Addendum Two.pdf

PDF 814 KB Posted

Attached to
IFB 2026-075 Union County Judicial Center Temporary Generator Connections
Solicitation number
377-IFB 2026-075
Issued by
Union County, North Carolina

About this file

This Addendum No. 2, issued October 30, 2026, modifies and clarifies the Invitation for Bid (IFB) No. 2026-075 for the Union County Judicial Center Temporary Generator Connections project in Monroe, North Carolina. The addendum addresses 17 questions and answers regarding the scope of work, which involves providing and installing a Powertron or approved equal padmount rotary generator docking station (Manual Transfer Switch) rated at 480/277V, 600A, 3-phase, 4-wire with NEMA 4X enclosure. The project requires splicing existing generator feeders, routing new feeders to the docking station, and preparing infrastructure to accept a trailered backup generator via camlock connections. The sealed bid deadline remains unchanged at 10:00 a.m. local time on November 12, 2026, with bids submitted to Union County Procurement Department at 610 Patton Avenue, Monroe, NC 28112. The question submission deadline was October 20, 2026 at 5:00 p.m. Work must be completed within 45 calendar days from the Notice to Proceed issue date, with liquidated damages of $250 per calendar day assessed after the completion date. The addendum clarifies that the 45-day period begins from NTP issuance, not equipment delivery, and that the County will coordinate with the lowest bidder regarding material lead times and issue the NTP after the docking station is received.

The addendum provides critical technical clarifications including confirmation that the installation requires a padmount unit (not wall-mount), 304 stainless steel construction, 3-pole solid neutral configuration without neutral switching, phase-rotation monitoring capability, locking capability, and strip heater accessories. Security requirements include background checks processed by the Judicial Bureau with one week lead time, facility escorts, work hours starting after 9:00 a.m. in the sally port, and weekend scheduling for telehandler and concrete operations. Existing feeder conductors must undergo functional testing with insulation-resistance results documented in a written report, with any deficiencies due to pre-existing conditions considered additional work. The project involves removal and replacement of asphalt paving in kind using saw-cut patches without mill and overlay; striping must be restored if disturbed. The County will provide as-built drawings to the winning bidder and will coordinate power shutdown windows (weekends only), while the Owner maintains responsibility for fire-pump and life-safety impairment notifications and generator restart coordination. No modifications to specifications were made in this addendum; modifications to drawings include revised Sheet E001 reflecting the padmount design and clarifications, with existing drawing E6.1 included as attachment.

View the file

Other files

File Type Posted
Addendum One.pdf PDF
IFB 2026-075.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Invitation for Bid No. 2026-075

Union County Judicial Center

Temporary Generator Connections

ADDENDUM No. 2 ISSUE DATE: November 2, 2026

Responding Offerors on this project are hereby notified that this Addendum shall be made a part of the above named IFB document.

The following items add to, modify, and/or clarify the IFB documents and shall have the full force and effect of the original Documents. This Addendum shall be acknowledged by the Offeror in the IFB document.

ADDENDUM NO. 02

Union County Judicial Center Temporary Generator Connections Union County, Owner Project No.: 2026-075 Contract Document Date: August 04, 2026 Issue to: Bidders Addendum Date: October 30,2026

A. NOTICE TO BIDDER

1.1 This Addendum is issued pursuant to the Conditions of the Contract and is hereby made part of theContract Documents. The addendum serves to clarify, revise, and supersede information in the Project Manual, the Drawings, and previously issued Addenda. The Bidder shall acknowledge receipt of this Addendum in the appropriate space on the Bid Form. Failure to do so may subject the Bidder to disqualification. A list of attachments, if any, is part of this document.

1.2 Acknowledge receipt of this Addendum in the space provided in the Bid Form. Failure to do so may disqualify the Bidder.

1.3 The date for receipt of bids for this project is unchanged by this Addendum. Sealed Bids for

Union County Judicial Center Temporary Generator Connections will be received by the Union County Procurement Department until 10:00 AM local time on November 12, 2026 at 610 Patton Avenue Monroe, NC 28112.

1.4 All questions about the meaning or intent of the Bidding Documents are to be submitted in writing to the Procurement contact person listed on the cover page (Kyle.hodge@unioncountync.gov).

