Addenum_2_(IFB_10206502).pdf

PDF 761 KB Posted

Attached to
IFB # 10206502 - Cone Penetrometer Testing (CPT).
Solicitation number
0000033750
Issued by
California

About this file

This is Addendum #2 to Invitation for Bid (IFB) #10206502 issued by the California Department of Water Resources for Cone Penetrometer Testing (CPT) services. The addendum modifies the original solicitation issued December 18, 2024, updating the bid key action dates and bid sheets. Technical questions were due January 8, 2025, with answers provided by January 10, 2025. Bids must be received by January 29, 2025 at 11:00am, with bid opening via Microsoft Teams at 1:00pm the same day. The anticipated start date is February 2025, with a two-year base period and two one-year extension options.

The bid sheets detail requirements for CPT rig mobilization/demobilization (250 hours), standard testing services (650 hours), and overtime rates (160 hours) for the base period, with reduced quantities for each extension year. Additional line items include special equipment (up to $100,000 with 10% markup cap) and miscellaneous materials/supplies (up to $50,000 with 10% markup cap) for the base period, with reduced amounts for extension years. Bidders must complete all line items on the revised bid sheets (Attachments I, IA, and IB), with zero-dollar bids interpreted as no-cost services. The bid opening will be visual-only with no opportunity for questions and answers during the session.

View the file

Other files

File Type Posted
IFB___10206502_(CPT_Drilling).pdf PDF
Addendum_1_(Questions_and_Answers).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF CALIFORNIA – CALIFORNIA NATURAL RESOURCES AGENCY GAVIN NEWSOM, Governor

DEPARTMENT OF WATER RESOURCES

715 P STREET, 7th FLOOR P.O. BOX 942836

SACRAMENTO, CA 94236-0001

INVITATION FOR BID

ADDENDUM # 2

SOLICITATION # 10206502

NOTICE TO PROSPECTIVE BIDDERS

January 15, 2025

To All Prospective Bidders:

Attached for your review is IFB # 10206502, Addendum 2, which includes changes to the original solicitation issued December 18, 2024.

Change has been made to the following section:

1. Please see highlighted changes made to Section C. Bid Requirements and Information, Item 1, Bid Key Action Dates (page 5 of 132).

C. Bid Requirements and Information

1. BID KEY ACTION DATES

All bidders must adhere to the following time schedule.

IFB available to prospective bidders on December 18, 2024 Technical questions must be submitted by January 8, 2025 at 11:00am Answers to technical questions will be disseminated by January 10, 2025 at 1:00pm Bids must be received by January 29, 2025 at 11:00am Bid opening to be held on January 29, 2025 at 1:00pm Anticipated start date of agreement is February, 2025

Bid Openings: Sealed bids will be publicly opened and read via a TEAMS link. You may participate using the link provided below.

Topic: Public Bid Opening IFB # 10206502 - Cone Penetrometer Testing (CPT) Time: January 29, 2025 at 1:00pm

Join TEAMS Meeting https://teams.microsoft.com/l/meetup-join/19%3ameeting_MTEwNWY5YzgtOTkxZS00MDI3LTlkYjgtZDU3ZTY0OTdhMmM1%40t hread.v2/0?context=%7b%22Tid%22%3a%22b71d5652-4b83-4257-afcd- 7fd177884564%22%2c%22Oid%22%3a%22590e9182-a17f-4db4-9436- 5073408cf34b%22%7d

Or by Telephone (audio only):

Dial: 916-573-2034 Phone Conference ID : 926 887 699#

IFB # 10206502

Addendum 2 https://teams.microsoft.com/l/meetup-join/19%3ameeting_MTEwNWY5YzgtOTkxZS00MDI3LTlkYjgtZDU3ZTY0OTdhMmM1%40thread.v2/0?context=%7b%22Tid%22%3a%22b71d5652-4b83-4257-afcd-7fd177884564%22%2c%22Oid%22%3a%22590e9182-a17f-4db4-9436-5073408cf34b%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_MTEwNWY5YzgtOTkxZS00MDI3LTlkYjgtZDU3ZTY0OTdhMmM1%40thread.v2/0?context=%7b%22Tid%22%3a%22b71d5652-4b83-4257-afcd-7fd177884564%22%2c%22Oid%22%3a%22590e9182-a17f-4db4-9436-5073408cf34b%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_MTEwNWY5YzgtOTkxZS00MDI3LTlkYjgtZDU3ZTY0OTdhMmM1%40thread.v2/0?context=%7b%22Tid%22%3a%22b71d5652-4b83-4257-afcd-7fd177884564%22%2c%22Oid%22%3a%22590e9182-a17f-4db4-9436-5073408cf34b%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_MTEwNWY5YzgtOTkxZS00MDI3LTlkYjgtZDU3ZTY0OTdhMmM1%40thread.v2/0?context=%7b%22Tid%22%3a%22b71d5652-4b83-4257-afcd-7fd177884564%22%2c%22Oid%22%3a%22590e9182-a17f-4db4-9436-5073408cf34b%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_MTEwNWY5YzgtOTkxZS00MDI3LTlkYjgtZDU3ZTY0OTdhMmM1%40thread.v2/0?context=%7b%22Tid%22%3a%22b71d5652-4b83-4257-afcd-7fd177884564%22%2c%22Oid%22%3a%22590e9182-a17f-4db4-9436-5073408cf34b%22%7d

