AE 11-01 - THIRD FLOOR REFLECTED CEILING PLAN - OVERALL.pdf

PDF 931 KB Posted

Attached to
6530--Ward 1B Ceiling Lift Procurement Federal contract opportunity
Solicitation number
36C24924Q0337
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9

About this file

This document is a Request for Quote (RFQ) for the procurement of ceiling lift equipment for Ward 1B at a Department of Veterans Affairs (VA) facility. The VA is seeking commercial products and services for this requirement, which is set aside for small businesses. The solicitation number is 36C24924Q0337 and it is being issued as a combined synopsis/solicitation. Interested vendors must submit a completed solicitation document along with their quote by the due date. A site visit is highly encouraged but not mandatory. The RFQ provides details on the required submission format, pricing, and terms and conditions. Vendors must indicate whether they accept the stated terms and conditions or propose any exceptions. Any questions must be submitted to the Contracting Officer's Representative at least two business days before the offer due date.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HIGH BAY

LIGHT FIXTURE

DOWNLIGHT

DOWNLIGHT

RECESSED

EXIT LIGHT

SINGLE FACE

S

D

SPEAKER

WALL MOUNTED

LIGHT FIXTURE

EXIT LIGHT

DOUBLE FACE

SMOKE DETECTOR

LINEAR LIGHTING

CEILING MATERIAL LEGEND:

CEILING FIXTURES LEGEND:

2x2 LIGHT FIXTURE - RECESSED, SUSPENDED OR SURFACE MOUNTED

2x4 LIGHT FIXTURE - RECESSED, SUSPENDED OR SURFACE MOUNTED

1x4 LIGHT FIXTURE - RECESSED, SUSPENDED OR SURFACE MOUNTED

SUPPLY GRILLE

RETURN GRILLE

EXHAUST GRILLE

GYPSUM

BOARD

2 X 2

ACT

EXPOSED

STRUCTURE

TYP

EQ

TYP

EQ

T Y

P

E Q

T Y

P

E Q

ACCESS PANEL

T Y

P

IC

A L

E Q

U

N O

E Q

TYPICAL

EQ

- UNO

EQ

CEILING FIXTURE MOUNTING:

BARI. TLT.

B355A

BARI PRIVATE

ROOM

B355 PRIVATE ROOM

B354

PRIVATE ROOM

B353

PAT. TLT.

B353A

PAT. TLT.

B354A

NOURISHMENT

B356

CORRIDOR

B374

CORRIDOR

B370

CORRIDOR

B300

CORRIDOR

B300

CHAIR ALCOVE

B305

STAFF LOCKERS

B304B

STAFF LOUNGE

B304

STAFF TLT.

B304A

INPATIENT

REHAB

B303

SOCIAL WORKER

B302

EQUIP STORAGE

B301

CLEAN SUPPLY

B363

LAUNDRY

B359

RETHERM

B361

DIRTY

B362

DINING/DAY

ROOM

B337

PANTRY

B338A

TEAM WORK

B341

CLEAN LINEN

B351

SOILED HOLD

B352

CLEAN UTILITY

B346

ISO ROOM

B347

PRIVATE ROOM

B348

PRIVATE ROOM

B349

ANTE

B347A

ELEC.

B344

EQUIP STOR.

B343

STAFF TLT.

B358A

SUB NS.

B358

HAC

B357

NURSE STATION

B336

CHARGE NURSE

B336A

MEDS

B336B

DATA

B335

COMM

B334

NURSE

MANAGER

B333

TEAM ROOM

B332

FAM/PUB. TLT.

B308

REC.THR. STOR.

B309

CONSULT

B310FAM. LOUNGE

B307

PRIVATE ROOM

B331

PRIVATE ROOM

B330

PAT. TLT.

B330A

PAT. TLT.

B331A

TEAM WORK

ROOM

B329

WOUND CART

STOR.

B311B

SUB N.S.

B311

ST. TLT.

B311A

EMPTY CYL.

STOR.

B317

CLEAN LINEN

B318

PRIVATE ROOM

B315

PRIVATE ROOM

B314

BARI PRIVATE

ROOM

B313

BARIATRIC

PATIENT TOILET

B313A

NOURISH

B312

PAT. TLT.

B314A

PAT. TLT.

B315A

SOILED HOLD

B327

HAC.

B325

ELEC.

B326

CLEAN UTILITY

B320

ISO ROOM

B321

PRIVATE ROOM

B322

PAT. TLT.

B322A

PAT. TLT.

B321B

ANTE

B321A

SERVING

KITCHEN

B338

PRIVATE ROOM

B340

PRIVATE ROOM

B339

DN DN

DN UP

PRIVATE ROOM

B323

PRIVATE ROOM

B324

PAT. TLT.

B324A

PAT. TLT.

B323A

CORRIDOR

B373

PAT. TLT.

B339A

PAT. TLT.

B340A

PAT. TLT.

B348A

PAT. TLT.

B347B

PRIVATE ROOM

B350 PAT. TLT.

