Addendum No. 1.pdf
PDF 158 KB Posted
- Solicitation number
- RFQ - 171 - 200000000205
- Issued by
- Houghton County, Holly Village, Michigan
About this file
This document is an Addendum No. 1 issued by U.P. Engineers & Architects, Inc. on March 31, 2020 for the Culhane Creek Crossing project in Luce County, Michigan. The addendum changes the bid opening date to May 20, 2020 at 2:00 p.m. local time and announces a mandatory pre-bid conference on May 8, 2020 at 11:00 a.m. local time, followed by a site tour. The project is referenced as File No. 751/18305.TAP, Index No. 7301, with GPS coordinates N46o41.243' - W85o20.670' (WGS84).
The contract opportunity is for the Culhane Creek Crossing bridge replacement project in Houghton County and Holly Village, Michigan. Bid submissions must be uploaded to SIGMA VSS, and questions should be emailed to the designated contact at U.P. Engineers & Architects, Inc. Individual bid attachments cannot exceed 6 mb in size. Vendors are advised to keep the office apprised of any SIGMA VSS issues and include their SIGMA ticket number when communicating.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DCSpec.pdf | ||
| Advertisement.pdf | ||
| Addendum No. 2.pdf | ||
| Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
707 Ashmun Street Sault Ste. Marie, MI 49783
906-635-0511 • 800-867-0511 • Fax: 906-635-0612
Offices also in:
Houghton
Iron Mountain Ishpeming Marinette
U.P. Engineers & Architects, Inc.
www.UPEA.com
[M12-19330]
ADDENDUM NO. 1
TO THE
CULHANE CREEK CROSSING
LUCE COUNTY
ADDENDUM NO. 1 is issued March 31, 2020 to clarify, modify, and/or change the original plans and specifications issued by UP Engineers and Architects. This ADDENDUM NO. 1 is hereby made part of the Contract Documents for the contract noted below.
File No. 751/18305.TAP, Index No. 7301, Culhane Creek Crossing, GPS Coordinates: N46º41.243’ – W85º20.670’ (WGS84)
Please acknowledge receipt of this ADDENDUM NO. 1 on the appropriate blank on the Bid Form and also include this addendum with the bid package.
Specifications:
1. BID SUMMARY – BID OPENING DATE is changed to May 20, 2020 at 2:00 p.m.
Local Time.
2. SECTION 00010 PRE-BID INFORMATION – Pre-Bid Conference A mandatory pre-bid conference will be held at Natural Resources Newberry Office, 5666 M-123, Newberry, MI 49868, on May 8, 2020 at 11:00 a.m. Local Time. A tour will be held on the same day, starting at 11:00 a.m. local time. All prospective Bidders are required to attend the tour, if held. Other parties interested in the Work are encouraged to attend the tour. Addenda may be issued, in response to issues raised at the pre-bid conference and tour, or as the Owner and/or Professional may otherwise consider necessary.
END OF ADDENDUM NO. 1
Prepared by:
U.P. Engineers & Architects, Inc
File details come from the government source that posted it. Updated .