Advertisement.pdf

PDF 78 KB Posted

Attached to
751/19133. TAP Werner Creek Crossing - Remove/Replace Bridge
Solicitation number
RFQ - 171 - 200000000203
Issued by
Houghton County, Holly Village, Michigan

About this file

This document is a project advertisement from the Michigan Department of Technology, Management and Budget State Facilities Administration Design & Construction Division for the removal and replacement of the Werner Creek Crossing bridge located on US-41 and Diffin Road in Alger County, Michigan. The project includes the removal of the existing rail car/timber bridge and replacement with a new bridge, including concrete abutment repairs, approaches, embankment, and other associated work. The bid is due on April 29, 2020 at 2:00 p.m. local time. A mandatory walkthrough inspection is scheduled for April 15, 2020 at 2:00 p.m. local time. Questions will be accepted until April 22, 2020 at 5:00 p.m. local time. The project is funded by the State of Michigan and is located within the jurisdictions of Houghton County and Holly Village.

The bid requires 5% bid security. The project involves NIGP codes 90976, 91200, 91244, 91223, 91313, and 91366. Bidders must upload all bid attachments to the SIGMA VSS system, as hard copies will not be accepted. Emailed submissions require prior approval from the DCD Contracting Section Manager and will be handled on a case-by-case basis.

View the file

Other files

File Type Posted
DCSpec.pdf PDF
Addendum No. 1.pdf PDF
Drawings.pdf PDF
Addendum No. 2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0415 (R 6/16)

PROJECT ADVERTISEMENT

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE FACILITIES ADMINISTRATION

DESIGN & CONSTRUCTION DIVISION

This form is required for the advertisement of all construction projects. (1984 PA 431)

TO:

DESIGN & CONSTRUCTION DIVISION

DATE

March 2, 2020

FROM:

U.P. Engineers & Architects, Inc.

PROJECT MANAGER

Tom Pawlowski

DTMB FILE NUMBER

751/19133.TAP

INDEX NUMBER

ADVERTISEMENT DATE

March 2, 2020

ELECTRONIC BID DUE DATE

April 29, 2020 @ 2:00 p.m. local time

PROJECT NAME AND LOCATION (INCLUDE STREET ADDRESS)

Werner Creek Crossing GPS Coordinates: Lat 46.1666 – Lon-87.0675

WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION

US-41 and Diffin Road, Alger County, MI on April 15, 2020 at 2:00 p.m. Local Time.

Mandatory Yes X No

LEIN CHECK (Dept. of Corrections ONLY) to (name of contact) at (name of facility), (phone number) no later than 12:00 p.m.

on the 3 rd day prior to the scheduled Walk-Through. Please include in your request, the project name and date, time and place of the Pre Bid Walkthrough.

NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through.

DESCRIPTION OF WORK:

Removal of the rail car/timber bridge and replacement with a new bridge including concrete abutment repairs, approaches and embankment and other details per the drawings and specifications.

5% Bid Security:

X

Required

Not Required

NIGP CODES: 90976, 91200, 91244, 91223, 91313, 91366

ACCEPTING QUESTIONS UNTIL: By 5:00 p.m. local time on Wednesday, April 22, 2020.

Documents may be obtained from:

https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService

PSC/Agency: U.P. Engineers & Architects, Inc.

Address: 707 Ashmun Street, Sault Ste. Marie, MI 49783

Phone: 906-635-0511

Email: jgagnon@upea.com

Fax: 906-635-0612