About this file

The document is a specification sheet for custom prefabricated air monitoring shelters issued by the Alabama Department of Environmental Management (ADEM). ADEM is procuring three specialized shelters for housing air monitoring instrumentation: two 10'L x 8'W x 8'H shelters to be delivered to Helena and Wetumpka, Alabama, and one 20'L x 8'W x 8'H modified shipping container shelter to be delivered in the Africatown area near Prichard, Alabama. Each shelter will have unique configurations tailored to specific monitoring needs, including dedicated instrument racks, electrical systems, HVAC, lighting, and specialized inlet and exhaust systems for monitoring ozone, sulfur dioxide, and particulate matter.

The shelters will be fully prefabricated off-site and delivered to pre-existing concrete pads, with detailed specifications for construction materials, electrical components, and environmental controls. The shelters feature premium components like SquareD electrical systems, 1-ton cooling capacity HVAC units, programmable thermostats, and R-25 equivalent insulation. Technical drawings must be submitted to ADEM for approval to ensure compliance with specifications. Delivery is included in the contract, with precise GPS coordinates provided for each installation site. The document indicates these shelters are likely funded through infrastructure or environmental monitoring programs, with a focus on creating robust, specialized environments for scientific air quality measurement equipment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Custom Prefabricated Air Monitoring Shelters

Qty:3 Shelters

ADEM is purchasing three prefabricated, stand-alone shelters specifically to house air monitoring instrumentation. Each shelter will have a self-contained heating and cooling system with digital thermostat to ensure consistent temperatures required for scientific instrumentation. Each shelter will be built off-site and delivered, fully assembled.

MUST MEET THE FOLLOWING REQUIREMENTS:

1. Shelter Dimensions

Shelters#1 & #2: 10’L X 8’W x 8’H - Will be configured the same but delivered to two separate locations.

Shelter#3: 20’L X 8’W x 8’H - Separate delivery location.

2. Construction and design

a. Shelters #1 and #2:

• Prefabricated modular custom building

• Four (4) Crane Lifting and Shelter Anchoring Points integrated into shelter skid base.

Spreader bar required during crane lifting.

• Aluminum Skid Base

• Aluminum exterior skin including trim.

• Rust proof fasteners.

• Rubber membrane roof.

• Titanium dioxide waterproofing agent (or equivalent).

• Insulation in walls and ceiling shall be R-25 equivalent.

• Stud-less wall construction to minimize thermal bridges heat loss or gain.

• Seamless vinyl flooring (slip resistant).

• Fiberglass reinforced panel interior finish (white).

• Insulated metal access door (36”), includes hydraulic door closer, weather stripping, door drip shield, door threshold, and handle with lock.

b. Shelter #3:

• Modified Shipping Container

• Full Dimensions 20ft by 8ft by 8ft o Control Room Area 16ft by 8ft o Storage Area 3.5ft by 8ft uninsulated

• Container Style Envelope Steel, 16gauge, Corten Steel

• Forktruck and crane lifting points

• Control room insulation in walls and ceiling shall be R-25 equivalent

• Stud-less Wall construction to minimize thermal bridges heat loss or gain.

• Seamless vinyl flooring, (slip resistant).

• Fiberglass reinforced panel interior finish (White)

• Insulated metal access door (36”) includes hydraulic door closer, weather stripping, door drip, door threshold, commercial-type handle with lock

3. Electrical System (for all shelters)

• Premium SquareD Electrical Components .

• 100A 1PH 120/240V Electrical System.

• 100A 1PH 120/240V Load Center.

• 100A 1PH 240V External Disconnect, Nema 3R.

• Electrical Surge Protection for System.

• Metal Electrical Raceway.

4. HVAC System (for all shelters)

• 1 Ton Cooling Capacity with heater unit.

• 208/240V 1PH 20A Hardwired.

• Programmable, auto-switching thermostat installed.

• High Efficiency rotary compressor.

• Automatic condensate disposal system.

• Warranty-12 months from beginning date of service.

5. Shelter Configuration

Shelters #1 and #2– Monitor configuration (Ozone only) – see attached schematic

• No roof penetrations.

