UST System Upgrades – Northville Public Schools Transportation Facility

This specification document details a Request for Quotation (RFQ) issued by Northville Public Schools for underground storage tank (UST) system upgrades at its Transportation Facility located at 504 West Eight Mile Road in Northville, Michigan. The project includes the removal and temporary relocation of one electronic tank monitor, installation of a new Veeder Root TLS 4 electronic tank monitor system with magnetostrictive probes, temporary and permanent power connections to fuel dispensers, installation of new probe and sensor wiring, emergency shut-off switch relocation, and site restoration including concrete and asphalt work. Additional bid alternates are available for a new fuel island at the existing location (Alternate 1A), a new fuel island at the UST area location (Alternate 1B), and a fuel management system (Alternate 2). A mandatory Pre-Bid Conference and site tour was held on November 2, 2021, at 10:00 a.m., with sealed bid packets due by 2:00 p.m. on November 9, 2021. Bids were to be publicly opened on November 9, 2021, at the Northville Public Schools Administration Building, with bid tabulations provided to plan holders by 3:00 p.m. on November 10, 2021. The project is scheduled to occur between February and August 2022, coordinated with a separate transportation building construction project, and award was intended for the first available Board of Education meeting following bid evaluation.

Bidders must submit a 5 percent bid bond or certified check payable to Northville Public Schools, along with completed RFQ packets including signed and notarized Familial Relationship Disclosure Statements and Iran Economic Sanctions Act affidavits. The selected contractor must provide Performance and Labor and Materials Payment Bonds in the amount of 100 percent of the contract price from a Treasury-approved surety licensed in Michigan. Comprehensive General Liability Insurance with a minimum combined single limit of $2,000,000 per occurrence, Worker's Compensation Insurance with Michigan statutory limits, and Automobile Liability Insurance with a minimum combined single limit of $1,000,000 are required, with Northville Public Schools and Arch Environmental Group, Inc. named as additional insureds. The contractor is responsible for all permits, approvals, notifications, and compliance with federal and state regulations, including OSHA requirements for excavation and confined space entry, HAZWOPER training for applicable workers, and Michigan Department of Licensing and Regulatory Affairs compliance. Liquidated damages of $1,500 plus additional Arch Environmental Group, Inc. costs (minimum $654 per day) apply if the project is not completed by the required completion date. A 10 percent retainage is held for a minimum of 90 days following work completion, with final payment contingent on submission of lien waivers, Final Consent of Surety, and all closeout documentation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UST SYSTEM UPGRADES

SPECIFICATIONS

for

Northville Public Schools Transportation Facility

Owner:

405 W. Main Street Northville, Michigan 48167

Site:

504 W. Eight Mile Road

AEG Project #: AE210472 Issue Date: Tuesday, October 26, 2021 Pre-Bid: 10:00 a.m., Tuesday, November 02, 2021 Bids Due: 2:00 p.m., Tuesday, November 09, 2021

UST CONSULTANT

Arch Environmental Group, Inc.

37720 Interchange Drive Farmington Hills, Michigan 48335

Phone: (248) 426-0165 Fax: (248) 427-0305

TABLE OF CONTENTS

SECTION I

Bid Advertisement and Project Information ............................................................................................................. 1-7

Bid Advertisement ........................................................................................................................................ 2-4 Project Summary Location Map to Northville Public Schools Transportation Facility Site Site Map for Northville Public Schools Transportation Facility Site

SECTION II

RFQ Packet ............................................................................................................................................................... 8-18

RFQ Cover Sheet Bidder’s Agreement & Certification and Bidder Acknowledgment .......................................................... 10-11 Bid No. 21.01 – UST System Upgrades for Northville Public Schools Transportation Facility Familial Relationship Disclosure Statement Affidavit of Compliance – Iran Economics Sanctions Act Bidder’s Statement of Qualifications and Statement of Bid Preparation ................................................ 15-17 Bidder’s Checklist for RFQ Submittals

SECTION III

Project Details and Scope of Work ........................................................................................................................ 19-32

Project Description and Site Information ................................................................................................. 20-21 Project Scope of Work .............................................................................................................................. 22-29 General Project Requirements and Information ...................................................................................... 30-31 Project Schedule and Site Availability

SECTION IV

General Conditions ................................................................................................................................................ 33-46

UST System Upgrades

Transportation Facility Page 1

SECTION I

BID ADVERTISEMENT and PROJECT INFORMATION

Bid Advertisement Project summary

Location Map Site Map

Transportation Facility Page 2

BID ADVERTISEMENT

Northville Public Schools will receive sealed Request for Quotation (RFQ) Packets until 2:00 p.m.

Local Time, Tuesday, November 09, 2021 for:

at Northville Public Schools Transportation Facility

A MANDATORY General Pre-Bid Conference and site tour will be held to review and answer questions relating to the project:

Time: 10:00 a.m. Local Time on Tuesday, November 02, 2021 At: Northville Public Schools Transportation Facility 504 West Eight Mile Road Northville, Michigan 48167 Directions: A map of the Northville Public Schools Transportation Facility discussed in this Bid Advertisement follows the Project Summary.

Schedule: The format of the Pre-Bid Conference will be an initial presentation on the bidding process and the scope of work. This activity will be conducted in the driver’s lounge in the Transportation Facility from approximately 10:00 a.m. to 11:00 a.m. Afterwards, Arch Environmental Group, Inc. will provide a brief site tour and host a question & answer session for interested bidders. This site-specific review with Arch Environmental Group, Inc. is mandatory.

