Administrative Record - McConnell.xlsx
XLSX spreadsheet 1 MB Posted
- Attached to
- Optimized Remediation Contract at McConnell Air Force Base, KS - Sources Sought - Question & Answer
- Solicitation number
- FA8903-22-RFI-ORC_MCCONNELL_AFB
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Draft PWS - McConnell AFB ORC.pdf | ||
| Q_A - Sources Sought - McConell.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 1
| Installation Name | AR File | Document Date | Subject/Title | Author | Author Affiliation | Recipient | Recipient Affiliation | Site # | ROD Docs | Image Number |
| McConnell AFB, KS | 1 | Jan/04/2013 | URS Responses to KDHE Comments Draft SS01 September 2012 Long-Term Groundwater and Treatment System Monitoring Annual Report | McConnell AFB | SS-01 | AR-3936.pdf | ||||
| McConnell AFB, KS | 10 | Sep/26/1988 | Contractor Letter to Base Concerning Drawings for UST Removal at Base and SHWR | Skrypczuk, Oleh, LtCol | 384 CES/CC | Rumbo, James E | Engineering-Science, Inc. | ST-17 | AR-10.pdf | |
| McConnell AFB, KS | 100 | May/18/1993 | KDHE Letter to Base Transmitting Review Comments on Draft Work Plan, Sampling and Analysis Plan for Nine Sites | Brown, Randolph L | Kansas Department of Health and Environment | Imes, Vernon W | 384 CES/CEVR | SS-01 | AR-100.pdf | |
| McConnell AFB, KS | 1000 | Mar/21/2007 | Notice of Site Investigation Activities at Titan II Missile Site 16 | Shirk, Ryan | Tetra Tech, Inc. | Thissen, Pat | Owner Titan II Site 16 | SS-28 | AR-1000.pdf | |
| McConnell AFB, KS | 10000 | Oct/15/2018 | F I N A L |
FT007
GROUNDWATER MONITORING ANNUAL
| REPORT – SEPTEMBER 2017 | URS | AECOM | Ruby Crysler | EPA | FT-07 | FT007_FNL_Sept 2017 GM Annual Report.pdf |
| McConnell AFB, KS | 10001 | Oct/15/2018 | F I N A L |
FT006
GROUNDWATER MONITORING ANNUAL
| REPORT – SEPTEMBER 2017 | URS | AECOM | Ruby Crysler | EPA | FT-06 | 579341.pdf |
| McConnell AFB, KS | 10002 | Oct/15/2018 | F I N A L |
FT006 (SWMU 107, 117, 160, AND 167)
GROUNDWATER MONITORING DATA REPORT
| — MARCH 2018 | URS | AECOM | Ruby Crysler | EPA | FT-06 | FT006_FNL_GW_Data_Rpt-Mar 2018.pdf |
| McConnell AFB, KS | 10003 | Aug/15/2018 | F I N A L |
FT006
2016 LONG-TERM GROUNDWATER AND
TREATMENT SYSTEM MONITORING
| ANNUAL REPORT | URS | AECOM | Ruby Crysler | EPA | FT-06 | FT006_FNL_2016 LTM.pdf |
| McConnell AFB, KS | 10004 | Jun/15/2018 | F I N A L |
1,4-DIOXANE GROUNDWATER SAMPLING
REPORT (TITAN MISSILE AND SMOKY HILL
| SITES) | URS | AECOM | Mandi Chace | KDHE | DP-09|DP-12|SS-19|SS-20|SS-21 | DIOXANE_FNL_TITAN SMOKY GW SAMP RPT.pdf |
| McConnell AFB, KS | 10005 | Oct/15/2018 | F I N A L ( R E V I S I O N 1 ) |
1,4-DIOXANE GROUNDWATER SAMPLING
REPORT (TITAN MISSILE AND SMOKY HILL
| SITES) | URS | AECOM | Mandi Chace | KDHE | DP-09|DP-12|OT-22|SS-19|SS-20|SS-21|SS-28|SS-29|SS-30|SS008|SS012|SS015|SS018|ST-05|ST-25|ST-26 | DIOXANE_FNL REV1_TITAN SMOKY GW SAMP RPT_Optimized.pdf | ||||
| McConnell AFB, KS | 10006 | Aug/13/2018 | 2018-08-13-AFCEC-SS030 MS 10 FINAL ROD - SIGNED | URS | AECOM | Mandi Chace | KDHE | SS-30 | 2018-08-13-AFCEC-SS030 MS 10 FINAL ROD - SIGNED.pdf | |
| McConnell AFB, KS | 10007 | Nov/16/2018 | F I N A L |
TU601 (SWMU 171)
| RCRA FACILITY INVESTIGATION REPORT | URS | AECOM | Ruby Crysler | EPA | TU601 | Pages from TU601_FNL_RFI-2.pdf |
| McConnell AFB, KS | 10007 | Nov/16/2018 | F I N A L |
TU601 (SWMU 171)
| RCRA FACILITY INVESTIGATION REPORT-PART 2 | URS | AECOM | Ruby Crysler | EPA | TU601 | Pages from Pages from TU601_FNL_RFI-3.pdf |
| McConnell AFB, KS | 10007 | Nov/16/2018 | F I N A L |
TU601 (SWMU 171)
| RCRA FACILITY INVESTIGATION REPORT-PART 3 | URS | AECOM | Ruby Crysler | EPA | TU601 | Pages from Pages from TU601_FNL_RFI-5.pdf | ||||
| McConnell AFB, KS | 10008 | May/15/2016 | F I N A L SWMU 207 RFI Report - Part 1 | URS | AECOM | Ruby Crysler | EPA | SS544 | Pages from Final SWMU No 207 RFI Report-1.pdf | |
| McConnell AFB, KS | 10008 | May/15/2016 | F I N A L SWMU 207 RFI Report - Part 2 | URS | AECOM | Ruby Crysler | EPA | SS544 | Pages from Pages from Final SWMU No 207 RFI Report-2-1.pdf | |
| McConnell AFB, KS | 10008 | May/15/2016 | FINAL SWMU 207 RFI REPORT - PART 5 | URS | AECOM | Ruby Crysler | EPA | SS544 | Pages from Pages from Final SWMU No 207 RFI Report-2-4.pdf | |
| McConnell AFB, KS | 10008 | May/15/2016 | FINAL SWMU 207 RFI REPORT - PART 6 | URS | AECOM | Ruby Crysler | EPA | SS544 | Pages from Final SWMU No 207 RFI Report-3.pdf | |
| McConnell AFB, KS | 10008 | May/15/2016 | FINAL SWMU 207 RFI REPORT - PART 7 | URS | AECOM | Ruby Crysler | EPA | SS544 | Pages from Final SWMU No 207 RFI Report-7-1.pdf | |
| McConnell AFB, KS | 10008 | May/15/2016 | FINAL SWMU 207 RFI REPORT - PART 8 | URS | AECOM | Ruby Crysler | EPA | SS544 | Pages from Final SWMU No 207 RFI Report-8-1.pdf | |
| McConnell AFB, KS | 10008 | Jun/15/2016 | FINAL SWMU 207 RFI Report - PART 10 | URS | AECOM | Ruby Crysler | EPA | SS544 | Pages from Final SWMU No 207 RFI Report-10-1.pdf | |
| McConnell AFB, KS | 10008 | Jun/15/2016 | FINAL SWMU 207 RFI Report - PART 11 | URS | AECOM | Ruby Crysler | EPA | SS544 | Pages from Final SWMU No 207 RFI Report-11-1.pdf | |
| McConnell AFB, KS | 10008 | Jun/15/2016 | FINAL SWMU 207 RFI Report - PART 12 | URS | AECOM | Ruby Crysler | EPA | SS544 | Pages from Final SWMU No 207 RFI Report-12-1.pdf | |
| McConnell AFB, KS | 10008 | Jun/15/2016 | FINAL SWMU 207 RFI Report - PART 13 | URS | AECOM | Ruby Crysler | EPA | SS544 | Pages from Pages from Final SWMU No 207 RFI Report-13-1-1.pdf | |
| McConnell AFB, KS | 10008 | Jun/15/2016 | FINAL SWMU 207 RFI Report - PART 14 | URS | AECOM | Ruby Crysler | EPA | SS544 | Pages from Pages from Final SWMU No 207 RFI Report-13-1-2.pdf | |
| McConnell AFB, KS | 10008 | Jun/15/2016 | FINAL SWMU 207 RFI Report - PART 15 | URS | AECOM | Ruby Crysler | EPA | SS544 | Pages from Pages from Final SWMU No 207 RFI Report-14-1.pdf | |
| McConnell AFB, KS | 10008 | Jun/15/2016 | FINAL SWMU 207 RFI Report - PART 16 | URS | AECOM | Ruby Crysler | EPA | SS544 | Pages from Pages from Final SWMU No 207 RFI Report-15-1.pdf | |
| McConnell AFB, KS | 10008 | Jun/15/2016 | FINAL SWMU 207 RFI Report - PART 4 | URS | AECOM | Ruby Crysler | EPA | SS544 | Pages from Pages from Final SWMU No 207 RFI Report--4.pdf | |
| McConnell AFB, KS | 10008 | Jun/15/2016 | FINAL SWMU 207 RFI Report - PART 8 | URS | AECOM | Ruby Crysler | EPA | SS544 | Pages from Final SWMU No 207 RFI Report-8-1.pdf | |
| McConnell AFB, KS | 10008 | Jun/15/2016 | FINAL SWMU 207 RFI Report - PART 9 | URS | AECOM | Ruby Crysler | EPA | SS544 | Pages from Final SWMU No 207 RFI Report-9-1.pdf | |
| McConnell AFB, KS | 10008 | May/15/2018 | FINAL SWMU 207 RFI REPORT - PART 3 | URS | AECOM | Ruby Crysler | EPA | SS544 | Pages from Pages from Final SWMU No 207 RFI Report-2-2.pdf | |
| McConnell AFB, KS | 10009 | Nov/26/2018 | F I N A L |
LF011
2016 LONG-TERM GROUNDWATER AND
TREATMENT SYSTEM MONITORING
| ANNUAL REPORT - PART 1 | URS | AECOM | Ruby Crysler | EPA | LF-11 | Pages from Pages from LF011_FNL_2016 LTM Rpt-1-1.pdf |