STATE OF CALIFORNIA – CALIFORNIA NATURAL RESOURCES AGENCY GAVIN NEWSOM, Governor

DEPARTMENT OF WATER RESOURCES

715 P STREET, 7th FLOOR P.O. BOX 942836

SACRAMENTO, CA 94236-0001

*Please note that the bid opening via TEAMS will be visual only with no opportunity for questions and answers.

2. The original Attachment I, Two Year Contract Bid Sheet, Attachment 1A, Bid Sheet First One

(1) Year Extension, and Attachment 1B, Bid Sheet Second One (1) Year Extension, pages 19-24 of the IFB solicitation, have been revised. Please see changes highlighted below.

Revised Bid Sheets, Attachment I through IB, replaces the original Bid Sheets, Attachments I though 1B. Revised Bid Sheets, Attachment I, 1A, and 1B, and must be included with bid submission.

IFB # 10206502

Addendum 2

ATTACHMENT I

TWO (2) YEAR CONTRACT BID SHEET

The items and quantities indicated below will be used solely for computing the cost as fair and equitable formula to determine the low bidder and is not binding on the contracting agency. However, the actual costs quoted below by the bidder shall be binding for the term of the Agreement.

The bidder here by agrees to provide all labor, materials, licenses, permits, and transportation necessary to perform all services required for the foregoing tilted work in accordance with the Scope of Work, Exhibit A. The rates listed on this Bid sheet shall include every item of expense, direct and indirect, including taxes incidental to the specified rates.

The bidder is required to bid each item. Failure to indicate a dollar amount in any item will be grounds to reject the entire bid. A zero-dollar ($0.00) amount listed for any and all items will be interpreted and understood by the State to mean that the bidder indicated a zero-dollar amount shall perform any such services, up to and including the quantity indicated, at no cost to the state.

(A)

BID

ITEM

(B)

APPROX.

QUANTITY

(C)

ITEM WITH UNIT PRICE

WRITTEN IN WORDS

(D)

UNIT

PRICE IN

NUMBERS

(E)

TOTALS

1 250 Hours CPT Rig Call-Up -- Mobilizing and demobilizing CPT equipment to and from the site at a rate of dollars per hour.

per hour

2A 650 Hours Cone Penetration Tests using a standard cone or piezo-cone, Seismic Cone Penetration Tests, Testing, Sampling, Pore Pressure Dissipation Tests, hydropunch groundwater sampling, soil sampling, resistivity/conductivity tests, standby time, moving between holes, and backfilling holes with cement grout at a rate of

2B 160 Hours OVERTIME Rate > 8 working hours On-Site. Cone Penetration Tests using a standard cone or piezo-cone, Seismic Cone Penetration Tests, Testing, Sampling, Pore Pressure Dissipation Tests, hydropunch groundwater sampling, soil sampling, resistivity/conductivity tests, standby time, moving between holes, and backfilling holes with cement grout at a rate of

3 $100,000 Providing Special Equipment at

Percent Mark-up.

(Mark-up not to exceed 10%)

4 $50,000 Providing Miscellaneous Materials and Supplies at

TOTAL (COLUMN E) $____________________

NO GUARANTEE OF WORK UNDER THIS CONTRACT

In the event of a computational error, unit prices will prevail over extended totals. The state will check bid calculations and recalculate bids.

The contractor’s signature in ink, affixed heron and dated will constitute a certification under the penalty of perjury under the laws of the State of California that the Contractor’s license number and expiration date are true and correct.

Company Name

Contractor’s License Number Contractor’s License Expiration Date

Printed Name and Title of Bidder

Signature of Bidder

ATTACHMENT 1A

BID SHEET FIRST ONE (1) YEAR EXTENSION

The items and quantities indicated below will be used solely for computing the cost as fair and equitable formula to determine the low bidder and is not binding on the contracting agency. However, the actual costs quoted below by the bidder shall be binding for the term of the Agreement.