All Request for Quotation Packets must be mailed or delivered to the Northville Public Schools’:

Format: All Request for Quotation Packets shall be submitted in a sealed envelope and labeled as outlined below.

Mail To: SEALED BID:

UST System Upgrades – Transportation Facility Attn: Mr. Steve Banchero, Executive Director of Operations Northville Public Schools 405 West Main Street Northville, Michigan 48167

All Request for Quotation Packets must be received by the Northville Public Schools’ Purchasing Department no later than:

Time: 2:00 p.m. Local Time, Tuesday, November 09, 2021 At: Northville Public Schools Administration Building 405 West Main Street Northville, Michigan 48167 Format: All official hard copy Request for Quotation Packets must be received prior to the date and time specified in order to be accepted.

Transportation Facility Page 3

All Request for Quotation Packets will be publicly opened:

Time: 2:00 p.m. Local Time, Tuesday, November 09, 2021 At: Northville Public Schools Administration Building 405 West Main Street Northville, Michigan 48167 Format: Complete Bid Tabulations will be faxed or emailed to all plan holders by 3:00 p.m., November 10, 2021.

Northville Public Schools and Arch Environmental Group, Inc. request that no Bidders call for bid results prior to 5:00 p.m. November 10, 2021.

Northville Public Schools intends to formally award the project at:

Event: First available Northville Public Schools’ Board of Education Meeting Note: Arch Environmental Group will issue a letter of recommendation and/or formal letter of intent to the low qualified Bidder prior to the meeting to allow the recommended contractor the opportunity to prepare for the project, submit the project notification and accurately consider other bids.

Questions Regarding Project Specifications:

All questions regarding the Project Specifications should be addressed to:

George Ontko, Arch Environmental Group, Inc.

Office: (248) 426-0165 Mobile: (248) 229-8074 Email: george@archenvgroup.com

All official changes and interpretations to the Project Specifications will be made via addenda only. Bidders are encouraged to fax [(248) 427-0305] or email (to the email address(es) listed above) all questions regarding the specifications, bidding procedures, etc. to Arch Environmental Group, Inc.

Project Specification Documents:

Project Specification Documents will be available at available at www.archenvgroup.com beginning on Tuesday, October 26, 2021. Project Specification Documents can also be picked up by visiting Arch Environmental Group, Inc.’s office at 37720 Interchange Drive, Farmington Hills, Michigan, between 9:00 a.m. and 4:00 p.m. starting Tuesday, October 26, 2021. There will be a $50.00 per set (non-refundable) charge for all hard copies of Project Specification Documents. Bidders must notify Arch Environmental Group, Inc. twenty-four (24) hours in advance. Arch Environmental Group, Inc. recommends calling the Farmington Hills office [(248) 426-0165] first to arrange for pick-up of the specifications. Project Specification Documents have not been provided by Arch Environmental Group, Inc.

to any advertising agencies. Specifications will not be mailed to Bidders unless pre-paid with postage.

Bidders desiring more than one (1) set of documents may obtain additional sets for $50.00 per set (non-refundable), up to a maximum of three (3) sets. All checks should be made payable to “Arch Environmental Group, Inc.”.

Specifications will be mailed to Bidders upon receipt of pre-payment of a non-refundable charge ($30.00) for shipping and handling.

Bonding Requirements:

Northville Public Schools requires that all bidders submit a Bid Bond in accordance with the requirements summarized below and that all selected Contractors submit Performance and Labor and Materials Bonds in accordance with the requirements summarized below:

mailto:george@archenvgroup.com

Transportation Facility Page 4

Bid Bond Amount: 5% Requirements: The Bidder shall submit the required Bid Security in the form of a Bid Bond by a Treasury approved surety licensed to do business in the State of Michigan, a Cashier's Check, or a Certified Check in the amount of 5% of the bid price. The Bid Security shall be submitted with the understanding that if the bid is accepted, the Bidder will enter into a formal contract with Northville Public Schools and that the required Performance and Labor and Material Payment Bonds (as listed below and fully detailed in the General Conditions section) will be provided by the Contractor. The Bid Security oblige is Northville Public Schools. Bidders shall agree not to withdraw proposals for a period of thirty (30) days after the bid due date.

Performance Bond & Labor and Material Payment Bonds Amount: 100% Requirements: The accepted Contractor will be required to furnish, in the amount of 100% of the Contract Price, satisfactory Performance Bond and Labor and Material Payment Bond by a Treasury approved surety, as listed on the U.S. Department of Treasury Circular 570, licensed to do business in the State of Michigan. The U.S. Department of Treasury Circular 570 can be viewed at the following web site: https://www.fiscal.treasury.gov/fsreports/ref/suretyBnd/c570_a-z.htm. The accepted Contractor will be required to furnish the bonds prior to the start of the project. Mobilization to the project site will not begin until acceptable bonds are furnished by the accepted Contractor.

Additional Information for Bidders:

All applicable insurance policies will be required of each accepted Bidder. This project is not tax exempt from State Sales Tax and/or Use Tax. All materials and supplies incorporated and used in construction and becoming a permanent part of this project will not be exempt from State Sales Tax and/or Use Tax.

Request for Quotation Packet - Submittal Requirements:

The RFQ Packet (Pages 8-18) shall be submitted on the forms furnished in this specification. The RFQ Packet must be submitted in duplicate. The RFQ Packet and all additional information requested must be submitted as follows:

Item Item Description Page No.