| McConnell AFB, KS | 10009 | Nov/26/2018 | F I N A L |
LF011
2016 LONG-TERM GROUNDWATER AND
TREATMENT SYSTEM MONITORING
| ANNUAL REPORT - Part 3 | URS | AECOM | Ruby Crysler | EPA | LF-11 | Pages from LF011_FNL_2016 LTM Rpt-2.pdf |
| McConnell AFB, KS | 10009 | Nov/26/2018 | F I N A L |
LF011
2016 LONG-TERM GROUNDWATER AND
TREATMENT SYSTEM MONITORING - Part 1
| ANNUAL REPORT | URS | AECOM | Ruby Crysler | EPA | LF-11 | Pages from Pages from LF011_FNL_2016 LTM Rpt-1-1.pdf | ||||
| McConnell AFB, KS | 10009 | Nov/26/2018 | LF011 Final 2016 LTM Annual Report - Part 4 | URS | AECOM | Ruby Crysler | EPA | LF-11 | Pages from LF011_FNL_2016 LTM Rpt-3.pdf | |
| McConnell AFB, KS | 1001 | Mar/21/2007 | Notice of Site Investigation Activities at Titan II Missile Site 10 | Shirk, Ryan | Tetra Tech, Inc. | Pettigrew, C.W. Jr | Owner Titan II Site 10 | SS-30 | AR-1001.pdf | |
| McConnell AFB, KS | 10010 | Nov/26/2018 | F I N A L |
LF034 2016 LONG-TERM GROUNDWATER AND
TREATMENT SYSTEM MONITORING ANNUAL
| REPORT | URS | AECOM | Ruby Crysler | EPA | LF-34 | Pages from LF034_FNL_2016 LTM Rpt-1.pdf |
| McConnell AFB, KS | 10010 | Nov/26/2018 | F I N A L |
LF034 2016 LONG-TERM GROUNDWATER AND
TREATMENT SYSTEM MONITORING ANNUAL
| REPORT - Part 2 | URS | AECOM | Ruby Crysler | EPA | LF-34 | Pages from LF034_FNL_2016 LTM Rpt-2.pdf |
| McConnell AFB, KS | 10011 | Nov/16/2018 | F I N A L |
SS003 (SWMU 165)
2016 LONG-TERM GROUNDWATER AND
TREATMENT SYSTEM MONITORING ANNUAL
| REPORT - Par 2 | URS | AECOM | Ruby Crysler | EPA | SS-03 | Pages from SS003_FNL_2016 LTM Rpt-2.pdf |
| McConnell AFB, KS | 10011 | Nov/16/2018 | F I N A L |
SS003 (SWMU 165)
2016 LONG-TERM GROUNDWATER AND
TREATMENT SYSTEM MONITORING ANNUAL
| REPORT - Par3 | URS | AECOM | Ruby Crysler | EPA | SS-03 | Pages from SS003_FNL_2016 LTM Rpt-3.pdf |
| McConnell AFB, KS | 10011 | Nov/16/2018 | F I N A L |
SS003 (SWMU 165)
2016 LONG-TERM GROUNDWATER AND
TREATMENT SYSTEM MONITORING ANNUAL
| REPORT - Part 1 | URS | AECOM | Ruby Crysler | EPA | SS-03 | Pages from SS003_FNL_2016 LTM Rpt-1.pdf |
| McConnell AFB, KS | 10012 | Nov/16/2018 | F I N A L |
SS014
2016 QUARTER 3 INTERIM MEASURES
PERFORMANCE MONITORING ANNUAL
| REPORT - Part 1 | URS | AECOM | Ruby Crysler | EPA | SS-14 | Pages from SS014_FNL_Q3 2016 IM PM Annual Rpt-1.pdf |
| McConnell AFB, KS | 10012 | Nov/16/2018 | F I N A L |
SS014
2016 QUARTER 3 INTERIM MEASURES
PERFORMANCE MONITORING ANNUAL
| REPORT - Part 2 | URS | AECOM | Ruby Crysler | EPA | SS-14 | Pages from SS014_FNL_Q3 2016 IM PM Annual Rpt-2.pdf |
| McConnell AFB, KS | 10012 | Nov/16/2018 | F I N A L |
SS014
2016 QUARTER 3 INTERIM MEASURES
PERFORMANCE MONITORING ANNUAL
| REPORT - Part 4 | URS | AECOM | Ruby Crysler | EPA | SS-14 | Pages from SS014_FNL_Q3 2016 IM PM Annual Rpt-4.pdf |
| McConnell AFB, KS | 10012 | Nov/16/2018 | F I N A L |
SS014
2016 QUARTER 3 INTERIM MEASURES
PERFORMANCE MONITORING ANNUAL - Part 3
| REPORT - Part 3 | URS | AECOM | Ruby Crysler | EPA | SS-14 | Pages from SS014_FNL_Q3 2016 IM PM Annual Rpt-3.pdf |
| McConnell AFB, KS | 10013 | Nov/16/2018 | F I N A L |
ST017
2016 LONG-TERM GROUNDWATER AND
TREATMENT SYSTEM MONITORING ANNUAL
| REPORT | URS | AECOM | Ruby Crysler | EPA | ST-17 | Pages from ST017_FNL_2016_LTM_Report-1.pdf |
| McConnell AFB, KS | 10013 | Nov/16/2018 | F I N A L |
ST017
2016 LONG-TERM GROUNDWATER AND
TREATMENT SYSTEM MONITORING ANNUAL
| REPORT -2 | URS | AECOM | Ruby Crysler | EPA | ST-17 | Pages from ST017_FNL_2016_LTM_Report-2.pdf |
| McConnell AFB, KS | 10014 | Sep/11/2018 | F I N A L |
SS015 TITAN II MISSILE SITE 15
| RECORD OF DECISION | URS | AECOM | Mandi Chace | KDHE | SS015 | SS015 (MS15)_FNL_ROD.pdf | ||||
| McConnell AFB, KS | 10015 | Oct/29/2018 | ST025 (Titan II Missile Site 9) FINAL ROD - SIGNED | URS | AECOM | Mandi Chace | KDHE | ST-25 | 2018-10-29-AECOM-ST025 ROD -SIGNED.pdf | |
| McConnell AFB, KS | 10016 | Aug/03/2018 | 2018-08-03-KDHE-Draft SS028 Titan II Missile Site 4 Proposed Plan Fact Sheet | Brittany Bennett | KDHE | Cole Knight | AFCEC/CZOM | SS-28 | 2018-08-03-KDHE-Draft SS028 Titan II Missile Site 4 Proposed Plan Fact Sheet.pdf | |
| McConnell AFB, KS | 10017 | Jul/09/2018 | 2018-07-09-EPA-Final Decision Document | Ruby Crysler | EPA | Cole Knight | AFCEC/CZOM | FT04|IN050|IN051|OW576|OW632|RW629|ZZ047 | 2018-07-09-EPA-Final Decision Document.pdf | |
| McConnell AFB, KS | 10018 | Jul/30/2018 | 2018-07-30-LF011_DFT_GM Data Rpt - Mar 2018 Transmittal Letter | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | LF-11 | 2018-07-30-LF011_DFT_GM Data Rpt - Mar 2018 Transmittal Letter.pdf | |
| McConnell AFB, KS | 10019 | Jul/30/2018 | 2018-07-30-ST005 (MS2)_FNL_EXC CR_AF XMIT_27JUL18 Transmittal Letter | Cole Knight | AFCEC/CZOM | Mandi Chace | KDHE | ST-05 | 2018-07-30-ST005 (MS2)_FNL_EXC CR_AF XMIT_27JUL18 Transmittal Letter.pdf | |
| McConnell AFB, KS | 1002 | Mar/21/2007 | Notice of Site Investigation Activities at Titan II Missile Site 11 | Shirk, Ryan | Tetra Tech, Inc. | Tower-Lupton, Billie R | Owner Titan II Site 11 | SS-30 | AR-1002.pdf | |
| McConnell AFB, KS | 10020 | Aug/24/2018 | 2018-08-24-SS001_FNL_2016 LTM Rpt_XMIT_22Aug18-Transmittal Letter (2) | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | SS-01 | 2018-08-24-SS001_FNL_2016 LTM Rpt_XMIT_22Aug18-Transmittal Letter (2).pdf | |
| McConnell AFB, KS | 10021 | Aug/27/2018 | 2018-08-27-KDHE-Responses to KDHE (Saegert) Comments | Jesse Saegert | KDHE | Cole Knight | AFCEC/CZOM | FT-06|LF059|TU046 | 2018-08-27-KDHE-Responses to KDHE (Saegert) Comments.pdf | |
| McConnell AFB, KS | 10022 | Aug/01/2018 | 2018-08-01-AECOM-OW579 PD RFA Transmittal Letter | URS | AECOM | Cole Knight | AFCEC/CZOM | OW579 | 2018-08-01-AECOM-OW579 PD RFA Transmittal Letter.pdf | |
| McConnell AFB, KS | 10023 | Aug/01/2018 | 2018-08-01-KDHE-Draft LF059 RCRA Facility Assessment Report | Jesse Saegert | KDHE | Cole Knight | AFCEC/CZOM | LF059 | 2018-08-01-KDHE-Draft LF059 RCRA Facility Assessment Report.pdf | |
| McConnell AFB, KS | 10024 | Aug/02/2018 | 2018-08-02-AECOM- SS018 MS18 Responses to Comments | URS | AECOM | Cole Knight | AFCEC/CZOM | SS018 | 2018-08-02-AECOM- SS018 MS18 Responses to Comments.pdf | |
| McConnell AFB, KS | 10025 | Aug/02/2018 | 2018-08-02-AECOM-FT008_PD_RFA WP TM_AFCEC (Hamlett) RTCs | URS | AECOM | Pamela Hamlett | AFCEC/CZOM-CZTE | FT008 | 2018-08-02-AECOM-FT008_PD_RFA WP TM_AFCEC (Hamlett) RTCs.pdf | |
| McConnell AFB, KS | 10026 | Aug/02/2018 | 2018-08-02-KDHE-Draft SS028 Titan II Missile Site 6 Proposed Plan and Fact Sheet | Brittany Bennett | KDHE | Cole Knight | AFCEC/CZOM | SS-28 | 2018-08-02-KDHE-Draft SS028 Titan II Missile Site 6 Proposed Plan and Fact Sheet.pdf | |
| McConnell AFB, KS | 10027 | Aug/03/2018 | 2018-08-03-AGEISS-SS003_PD_GM Data Rpt-Mar 18_RTCs | Contractor | AGEISS | URS | AECOM | SS-03 | 2018-08-03-AGEISS-SS003_PD_GM Data Rpt-Mar 18_RTCs.pdf | |
| McConnell AFB, KS | 10028 | Aug/03/2018 | 2018-08-03-AGEISS-TU036_PD_GM Annual Rpt-Mar 18_RTCs | Contractor | AGEISS | URS | AECOM | TU036 | 2018-08-03-AGEISS-TU036_PD_GM Annual Rpt-Mar 18_RTCs.pdf | |
