ADVERTISEMENT TO BID_GP to NH Interconnect.docx

DOCX document 14 KB Posted

Attached to
Grove Pointe-Nelson Hill Interconnection
Solicitation number
PE-69200-NONST-2025-000000020
Issued by
Liberty County, Georgia

About this file

This document is an Advertisement to Bid for the Grove Pointe - Nelson Hill Watermain Interconnection project issued by Lowndes County, Georgia. The proposed project involves the installation of 625 LF of 8" PVC watermain to interconnect the Grove Pointe and Nelson Hill water distribution lines. The contract time is 180 calendar days. The bid documents can be obtained from the Lowndes County website or viewed at the Lowndes County Utilities office. A mandatory pre-bid meeting will be held on September 3rd, 2024 at 11:00 a.m. Lowndes County will receive sealed bids for this project until September 19, 2024 at 11:00 a.m. in the Lowndes County Administration Building, where the bids will be publicly opened and read. A 5% bid bond is required, and all bidders must be licensed underground utility contractors in the State of Georgia.

The Advertisement does not provide details on pricing terms, set asides, incumbents, funding requirements or sources, or any other salient information beyond the project details and bid submission requirements.

View the file

Other files

File Type Posted
GPNH WATERMAIN EXT.pdf PDF
GP to NH WM Interconnect Bid Document.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADVERTISEMENT TO BID

Lowndes County is accepting bids for

GROVE POINTE - NELSON HILL WATERMAIN INTERCONNECTION

The proposed project includes the installation of a ±625 LF 8” PVC Watermain interconnecting the Grove Pointe and Nelson Hill water distribution lines.

The contract time is 180 calendar days. The Bid Documents may be viewed at the Lowndes County Utilities office, 327 N. Ashley Street, Valdosta, Georgia on the 1st floor of the Administration building and a pdf copy of the bid documents can be obtained from the Lowndes County website.

There will be a mandatory pre-bid meeting on September 3rd, 2024 at 11:00 a.m., on the 1st Floor, Utilities Department Conference Room of the Lowndes County Administration Building, 327 N. Ashley Street.

Lowndes County will receive sealed proposals on this project until September 19, 2024 at 11:00 a.m., in the Lowndes County Administration Building, 1st Floor, Utilities Department Conference Room, located at 327 N. Ashley Street, Valdosta, Georgia 31601, (229-671-2500) where at such time and place the proposals will be publicly opened and read. A 5% bid bond is required.

All Bidders shall be licensed underground utility contractors in the State of Georgia.

Run in Valdosta Daily Times August 16 and August 30

File details come from the government source that posted it. Updated .