Publications can be found at:
https://www.pa.gov/agencies/penndot/forms-and-publications
INCIDENTAL CONSTRUCTION
There are items incidental to construction that may or may not be noted as such. Construct the job per the plans and consider all items not specifically included under a pay item as incidental to construction.
SC-1
TECHNICAL SPECIFICATIONS
AND SPECIAL PROVISIONS
0901-0001 – Maintenance and Protection of Traffic During Construction
0901.1 Description – This work is the furnishing, installing, maintaining, and relocating of traffic control devices in accordance with section 901 of PennDOT publication 408, latest revision, except as modified herein. This work may include flagging for guidance of traffic through the temporary traffic control zone and dust control. All work shall be done as specified in these Specifications, PennDOT Publication 212 and Publication
213, the MUTCD, the Special Provisions, the Contract Drawings, and as directed.
0901.3 Construction –
ADD THE FOLLOWING TO SECTION 901.3
(dd) Maintain satisfactory access to all homes and businesses throughout the duration of the project.
(ee) If it is determined that limited space is available in some areas for placing signs, as required, the final determination as to the location of the signs and the type of installation will be made by the Township or their representative. Additional compensation will not be made as a result of this determination. Do not place signs in a location that would block intersecting streets and drives.
(ff) Provide two (2) weeks advance notice to the Township of Summit prior to imposing any traffic restrictions. Keep the municipality informed at all times of the construction schedule and work progress with respect to traffic restrictions.
If deemed necessary by the Township, distribute a flyer advising property owners of parking restrictions during construction operations and post "NO
PARKING AFTER 8 AM" signs one (1) day prior to beginning work.
(gg) At least one (1) week in advance of the start of work, provide to the Engineer for approval a traffic control plan for vehicles during non-working hours.
During construction, maintain and protect vehicle traffic in accordance with
Publication 213, Work Zone Traffic Control Guidelines.
0901.4 Measurement and Payment –
REVISE SECTION 901.4 TO READ AS FOLLOWS
All work described in this section shall be paid on a Lump Sum (LS) basis.
9000-0002 – Bituminous Wedge Curb
9000-2.1 Description – This work is the placement of a bituminous wedge curb, as directed or as noted on the plans.
9000-2.2 Material –
(a) FB-2 Modified Binder Course. In accordance with specifications included in this document.
(b) Bituminous Tack Coat. In accordance with Section 460.2.
9000-2.3 Construction – Section 409.3, except revise by adding the following:
(a) Size and Location. Provide 4” high curb with a 12” face, the gutter line will be at the edge of the lane.
(b) Final Surface. Place as part of the final surface paving operation integral with the bituminous surface using the paver with an extension set for the dimensions specified. Use a hand roller to roll the face of the curb.
9000-2.4 Measurement and Payment –
(a) This item shall be measured and paid on a Linear Foot (LF) basis completed and accepted in place including all materials, labor, etc. outlined herein.
Section 470 – Asphalt Seal Coat, Double Application
Description – This work is two applications of bituminous material, each immediately followed by application of coarse aggregate in accordance with Section 470 of PennDOT Publication 408, latest revision, except as modified herein.
Construction –
ADD THE FOLLOWING TO SECTION
(d) Add the following to Protection of Surface: In addition to using a power broom to remove loose aggregate before and after the roadway is opened to traffic, use a vacuum truck to remove any additional loose stone within 72 hours.
(e) Utility Structures. Protect valve boxes, manholes and inlets from application of bituminous material and aggregate as necessary to keep them clean.
(f) Double Application. A double application of the Bituminous Seal
Coat is required.
Measurement and Payment –
REVISE TO READ AS FOLLOWS
Asphalt Seal Coat, Double Application. This item shall be measured and paid on a Square Yard (SY) basis for a double application (i.e. two coats) of the above described process. All work will be measured upon completion for purposes of payment.
END OF SECTION
000-0003
9000-0003 - FB-2 Modified Bituminous Binder Course, 3" Depth
9000-0003 - FB-2 Modified Bituminous Binder Course, 3" Depth