| McConnell AFB, KS | 10029 | Aug/03/2018 | 2018-08-03-FPM-MS1 Well Abandonment Notification Letter | Contractor | FPM | Lucille King | Land Owner | SS-29 | 2018-08-03-FPM-MS1 Well Abandonment Notificaiton Letter.pdf | |
| McConnell AFB, KS | 1003 | Mar/21/2007 | Notice of Site Investigation Activities at Titan II Missile Site 14 | Shirk, Ryan | Tetra Tech, Inc. | Power, Jerry | Owner Titan II Site 14 | SS-30 | AR-1003.pdf | |
| McConnell AFB, KS | 10030 | Aug/03/2018 | 2018-08-03-FT007_FNL_ISCR MI 1 ICR_AF XMIT_6Aug18 Transmittal Letter | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | FT-07 | 2018-08-03-FT007_FNL_ISCR MI 1 ICR_AF XMIT_6Aug18 Transmittal Letter.pdf | |
| McConnell AFB, KS | 10031 | Aug/03/2018 | 2018-08-03-ID636_DFT_GM Data Rpt - Mar 2018 XMIT_19JULY18 Transmittal Letter | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | ID636 | 2018-08-03-ID636_DFT_GM Data Rpt - Mar 2018 XMIT_19JULY18 Transmittal Letter.pdf | |
| McConnell AFB, KS | 10032 | Aug/03/2018 | 2018-08-03-KDHE-Final 14-Dioxane Groundwater Sampling Report | Jesse Saegert | KDHE | Cole Knight | AFCEC/CZOM | DP-09|DP-12|SS-19|SS-20|SS-21|SS-28|SS-29|SS-30|SS008|SS012|SS015|SS018|ST-05|ST-25|ST-26 | 2018-08-03-KDHE-Final 14-Dioxane Groundwater Sampling Report.pdf | |
| McConnell AFB, KS | 10033 | Aug/03/2018 | 2018-08-03-SS001_FNL_ISCO MI4 ICR_AF XMIT_6Aug18 Transmittal Letter | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | SS-01 | 2018-08-03-SS001_FNL_ISCO MI4 ICR_AF XMIT_6Aug18 Transmittal Letter.pdf | |
| McConnell AFB, KS | 10034 | Aug/03/2018 | 2018-08-03-TU036_FNL_ISCO MI2 ICR_AF XMIT_03AUG18 Transmittal Letter | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | TU036 | 2018-08-03-TU036_FNL_ISCO MI2 ICR_AF XMIT_03AUG18 Transmittal Letter.pdf | |
| McConnell AFB, KS | 10035 | Aug/06/2018 | 2018-08-06-AFCEC-CZTE-PH-OT547_pre-draft_ISCR_MI_R2_WP_TM | Pamela Hamlett | AFCEC/CZTE | URS | AECOM | OT547 | 2018-08-06-AFCEC-CZTE-PH-OT547_pre-draft_ISCR_MI_R2_WP_TM.pdf | |
| McConnell AFB, KS | 10036 | Aug/06/2018 | 2018-08-06-KDHE-RE Draft FT006 Groundwater Monitoring Data Rpt - March 2018 | Jesse Saegert | KDHE | Cole Knight | AFCEC/CZOM | FT-06 | 2018-08-06-KDHE-RE Draft FT006 Groundwater Monitoring Data Rpt - March 2018.pdf | |
| McConnell AFB, KS | 10037 | Aug/06/2018 | 2018-08-06-OT547_FNL_ISCR MI 1 ICR_AF XMIT_6Aug18-Transmittal Letter | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | OT547 | 2018-08-06-OT547_FNL_ISCR MI 1 ICR_AF XMIT_6Aug18-Transmittal Letter.pdf | |
| McConnell AFB, KS | 10038 | Aug/07/2018 | 2018-08-07-AECOM-SS028 MS 4 PP and Fract Sheet RTCs | URS | AECOM | Cole Knight | AFCEC/CZOM | SS-28 | 2018-08-07-AECOM-SS028 MS 4 PP and Fract Sheet RTCs.pdf | |
| McConnell AFB, KS | 10039 | Aug/07/2018 | 2018-08-07-AECOM-SSD016 PD NFA TM Transmittal Letter | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | SS-16 | 2018-08-07-AECOM-SSD016 PD NFA TM Transmittal Letter.pdf | |
| McConnell AFB, KS | 1004 | Apr/09/2007 | Addendum to the Final Remedial Investigation Planning Documents for Titan II Missile Sites 3, 6, and 16 (SS28) 10, 11, and 14 (SS30) McConnell AFB Sites SS31, SS32, LF33, LF34, and SS01, Dated March 2007 | Baum, Don | Tetra Tech, Inc. | Knight, Cole | 22 CES/CEV | LF-33 | AR-1004.pdf | |
| McConnell AFB, KS | 10040 | Aug/07/2018 | 2018-08-07-SS001_FNL_ISCR MI 2 ICR_AF XMIT_8Aug18 | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | SS-01 | 2018-08-07-SS001_FNL_ISCR MI 2 ICR_AF XMIT_8Aug18.pdf | |
| McConnell AFB, KS | 10040 | Aug/07/2018 | 2018-08-07-SS003_FNL_PZ Sampling WP TM_AF XMIT_8Aug18 | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | SS-03 | 2018-08-07-SS003_FNL_PZ Sampling WP TM_AF XMIT_8Aug18.pdf | |
| McConnell AFB, KS | 10041 | Aug/07/2018 | 2018-08-07-URS-LF027 PD NFA TM Transmittal Letter | URS | AECOM | Cole Knight | AFCEC/CZOM | LF-27 | 2018-08-07-URS-LF027 PD NFA TM Transmittal Letter.pdf | |
| McConnell AFB, KS | 10042 | Nov/26/2018 | F I N A L |
ZZ053 (SWMU 152)
| RCRA FACILITY ASSESSMENT REPORT | URS | AECOM | Ruby Crysler | EPA | ZZ053 | ZZ053_FNL_RFA.pdf |
| McConnell AFB, KS | 10043 | Nov/12/2018 | F I N A L |
ST025 TITAN II MISSILE SITE 9
| RECORD OF DECISION | URS | AECOM | Mandi Chace | KDHE | ST-25 | ST025 (MS9)_FNL_ROD.pdf |
| McConnell AFB, KS | 10044 | Nov/05/2018 | F I N A L |
ST005 TITAN II MISSILE SITE 2
| PROPOSED PLAN | URS | AECOM | Mandi Chace | KDHE | ST-05 | ST005 (MS2)_FNL_PP_KDHE (Chace) RTC (002).pdf |
| McConnell AFB, KS | 10045 | Oct/04/2018 | Titan II Missile Site 02 | |||
| Proposed Plan Fact Sheet | URS | AECOM | Mandi Chace | KDHE | ST-05 | ST005 (MS2)_FNL_PP_KDHE (Chace) RTC (002).pdf |
| McConnell AFB, KS | 10046 | Nov/09/2018 | F I N A L |
SS028 TITAN II MISSILE SITE 16
| PROPOSED PLAN | URS | AECOM | Mandi Chace | KDHE | SS-28 | ST005 (MS2)_FNL_PP_KDHE (Chace) RTC (002).pdf |
| McConnell AFB, KS | 10047 | Oct/08/2018 | Titan II Missile Site 16 | |||
| Proposed Plan Fact Sheet | URS | AECOM | Mandi Chace | KDHE | SS-28 | SS028 (MS16)_FNL_PP FCT SHT.pdf |
| McConnell AFB, KS | 10048 | Nov/26/2018 | F I N A L |
SA057 (SWMU 173)
| RCRA FACILITY ASSESSMENT REPORT | URS | AECOM | Ruby Crysler | EPA | SA057 | SA057_FNL_RFA.pdf |
| McConnell AFB, KS | 10049 | Aug/04/2015 | FINAL |
PRELIMINARY ASSESSMENT REPORT
FOR PERFLUORINATED COMPOUNDS
AT
MCCONNELL AIR FORCE BASE
| WICHITA, KANSAS | Contractor | Aerostar | Cole Knight | AFCEC/CZOM | FT-07|FT008|FT04|SS-03 | McConnell AFB_Final_Preliminary_Assessment_Report.pdf | ||||
| McConnell AFB, KS | 1005 | Apr/10/2007 | Addendum 2 to the Fianl Planning Documents for the Remedial Investigation at Titan II Missile Sites 3, 6, and 16 (SS28) 10, 11, and 14 (SS30) McConnell AFB Sites SS31, SS32, LF33, LF34, and SS01m Dated March 2007 | Cocran, Michelle | Tetra Tech, Inc. | Knight, Cole | 22 CES/CEV | LF-33 | AR-1005.pdf | |
| McConnell AFB, KS | 10050 | Jan/03/2019 | 2018-01-03-AECOM-RTCs_PD_OW633_GWM Rpt_Sept18_(AGEISS #1659) (002) | URS | AECOM | Contractor | AGEISS | OW633|OW633 | 2018-01-03-AECOM-RTCs_PD_OW633_GWM Rpt_Sept18_(AGEISS #1659) (002).pdf | |
| McConnell AFB, KS | 10051 | Nov/14/2018 | F I N A L |
SS031 (SWMU 174) SITE CHARACTERIZATION
| REPORT | URS | AECOM | Ruby Crysler | EPA | SS-31 | SS031_FNL_SC_RPT.pdf |
| McConnell AFB, KS | 10052 | Dec/03/2018 | F I N A L |
SS028 TITAN II MISSILE SITE 4
| RECORD OF DECISION | URS | AECOM | Mandi Chace | KDHE | SS-28 | SS028 (MS4)_FNL_ROD.pdf |
| McConnell AFB, KS | 10053 | Nov/15/2018 | F I N A L |
SS018 TITAN II MISSILE SITE 18
| PROPOSED PLAN | URS | AECOM | Mandi Chace | KDHE | SS018 | SS018 (MS18)_FNL_PP.pdf | ||||
| McConnell AFB, KS | 10054 | Oct/02/2018 | Titan II Missile Site 18 | |||||||
| Proposed Plan Fact Sheet | URS | AECOM | Mandi Chace | KDHE | SS018 | SS018 (MS18)_FNL_FCT SHT.pdf | ||||
| McConnell AFB, KS | 10055 | Jan/07/2018 | 2018-01-07-AECOM-FT006_Dft_Ex Completion Report_RTCs (USEPA) | URS | AECOM | Ruby Crysler | EPA | FT-06 | 2018-01-07-AECOM-FT006_Dft_Ex Completion Report_RTCs (USEPA).pdf | |
