This document is a Request for Qualifications (RFQ) for a Task Order under the VISN 8 Architectural and Engineering (AE) Multiple Award Task Order Contract (MATOC) to provide design services for replacing the emergency generators, controls, and fuel polishing system at the C.W. Bill Young VA Medical Center in Bay Pines, Florida.
The key details are: the project involves replacing 600 kW generators, day tanks, controls, batteries, chargers, feeders, and paralleling switchgear, as well as the diesel fuel polishing system. The AE firm must have specialized experience in emergency power systems, fuel polishing, and working in healthcare facilities. The interview questions focus on resolving construction issues, overcoming design challenges in healthcare facilities, and experience with HEFP design reviews. The project is estimated between $5-10 million and has a 224-calendar day period of performance. The procurement is 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. The submission is due September 16, 2024. After the most qualified firm is identified, they will be asked to provide pricing, and negotiations may commence.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Floor Plan 1-page.pdf | ||
| Architectural Plan 1-page.pdf | ||
| 36C24824R0155.docx | DOCX document | |
| SOW 08-19-2024 88-Pages.docx | DOCX document | |
| Campus Map 1-page.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The following AE interview questions evaluation criteria are provided, in order of most importance, and will also be used in the evaluation of AE firms:
1. Provide one or more experiences that required your technical assistance to resolve a problem during the construction of emergency and essential electrical power distribution systems, power generation fuel delivery systems. Explain any use of software simulation.
2. Considering the critical systems in a healthcare facility, what was the most difficult condition to overcome for emergency power supply, essential electrical branch, and/or fuel polishing design?
3. What are your experiences with design reviews from the Healthcare Environment Facilities Program (HEFP) level?