1. RFQ Submittal Packet Cover Sheet 9

2. Bidder’s Agreement and Certification and Bidder Acknowledgment 10-11

3. Bid No. 21.01 – UST System Upgrades-Northville Public Schools Transportation Facility 12

4. Familial Relationship Disclosure Statement 13 [STATE REQUIREMENT - BID WILL NOT BE ACCEPTED WITHOUT THIS SIGNED AND NOTARIZED STATEMENT]

5. Affidavit of Compliance – Iran Economics Sanctions Act 14 [STATE REQUIREMENT - BID WILL NOT BE ACCEPTED WITHOUT THIS SIGNED AND NOTARIZED STATEMENT]

6. Bidder’s Statement of Qualifications and Statement of Bid Preparation 15-17

7. Bidder’s Response to Statement of Qualifications and Statement of Bid Preparation Submit

8. Bid Security Submit

9. Proof of Insurance Submit

10. Additional Information Submitted by Bidder Submit

Arch Environmental Group, Inc. and Northville Public Schools request that the Bidder enter “NO BID” on the bid forms in lieu of omitting the page.

https://www.fiscal.treasury.gov/fsreports/ref/suretyBnd/c570_a-z.htm

Transportation Facility Page 5

- Bid No. 21.01 - UST System Upgrades Northville Public Schools Transportation Facility

Project Summary for Bid Advertisement

This project summary provides a summary of the work associated with the project, to be included as part of the bid.

The Scope-of-Work, project requirements and project schedule are provided in the specification documents. The Contractor is encouraged to review all aspects of the Scope-of-Work when preparing the bid and is instructed not to use this summary when preparing this bid.

• UST System Upgrades

The Project at Northville Public Schools Transportation Facility includes the removal and temporary relocation of one (1) electronic tank monitor, connection of temporary power to one (1) fuel dispenser, connection of temporary power and probe/sensor wiring to the relocated electronic tank monitor, installation of one (1) new electronic tank monitor complete with new probes and sensors, and removal of the temporary installations. Work includes, but is not limited to electrical for the connection of power and probe/sensor wiring to the temporarily relocated electronic tank monitor, and temporary power to the fuel dispenser; disconnection of fuel supply piping for temporary removal of fuel dispenser, and reinstallation/reconnection of same; removal and proper disposal of asphalt and concrete paving;

excavation for, and installation of conduit for final power and probe/sensor wiring for new electronic tank monitor and fuel dispenser; backfill, and installation of new concrete pad and manholes; start up and commissioning of systems; dewatering as required to perform the work, including proper disposal of same;

coordination of all work with the construction/renovation activities and phasing of the new transportation building and site work/paving.

Additional work under bid alternates includes the removal of one (1) fuel island, complete with bumper posts, fuel dispenser, and under dispenser sump, and installation of new fuel island with two (2) new under dispenser sumps, two (2) fuel dispensers, one (1) fuel management system. Work includes, but is not limited to that previously noted; electrical for the disconnection, removal, and replacement of power and controls wiring; cleaning of fuel supply piping to be removed, including proper disposal of liquids; rework or removal and proper disposal of fuel supply and vent piping; and installation of new fuel supply piping, under dispenser sumps, dispensers, and fuel management system.

The work will be performed concurrent with a separate construction project to upgrade the Transportation Building and site and will need to be performed in phases to facilitate the schedule of that construction project.

The exact dates for start and completion of this UST System Upgrade project will be determined following the award of the project, but the work is expected take place over a period from February to August 2022, dependent upon the phasing of the work on the Transportation Building construction/site work project.

Transportation Facility Page 6

Location Map of Northville Public Schools Transportation Facility

NORTH

PROJECT SITE

Transportation Facility Page 7

Map of Northville Public Schools Transportation Facility

SUPPORT

STRUCTURE

UST AREA

FUEL ISLAND

TRANSPORTATION

BUILDING

NORTH

Transportation Facility Page 8

SECTION II

RFQ PACKET

Transportation Facility Page 9

BIDDER INFORMATION

Contractor Name:

Address:

Phone/Fax: P: F:

E-Mail:

Representative:

Transportation Facility Page 10

BIDDER’S AGREEMENT AND CERTIFICATION

The undersigned Bidder, having fully examined the Project Specification Documents [including, but not limited to, Section I (the Bid Advertisement and the Project Summary), Section II (the RFQ Packet), Section III (the Project Scope of Work, Project Schedule, and Site Availability) and Section IV (the General Conditions), as well as all other associated information (including the addenda listed and acknowledged on the following page), and having familiarized itself with the conditions to be encountered affecting the cost of the work, does hereby propose to satisfactorily complete all activities required to be performed and to furnish all of the labor, materials, tools, equipment and all other necessary additional services needed to complete the UST System Upgrades activities required in connection with this project. Addenda issued by Northville Public Schools or Arch Environmental Group, Inc. and acknowledged by the Bidder, are made part of the Project Specification Documents and are listed on the following page.

All Bidders were provided the opportunity to attend the Pre-Bid Conference on Tuesday, November 02, 2021, and provided the opportunity for an accompanied tour of the site and all Bidders have been encouraged, and provided the opportunity, to examine the project site and familiarize themselves with the work described in the Project Specification Documents. The submission of a bid for the project described in the Project Specification Documents shall be deemed conclusive evidence that the Bidder has thoroughly examined all documents constituting this specification (including, but not limited to, those items and sections listed above), has familiarized itself with the work and requirements described and shall constitute a waiver of all claims of error in bid, withdrawal of bid, or payment of extras, or combination thereof, under the executed Contract, or any revision thereof. All figures set forth in the Project Specification Documents referencing sizes, amounts, or materials are estimates only and are provided for the convenience of the Bidder. The Bidder is solely and completely responsible for its own measurements and for its own determination regarding the scope of the project(s).