| McConnell AFB, KS | 10056 | Jan/07/2018 | 2018-01-07-AECOM-OT614_DFT_DNFA TM_USEPA RTCs (004) | URS | AECOM | Ruby Crysler | EPA | OT614 | 2018-01-07-AECOM-OT614_DFT_DNFA TM_USEPA RTCs (004).pdf | |
| McConnell AFB, KS | 10057 | Aug/13/2018 | SS030 Missile Site 10 Final ROD - Signed | URS | AECOM | Mandi Chace | KDHE | SS-30 | 2018-08-13-AFCEC-SS030 MS 10 FINAL ROD - SIGNED.pdf | |
| McConnell AFB, KS | 10058 | Aug/27/2018 | 2018-08-08-27-AGEISS-PD_RfD NFRAP_Site LF027_(AGEISS #1598) (002) | Contractor | AGEISS | Cole Knight | AFCEC/CZOM | LF-27 | 2018-08-08-27-AGEISS-PD_RfD NFRAP_Site LF027_(AGEISS #1598) (002).pdf | |
| McConnell AFB, KS | 10059 | Aug/08/2018 | 2018-08-08-EPA-LF034 Draft 2016 Long-Term GW Annual Report | Ruby Crysler | EPA | Cole Knight | AFCEC/CZOM | LF-34 | 2018-08-08-EPA-LF034 Draft 2016 Long-Term GW Annual Report.pdf | |
| McConnell AFB, KS | 1006 | Apr/11/2007 | ROC Glayds Harrison, Titan II Site 3 Owner Regarding Acces to the Site for the Remedial Investigation Activities, MS Harrison will Provide a Gate Key for Access | Shirk, Ryan | Tetra Tech, Inc. | Knight, Cole | 22 CES/CEV | SS-28 | AR-1006.pdf | |
| McConnell AFB, KS | 10060 | Aug/08/2018 | 2018-08-08-EPA-OW633, SS044, and OW041 Draft 2017 Quarter Report | Ruby Crysler | EPA | Cole Knight | AFCEC/CZOM | OW041|OW633|OW633|SS044 | 2018-08-08-EPA-OW633, SS044, and OW041 Draft 2017 Quarter Report.pdf | |
| McConnell AFB, KS | 10061 | Dec/15/2018 | F I N A L R E V I S I O N 2 |
TU036
2016 QUARTER 3 INTERIM MEASURES
| PERFORMANCE MONITORING DATA REPORT | URS | AECOM | Ruby Crysler | EPA | TU036 | TU036_FNL Rev 2_2016 Q3 IM PM Data Rpt.pdf | ||||
| McConnell AFB, KS | 10062 | Dec/15/2018 | Final Groundwater Sampling Work Plan | |||||||
| OW545, Former Building 980, McConnell AFB, Kansas | URS | AECOM | Ruby Crysler | EPA | OW545 | OW545_FNL_Sampling TM.pdf | ||||
| McConnell AFB, KS | 10063 | Aug/08/2018 | 2018-08-08-FT006 and FT007 Draft GW Monitoring Annual Report- September 2017 | Ruby Crysler | EPA | Cole Knight | AFCEC/CZOM | FT-06|FT-07 | 2018-08-08-FT006 and FT007 Draft GW Monitoring Annual Report- September 2017.pdf | |
| McConnell AFB, KS | 10064 | Aug/08/2018 | 2018-08-08-USEPA-TU036 Draft ISCO MI2 ISCR | Ruby Crysler | EPA | Cole Knight | AFCEC/CZOM | TU036 | 2018-08-08-USEPA-TU036 Draft ISCO MI2 ISCR.pdf | |
| McConnell AFB, KS | 10065 | Aug/09/2018 | 2018-08-09-AECOM-SS028 MS 6 RTCs for Proposed Plan and Fact Sheet | Brian Wight | AECOM | Cole Knight | AFCEC/CZOM | SS-28 | 2018-08-09-AECOM-SS028 MS 6 RTCs for Proposed Plan and Fact Sheet.pdf | |
| McConnell AFB, KS | 10066 | Aug/09/2018 | 2018-08-09-AECOM-SS030 MS 11 RTCs for Proposed Plan and Fact Sheet | Brian Wight | AECOM | Cole Knight | AFCEC/CZOM | SS-30 | 2018-08-09-AECOM-SS030 MS 11 RTCs for Proposed Plan and Fact Sheet.pdf | |
| McConnell AFB, KS | 10067 | Aug/09/2018 | 2018-08-09-AECOM-SS032 Document Transmittal Letter | URS | AECOM | Cole Knight | AFCEC/CZOM | SS-32 | 2018-08-09-AECOM-SS032 Document Transmittal Letter.pdf | |
| McConnell AFB, KS | 10068 | Aug/09/2018 | 2018-08-09-AGEISS-ISCR MI R1 WP TM1_Site SS014_(AGEISS #1586) (002) | Contractor | AGEISS | Cole Knight | AFCEC/CZOM | SS-14 | 2018-08-09-AGEISS-ISCR MI R1 WP TM1_Site SS014_(AGEISS #1586) (002).pdf | |
| McConnell AFB, KS | 10069 | Aug/09/2018 | 2018-08-09-AGEISS-ISCR MI R1 WP TM1 | Brittany Bennett | KDHE | Cole Knight | AFCEC/CZOM | SS-28 | 2018-08-09-AGEISS-ISCR MI R1 WP TM1.pdf | |
| McConnell AFB, KS | 1007 | Apr/12/2007 | Addendum Number 3 to the Final Planning Documents for the Remedial Investigation at Titan II Missile Sites 3, 6, and 16 (SS28) 10, 11, and 14 (SS30) McConnell AFB Sites SS31, SS32, LF33, LF34, and SS01, Dated March 2007 | Cocran, Michelle | Tetra Tech, Inc. | Knight, Cole | 22 CES/CEV | LF-33 | AR-1007.pdf | |
| McConnell AFB, KS | 10070 | Aug/10/2018 | 2018-08-10-AECOM-SS028 MS6 Responses to KDHE RTCs for Draft PP and Fact Sheet | URS | AECOM | Cole Knight | AFCEC/CZOM | SS-28 | 2018-08-10-AECOM-SS028 MS6 Responses to KDHE RTCs for Draft PP and Fact Sheet.pdf | |
| McConnell AFB, KS | 10071 | Aug/10/2018 | 2018-08-10-EPA-ID636 Final 2016 Quarter 4 IMPM Data Report | Ruby Crysler | EPA | Cole Knight | AFCEC/CZOM | ID636 | 2018-08-10-EPA-ID636 Final 2016 Quarter 4 IMPM Data Report.pdf | |
| McConnell AFB, KS | 10072 | Aug/10/2018 | 2018-08-10-EPA-LF33 Final TM Remedy Proposal | Ruby Crysler | EPA | Cole Knight | AFCEC/CZOM | LF-33 | 2018-08-10-EPA-LF33 Final TM Remedy Proposal.pdf | |
| McConnell AFB, KS | 10073 | Aug/10/2018 | 2018-08-10-EPA--OW026, OS041, and TU036 Draft 2017 GW Monitoring Data Reports | Ruby Crysler | EPA | Cole Knight | AFCEC/CZOM | TU036 | 2018-08-10-EPA--OW026, OS041, and TU036 Draft 2017 GW Monitoring Data Reports.pdf | |
| McConnell AFB, KS | 10074 | Aug/10/2018 | 2018-08-10-EPA-OW040 Draft RFI Report Comments | Ruby Crysler | EPA | Cole Knight | AFCEC/CZOM | OW040 | 2018-08-10-EPA-OW040 Draft RFI Report Comments.pdf | |
| McConnell AFB, KS | 10075 | Aug/10/2018 | 2018-08-10-KDHE-Draft SS044 Groundwater Monitoring Annual Report- March 2018 | Jesse Saegert | KDHE | Cole Knight | AFCEC/CZOM | SS055 | 2018-08-10-KDHE-Draft SS044 Groundwater Monitoring Annual Report- March 2018.pdf | |
| McConnell AFB, KS | 10076 | Aug/12/2018 | 2018-08-12-SS032_DFT_GW SAMP RPT_AF XMIT_13SEP18 Transmittal Letter | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | SS-32 | 2018-08-12-SS032_DFT_GW SAMP RPT_AF XMIT_13SEP18 Transmittal Letter.pdf | |
| McConnell AFB, KS | 10077 | Aug/13/2018 | 2018-08-13-SS030 (MS10)_FNL_ROD_AF XMIT_14AUG18-Transmittal Letter | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | SS-30 | 2018-08-13-SS030 (MS10)_FNL_ROD_AF XMIT_14AUG18-Transmittal Letter.pdf | |
| McConnell AFB, KS | 10078 | Aug/13/2018 | 2018-08-13- LF034_FNL_rev1_2016 Q4 IM PM Data Rpt XMIT-Transmittal Letter | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | LF-34 | 2018-08-13- LF034_FNL_rev1_2016 Q4 IM PM Data Rpt XMIT-Transmittal Letter.pdf | |
| McConnell AFB, KS | 10079 | Aug/13/2018 | 2018-08-13-AECOM-SS003 MW Installation | Brian Wight | AECOM | Cole Knight | AFCEC/CZOM | SS-03 | 2018-08-13-AECOM-SS003 MW Installation.pdf | |
| McConnell AFB, KS | 1008 | May/23/2007 | E-Mail From USEPA Region VII to Base Regarding Background Soil Sampling Locations on McConnell AFB during the Remedial Investigation | Gravatt, Daniel R, P.G. | EPA Region VII | Knight, Cole | 22 CES/CEV | ACC Titan|Bldg 315|Bldg 692|Bldg 971|Bldg 980|DP-09|DP-12|DP-13|EOD Range|FNA/DR|FR397|FT-06|FT-07|FT008|Grenade|LF-10|LF-11|LF-27|LF-33|LF-34|MUN01|O/W Sep|OT-15|OT-18|OT-22|SA/DR|SAR01|SS-01|SS-02|SS-03|SS-04|SS-14|SS-16|SS-19|SS-20|SS-21|SS-28|SS-29|SS-30|SS-31|SS-32|SS-35|SS544|ST-05|ST-17|ST-23|ST-24|ST-25|ST-26|TM358|TM359|TS355|TU546 | AR-1008.pdf | |
| McConnell AFB, KS | 10080 | Aug/13/2018 | 2018-08-13-AGEISS-ISCR MI R2 WP TM1_Site OT547_AGEISS #1587 (002) | Contractor | AGEISS | Cole Knight | AFCEC/CZOM | OT547 | 2018-08-13-AGEISS-ISCR MI R2 WP TM1_Site OT547_AGEISS #1587 (002).pdf | |