• Side Inlet - One (1) Aluminum Folding Mast; Includes aluminum folding mast, hinged at

1/3 point, 45 degree weld fitting for tubing entrance, flexible conduit for connection to building for CAS inlet. Height of mast must allow inlet to extend 3ft above roof line.

• One (1) floor mounted exhaust manifold, includes PVC manifold with ¼” quick release ports. Located near the instrument rack.

• Two (2) 48” LED light fixtures with wall-mounted power switch.

• One (1) dedicated instrument rack outlet, 120V 20A, Twist-lock, wall or ceiling-mounted.

• Three (3) 120V 20A duplex interior wall-mounted receptacles.

• One (1) instrument rack- 24”W x 30”D x 75”H, Open Frame Type Steel (Painted), includes wire/tubing management system with access to the dedicated instrument rack receptacle.

• One (1) NEMA 4 data port junction box; side penetration through the wall to allow miscellaneous wires to be routed to the exterior. Installed adjacent to side inlet.

• Workbench- with a moisture, heat and scratch-resistant laminate surface.

• See approximate configuration in diagram on next page.

Shelter #1 & #2

Shelter#3 – Monitor configuration (Ozone, SO2, PM2.5-BAM 1022) – see attached schematic

• Two (2) roof penetrations to accommodate analyzer inlets (for API T100 and API T400) one over each rack. Flanges and caps included. Inlets should be located adjacent to steel plating of the roof system so they are accessible from the roof deck but not under it.

• Two (2) floor-mounted exhaust manifolds, includes PVC manifold with ¼” quick release ports. One located next to each instrument rack

• Include any necessary tie-down hardware compatible with the roof flooring system to install a BAM-1022.

• Three (3) 48” LED light fixtures with wall-mounted switch in the control room.

• One (1) 48” LED light fixture with motion sensor in storage area.

• Three (3) 120V 20A duplex interior wall-mounted receptacles in the control room.

• One (1) 120V 20A duplex interior wall-mounted receptacle in the storage room.

• Two (2) dedicated instrument rack outlets, 120V 20A, Twist-lock, wall or ceiling mounted.

• Cylinder bracket in the storage room area for one gas cylinder.

• One (1) set of waterproof Roof Outlets (includes one 120V 20A circuit with one GFCI duplex outlet).

• Two (2) instrument racks- 24”W x 30”D x 75”H, Open Frame Type Steel (Painted), includes wire/tubing management system with access to a dedicated instrument rack receptacle.

• One (1) NEMA4 data port junction box; a penetration through the wall to allow miscellaneous wires to be routed to the exterior (near installation of BAM-1022).

• Aluminum ladder installed in the interior storage room for roof access.

• Aluminum Single door roof hatch.

• 96” L Workbench- with a moisture, heat and scratch-resistant laminate surface.

• Aluminum Modular Roof Railing System, which meets OSHA specifications. This shall cover approximately 14ftx8ft of the roof area with the railing system with toe-plate.

• Galvanized steel grating, slip resistant roof (over only 14ftx8ft of the shelter).

• Eight (8) additional tie-down brackets.

• Storage Area (includes insulated partition wall, FRP wall finish Aluminum trim)

• Storage Area Door Assembly (door, frame, keyway entrance, closer, threshold).

• All doors have panic bars installed.

• See approximate configuration in diagram on next page.

Shelter #3

6. Delivery and Offloading

The quote shall include delivery and offloading at the site to the pre-existing concrete pad.

7. Delivery Location – All locations will be confirmed prior to delivery.

Shelter#1 will be delivered to: Helena, AL (Shelby County)

237 Limestone Drive, Helena, AL

Coordinates: 33.317142, -86.825754

Access from Bearden Rd.

Shelter#2 will be delivered to: Wetumpka, AL (Elmore County)

3148 Elmore Road, Wetumpka, AL

Coordinates: 32.535680, -86.255193

Access from AL Hwy 14

Shelter#3 will be delivered to: Africatown, AL (Mobile County)

Actual location will be confirmed prior to delivery.

In the vicinity of Whitley Elementary School, Prichard, AL

8. Drawings/Cut Sheets

Technical drawings shall be submitted to ADEM for approval to ensure the proposed building meets specifications.