These specifications including, but not limited to, the Bid Advertisement, the Project Scope of Work, Project Schedule and Site Availability, and the General Conditions, have attempted to detail and address all aspects of the project being performed for Northville Public Schools. Nonetheless, the successful completion of the project in a safe manner and in compliance with all applicable regulations remains as the foremost concern of Northville Public Schools. To insure that this goal is met, it is expressly agreed by and between the parties to the contract, hereinafter to be signed between Northville Public Schools and the Contractor, that Northville Public Schools and/or Arch Environmental Group, Inc., as Northville Public Schools’ Representative, have complete control over the manner in which the project shall proceed and may, in their sole discretion, waive provisions of these Project Specifications or require and enforce more stringent or different provisions should they, in their discretion, determine that such changes will or may more fully protect Northville Public Schools, the Contractor, their subcontractors, agents, servants or others under their control or direction or the general public from any risks and/or situations associated with the said project.

This provision in no way constitutes a waiver by the Contractor of its responsibilities to conduct said project in accordance with all applicable regulations and in accordance with these specifications. This provision is set forth and is intended to provide Northville Public Schools and/or Arch Environmental Group, Inc. with the power to require additional steps to be taken to ensure that the project proceeds in a manner to fully, to the utmost extent possible, protect Northville Public Schools and/or Arch Environmental Group, Inc., as well as the general public, from risks and liability associated with such projects.

After the bids are received, tabulated and evaluated by Arch Environmental Group, Inc., and the apparent lowest Bidder(s) has been determined, the Bidder(s) agrees to meet with Arch Environmental Group, Inc., if so requested.

For purposes of these meetings, the Bidder agrees to provide any post bid information as listed in the General Conditions. The Bidder, if awarded a contract, agrees to commence all pre-project planning and preparation activities upon receipt of a written “Notice to Proceed/Letter of Intent” and to fully complete its work in accordance with and to conform to the milestone activity dates and durations set forth in the Project Specification Documents.

Transportation Facility Page 11

The signature of a representative for the Bidder constitutes a full and complete agreement with the Project Specifications and the Bidder’s Agreement and Certification. All Bid Forms must be completed. Bids which are not submitted should be marked “N/A”, or have similar notations.

BIDDER ACKNOWLEDGMENTS

Type of Bid Security Please indicate type of bid security provided: [ ] 5% Bid Bond [ ] Certified Check

Acknowledgment of Addenda:

The Bidder has received and reviewed the following addenda:

Addendum No. Addendum No. Addendum No.

Dated Dated Dated

Acknowledgment of Pre-Bid Conference Minutes:

The Bidder has received and reviewed the Pre-Bid Conference Minutes dated [ ] Check here if not issued

Type of Business:

The Bidder is a (check one): Partnership Corporation

The Bidder is (check all that apply): Minority Woman Owned Small Business Enterprise

Identification of Potential Conflict of Interest The Bidder hereby discloses and describes any business, financial, or pecuniary relationship existing between the Bidder (or any officer, agent, or employee of the Bidder) and any officer, employee, agent, board member, or owner of Northville Public Schools, Arch Environmental Group, Inc., the Construction Manager/General Contractor, or Architect. If no such relationship exists, so state in the space provided.

Attach additional pages if necessary

Signature of Chief Executive Office (or equivalent)

Acknowledgment of Specification Details/Bid Preparation:

The Bidder acknowledges that the Bidder has reviewed each section of the bid documents relating to each of the Bids and understands that the Bidder will not be released from the Bid(s) due to missed activities or other similar oversights. The Bidders also acknowledges that he has checked each bid and that all figures are correctly listed on the bid forms.

Signature of Chief Executive Office (or equivalent)

Transportation Facility Page 12

Bid No. 21.01 - UST System Upgrades - Northville Public Schools Transportation Facility

The Bidder hereby agrees and certifies to comply with all requirements described within this Project Specification and the listed and acknowledged Addenda and agrees to accept a payment of

Base Bid dollars ($ ) Base Bid

Alternates

Alternate No. 1A (New Fuel Island- Existing Location) dollars ($ ) Alternate No. 1B (New Fuel Island-UST Area)

Alternate No. 2 (Fuel Management System)

Additional Costs

Cost per gallon of Impacted Groundwater/Rainwater Removal and Disposal for all work regarding this bid as described in the “Project Scope of Work/Project Schedule and Site Availability”.

The Bidder agrees and certifies that the above stated cost includes all charges for all wages, overtime, taxes, materials, supplies, equipment, disposal costs, general conditions, supervision, insurance, overhead, profit and incidental expenses and fees. The Bidder hereby agrees and certifies that if the project is not completed by the final due date the Bidder will accept a penalty as described in the project specifications.

The Undersigned, a Representative of the Bidder, hereby authorizes and requests any person, firm, or corporation to furnish any information requested by Northville Public Schools and/or their Representatives in verification of the recitals comprising the Bidder’s Statement of Qualifications. When requested, a breakdown of the bid will be submitted following award of a contract.

COMPANY NAME

PRINT NAME

TITLE

SIGNATURE

Alternate Bids Provided: Bidder Noted Conditions/Restrictions on Bid:

[ ] None [ ] None [ ] Attached - List Below: [ ] Listed Below:

Transportation Facility Page 13

FAMILIAL RELATIONSHIP DISCLOSURE STATEMENT

Important: This disclosure statement must be included with your bid as required by state law (Public Act 232 of 2005).

As required by Public Act 232 of 2005, all bids shall be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the owner or any employee of the bidder and any member of the Northville Public Schools’ Board of Education or the Superintendent of Schools. The Board of Education shall not accept a bid that does not include this sworn and notarized disclosure statement.