| McConnell AFB, KS | 10081 | Aug/13/2018 | 2018-08-13-FT006_FNL_rev1_2017 Q1 IM PM Data Rpt XMIT-Transmittal Letter | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | FT-06 | 2018-08-13-FT006_FNL_rev1_2017 Q1 IM PM Data Rpt XMIT-Transmittal Letter.pdf | |
| McConnell AFB, KS | 10082 | Aug/13/2018 | 2018-08-13-KDHE- Final OW633 SS044 OT547 ST017 Interim Measures Work Plan | Jesse Saegert | KDHE | Cole Knight | AFCEC/CZOM | OW633|OW633 | 2018-08-13-KDHE- Final OW633 SS044 OT547 ST017 Interim Measures Work Plan.pdf | |
| McConnell AFB, KS | 10083 | Aug/13/2018 | 2018-08-13-KDHE-Draft DP013 Excavation Completion Report MAFB | Jesse Saegert | KDHE | Cole Knight | AFCEC/CZOM | DP-13 | 2018-08-13-KDHE-Draft DP013 Excavation Completion Report MAFB.pdf | |
| McConnell AFB, KS | 10084 | Aug/13/2018 | 2018-08-13-LF034_FNL_rev1_2017 Q1 IM PM Data Rpt XMIT Transmittal Letter | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | LF-34 | 2018-08-13-LF034_FNL_rev1_2017 Q1 IM PM Data Rpt XMIT Transmittal Letter.pdf | |
| McConnell AFB, KS | 10085 | Aug/13/2018 | 2018-08-13-OT547_FNL_rev1_2016 Q4 IM PM Data Rpt XMIT Transmittal Letter | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | OT547 | 2018-08-13-OT547_FNL_rev1_2016 Q4 IM PM Data Rpt XMIT Transmittal Letter.pdf | |
| McConnell AFB, KS | 10086 | Aug/13/2018 | 2018-08-13-SS001_FNL_rev1_2017 Q1 IM PM Data Rpt XMIT Transmittal Letter | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | SS-01 | 2018-08-13-SS001_FNL_rev1_2017 Q1 IM PM Data Rpt XMIT Transmittal Letter.pdf | |
| McConnell AFB, KS | 10087 | Aug/13/2018 | 2018-08-13-SS014_FNL_rev1_2017 Q1 IM PM Data Rpt XMIT - Transmittal Letter | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | SS-14 | 2018-08-13-SS014_FNL_rev1_2017 Q1 IM PM Data Rpt XMIT - Transmittal Letter.pdf | |
| McConnell AFB, KS | 10088 | Aug/13/2018 | 2018-08-13-Tetra Tech-SS005 Draft RFI Transmittal Letter | Contractor | Tetra Tech | Cole Knight | AFCEC/CZOM | SS005 | 2018-08-13-Tetra Tech-SS005 Draft RFI Transmittal Letter.pdf | |
| McConnell AFB, KS | 10089 | Aug/13/2018 | 2018-08-13-TU036_FNL_rev1_2016 Q4 IM PM Data Rpt XMIT | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | TU036 | 2018-08-13-TU036_FNL_rev1_2016 Q4 IM PM Data Rpt XMIT.pdf | |
| McConnell AFB, KS | 1009 | May/30/2007 | Letter Report Preliminary Round 1 Sample Results for the Remedial Investigation at Sites SS31, SS32, LF33, and LF34 | Baum, Don | Tetra Tech, Inc. | Knight, Cole | 22 CES/CEV | LF-33 | AR-1009.pdf | |
| McConnell AFB, KS | 10090 | Dec/15/2018 | F I N A L |
ST017
GROUNDWATER MONITORING DATA
| REPORT — MARCH 2018 | URS | AECOM | Ruby Crysler | EPA | ST-17 | ST017_FNL_GM_Data_RPT.pdf |
| McConnell AFB, KS | 10091 | Dec/15/2018 | F I N A L |
FT007
GROUNDWATER MONITORING DATA
| REPORT — MARCH 2018 | URS | AECOM | Ruby Crysler | EPA | FT-07 | FT007_FNL_GM Data Rpt-Mar 18.pdf |
| McConnell AFB, KS | 10092 | Dec/15/2018 | F I N A L |
LF011
GROUNDWATER MONITORING DATA REPORT
| — MARCH 2018 | URS | AECOM | Ruby Crysler | EPA | LF-11 | LF011_FNL_GM Data Rpt-Mar 18.pdf | ||||
| McConnell AFB, KS | 10093 | Aug/14/2018 | 2018-08-14-AECOM-SS001 and TU046 Responses To Comments | Brian Wight | AECOM | Cole Knight | AFCEC/CZOM | SS-01|TU046 | 2018-08-14-AECOM-SS001 and TU046 Responses To Comments.pdf | |
| McConnell AFB, KS | 10094 | Aug/14/2018 | 2018-08-14-FT006_FNL_rev1_2016 Q4 IM PM Data Rpt XMIT-Transmittal Letter | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | FT-06 | 2018-08-14-FT006_FNL_rev1_2016 Q4 IM PM Data Rpt XMIT-Transmittal Letter.pdf | |
| McConnell AFB, KS | 10095 | Aug/14/2018 | 2018-08-14-FT007_FNL_rev1_2017 Q1 IM PM Data Rpt XMIT-Transmittal Letter | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | FT-07 | 2018-08-14-FT007_FNL_rev1_2017 Q1 IM PM Data Rpt XMIT-Transmittal Letter.pdf | |
| McConnell AFB, KS | 10096 | Aug/14/2018 | 2018-08-14-KDHE- SS030 Draft (MS11) PP and Fact Sheet | Brittany Bennett | KDHE | Cole Knight | AFCEC/CZOM | SS-30 | 2018-08-14-KDHE- SS030 Draft (MS11) PP and Fact Sheet.pdf | |
| McConnell AFB, KS | 10097 | Aug/14/2018 | 2018-08-14-SS028 (MS4)_FNL_PP_AF XMIT_14AUG18-Transmittal | Cole Knight | AFCEC/CZOM | Mandi Chace | KDHE | SS-28 | 2018-08-14-SS028 (MS4)_FNL_PP_AF XMIT_14AUG18-Transmittal.pdf | |
| McConnell AFB, KS | 10098 | Aug/15/2018 | 2018-08-15-AECOM-FT008_PD RFA WP TM (AGEISS #1566) RTCs | URS | AECOM | Contractor | AGEISS | FT008 | 2018-08-15-AECOM-FT008_PD RFA WP TM (AGEISS #1566) RTCs.pdf | |
| McConnell AFB, KS | 10099 | Aug/15/2018 | 2018-08-15-AECOM-LF059_RFA Rpt_RTCs (KDHE_Saegert) | URS | AECOM | Jesse Saegert | KDHE | LF059 | 2018-08-15-AECOM-LF059_RFA Rpt_RTCs (KDHE_Saegert).pdf | |
| McConnell AFB, KS | 101 | May/26/1993 | Base Letter to AF Representatives and TRC Members Concerning First TRC Meeting | Mang, Douglas K, Col | 384 BW/CV | Distribution List | SS-01 | AR-101.pdf | ||
| McConnell AFB, KS | 1010 | May/14/2007 | Round 2 Sampling Schedule and Proposed Activities for the Remedial Investigation at Sites SS31, SS32, LF33, and LF34 | Baum, Don | Tetra Tech, Inc. | Knight, Cole | 22 CES/CEV | LF-33 | AR-1010.pdf | |
| McConnell AFB, KS | 10100 | Aug/15/2018 | 2018-08-15-AECOM-SA057_PD_RFA_USACE (Sansom) RTC | URS | AECOM | Andrea Sansom | USACE | SA057 | 2018-08-15-AECOM-SA057_PD_RFA_USACE (Sansom) RTC.pdf | |
| McConnell AFB, KS | 10101 | Feb/01/2019 | F I N A L |
FT006
ISCR MITIGATION INJECTION 2
| INJECTION COMPLETION REPORT | URS | AECOM | Ruby Crysler | EPA | FT-06 | FT006_FNL_ISCR MI 2 ICR.pdf | ||||
| McConnell AFB, KS | 10102 | Aug/18/2015 | 2015-08-18-KDHE-Building 314 RFI WP Addendum 1 | Ruby Crysler | EPA | Kristi Draney | 22CES/CEIE | TU546 | 2015-08-18-KDHE-Building 314 RFI WP Addendum 1.pdf | |
| McConnell AFB, KS | 10103 | Jan/08/2019 | TECHNICAL REVIEW COMMENTS |
McConnell AFB PBR W9128F-13-C-022 SS012 Titan II Missile Site 12 Final RAWP Revision Memo
| McConnell Air Force Base, Wichita, Kansas | URS | AECOM | Mandi Chace | KDHE/BER | SS012 | 2018-01-09-AECOM-SS012 (MS12)_FNL_RAWP REV MEMO_KDHE (Chace) RTC.pdf | ||||
| McConnell AFB, KS | 10104 | Aug/15/2018 | McConnell AFB PBR SS003 MW Installation Email WP | Jesse Saegert | KDHE | Cole Knight | AFCEC/CZOM | SS-03 | 2018-08-15-KDHE-S003 MW Installation Email WP.pdf | |
| McConnell AFB, KS | 10105 | Aug/14/2018 | Responses to KDHE (Bennett) Comments SS028 (MS6) Draft | |||||||
| PP/Fact Sheet | Brittany Bennett | KDHE | Cole Knight | AFCEC/CZOM | SS-28 | 2018-08-15-KDHE-SS028 (MS6) Draft PP_Fact Sheet.pdf | ||||
| McConnell AFB, KS | 10106 | Aug/16/2018 | Draft SS028 Titan II Missile Site 4 Record of Decision Transmittal letter | Cole Knight | AFCEC/CZOM | Mandi Chace | KDHE/BER | SS-28 | 2018-08-15-SS028 (MS4)_DFT_ROD_AF XMIT_16AUG18 Transmittal Letter.pdf | |
| McConnell AFB, KS | 10107 | Aug/15/2018 | Final SS030 Titan II Missile Site 11 Proposed Plan and Fact Sheet Transmittal Letter | Cole Knight | AFCEC/CZOM | Mandi Chace | KDHE/BER | SS-30 | 2018-08-15-SS030 (MS11)_FNL_PP_AF XMIT_15AUG18-Transmittal Letter.pdf | |