B350A

PAT. TLT.

B349A

CORRIDOR

B376

AREA NOT IN SCOPE

HATCH LEGEND

12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554

©Copyright 2019

TLC No.:

www.tlc-engineers.com

118626

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

PROJECT TEAM:

Office of

Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

KEYPLAN

MURFREESBORO, TN

615.370.8500

615.370.8530 hfrdesign.com

214 Centerview Drive Suite 300 Brentwood, TN 37027

BLDG 2

BLDG 1

BLDG 9

Phase

FULLY SPRINKLERED

C U s e rs \a tr a y lo r\ D o c u m e n ts

\M b o ro V

A W a rd b

R e n o a tr a y lo r2 X

N D

H .r v t

/1

/2

:2

:0

P

M

04-14-2023

626A4-19-101

AE 11.01

AE RENOVATE WARD 1B

THIRD FLOOR REFLECTED CEILING PLAN -

OVERALL

AT/MC

HFR Project No: 2019056

100% CONSTRUCTION

DOCUMENTS

2. WHERE NEW CEILINGS ARE INDICATED, REMOVE ALL EXISTING CEILINGS TO ALLOW FOR PROPER INSTALLATION OF NEW CEILINGS. PATCH & REPAIR EXISTING WALLS AS REQUIRED TO INSTALL NEW

FINISHES.

1. REPAIR EXISTING CEILING GRID AND TILES AS NECESSARY AT CONSTRUCTION TIE-INS.

RENOVATION WORK

11. ALL PATIENT TOILETS TO RECEIVE MOISTURE RESISTANT CEILING TILES AND GRID.

10. PAINT INTERIOR SURFACES OF AIR DUCTS AND CONVECTOR / BASEBOARD HEATING CABINETS THAT

ARE VISIBLE THROUGH GRILLES AND LOUVERS WITH ONE COAT OF FLAT BLACK PAINT, FOR A

MINIMUM OF 1'-6" OR BEYOND SIGHT LINE, WHICHEVER IS GREATER. PAINT DAMPERS EXPOSED...

9. INSTALL CEILINGS IN ALL ROOMS AS SHOWN ON THE REFLECTED CEILING PLAN AND AS INDICATED

ON THE FINISH PLAN TO RECEIVE NEW CEILINGS.

8. ACCESS PANELS: PROVIDE ALLOWANCE FOR (2) 24" X 24" ACCESS PANELS IN EACH HARD CEILING

LOCATION IN ADDITION TO THOSE SHOWN ON THE DRAWINGS. CREDIT UNUSED ACCESS PANEL

MONIES BACK TO OWNER AT PROJECT CLOSEOUT. PROVIDE ACCESS PANELS WHERE REQUIRED

FOR TEST VALVES, CONTROLS, AND ABOVE CEILING MAINTENANCE THAT MEET THE RATING OF THE

ASSEMBLY IN WHICH THEY ARE INSTALLED.

7. CENTER EXIT SIGNS OVER EXIT DOORS (U.N.O.)

6. CENTER LIGHT FIXTURES, DEVICES AND SPRINKLER HEADS IN CEILING TILES.

5. CENTER CEILING GRIDS IN BOTH DIRECTIONS OF SPACE (U.N.O.)

4. CEILING MATERIALS ARE AS SHOWN. REFER TO INTERIORS PLAN FOR SPECIFICS REGARDING

TYPES OF FINISHES.

● MECHANICAL ITEMS LESS THAN 20 POUNDS MAY BE ATTACHED TO GRID.

● FOR LIGHT FIXTURES AND MECHANICAL ITEMS WITH A COMBINED WEIGHT GREATER THAN 56

POUNDS, ATTACH SEPARATE WIRES (4 MINIMUM) TO INDEPENDENTLY SUPPORT FIXTURES

FROM STRUCTURE. DO NOT INSTALL FIXTURES SUCH THAT SUPPORT FOR FIXTURES COMES

FROM CEILING GRID.

● FOR LIGHT FIXTURES, MECHANICAL ITEMS AND ATTACHMENTS WITH A COMBINED WEIGHT OF

56 POUNDS OR LESS, PROVIDE POSITIVE ATTACHMENT WITH TWO DEVICES PLUS TWO SLACK

WIRES AT DIAGONAL CORNERS.

3. SAFETY WIRES FOR LIGHTING, MPE, AND OTHER ITEMS:

2. HANG SUSPENSION SYSTEM INDEPENDENTLY OF WALLS, COLUMNS, DUCTS, PIPES AND CONDUIT.

WHERE CARRYING MEMBERS ARE SPLICED, AVOID VISIBLE DISPLACEMENT OF THE LONGITUDINAL

AXIS OR FACE PLANE OF ADJACENT MEMBERS.

1. COORDINATE ABOVE CEILING DUCTWORK, PIPES, ETC. TO MEET CEILING HEIGHTS AS SHOWN ON

DRAWINGS. REMOVE EXISTING CEILINGS INDICATED TO REMAIN TO ALLOW FOR PROPER

INSTALLATION OF ABOVE CEILING MPE WORK AND REINSTALL WHEN WORK IS COMPLETE.