The undersigned, the owner or authorized officer of (the “Bidder”), pursuant to the familial disclosure requirement provided in the Northville Public Schools advertisement for construction bids, hereby represent and warrant, except as provided below, that no familial relationships exist between the owner(s) or any employee of the company and any member of the Northville Public Schools’ Board of Education or the Superintendent of Schools. If such a relationship exists, please explain:

Attach additional pages if necessary

By: (bidder signature)

Title: (type or print)

Date:

Subscribed and Sworn to Before Me:

This day of , 20 A.D., in and for the County of , Michigan.

My commission expires:

Acting in the County of:

Signature of Notary

Transportation Facility Page 14

AFFIDAVIT OF COMPLIANCE - IRAN ECONOMIC SANCTIONS ACT

Important: This disclosure statement must be included with your bid as required by state law (Public Act 517 of 2012).

The undersigned, the owner or authorized officer of (the “Contractor”), hereby certifies, represents and warrants that the Contractor (including its officers, directors and employees) is not an “Iran linked business” within the meaning of the Iran Economic Sanctions Act, Michigan Public Act No. 517 of 2012 (the “Act”), and that, in the event Contractor is awarded a contract as a result of the aforementioned Request For Proposal, the Contractor will not become an “Iran linked business” at any time during the course of performing the Work or any services under the contract.

The Contractor understands and agrees that, if Northville Public Schools receives credible information that this Affidavit includes false information, Northville Public Schools will conduct an investigation that may lead to the termination of this contract as provided in the Act. The Contractor agrees to indemnify Northville Public Schools (including its agents, employees and representatives), and hold them harmless, for all actual attorneys’ fees and costs, settlements, awards, judgments, interest and bonds arising from or relating to any such investigation.

The Contractor further acknowledges that any person who is found to have submitted a false certification may be responsible for a civil penalty of not more than $250,000.00 or 2 times the amount of the contract or proposed contract for which the false certification was made, whichever is greater, the cost of the Northville Public Schools’ investigation, and reasonable attorney fees, in addition to the fine. Moreover, any person who submitted a false certification shall be ineligible to bid on a request for proposal for three (3) years from the date the it is determined that the person has submitted the false certification.

By: (bidder signature)

Title: (type or print)

Date:

Subscribed and Sworn to Before Me:

This day of , 20 A.D., in and for the County of , Michigan.

My commission expires:

Acting in the County of:

Signature of Notary

Transportation Facility Page 15

BIDDER’S STATEMENT OF QUALIFICATIONS and

STATEMENT OF BID PREPARATION

All questions must be answered clearly and in a comprehensive manner on Bidder supplied answer sheets. Do not submit answers on this sheet. Any Bidder failing to answer all questions may be rejected on these grounds. It is understood that the by submitting a signed bid, the Bidder is certifying the correctness of all statements and is hereby under oath. All answer sheets that are used must have a reference to this Statement of Qualifications and/or a reference to the project or Northville Public Schools. The Bidder may submit any additional information which may be of assistance in evaluating the qualification of the Bidder. Information will only be released by Northville Public Schools following a written request.

Corporate Information

1. Name of Bidder

2a. Permanent Main Office Address, Phone Number and Fax Number 2b. Additional Offices - Number, Locations, Addresses, Phone Numbers and Fax Numbers

Corporate History

3. When was (Name of Bidder) Organized?

4. If a Corporation, where is (Name of Bidder) Incorporated?

5. How many years has (Name of Bidder) been operating under the (Name of Bidder) name?

6. How many years has (Name of Bidder) been working in the State of Michigan on underground storage tank

(UST) systems?

7a. What other names are the principals of (Name of Bidder) operating under that are associated with the UST industry?

7b. What other names have the principals of (Name of Bidder) operated under that have been associated with the UST industry?

8. Have the principals of (Name of Bidder) filed for Chapter 11 or Chapter 13 for protection of (Name of Bidder) or for any other UST related firm, company or organization, in the last five years? Describe.

Corporate Experience and References

9. Please list contracts currently on hand, including those projects which are in progress. Please provide a schedule (with actual or anticipated commencement and completion dates) and approximate gross dollar amount of each contract. Specifically highlight non-Northville Public Schools projects which will be conducted at the same time as this project.

10. Please list all specifications (Name of Bidder) is currently submitting bids for which have overlapping project dates. Please provide a schedule with anticipated commencement and completion dates.

11. Have you (Name of Bidder and other entities identified in Questions 7a and 7b answers) ever failed to complete any work awarded to you?

12. Have you (Name of Bidder and other entities identified in Questions 7a and 7b answers) ever been disqualified from bidding in Northville Public Schools?

13. Have you (Name of Bidder and other entities identified in Questions 7a and 7b answers) ever not been recommended for bid contracts when you were the low bidder in Northville Public Schools?

Transportation Facility Page 16

14. Have you (Name of Bidder and other entities identified in Question 7a and 7b answers) ever not been recommended for bid contracts when you were the low bidder on a project designed by Arch Environmental Group, Inc. (formerly The healthAIR Group, healthAIR, inc., and J. Scott Environmental, Inc.)?

15. Please list all projects (Name of Bidder) completed in Northville Public Schools in the last three (3) years.

16. Please list all projects over $15,000 completed by (Name of Bidder) in the last twelve (12) months (projects with Northville Public Schools do not need to be listed in response to this question), stating approximate gross dollar amount, and the month and year completed.