| McConnell AFB, KS | 10108 | Aug/06/2018 | Final SS018 Titan II Missile Site 18 Proposed Plan and Fact Sheet Transmittal Letter | Cole Knight | AFCEC/CZOM | Mandi Chace | KDHE/BER | SS018 | 2018-08-15-ST018 (MS18)_FNL_PP_AF XMIT_15AUG18-Transmittal Letter.pdf | |
| McConnell AFB, KS | 10109 | Aug/16/2018 | 2018-08-16-AECOM-MS4, MS6, MS 7, MS11, and MS18 Public Notices | Brian Wight | AECOM | Cole Knight | AFCEC | SS-28|SS-30|SS018 | 2018-08-16-AECOM-MS4, MS6, MS 7, MS11, and MS18 Public Notices.pdf | |
| McConnell AFB, KS | 1011 | Jun/01/2007 | Additional Data Summary from the Remedial Investigation at Sites SS31, SS32, LF33, and LF34 | Cocran, Michelle | Tetra Tech, Inc. | Knight, Cole | 22 CES/CEV | LF-33 | AR-1011.pdf | |
| McConnell AFB, KS | 10110 | Aug/15/2018 | Final SS028 Titan II Missile Site 6 Proposed Plan and Fact Sheet Transmittal Letter | Cole Knight | AFCEC/CZOM | Mandi Chace | KDHE/BER | SS-28 | 2018-08-15-SS028 (MS6)_FNL_PP_AF XMIT_15AUG18-Transmittal Letter.pdf | |
| McConnell AFB, KS | 10111 | Aug/16/2018 | 2018-08-16-AGEISS- OW026_(AGEISS #1585) | AGEISS | AGEISS | URS | AECOM | OW026 | 2018-08-16-AGEISS- OW026_(AGEISS #1585).pdf | |
| McConnell AFB, KS | 10112 | Aug/16/2018 | 2018-08-16-AGEISS-ID363_(AGEISS #1584) (002) | AGEISS | AGEISS | URS | AECOM | ID636 | 2018-08-16-AGEISS-ID363_(AGEISS #1584) (002).pdf | |
| McConnell AFB, KS | 10113 | Aug/16/2018 | 2018-08-16-Fall Mitigation Injection Sites | Ryan Mowan URS | AECOM | Cole Knight | AFCEC/CZOM | FT-06|ID636|OT547|SS-03|SS-14 | 2018-08-16-Fall Mitigation Injection Sites.pdf | |
| McConnell AFB, KS | 10114 | Aug/17/2018 | 2018-08-16-FT006_DFT_ISCR MI R3 WP TM_AF XMIT_17AUG18-Transmittal Letter | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | FT-06 | 2018-08-16-FT006_DFT_ISCR MI R3 WP TM_AF XMIT_17AUG18-Transmittal Letter.pdf | |
| McConnell AFB, KS | 10115 | Aug/17/2018 | 2018-08-16-ID636_DFT_ISCR MI R1 WP TM_AF XMIT_17AUG18 Transmittal Letter | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | ID636 | 2018-08-16-ID636_DFT_ISCR MI R1 WP TM_AF XMIT_17AUG18 Transmittal Letter.pdf | |
| McConnell AFB, KS | 10116 | Aug/16/2018 | 2018-08-16-KDHE- Final Excavation Completion Report ST005 Titan II Missile Site 02 | Gary Richards | KDHE | Cole Knight | AFCEC/CZOM | ST-05 | 2018-08-16-KDHE- Final Excavation Completion Report ST005 Titan II Missile Site 02.pdf | |
| McConnell AFB, KS | 10117 | Aug/16/2018 | 2018-08-16-KDHE- Final SS003 Piezometer Sampling Work Plan | Jesse Saegert | KDHE | Cole Knight | AFCEC/CZOM | SS-03 | 2018-08-16-KDHE- Final SS003 Piezometer Sampling Work Plan.pdf | |
| McConnell AFB, KS | 10118 | Aug/17/2018 | 2018-08-16-KDHE-15 August 2018 Missile_Smokey Hill Sites DPL | Mandi Chace | KDHE | Cole Knight | AFCEC/CZOM | DP-09 | 2018-08-16-KDHE-15 August 2018 Missile_Smokey Hill Sites DPL.pdf | |
| McConnell AFB, KS | 10119 | Aug/16/2018 | 2018-08-16-KDHE-Draft Proposed Plan and Fact Sheet SS018 Titan II Missile Site 18 dated 4-18 McConnell AFB | Gary Richards | KDHE | Cole Knight | AFCEC/CZOM | SS018 | 2018-08-16-KDHE-Draft Proposed Plan and Fact Sheet SS018 Titan II Missile Site 18 dated 4-18 McConnell AFB.pdf | |
| McConnell AFB, KS | 1012 | Jul/16/2007 | Proposed Monitoring Well Locations for the Remedial Investigation at Titan II Missile Sites 3, 6, 11, and 16 | Dickens, Nancy | Tetra Tech, Inc. | Knight, Cole | 22 CES/CEV | SS-28 | AR-1012.pdf | |
| McConnell AFB, KS | 10120 | Aug/16/2018 | 2018-08-16-KDHE-Final LF011 ISCR Injection Completion Report MAFB | Jesse Saegert | KDHE | Cole Knight | AFCEC/CZOM | LF-11 | 2018-08-16-KDHE-Final LF011 ISCR Injection Completion Report MAFB.pdf | |
| McConnell AFB, KS | 10121 | Aug/16/2018 | 2018-08-16-KDHE-Final OW026 ISCO Injection Completion Report MAFB | Jesse Saegert | KDHE | Cole Knight | AFCEC/CZOM | OW026 | 2018-08-16-KDHE-Final OW026 ISCO Injection Completion Report MAFB.pdf | |
| McConnell AFB, KS | 10122 | Aug/16/2018 | 2018-08-16-KDHE-Final SS035 Corrective Measures Completion Report MAFB | Jesse Saegert | KDHE | Cole Knight | AFCEC/CZOM | SS-35 | 2018-08-16-KDHE-Final SS035 Corrective Measures Completion Report MAFB.pdf | |
| McConnell AFB, KS | 10123 | Aug/17/2018 | 2018-08-16-OT547_DFT_ISCR MI R2 WP TM_AF XMIT_17AUG18-Transmittal Letter | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | OT547 | 2018-08-16-OT547_DFT_ISCR MI R2 WP TM_AF XMIT_17AUG18-Transmittal Letter.pdf | |
| McConnell AFB, KS | 10124 | Aug/17/2018 | 2018-08-16-SS014_DFT_ISCR MI R1 WP TM_AF XMIT_17AUG18 - Transmittal Letter | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | SS-14 | 2018-08-16-SS014_DFT_ISCR MI R1 WP TM_AF XMIT_17AUG18 - Transmittal Letter.pdf | |
| McConnell AFB, KS | 10125 | Aug/17/2018 | 2018-08-17-AGEISS-ISCR MI R3 WP TM_Site FT006_(AGEISS #1588) (002) | AGEISS | AGEISS | URS | AECOM | FT-06 | 2018-08-17-AGEISS-ISCR MI R3 WP TM_Site FT006_(AGEISS #1588) (002).pdf | |
| McConnell AFB, KS | 10126 | Aug/17/2018 | 2018-08-18-KDHE-Final SWMU 207 (SS544) RFI Report Replacement Pages | Jesse Saegert | KDHE | Cole Knight | AFCEC/CZOM | SS544 | 2018-08-18-KDHE-Final SWMU 207 (SS544) RFI Report Replacement Pages.pdf | |
| McConnell AFB, KS | 10127 | Aug/21/2018 | 2018-08-21-AECOM-DP013_DFT_EXC CR_KDHE (Saegert) RTC | URS | AECOM | Jesse Saegert | KDHE | DP-13 | 2018-08-21-AECOM-DP013_DFT_EXC CR_KDHE (Saegert) RTC.pdf | |
| McConnell AFB, KS | 10128 | Aug/21/2018 | 2018-08-21-AECOM-RTCs for OT547, SS014, and SS001 | Brian Wight | AECOM | Cole Knight | AFCEC/CZOM | OT547|SS-01|SS-14 | 2018-08-21-AECOM-RTCs for OT547, SS014, and SS001.pdf | |
| McConnell AFB, KS | 10129 | Aug/21/2018 | 2018-08-21-AECOM-TU046_MW INSTALL_USEPA RTC | URS | AECOM | Ruby Crysler | EPA | TU046 | 2018-08-21-AECOM-TU046_MW INSTALL_USEPA RTC.pdf | |
| McConnell AFB, KS | 1013 | Jul/13/2007 | Proposed Well Locations for the Remedial Investigation at Titan II Missile Sites 3, 6, and 16 (SS28) 10, 11, and 14 (SS30) | Dickens, Nancy | Tetra Tech, Inc. | Bailey, Diana J Crysler, Ruby | EPA Region VII Kansas Department of Health and Environment | SS-28 | AR-1013.pdf | |
| McConnell AFB, KS | 10130 | Aug/22/2018 | 2018-08-21-FT007_FNL_2016 LTM_AF XMIT_22AUG18-Transmittal Letter | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | FT-07 | 2018-08-21-FT007_FNL_2016 LTM_AF XMIT_22AUG18-Transmittal Letter.pdf | |
| McConnell AFB, KS | 10131 | Aug/21/2018 | 2018-08-21-KDHE-Draft OW041 (SWMU 179) Groundwater Monitoring Annual Report - March 2018 | Jesse Saegert | KDHE | Cole knight | AFCEC/CZOM | OW041 | 2018-08-21-KDHE-Draft OW041 (SWMU 179) Groundwater Monitoring Annual Report - March 2018.pdf | |
| McConnell AFB, KS | 10132 | Aug/21/2018 | Titan II Sites Public Notices email | Mandi Chace | KDHE | Cole Knight | AFCEC/CZOM | SS-28|SS-29|SS-30|SS012|SS015|SS018 | 2018-08-21-KDHE-Titan II Public Notice.pdf | |
| McConnell AFB, KS | 10133 | Aug/22/2018 | 2018-08-21-SS001_FNL_2016 LTM Rpt_XMIT_22Aug18-Transmittal Letter | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | SS-01 | 2018-08-21-SS001_FNL_2016 LTM Rpt_XMIT_22Aug18-Transmittal Letter.pdf | |