The bidder here by agrees to provide all labor, materials, licenses, permits, and transportation necessary to perform all services required for the foregoing tilted work in accordance with the Scope of Work, Exhibit A. The rates listed on this Bid sheet shall include every item of expense, direct and indirect, including taxes incidental to the specified rates.

The bidder is required to bid each item. Failure to indicate a dollar amount in any item will be grounds to reject the entire bid. A zero-dollar ($0.00) amount listed for any and all items will be interpreted and understood by the State to mean that the bidder indicated a zero-dollar amount shall perform any such services, up to and including the quantity indicated, at no cost to the state.

(A)

BID

ITEM

(B)

APPROX.

QUANTITY

(C)

ITEM WITH UNIT PRICE

WRITTEN IN WORDS

(D)

UNIT

1 125 Hours

CPT Rig Call-Up -- Mobilizing and demobilizing CPT equipment to and from the site at a rate of

2A 325 Hours

Cone Penetration Tests using a standard cone or piezo-cone, Seismic Cone Penetration Tests, Testing, Sampling, Pore Pressure Dissipation Tests, hydropunch groundwater sampling, soil sampling, resistivity/conductivity tests, standby time, moving between holes, and backfilling holes with cement grout at a rate of dollars hour.

2B 100 Hours

OVERTIME Rate > 8 working hours On-Site. Cone Penetration Tests using a standard cone or piezo-cone, Seismic Cone Penetration Tests, Testing, Sampling, Pore Pressure Dissipation Tests, hydropunch groundwater sampling, soil sampling, resistivity/conductivity tests, standby time, moving between holes, and backfilling holes with cement grout at a rate of

3 $50,000 Providing Special Equipment at

4 $25,000 Providing Miscellaneous Materials and Supplies at

TOTAL (COLUMN E) $_____________

In the event of a computational error, unit prices will prevail over extended totals. The state will check bid calculations and recalculate bids.

The contractor’s signature in ink, affixed heron and dated will constitute a certification under the penalty of perjury under the laws of the State of California that the Contractor’s license number and expiration

Signature of Bidder Date

ATTACHMENT 1B

BID SHEET SECOND (1) YEAR EXTENSION

The items and quantities indicated below will be used solely for computing the cost as fair and equitable formula to determine the low bidder and is not binding on the contracting agency. However, the actual costs quoted below by the bidder shall be binding for the term of the Agreement.

The bidder here by agrees to provide all labor, materials, licenses, permits, and transportation necessary to perform all services required for the foregoing tilted work in accordance with the Scope of Work, Exhibit A. The rates listed on this Bid sheet shall include every item of expense, direct and indirect, including taxes incidental to the specified rates.

The bidder is required to bid each item. Failure to indicate a dollar amount in any item will be grounds to reject the entire bid. A zero-dollar ($0.00) amount listed for any and all items will be interpreted and understood by the State to mean that the bidder indicated a zero-dollar amount shall perform any such services, up to and including the quantity indicated, at no cost to the state.

(A)

BID

ITEM

(B)

APPROX.

QUANTITY

(C)

ITEM WITH UNIT PRICE

WRITTEN IN WORDS

(D)

UNIT

1 125

CPT Rig Call-Up -- Mobilizing and demobilizing CPT equipment to and from the site at a rate of per call-up

2A 325

Cone Penetration Tests using a standard cone or piezo-cone, Seismic Cone Penetration Tests, Testing, Sampling, Pore Pressure Dissipation Tests, hydropunch groundwater sampling, soil sampling, resistivity/conductivity tests, standby time, moving between holes, and backfilling holes with cement grout at a rate of

2B 100 Hours

OVERTIME Rate > 8 working hours On-Site. Cone Penetration Tests using a standard cone or piezo-cone, Seismic Cone Penetration Tests, Testing, Sampling, Pore Pressure Dissipation Tests, hydropunch groundwater sampling, soil sampling, resistivity/conductivity tests, standby time, moving between holes, and backfilling holes with cement grout at a rate of

3 $50,000 Providing Special Equipment at

(Mark-up not to exceed 10%)

4 $25,000 Providing Miscellaneous Materials and Supplies at

(Mark-up not to exceed 10%)

TOTAL (COLUMN E) $_____________

In the event of a computational error, unit prices will prevail over extended totals. The state will check bid calculations and recalculate bids.

The contractor’s signature in ink, affixed heron and dated will constitute a certification under the penalty of perjury under the laws of the State of California that the Contractor’s license number and expiration

Signature of Bidder Date

***END OF CHANGES***

Addendum 2 (Revised Bid Sheet & Due Date Extension)
IFB 10206502 - revised bid sheet (1-15-25)
ATTACHMENT 1B