ALL WORK

GENERAL CEILING NOTES

3/32" = 1'-0"

1 THIRD FLOOR OVERALL - RCP

0 5' 10'

No. Date Description

Sheets
AD 01.01 - THIRD FLOOR DEMOLITION PLAN - OVERALL
AE 01.00 - SECOND FLOOR PLAN AND REFLECTED CEILING PLAN
AE 01.01 - FOURTH FLOOR/ATTIC PLAN
AE 01.03 - THIRD FLOOR OVERALL PLAN
AE 01.11 - PARTIAL THIRD FLOOR PLAN - PART A NOTED
AE 01.12 - PARTIAL THIRD FLOOR PLAN - PART B NOTED
AE 01.13 - PARTIAL THIRD FLOOR PLAN - PART C NOTED
AE 01.14 - PARTIAL THIRD FLOOR PLAN - PART A DIMENSIONED
AE 01.15 - PARTIAL THIRD FLOOR PLAN - PART B DIMENSIONED
AE 01.16 - PARTIAL THIRD FLOOR PLAN - PART C DIMENSIONED
AE 02.01 - ENLARGED PLANS AND REFLECTED CEILING PLANS
AE 02.02 - ENLARGED PLANS AND REFLECTED CEILING PLANS
AE 02.03 - ENLARGED TOILET PLANS AND ELEVATIONS
AE 03.01 - DOOR ELEVATIONS, SCHEDULE, & NOTES
AE 03.02 - DOOR DETAILS
AE 03.03 - WINDOW DETAILS
AE 08.01 - MISC. DETAILS
AE 08.02 - MISC. DETAILS
AE 08.03 - MISC. DETAILS
AE 08.04 - MISC. DETAILS
AE 08.05 - MISC. INTERIOR DETAILS
AE 08.06 - MISC CEILING DETAILS
AE 09.01 - INTERIOR ELEVATIONS
AE 09.02 - INTERIOR ELEVATIONS
AE 09.03 - CORRIDOR ELEVATIONS
AE 09.04 - CORRIDOR ELEVATIONS
AE 09.05 - 3D VIEWS
AE 10.01 - CASEWORK SECTIONS AND DETAILS
AE 10.02 - CASEWORK SECTIONS AND DETAILS
AE 11.01 - THIRD FLOOR REFLECTED CEILING PLAN - OVERALL
AE 11.10 - THIRD FLOOR RCP - PART A
AE 11.11 - THIRD FLOOR RCP - PART B
AE 11.12 - THIRD FLOOR RCP - PART C
AE 12.01A - EQUIPMENT PLANS
AE 12.01B - EQUIPMENT PLANS
AE 12.01C - EQUIPMENT PLANS
AE 12.02 - EQUIPMENT PLANS - PATIENT ROOMS AREA B
AE 12.02B - EQUIPMENT PLANS - PATIENT ROOMS AREA C
GI 00.01 - COVER SHEET
GI 01.01 - GENERAL DATA
GI 01.02 - CONSTRUCTION STAGING PLAN
GI 01.10 - WALL TYPE DETAILS
GI 01.20 - ACCESSIBILITY DETAILS
GI 02.01 - THIRD FLOOR LIFE SAFETY PLAN - OVERALL
GI 03.01 - SECOND FLOOR ICRA PLAN
GI 03.02 - THIRD FLOOR ICRA PLAN
GI 04.01 - ACM DUCT WORK AND ACM PIPE INSULATION
GI 04.02 - LEAD PAINT AND TRANSITE PANELS
GI 05.01 - PHASING PLANS
IN 01.00 - THIRD FLOOR FINISH LEGEND
IN 01.02 - PARTIAL THIRD FLOOR FINISH PLAN - PART A
IN 01.03 - PARTIAL THIRD FLOOR FINISH PLAN - PART B
IN 01.04 - PARTIAL THIRD FLOOR FINISH PLAN - PART C
IN 01.05 - THIRD FLOOR PATTERN PLAN OVERALL
IN 01.06 - PARTIAL THIRD FLOOR PATTERN - PART A
IN 01.07 - PARTIAL THIRD FLOOR PATTERN - PART B
IN 01.08 - PARTIAL THIRD FLOOR PATTERN - PART C
IN 02.00 - THIRD FLOOR SIGNAGE LEGEND
IN 02.01 - THIRD FLOOR SIGNAGE SCHEDULE
IN 02.02 - PARTIAL THIRD FLOOR SIGNAGE PLAN - PART A
IN 02.03 - PARTIAL THIRD FLOOR SIGNAGE PLAN - PART B
IN 02.04 - PARTIAL THIRD FLOOR SIGNAGE PLAN - PART C
VN 01.00 - PATIENT LIFT VENDOR DRAWINGS

File details come from the government source that posted it. Updated .