| McConnell AFB, KS | 10134 | Aug/22/2018 | 2018-08-22-AECOM-FT006_DFT_GW Data Rpt_Mar 2018_RTCs (KDHE-Saegert) (002) | URS | AECOM | Jesse Saegert | KDHE | FT-06 | 2018-08-22-AECOM-FT006_DFT_GW Data Rpt_Mar 2018_RTCs (KDHE-Saegert) (002).pdf | |
| McConnell AFB, KS | 10135 | Aug/22/2018 | 2018-08-22-AECOM-LF059_RFA Rpt_RTCs (KDHE_Saegert) (002) | URS | AECOM | Jesse Saegert | KDHE | LF059 | 2018-08-22-AECOM-LF059_RFA Rpt_RTCs (KDHE_Saegert) (002).pdf | |
| McConnell AFB, KS | 10136 | Aug/22/2018 | 2018-08-22-AECOM-SS001_DFT_GM Data Rpt - Mar 2018_RTCs (KDHE-Saegert) (002) | URS | AECOM | Jesse Saegert | KDHE | SS-01 | 2018-08-22-AECOM-SS001_DFT_GM Data Rpt - Mar 2018_RTCs (KDHE-Saegert) (002).pdf | |
| McConnell AFB, KS | 10137 | Aug/22/2018 | 2018-08-22-AECOM-TU046_DFT RFA_KDHE (Saegert) RTCs (002) | URS | AECOM | Jesse Saegert | KDHE | TU046 | 2018-08-22-AECOM-TU046_DFT RFA_KDHE (Saegert) RTCs (002).pdf | |
| McConnell AFB, KS | 10138 | Aug/22/2018 | 2018-08-22-AGEISS-FT008_PD RFA WP (AGEISS #1566 RTCs) | AGEISS | AGEISS | URS | AECOM | FT008 | 2018-08-22-AGEISS-FT008_PD RFA WP (AGEISS #1566 RTCs).pdf | |
| McConnell AFB, KS | 10139 | Aug/20/2018 | 2018-08-22-AGEISS-PD_RFA Rpt_Site SA057_(AGEISS #1582) (002) | AGEISS | AGEISS | URS | AECOM | SA057 | 2018-08-22-AGEISS-PD_RFA Rpt_Site SA057_(AGEISS #1582) (002).pdf | |
| McConnell AFB, KS | 1014 | Jul/13/2007 | USEPA Region VII Response to the Proposed Monitoring Well Locations for the Remedial Investigation at Titan II Missile Sites 3, 6, and 16 (SS28) 10, 11, and 14 (SS30) | Bailey, Diana J | EPA Region VII | Dickens, Nancy | Tetra Tech, Inc. | SS-28 | AR-1014.pdf | |
| McConnell AFB, KS | 10140 | Aug/22/2018 | 2018-08-22-EPA-SS001 ISCR MIT 2 ICR Comments | Ruby Crysler | EPA | Cole Kight | AFCEC/CZOM | SS-01 | 2018-08-22-EPA-SS001 ISCR MIT 2 ICR Comments.pdf | |
| McConnell AFB, KS | 10141 | Aug/22/2018 | 2018-08-22-EPA-ST017 ISCO MIT2 Injection Completion Report | Ruby Crysler | EPA | Cole Knight | AFCEC/CZOM | ST-17 | 2018-08-22-EPA-ST017 ISCO MIT2 Injection Completion Report.pdf | |
| McConnell AFB, KS | 10142 | Aug/22/2018 | 2018-08-22-KDHE- Draft SS028 Titan II Missile Site 16 Proposed Plan Fact Sheet | Brittany Bennett | KDHE | Cole Knight | AFCEC/CZOM | SS-28 | 2018-08-22-KDHE- Draft SS028 Titan II Missile Site 16 Proposed Plan Fact Sheet.pdf | |
| McConnell AFB, KS | 10143 | Aug/23/2018 | 2018-08-24-AGEISS-AFB_PD_SR_Site SS032_(AGEISS #1595) | AGEISS | AGEISS | URS | AECOM | SS-32 | 2018-08-24-AGEISS-AFB_PD_SR_Site SS032_(AGEISS #1595).pdf | |
| McConnell AFB, KS | 10144 | Aug/22/2018 | 2018-08-24-EPA- Responses to EPA's Comments SS001 email | Ruby Crysler | EPA | Cole Knight | AFCEC/CZOM | SS-01 | 2018-08-24-EPA- Responses to EPA's Comments.pdf | |
| McConnell AFB, KS | 10145 | Aug/24/2018 | 2018-08-24-FT006_FNL_2016 LTM_AF XMIT_23Aug18-Transmittal Letter | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | FT-06 | 2018-08-24-FT006_FNL_2016 LTM_AF XMIT_23Aug18-Transmittal Letter.pdf | |
| McConnell AFB, KS | 10146 | Aug/24/2018 | 2018-08-24-KDHE- Responses to KDHE (Saegert) Comments | Jesse Saegert | KDHE | Cole Knight | AFCEC/CZOM | FT-06|LF059|SS-01|TU046 | 2018-08-24-KDHE- Responses to KDHE (Saegert) Comments.pdf | |
| McConnell AFB, KS | 10147 | Aug/24/2018 | 2018-08-24-KDHE-Draft OW026) Groundwater Monitoring Annual Report - March 2018 | Jesse Saegert | KDHE | Cole Knight | AFCEC/CZOM | OW026 | 2018-08-24-KDHE-Draft OW026) Groundwater Monitoring Annual Report - March 2018.pdf | |
| McConnell AFB, KS | 10148 | Aug/24/2018 | 2018-08-24-SS001_FNL_2016 LTM Rpt_XMIT_22Aug18-Transmittal Letter | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | SS-01 | 2018-08-24-SS001_FNL_2016 LTM Rpt_XMIT_22Aug18-Transmittal Letter.pdf | |
| McConnell AFB, KS | 10149 | Aug/27/2018 | 2018-08-24-ST017_FNL_2016_LTM_Report XMIT_27AUG18-Transmittal Letter | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | ST-17 | 2018-08-24-ST017_FNL_2016_LTM_Report XMIT_27AUG18-Transmittal Letter.pdf | |
| McConnell AFB, KS | 1015 | Jul/16/2007 | KDHE Response to Preliminary Soils Data and Proposed Monitoring Well Locations for the Remedial Investigation at Titan II Missile Sites 3, 6, 11, and 16 | Crysler, Ruby | Kansas Department of Health and Environment | Dickens, Nancy | Tetra Tech, Inc. | SS-28 | AR-1015.pdf | |
| McConnell AFB, KS | 10150 | Aug/24/2018 | 2018-08-24-USEPA-SS003 Draft GW Monitoring Annual Report - September 2017 | Ruby Crysler | EPA | Cole Knight | AFCEC/CZOM | SS-03 | 2018-08-24-USEPA-SS003 Draft GW Monitoring Annual Report - September 2017.pdf | |
| McConnell AFB, KS | 10151 | Aug/30/2018 | 2018-08-25-EPA-OT547 Final INCR MI 1 Completion Report | Ruby Crysler | EPA | Cole Knight | AFCEC/CZOM | OT547 | 2018-08-25-EPA-OT547 Final INCR MI 1 Completion Report.pdf | |
| McConnell AFB, KS | 10152 | Aug/27/2018 | 2018-08-27-AECOM-LF034_DFT_2016 LTM Rpt_RTCs (USEPA) | URS | AECOM | Ruby Crysler | EPA | LF-34 | 2018-08-27-AECOM-LF034_DFT_2016 LTM Rpt_RTCs (USEPA).pdf | |
| McConnell AFB, KS | 10153 | Aug/27/2018 | 2018-08-27-AECOM-OW971 RTC to KDHE Comments | Brian Wight | AECOM | Cole Knight | AFCEC/CZOM | OW971 | 2018-08-27-AECOM-OW971 RTC to KDHE Comments.pdf | |
| McConnell AFB, KS | 10154 | Aug/27/2018 | 2018-08-27-AECOM-SS028 (MS16)_FNL_PP_AF XMIT_27AUG18-Transmittal Letter | Cole Knight | AFCEC/CZOM | Mandi Chace | KDHE | SS-28 | 2018-08-27-AECOM-SS028 (MS16)_FNL_PP_AF XMIT_27AUG18-Transmittal Letter.pdf | |
| McConnell AFB, KS | 10155 | Aug/24/2018 | 2018-08-27-KDHE- Final OW971 Site Closure Work Plan | Jesse Saegert | KDHE | Cole Knight | AFCEC/CZOM | OW971 | 2018-08-27-KDHE- Final OW971 Site Closure Work Plan.pdf | |
| McConnell AFB, KS | 10156 | Aug/27/2018 | 2018-08-27-KDHE-Draft TU036 Groundwater Monitoring Annual Rpt March 2018 | Jesse Saegert | KDHE | Cole Knight | AFCEC/CZOM | TU036 | 2018-08-27-KDHE-Draft TU036 Groundwater Monitoring Annual Rpt March 2018.pdf | |
| McConnell AFB, KS | 10157 | Aug/28/2018 | 2018-08-28-AECOM-DP013_DFT_EXC CR_KDHE (Saegert) RTC (002) | URS | AECOM | Jesse Saegert | KDHE | DP-13 | 2018-08-28-AECOM-DP013_DFT_EXC CR_KDHE (Saegert) RTC (002).pdf | |
| McConnell AFB, KS | 10158 | Aug/28/2018 | 2018-08-28-AECOM-FT006_PD_ISCR MI R3 WP TM_RTCs (MAFB-AGEISS) (002) | URS | AECOM | AGEISS | AGEISS | FT-06 | 2018-08-28-AECOM-FT006_PD_ISCR MI R3 WP TM_RTCs (MAFB-AGEISS) (002).pdf | |
| McConnell AFB, KS | 10159 | Aug/28/2018 | 2018-08-28-AECOM-ID636_PD_ISCR MI R2 WP TM_RTCs (MAFB-AGEISS) (002) | URS | AECOM | AGEISS | AGEISS | ID636 | 2018-08-28-AECOM-ID636_PD_ISCR MI R2 WP TM_RTCs (MAFB-AGEISS) (002).pdf | |
| McConnell AFB, KS | 1016 | Jul/17/2007 | Letter Report Rounds 1 and 2 Preliminary Sample Results fo rthe Remedial Investigation at Sites SS31, SS32, LF33, and LF34 | Baum, Don | Tetra Tech, Inc. | Knight, Cole | 22 CES/CEV | LF-33 | AR-1016.pdf | |
| McConnell AFB, KS | 10160 | Aug/28/2018 | 2018-08-28-AECOM-OW040_DFT_RFI Report_RTCs (USEPA) | URS | AECOM | Ruby Crysler | EPA | OW040 | 2018-08-28-AECOM-OW040_DFT_RFI Report_RTCs (USEPA).pdf | |