17. Please list the experience of (Name of Bidder) in work similar to this project. Project references must include: names, addresses, and phone numbers of Building Owners for whom projects were performed (minimum of four).

Corporate Compliance History

18. Please list any and all citations with or without monetary penalty received, pending, paid or disputed by

(Name of Bidder and other entities identified in Question 7a and 7b answers) during the past 3 years for failure to comply with applicable federal, state or local regulations. Describe in detail the type of citation, the reason for the citation and the ultimate disposition of same. Provide copies of all citations received in the last three (3) years and all correspondence associated with the citations.

19. Please provide the dates and results of the last on-site inspection by the Michigan Department of Licensing and Regulatory Affairs (formerly Department of Labor & Economic Growth and Consumer & Industry Services) and the Michigan Department of Environmental Quality.

20. Please list all penalties incurred through non-compliance, including projects designed by firms other than

Arch Environmental Group, Inc., including liquidated damages/penalties, overruns in scheduled time limitations and any subsequent resolutions for (Name of Bidder) in the last three (3) years.

Corporate Resources

21. Please list (Name of Bidder)’s staff size, including number of foreman (competent persons), number of workers and common sources for additional manpower. Estimated number of new hires for “peak” season may be listed with this response.

22. Please list (Name of Bidder)’s staff size, including number of foreman (competent persons), number of workers and common sources for additional manpower that will be used for this project.

23. Please list of (Name of Bidder)’s major equipment (as of the submitting of this bid) which will be available specifically for this contract. Do not provide an inventory list. The response to this question must specifically reference the equipment which will be available for this project. Please indicate the number of equipment, such as AFDs, showers, scaffolds, etc. which will be on-site for the duration of the project.

24. Please provide (Name of Bidder)’s bank references.

25. Please provide the name of the Bonding Company and the name and address of agent used for this bid.

Bidder’s Bid Preparation Information and Miscellaneous Acknowledgments

26. Did a representative of the Bidder attend the Pre-Bid Conference on Tuesday, November 02, 2021?

Transportation Facility Page 17

27. Did a representative of the Bidder conduct a field review to review the project scope of work? If yes, list the dates and times of each visit.

28. After a thorough review of the Project Summary and “Project Scope of Work/Project Schedule and Site

Availability”, did the Bidder note any project scope of work discrepancies or omissions?

29. Did a representative of the Bidder review the Project Penalties section?

30. Did a representative of the Bidder review the information regarding insurance and bonding? Does the

Bidder understand that the project cannot begin until the requested Certificate of Insurance and the Performance/Payment Bonds have been submitted and approved?

31. Does the bid provided by the Bidder contain any work scope adjustments or qualifications, such as locations of material/quantity inconsistencies or locations of omitted materials?

32. Are there any submittals that the Contractor will not be able to submit prior to the start of the project?

33. Please list all work hour restrictions that the Bidder proposes, such as days the Contractor will not work in the event of meeting the project schedule.

34. Please provide a summary of all bid limitations.

Additional Information

35. Please provide a Bidder’s Statement of Qualifications for all sub-contractors who will be used on this project. (A subcontractor does not include suppliers). Subcontractors not listed in this response will not be allowed for use on the project without the expressed written permission of Arch Environmental Group, Inc.

and Northville Public Schools.

36. Please feel free to provide any additional information which may assist Northville Public Schools and Arch

Environmental Group, Inc. with a complete and thorough evaluation of the bids.

Transportation Facility Page 18

BIDDER’S CHECKLIST FOR RFQ SUBMITTALS

This checklist is provided as a service to the Bidders to assist with complete bid submittals. The Bidder does not need to submit this checklist with the RFQ. All portions of the RFQ’s should be submitted as listed below and the entire packet must be submitted in duplicate.

From Project Specification Item Spec. Page [ ] Signed RFQ Cover Sheet 9 [ ] Completed Bidder’s Agreement and Certification and Bidder Acknowledgments 10-11 [ ] Completed and signed Bid No. 21.01 – UST System Upgrades- Northville Public Schools Transportation Facility 12 [ ] Signed and notarized Familial Relationship Disclosure Statement 13 [ ] Signed and notarized Affidavit of Compliance – Iran Sanctions Act 14 [ ] Copy of Bidder’s Statement of Qualifications and Statement of Bid Preparation 15-17

Provided By Contractor [ ] Bidder’s Response to Bidder’s Statement of Qualifications and Statement of Bid Preparation [ ] Bid Security [ ] 5% of Bid Price or 5% of Total Bid Price [ ] Treasury approved surety licensed to do business in the State of Michigan [ ] Bidder’s Proof of Insurance [ ] Any additional information submitted at discretion of Bidder

THIS PAGE DOES NOT NEED TO BE SUBMITTED.

Transportation Facility Page 19

SECTION III

PROJECT DETAILS and SCOPE OF WORK

Project Description and Site Information

Scope of Work General Project Requirements and Information

Project Schedule and Site Availability

Transportation Facility Page 20

- Bid No. 21.01 -

PROJECT DESCRIPTION and SITE INFORMATION Project Description

Bid No. 21.01 is for all labor, equipment, materials, and supplies needed to remove and temporarily relocate one (1) electronic tank monitor; connect temporary power to fuel dispenser; install one (1) new electronic tank monitor complete with new wiring, probes, and sensors; provide final power to fuel dispenser; and remove the temporary installations. Work includes, but is not limited to disconnection and removal of power and probe/sensor wiring to electronic tank monitor and to fuel dispenser; removal and salvage of electronic tank monitor for relocation; removal and proper disposal of asphalt paving, and excavation as required to install temporary conduit, power wiring, and probe/sensor wiring for electronic tank monitor and fuel dispenser; installation of temporary conduit, power wiring, and probe/sensor wiring; temporary installation of relocated electronic tank monitor; connection of probe/sensor wiring for temporary operation of monitor, and power wiring for temporary operation of fuel dispenser; start up and commissioning of systems.

