Advertisement.pdf
PDF 78 KB Posted
- Solicitation number
- RFQ - 171 - 200000000205
- Issued by
- Houghton County, Holly Village, Michigan
About this file
This document is a project advertisement for the Culhane Creek Crossing bridge replacement project in Houghton County, Michigan. The project involves the removal of an existing timber bridge and replacement with a concrete box culvert, including approaches and embankment. The bid is due on April 29, 2020 at 2:00 p.m. local time. A mandatory walk-through inspection is scheduled for April 16, 2020 at 11:00 a.m. local time at the Natural Resources Newberry Office. Questions will be accepted until April 22, 2020 by 5:00 p.m. local time. The project is being managed by U.P. Engineers & Architects, Inc. on behalf of the Michigan Department of Technology, Management and Budget State Facilities Administration Design & Construction Division.
The project requires a 5% bid security. The awarded contract will be for the completion of the bridge replacement, including all associated work per the drawings and specifications. No additional pricing terms, set asides, incumbent information, or funding details are provided in the advertisement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DCSpec.pdf | ||
| Addendum No. 2.pdf | ||
| Addendum No. 1.pdf | ||
| Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0415 (R 6/16)
PROJECT ADVERTISEMENT
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN & CONSTRUCTION DIVISION
This form is required for the advertisement of all construction projects. (1984 PA 431)
TO:
DESIGN & CONSTRUCTION DIVISION
DATE
March 2, 2020
FROM:
U.P. Engineers & Architects, Inc.
PROJECT MANAGER
Tom Pawlowski
DTMB FILE NUMBER
751/18305.TAP
INDEX NUMBER
ADVERTISEMENT DATE
March 2, 2020
ELECTRONIC BID DUE DATE
April 29, 2020 @ 2:00 p.m. local time
PROJECT NAME AND LOCATION (INCLUDE STREET ADDRESS)
Culhane Creek Crossing GPS Coordinates: N46º41.243’ – W85º20.670’ (WGS84)
WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION
Natural Resources Newberry Office, 5666 M-123, Newberry, MI 49868, on April 16, 2020 at 11:00 a.m. Local Time.
Mandatory Yes X No
LEIN CHECK (Dept. of Corrections ONLY) to (name of contact) at (name of facility), (phone number) no later than 12:00 p.m.
on the 3 rd day prior to the scheduled Walk-Through. Please include in your request, the project name and date, time and place of the Pre Bid Walkthrough.
NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through.
DESCRIPTION OF WORK:
Removal of an existing timber bridge and replacement with a concrete box culvert including approaches and embankment and other details per the drawings and specifications.
5% Bid Security:
X
Required
Not Required
NIGP CODES: 90976, 91200, 91244, 91223, 91313, 91366
ACCEPTING QUESTIONS UNTIL: By 5:00 p.m. local time on Wednesday, April 22, 2020.
Documents may be obtained from:
https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService
PSC/Agency: U.P. Engineers & Architects, Inc.
Address: 707 Ashmun Street, Sault Ste. Marie, MI 49783
Phone: 906-635-0511
Email: jgagnon@upea.com
Fax: 906-635-0612