| McConnell AFB, KS | 10161 | Aug/28/2018 | 2018-08-28-AECOM-SS044_DFT_GM Annual Rpt - March 2018_RTCs (KDHE) | URS | AECOM | Jesse Saegert | KDHE | SS044 | 2018-08-28-AECOM-SS044_DFT_GM Annual Rpt - March 2018_RTCs (KDHE).pdf | |
| McConnell AFB, KS | 10162 | Aug/28/2018 | 2018-08-28-AECOM-TU046_MW INSTALL_USEPA RTC (002) | URS | AECOM | Ruby Crysler | EPA | TU046 | 2018-08-28-AECOM-TU046_MW INSTALL_USEPA RTC (002).pdf | |
| McConnell AFB, KS | 10163 | Aug/27/2018 | 2018-08-28-AGEISS-PD_Re DNFA_Site SS587_(AGEISS #1594) (002) | AGEISS | AGEISS | URS | AECOM | SS587 | 2018-08-28-AGEISS-PD_Re DNFA_Site SS587_(AGEISS #1594) (002).pdf | |
| McConnell AFB, KS | 10164 | Aug/27/2018 | 2018-08-28-AGEISS-PD_RfD NFA_Site SS016_(AGEISS #1599) (002) | AGEISS | AGEISS | URS | AECOM | SS-16 | 2018-08-28-AGEISS-PD_RfD NFA_Site SS016_(AGEISS #1599) (002).pdf | |
| McConnell AFB, KS | 10165 | Aug/28/2018 | 2018-08-28-LF011_FNL_2016 LTM Rpt_AF XMIT_28Aug18-Transmittal Letter | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | LF-11 | 2018-08-28-LF011_FNL_2016 LTM Rpt_AF XMIT_28Aug18-Transmittal Letter.pdf | |
| McConnell AFB, KS | 10166 | Aug/28/2018 | 2018-08-28-OT547_PD_ISCR MI R2 WP TM_RTCs (MAFB-AGEISS) (002) | URS | AECOM | AGEISS | AGEISS | OT547 | 2018-08-28-OT547_PD_ISCR MI R2 WP TM_RTCs (MAFB-AGEISS) (002).pdf | |
| McConnell AFB, KS | 10167 | Aug/28/2018 | 2018-08-28-SS003_FNL_2016 LTM Rpt_AF XMIT_28AUG18-Transmittal Letter | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | SS-03 | 2018-08-28-SS003_FNL_2016 LTM Rpt_AF XMIT_28AUG18-Transmittal Letter.pdf | |
| McConnell AFB, KS | 10168 | Aug/29/2018 | 2018-08-28-SS029 (MS1 MS5)_FNL_ROD_AF XMIT_29AUG18-Transmittal Letter | Cole Knight | AFCEC/CZOM | Mandi Chace | KDHE | SS-29 | 2018-08-28-SS029 (MS1 MS5)_FNL_ROD_AF XMIT_29AUG18-Transmittal Letter.pdf | |
| McConnell AFB, KS | 10169 | Aug/29/2018 | 2018-08-29-AFCEC-ZZ058__pre-draft_RFA_report (002) | Pamela Hamlett | AFCEC/CZTE | URS | AECOM | ZZ058 | 2018-08-29-AFCEC-ZZ058__pre-draft_RFA_report (002).pdf | |
| McConnell AFB, KS | 1017 | Jul/23/2007 | Meeting Summary Conference Call Regarding the Remedial Investigation at Sites SS31, SS32, LF33, and LF34 Discussion of Analytical Resultsand Monitoring Well Placement | Sievers, Mark | Tetra Tech, Inc. | Knight, Cole | 22 CES/CEV | LF-33 | AR-1017.pdf | |
| McConnell AFB, KS | 10170 | Aug/29/2018 | 2018-08-29-EPA-TU046 Response to Comments | Ruby Crysler | EPA | Cole Knight | AFCEC/CZOM | TU046 | 2018-08-29-EPA-TU046 Response to Comments.pdf | |
| McConnell AFB, KS | 10171 | Aug/29/2018 | 2018-08-29-EPA-TU046_MW INSTALL_USEPA RTC | URS | AECOM | Ruby Crysler | EPA | TU046 | 2018-08-29-EPA-TU046_MW INSTALL_USEPA RTC.pdf | |
| McConnell AFB, KS | 10172 | Aug/29/2018 | 2018-08-29-OW579_DFT_RFA Report_AF XMIT_29AUG18-Transmittal Letter | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | OW579 | 2018-08-29-OW579_DFT_RFA Report_AF XMIT_29AUG18-Transmittal Letter.pdf | |
| McConnell AFB, KS | 10173 | Aug/30/2018 | 2018-08-30-EPA-FT007 Final ISCR MI 1 Completion Report | Ruby Crysler | EPA | Cole Knight | AFCEC/CZOM | FT-07 | 2018-08-30-EPA-FT007 Final ISCR MI 1 Completion Report.pdf | |
| McConnell AFB, KS | 10174 | Aug/30/2018 | 2018-08-30-EPA-FT007 Final Q1 IMPM Data Report | Ruby Crysler | EPA | Cole Knight | AFCEC/CZOM | FT-07 | 2018-08-30-EPA-FT007 Final Q1 IMPM Data Report.pdf | |
| McConnell AFB, KS | 10175 | Aug/30/2018 | 2018-08-30-EPA-LF034 Final 2016 Q4 IMPM Data Report | Ruby Crysler | EPA | Cole Knight | AFCEC/CZOM | LF-34 | 2018-08-30-EPA-LF034 Final 2016 Q4 IMPM Data Report.pdf | |
| McConnell AFB, KS | 10176 | Aug/30/2018 | 2018-08-30-EPA-OT547 Final ISCR MI 1 Completion Report | Ruby Crysler | EPA | Cole Knight | AFCEC/CZOM | OT547 | 2018-08-30-EPA-OT547 Final ISCR MI 1 Completion Report.pdf | |
| McConnell AFB, KS | 10177 | Aug/30/2018 | 2018-08-30-EPA-OW026 and OW041 Draft GW Monitoring Annual Report - March 2018 | Ruby Crysler | EPA | Cole Knight | AFCEC/CZOM | OW026|OW041 | 2018-08-30-EPA-OW026 and OW041 Draft GW Monitoring Annual Report - March 2018.pdf | |
| McConnell AFB, KS | 10178 | Aug/30/2018 | 2018-08-30-EPA-OW037 Final RFI Report | Ruby Crysler | EPA | Cole Knight | AFCEC/CZOM | OW037 | 2018-08-30-EPA-OW037 Final RFI Report.pdf | |
| McConnell AFB, KS | 10179 | Aug/30/2018 | 2018-08-30-EPA-SS001 Final 2017 Q1 IMPM Data Report | Ruby Crysler | EPA | Cole Knight | AFCEC/CZOM | SS-01 | 2018-08-30-EPA-SS001 Final 2017 Q1 IMPM Data Report.pdf | |
| McConnell AFB, KS | 1018 | Jul/27/2007 | Contractor E-Mail to Base Regarding KDHE Agreement of the Location of the Proposed Monitoring Wells at Site LF33 | Sievers, Mark | Tetra Tech, Inc. | Knight, Cole | 22 CES/CEV | LF-33 | AR-1018.pdf | |
| McConnell AFB, KS | 10180 | Aug/30/2018 | 2018-08-30-EPA-SS014 Final 2017 Q1 IMPM Data Report | Ruby Crysler | EPA | Cole Knight | AFCEC/CZOM | SS-14 | 2018-08-30-EPA-SS014 Final 2017 Q1 IMPM Data Report.pdf | |
| McConnell AFB, KS | 10181 | Aug/30/2018 | 2018-08-30-FT008_DFT_RFA WP TM_AF XMIT_30AUG18-TRANSMITTAL LETTER | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | FT008 | 2018-08-30-FT008_DFT_RFA WP TM_AF XMIT_30AUG18-TRANSMITTAL LETTER.pdf | |
| McConnell AFB, KS | 10182 | Aug/30/2018 | 2018-08-30-KDHE-Draft FT007 Groundwater Monitoring Data Report - March 2018 | Jesse Saegert | KDHE | Cole Knight | AFCEC/CZOM | FT-07 | 2018-08-30-KDHE-Draft FT007 Groundwater Monitoring Data Report - March 2018.pdf | |
| McConnell AFB, KS | 10183 | Aug/30/2018 | 2018-08-30-KDHE-Draft LF011 Groundwater Monitoring Data Report - March 2018 | Jesse Saegert | KDHE | Cole Knight | AFCEC/CZOM | LF-11 | 2018-08-30-KDHE-Draft LF011 Groundwater Monitoring Data Report - March 2018.pdf | |
| McConnell AFB, KS | 10184 | Aug/30/2018 | 2018-08-30-LF034 Final 2017 Quarter 1 IMPM Data Report | Ruby Crysler | EPA | Cole Knight | AFCEC/CZOM | LF-34 | 2018-08-30-LF034 Final 2017 Quarter 1 IMPM Data Report.pdf | |
| McConnell AFB, KS | 10185 | Aug/30/2018 | 2018-08-30-SA057_DFT_RFA_AF XMIT_30Aug18-TRANSMITTAL LETTER | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | SA057 | 2018-08-30-SA057_DFT_RFA_AF XMIT_30Aug18-TRANSMITTAL LETTER.pdf | |
| McConnell AFB, KS | 10186 | Aug/31/2018 | 2018-08-30-SS004 (SWMU 201)_DFT_RFA ADD__AF XMIT_31Aug18-TRANSMITTAL LETTER | Cole Knight | AFCEC/CZOM | Ruby Crysler | EPA | SS-04 | 2018-08-30-SS004 (SWMU 201)_DFT_RFA ADD__AF XMIT_31Aug18-TRANSMITTAL LETTER.pdf | |
| McConnell AFB, KS | 10187 | Aug/31/2018 | 2018-08-31-AFCEC-AFCEC Review Comments -FT008 PD RFA WP | Pamela Hamlett | AFCEC/CZTE | Cole Knight | AFCEC/CZOM | FT008 | 2018-08-31-AFCEC-AFCEC Review Comments -FT008 PD RFA WP.pdf | |
| McConnell AFB, KS | 10188 | Feb/18/2019 | FINAL FT006 Excavation Completion Report February 2019 | URS | AECOM | Cole Knight | AFCEC/CZOM | FT-06 | FT006_FNL_Ex Completion Report.pdf | |
| McConnell AFB, KS | 10189 | Feb/04/2019 | F I N A L |
FT006
ISCR MITIGATION INJECTION 2
| INJECTION COMPLETION REPORT | URS | AECOM | Cole Knight | AFCEC/CZOM | FT-06 | FT006_FNL_ISCR MI 2 ICR.pdf |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .