This document is an Addendum No. 2 issued by the State of Michigan Department of Technology, Management and Budget for the Werner Creek Crossing - Bridge Replacement project in Lansing, Michigan. The addendum suspends the pre-bid meeting scheduled for May 7, 2020 and the bid opening date of May 20, 2020. The project is anticipated to be re-advertised at a future date once agency funds are re-established as the state budget allows. Acknowledgment of Addendum No. 1 and Addendum No. 2 will not be required when the project is re-advertised.
The related state and local contract opportunity is for the removal and replacement of a bridge located in Houghton County and Holly Village, Michigan. All questions should be directed to the project engineer, and bid attachments must be uploaded to the state's SIGMA VSS system. Emailed submissions will only be accepted with prior approval on a case-by-case basis.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DCSpec.pdf | ||
| Advertisement.pdf | ||
| Addendum No. 1.pdf | ||
| Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DMB-406 (R 0/17)
STATE OF MICHIGAN Date Issued: April 22, 2020 Department of Technology, Management and Budget Index No(s): 7631 State Facilities Administration File No: 751/19133.TAP 3111 W. St Joseph St. Lansing, MI 48917 Department: Natural Resources P.O. Box 30026 Project Name: Werner Creek Crossing - Lansing, Michigan 48909 Bridge Replacement Subject: Suspend PreBid Meeting and Bidding Bid Opening Date: May 20, 2020
PRE-BID ADDENDUM NO. 2
TO: All Bidders
SUBJECT: Revision to Bid Documents
INTENT: This Addendum is issued to incorporate the item provided below into the Bidding/Construction Contract
Documents dated March 2020 for the Project named above.
Item 1 – The request and advertisement for bids is hereby indefinitely suspended. The mandatory PreBid Conference to be held on May 7, 2020 and the Bid Openning Date of May 20, 2020 are therefore cancelled at this time. The project is anticipated to be re-advertised at a future date once agency funds are re-established as the SOM Budget allows. Upon readvertisement, acknowledgement of Addendum No. 1 issued March 31, 2020 by UPEA and this Addendum No. 2 for this first bid letting will not be requrired.
Here ends Post-Bid Addendum No. 2.
ACKNOWLEDGEMENT: One copy of this Addendum, properly signed in the space provided below, must be acknowledged and returned for submission of a valid bid. The changes and information shall become part of the contract documents. (Authority: 1984 PA 431)
Firm Name
Bidder’s Signature and Title Date
Sincerely, Tom Pawlowski, Project Director DTMB - State Facilities Administration Design and Construction Division
Lansing, Michigan 48909 Bridge Replacement