Work also includes, but is not limited to removal and proper disposal of concrete/asphalt paving, and grade manholes, and excavation as required to install conduit for final probe/sensor wiring and final power wiring for fuel dispenser; installation of conduit for final power and probe/sensor wiring; installation of new electronic tank monitor in new transportation building; installation of final probe/sensor wiring and power wiring to new electronic tank monitor; installation of new emergency shut off switch; installation of final power wiring to fuel dispenser and emergency shut off switch; disconnection and removal of temporary power and probe/sensor wiring and conduit;

connection of final power to fuel dispenser, emergency shut off switch, and probe/sensor wiring to new electronic tank monitor; start up and commissioning of systems; place new grade manholes and concrete slab; dewatering as required to perform the work, including proper disposal of same; coordination of all work with the construction activities and phasing of the separate Transportation Building and site work project.

Bid alternates are for all labor, equipment, materials, and supplies needed to remove the fuel island, complete with bumper posts, fuel dispenser, and under dispenser sump; install one (1) new fuel island with two (2) new under dispenser sumps, two (2) fuel dispensers, fuel management system; rework or replace fuel supply and vent piping, and rework power and controls electrical.

Site Information

According to records, the UST system is composed of two 12,000-gallon double walled fiberglass reinforced plastic USTs (one diesel, one gasoline) manufactured by Owens Corning and installed in 1990 and 1994.The system was upgraded in 2017 to include new piping sumps, spill containment sump, sensors and sensor wiring, and emergency shut off switch.

Each tank has a fiberglass sump enclosing the tank manways, fuel delivery piping, probe risers, and electrical control conduits/connections. The fuel supply piping is double walled fiberglass reinforced plastic. The existing Veeder Root TLS-300C electronic tank monitor is located in the bus garage area of the existing transportation building, on the west face of the concrete masonry unit partition enclosing the bus garage toilet room. Existing probe, sensor, console wiring conduit extends up from monitor to the mezzanine and runs east to the east wall of the bus garage, then north along the exterior of the east wall to a transition box mounted on the north wall of the existing transportation building. The wiring runs underground from this point, northeast to the diesel tank interstitial riser port manhole, to be distributed to all the associated probes/sensors. The emergency shut off for the fueling system is currently located on the west wall of the existing support building just east of the fuel island.

The USTs are located in the driving lane of the paved bus parking lot, near the fuel dispense island and associated support building. The tanks are approximately 25’-0” apart, from 15’-0” to 35’-0” from the dispenser, and approximately 75’-0” from the northeast corner of the proposed new Transportation Building. The area over the

Transportation Facility Page 21 tanks is asphalt, with concrete pads at the piping sumps and spill containment sumps. There are two concrete pads at the gasoline tank: One at the piping sump, and one at the spill containment sump and interstitial access port.

There are two concrete pads at the diesel tank: One surrounds the piping sump and interstitial access manhole. The other surrounds the spill containment sump. Fuel is delivered via a suction supply system to a single dispenser cabinet with one hose each for gasoline and diesel fuel.

There is a concrete support building immediately east of the fuel dispense island. The emergency shut off switch is located on the west wall of the structure, facing the fuel dispense island.

Transportation Facility Page 22

SCOPE of WORK

General Scope Information This Scope of Work is intended to address all labor, equipment, materials, and supplies needed to remove and temporarily relocate the electronic tank monitor, connect temporary power to fuel dispenser, connect temporary power and probe/sensor wiring to the relocated electronic tank monitor, install one (1) new electronic tank monitor complete with new probes and sensors, and remove the temporary installations. The items listed in the Scope of Work, separately and as a whole, shall result in a complete and fully functional system that meets all applicable codes and regulations, and operates according to Northville Public Schools’ requirements. Line items listed in the Scope of Work are provided to assist with understanding of the work and are not intended to be all inclusive or specify sequencing of the work.

The work under this bid will be performed concurrent with a separate construction project to upgrade the Transportation Building and site (hereafter referred to as the Building Construction Project). The work under this bid will need to be performed in phases to facilitate the schedule of that Building Construction Project. As such, the scheduling of all work under this bid shall be coordinated with Northville Public Schools’ designated representative for that project.

Should dewatering be required to perform the work, remove and properly dispose of any groundwater and/or rainwater from excavation as needed for the duration of the project. Assume any such liquids are petroleum impacted. Liquids shall be transported off site for disposal at a licensed Class II disposal facility in accordance with local, State, and federal requirements. Transportation and disposal documentation must be provided to Arch Environmental Group, Inc.

All work related to the installation of the various components of the UST system, including but not limited to the electronic tank monitor, probes, sensors, wiring, fuel supply/vent piping, dispensers, and fuel management system shall be performed by an installer certified by the manufacturer.

For the purposes of this Scope of Work, the term “provide” shall mean “furnish and install”.

The Scope of Work separates the work under the Base Bid into four parts: Work related to the temporary relocation of the electronic tank monitor; work related to providing temporary power to the fuel dispenser; work related to the installation of the new tank monitor; and work related to providing final power to the fuel dispenser and relocation of the emergency stop switch. Some of the work described in these parts may be performed concurrently if determined to be acceptable by Northville Public Schools’ designated representative. Additional work described as Bid Alternates relates to provision of a new fuel island, dispensers and fuel management system, and reworking/replacing fuel supply/vent piping.

All wiring for probes, sensors, and controls, and installation of same shall meet the specifications of the manufacturer of the components.

Provide all sump penetration fittings/boots for fuel supply piping and conduit. Piping and conduit shall be installed such that penetration is perpendicular to the sump wall in both the horizontal and vertical planes. At no time shall the penetration exceed the angle specified by the sump/boot/fitting manufacturers. The first electrical fitting within sumps shall be a seal off, regardless of whether it is required by code, unless specifically prohibited by code.

Provide all electrical fittings, boxes, covers, seal-offs, couplings, conduit, wiring, connectors, and all other materials required to result in a fully functioning system, meeting all required codes and regulations.

All manholes shall be installed centered over all components located therein, and at such an elevation that the manhole cover does not impact said components. Manholes shall be level.

All metal fuel supply piping and fittings shall be schedule 40 black pipe.

Transportation Facility Page 23

The following is intended to specify certain components of the new UST system. The list is not intended to be all inclusive. The Contractor shall be responsible for providing all components and materials required to result in a complete installation.

Electronic tank monitor and leak detection system:

Veeder Root TLS 4, with printer, magnetostrictive probes for 0.1 GPH leak detection, complete with floats, software, including CSLD leak detection, and all materials and accessories required to result in a complete installation.

Piping sump manholes:

OPW 42” composite, or approved equal.

Manholes:

EBW 18” with steel lid, or approved equal.

Under Dispenser Sumps:

Single wall fiberglass reinforced plastic. Poly sumps are not acceptable.

Piping:

For scope requiring reworking of existing piping, 2” double wall fiberglass reinforced plastic. For

Alternate No. 1B, piping may be 2” double wall fiberglass reinforced plastic or double wall flexible plastic by OPW Flexworks.

Dispensers:

Gasboy Atlas 9153K series high flow mechanical, for suction system. Stainless steel cabinet, painted locking panel doors, high hose retrievers. Single hose for gasoline system (9153K) , double hose and two pumps on diesel (9153KTW1M). Configured with interfaces to work with selected fuel management system, and complete with hoses, nozzles, swivels, breakaways and all hardware for a complete and functioning installation.

Fuel Management System:

Complete with key controls and components to interface with fuel dispensers. Provide 100 keys.

Base Bid (Electronic Tank Monitor Upgrade)

A. Temporary Relocation/Installation of Electronic Tank Monitor:

A1. Identify, procure, and produce all required permits, approvals, and plans for the work. Copies of all permits, approvals, and plans must be provided to Arch Environmental Group, Inc. prior to the commencement of work activities. Additional information on permitting and planning is provided in the General Project Requirements and Information section.

A2. Prior to the start of any work activities, arrange for and assure the compete disconnection of all existing above ground and underground utilities in the area of excavation. Such disconnection shall include line and low voltage electrical to the fueling systems, including the dispenser and electronic tank monitor. In accordance with applicable State laws, the Contractor must contact Miss Dig via phone at 811 or online at misdig.org to locate and mark all underground utilities. Above ground utilities that are disconnected must be removed prior to excavation activities. Disconnected underground utilities may be removed as they are encountered during excavation. Northville Public Schools has limited information regarding underground utilities in the work area. It is the Contractor’s sole responsibility to locate, disconnect, and remove affected utilities, and all associated costs must be included in the submitted bid. All work on utilities shall be coordinated with Northville Public Schools’ designated representative for the Building Construction Project.

Transportation Facility Page 24

A3. Disconnect, remove, and salvage electronic tank monitor for relocation.

A4. Disconnect, remove and properly dispose of probe/sensor wiring from electronic tank monitor to junction box at diesel tank interstitial riser manhole. Cut all probe/sensor wires in junction box to allow for spliced connections to wiring from temporary location of electronic tank monitor.

A5. Install salvaged monitor on interior wall of support structure adjacent to fuel island.

A6. Install conduit from electrical panel (by others) in support structure to tank monitor for monitor power.

A7. Install conduit from monitor through the west wall of support structure, and down to grade for probe/sensor wiring.

A8. Saw cut asphalt paving as required to install probe/sensor wiring in saw cut(s) from support structure to concrete pad surrounding diesel tank interstitial riser manhole. Extend saw cut(s) into concrete to interstitial manhole

A9. Break up, remove, and properly dispose of asphalt.

A10. Install probe/sensor wire from electronic tank monitor to manhole, inserting wire in saw cut(s).

A11. Extend wire into junction box in manhole and make connections to all probes/sensors.

A12. Make probe/sensor wiring connections in monitor.

A13. Make electrical power connections in monitor.

A14. Power up and test function of monitor.

A15. Provide sealant in sawcut(s).

B. Temporary Power for Fuel Dispenser:

B1. Remove electrical wiring from Transportation Building to fuel island and to emergency stop switch.

B2. Disconnect fuel supply lines and drain fuel into containers for return to fuel tanks.

B3. Disconnect electrical wiring/conduit as necessary to remove dispenser.

B4. Remove dispenser and set aside for reinstallation.

B5. Saw cut asphalt from east wall of support structure to fuel island.

B6. Break up, remove, and properly dispose of asphalt.

B7. Excavate sub grade to 1’-6” below paving.

B8. Provide conduit from electrical panel (by others) in support structure to under-dispenser containment sump and extend into sump. Provide penetration boot at sump.

B9. Rework conduit in dispenser as required and connect to new conduit from support structure.

B10. Provide conduit from emergency stop switch as necessary to incorporate switch into dispenser power.