Deadline for questions is 5:00 PM local time on October 20, 2026. Questions will be addressed via Addenda no later than seven calendar days prior to the date for receipt of bids. All addenda and any associated contract document revisions will be posted to the following websites:

Union County, NC State IPS, Duncan Parnell Planroom.

B. QUESTION AND ANSWER SECTION

1. 00 11 16 §1.8; Bid Form (Time of Completion, Liquidated Damages); Agreement §4 & §17; 00

55 00 Notice to Proceed. The Bid Form says the bidder shall 'fully complete the Work within Forty-Five [45] calendar days' and 00 11 16 §1.8 says 'complete the Work within 45 calendar days', while the $250/day liquidated damages run to Substantial Completion and the Notice to Proceed form ties the 45 days to Substantial Completion. Please confirm which milestone the 45 days and the damages apply to. The Trystar TMTS-5 is built to order and, with the 15-day submittal review in 01 33 00, is unlikely to be delivered within 45 days of NTP. Will the County

(a) issue NTP after the MTS is delivered, or (b) set contract time at 45 days after equipment delivery? Please also confirm the LD amount (Bid Form reads 'Two Hundred Dollars [$250.00]').

Answer: The 45 days will start based off the issue date of the NTP; liquidated damages charges would start after the date for completion noted on the NTP. We will work with the lowest bidder on material lead times and issue the NTP after the lowest bidder has received the MTS so that the 45 days reflects actual work verse waiting on material.

2. E001 Det. 1 plan note ('Trystar Rotary WALLMOUNT'); E001 Det. 3 ('Trystar Rotary

PADMOUNT … TMTS-5 … NEMA 4X'); Power General Note B; 26 36 00 §3.01.F; 03 30 00 referenced but not issued The plan note calls for a wall-mount unit and the one-line calls for a pad-mount unit. Please confirm which is required. If pad-mounted: provide pad size, thickness, reinforcing and height above grade (Section 03 30 00 is referenced but not in the manual). If wall-mounted:

confirm the compound wall (precast/CMU) can carry the enclosure (Trystar large wall-mount is approx. 60"H x 48"W x 19.5"D) and whether an anchoring detail or structural review is required.

Answer: Plans revised for padmount docking station. Typical pad mount detail included in drawing revision.

3. E001 Det. 1; NEC 110.26; bid-walk measurement (about 5 ft from generator to compound wall) Please provide a dimensioned location and door orientation. A standard Trystar padmount is approx. 84"H x 48"W x 43"D and needs 3.5-4 ft of working space in front of the switch/camlock compartment (NEC 110.26), which will not fit in the ~5 ft between the generator and the compound wall. Also confirm where the portable generator trailer will park (inside the compound or in the sally port) and how the camlock cables reach the unit. Are any fence or gate modifications required, and by whom?

Answer: The design was modified to include Powertron or approved equal from the Contractor.

Powertron has MTS units with smaller footprints, but it is acceptable for the Contractor to submit alternate equipment for consideration by the Engineer of Record. If an alternate is proposed, it should be included in the Contractor’s bid package along with equipment information to confirm power requirements and physical dimensions.

The temporary generator will be brought in via trailer and parked with as much of the generator unit can fit within the generator area. It is understood and accepted by the County that the overhead door in the main courtyard areas closest to the generator areas will most likely be inaccessible while a temporary generator is installed. It is the intent of the project to keep one overhead door accessible.

4. E001 Det. 3 ('New Trystar docking station pull box, sized per NEC'); Keynotes 1-4; 26 05 19

§3.03.J.1; bid-walk note 'asphalt to be removed and replaced to place HH' Is the 'pull box' (a) an in-grade handhole at the splice point, (b) an above-grade NEMA 4X pull box at the docking station, or (c) both? Please give type, material, size, load rating (Tier 15/22) and location. Please also confirm that splicing the existing generator feeders inside an accessible in-grade handhole with UL 486D submersible connectors meets 26 05 19 §3.03.J.1 ('Make splices and taps only in accessible boxes').

Answer: As discussed during the site visit, the goal of the installation is to minimize trip hazards. So if the box is installed along a wall out of the walkable area, it can be above grade or on the wall. If it is to be installed in a walkway in between equipment where someone could trip on it, it should be flush with grade if it cannot be installed on the wall. As long as the paving material is not re-installed covering the box access and the top of the pull box is removable to access the conductors within, the installation meets the intent of 26 0519.

5. E001 Keynotes 1, 2, 3 & 5; Power General Note D; Det. 1 ('diagrammatic … contractor shall field verify') Please provide the existing generator-to-GDP feeder data: number of parallel sets, conductor size/material/insulation, EGC size, conduit size and type, burial depth, route, and the generator output breaker rating. Record drawings for the generator installation would answer most of this.

Answer: Please refer to Sheet E6.1 provided by the County for additional information. The

Contractor is responsible for verifying existing site conditions.

6. 01 10 00 §1.5 & §1.7; E001 Det. 2/3 (GDP feeds ATS-E, ATS-LS and the fire-pump ATS emergency source) Splicing the existing feeders takes the emergency generator out of service. Please confirm:

(a) the allowable outage window and duration (weekend or after-hours); (b) whether the contractor must provide a temporary generator during the outage (no connection point exists until the new docking station is complete); (c) that fire-pump/life-safety impairment, fire watch and notifications (Fire Marshal, Sheriff and court operations) are by the Owner; (d) that the Owner's generator service vendor will disable and re-enable the generator and attend the restart.

Answer: Any power shutdowns will need to be performed on weekends. Durations shall be coordinated with the County.

7. E001 Det. 3; 26 36 00 §2.01; 26 05 26 §2.01.E; 26 05 53 §2.01.A.1.a; 26 32 13 & 26 36 33 referenced but not issued Please confirm: (a) 3-pole (solid neutral) or 4-pole (switched neutral)? Are existing ATS-E, ATS-LS and the fire-pump ATS 3- or 4-pole, and is the generator neutral bonded at the generator? (b) Camlock arrangement for 600A (Series 16, two per phase plus two neutral and ground) for the temporary-generator input and the load-bank output. (c) Is overcurrent protection required in the docking station (TMTS-5 vs. TMTS-6)? (d) Required SCCR/withstand rating and the protective device it is based on. (e) 304 or 316 stainless. (f) Accessories required (phase-rotation monitor, Kirk-key interlock, strip heater, padlocking).

Answers:

(a) 3-pole (solid neutral) or 4-pole (switched neutral)? Are existing ATS-E, ATS-LS and the fire-pump ATS 3- or 4-pole, and is the generator neutral bonded at the generator?

Response: The County will provide as built drawings for the winning bidder to confirm this requirement. The MTS will not switch neutrals.

(b) Camlock arrangement for 600A (Series 16, two per phase plus two neutral and ground) for the temporary-generator input and the load-bank output.

Response: The County will provide as built drawings for the winning bidder to confirm this requirement.

(c) Is overcurrent protection required in the docking station (TMTS-5 vs. TMTS-6)?

Response: Please assume the temporary generator is provided with overcurrent protection and no overcurrent protection is needed at the docking station.

(d) Required SCCR/withstand rating and the protective device it is based on.

Response: Match the existing generator and generator distribution panel breaker ratings.

35,000kA.

(e) 304 or 316 stainless.

Response: The material of construction can be 304 stainless steel.

(f) Accessories required (phase-rotation monitor, Kirk-key interlock, strip heater, padlocking).

Response: Include phase-rotation, ability to lock enclosure and strip heater.

8. 26 05 26 §2.01.D-E & §3.02; NEC 700.3(F)

Is a grounding electrode required at the docking station for the portable generator connection, and does the 5-ohm fall-of-potential requirement apply to it? Please confirm the bonding and marking requirements for the portable source.

Answer: The temporary generator docking station MTS will not switch neutrals. Equipment should be bonded and marked per NEC 702.

9. Keynotes 1-3; 26 05 19 §3.04

What insulation-resistance acceptance criteria apply to the existing feeder conductors being spliced? If existing conductors fail testing or are damaged, please confirm replacement is extra work. Would the Engineer accept re-pulling new continuous conductors from the generator breaker to the MTS (in lieu of the eight generator-side splices) where the existing conduit allows?

Answer: A functional test is desired by the County that will require coordination with the County for testing date/time. Contractor will furnish all equipment required to perform the test. The test does not have to be a third party NETA testing firm. A written report documenting results along with pass/fail status for insulation resistance, phase rotation, ground resistance and no load operation is acceptable.

10. Keynotes 1-3; 26 05 19 §3.04

What insulation-resistance acceptance criteria apply to the existing feeder conductors being spliced? If existing conductors fail testing or are damaged, please confirm replacement is extra work. Would the Engineer accept re-pulling new continuous conductors from the generator breaker to the MTS (in lieu of the eight generator-side splices) where the existing conduit allows?

Answer: Existing feeder conductors shall be insulation-resistance tested prior to splicing, with results evaluated against applicable manufacturer recommendations and project specifications. Any existing conductors found to be damaged or failing acceptable test criteria shall be brought to the Engineer’s attention for evaluation along with the industry-applicable standard to which they pass or fail. Replacement of existing conductors due to pre-existing deficiencies is considered additional work which will be coordinated in contract between the County and the Contractor.

11. Keynote 4; Power General Note C; 01 73 29; 01 74 19 §3.3.B

Please confirm the pavement section to replace 'in kind' (asphalt thickness and base), that a saw-cut patch is acceptable (no mill and overlay), whether disturbed striping must be restored, and any limits of disturbance in the compound or sally port.

Answer: A saw cut patch is acceptable. Striping shall be restored if disturbed. It is expected that the only paved surfaces that will be disturbed are next to the existing generator in order to connect to the existing generator feeder.

12. E001 Det. 1; 01 73 00

Are record drawings available for underground utilities in the compound and sally port (storm drain, fire/domestic water, telecom, grounding)? County-owned lines are not located by NC 811.

Answer: Existing drawings will be provided to the lowest bidder. It will be the responsibility of the lowest bidder to hire a private locator to locate secondary existing lines not located by NC 811.

13. NEC 700.3(F) (2020); 26 36 00 §2.01.N; E001 shows no control wiring

NEC 700.3(F) requires the permanent switching means to include a contact point that annunciates at a location remote from the generator, or at another facility monitoring system, when the permanent emergency source is disconnected. E001 shows no annunciation wiring. Where should this alarm report – the generator's existing remote annunciator (through a spare controller input), the BAS, or the fire alarm panel – and who programs the receiving system? Is any other MTS position wiring required (for example a start inhibit)?

Answer: Generator’s existing remote annunciator.

14. 26 05 19 §2.02.H

The specification requires integrally colored insulation (brown/orange/yellow/gray). For 350 kcmil, may we use black insulation with phase-identification tape at every termination and splice (NEC 215.12(C) permits marking tape for phase identification; 200.6(B) permits gray marking of 4 AWG and larger neutrals at terminations), matching the existing feeder?

Answer: Yes, phasing tape on black insulated conductors is acceptable.

15. 01 10 00 §1.6-1.7; work is inside the secured sally port

Please confirm security requirements (background checks – who processes them and lead time; ID badges; escorts; tool control), work hours in the sally port, truck parking/staging, and access for a telehandler and a ready-mix truck to set a ~1,500-lb docking station and place the pad.

(1) Background checks – Judicial Bureau responsibility (1 week lead time)

(2) Escorts – Facilities Maintenance Technician

(3) Work hours – Start work after 9:00AM

(4) Parking – One truck inside intake, one truck outside intake

(5) Telehandler and Ready-mix truck – any work done with the telehandler and concrete pouring needs to be done on a weekend.

16. 00 52 00 Agreement, Exhibit A §I.D-G and §II.J

Exhibit A lists Professional, Pollution, Cyber ($1M/$3M) and Abuse & Molestation coverage and flows insurance requirements down to subcontractors. Please confirm these four coverages are not required of the electrical subcontractor for this construction-only scope, or are waived by the County Risk Manager.

Answer: The contractor is required to carry the type and limits of coverage listed in the small construction agreement. If the contractor assigns or subcontracts any work, the contractor shall ensure that the subcontractor maintains the (same) required insurance coverages and includes additional insured endorsements

17 IFB cover page; 00 11 13; 00 11 16 §1.3.4.a; 00 01 01; E001 title block & Det. 1 scale

(1) Bid date: Nov 09 (cover) vs. Nov 12 (00 11 13, 00 11 16). (2) Question deadline: Oct 20, 5:00 PM (00 11 13) vs. 10 days before bid opening (00 11 16 §1.3.4.a). (3) Address:

400 N. Main St. (manual) vs. 500 North Main St. (E001 title block). (4) Det. 1 is labeled 1- 1/2" = 1'-0" and cannot be scaled – please provide dimensions. (5) 00 11 13 titles the work 'Temporary Generator Controls'.

(1) Official Bid opening date is November 12th; an addendum was issued to replace the cover page with the correct date.

(2) 10 Days before bid opening

(3) Address for the project is 400 N. Main Street. Union County’s Official address is 500 N. Main Street.

(4) Drawing is not to scale (NTS.) Drawing has been changes to reflect NTS.

(5) Temporary Generator Connections is the official title of work

C. MODIFICATIONS TO DRAWINGS

1.5 Sheet E001 - ELECTRICAL PLAN, RISER, NOTES AND ABBREVIATIONS 1 – modified to include clarifications to questions.

D. MODIFICATIONS TO SPECIFICATIONS

1.6 None.

E. ATTACHMENTS

1.7 Existing drawing E6.1 inlcluded. Sheet E001 included.

END OF ADDENDUM

GENERAL ELECTRICAL NOTES

1. ALL WORK TO COMPLY WITH ALL APPLICABLE CODES AND REGULATIONS ADOPTED

BY THE AHJ FOR THE PROJECT LOCATION, INCLUDING (NOT LIMITED TO) 2020

NATIONAL ELECTRICAL CODES, BUILDING CODES, ENERGY CODES, ETC.

2. COORDINATE INSTALLATION WITH ARCHITECTURAL PLANS, ELEVATIONS, AND

REFLECTED CEILING PLANS FOR DEVICE AND FIXTURE PLACEMENT, AS WELL AS FIRE

RATED PARTITIONS, EXPANSION JOINTS, ETC.

3. COORDINATE INSTALLATION OF MECHANICAL EQUIPMENT POWER CONNECTIONS

WITH MECHANICAL/PLUMBING PLANS, SCHEDULES AND PRODUCT DATA SUBMITTALS.

4. COORDINATE INSTALLATION WITH VENDOR/ CONTRACTOR SHOP DRAWINGS WHERE

APPROPRIATE.

5. FIELD COORDINATE INSTALLATION WITH THE INSTALLATION OF OTHER TRADES TO

AVOID CLASHES AND CONFLICTS.

6. WHERE MOUNTING HEIGHTS ARE SHOWN, THEY ARE TO BE CONSIDERED TO BE TO

THE CENTER OF THE DEVICE, UNLESS NOTED OTHERWISE.

7. ALL CONDUCTORS OPERATING AT 50 VOLTS OR GREATER SHALL BE IN RACEWAY OR

PART OF A LISTED CABLE ASSEMBLY SUITABLE FOR THE INSTALLED PURPOSE AND

LOCATION, AND ALLOWED BY PROJECT SPECIFICATIONS.

8. ALL CABLES AND CONDUCTORS OPERATING AT LESS THAN 50 VOLTS SHALL BE IN

RACEWAY WHERE INSTALLED WITHIN WALLS OR INACCESSIBLE SPACES. CABLES

ABOVE ACCESSIBLE CEILINGS MAY BE ROUTED IN CABLE SUPPORT HOOKS/RINGS.

CABLES TO BE ROUTED IN CABLE TRAY WHERE SHOWN.

9. FOR 20 AMPERE, 120 VOLT BRANCH CIRCUITS, USE #10 AWG CONDUCTORS FOR

BRANCH CIRCUITS LONGER THAN 75 FEET AND #8 AWG CONDUCTORS FOR BRANCH

CIRCUITS LONGER THAN 150 FEET, UNO. THIS SHALL BE REQUIRED FOR THE ENTIRE

LENGTH OF THE CIRCUIT.

10. FOR 20 AMPERE, 277 VOLT BRANCH CIRCUITS, USE #10 AWG CONDUCTORS FOR

BRANCH CIRCUITS LONGER THAN 150 FEET, UNO. THIS SHALL BE REQUIRED FOR THE

ENTIRE LENGTH OF THE CIRCUIT.

11. WHERE CONFLICTS EXIST IN DRAWINGS OR BETWEEN DRAWINGS AND

SPECIFICATIONS, ISSUE REQUEST FOR INTERPRETATION TO DESIGN TEAM FOR

CLARIFICATION PRIOR TO INSTALLATION.

12. TV OUTLETS, VOLUME CONTROLS, TELEPHONE OUTLETS, DATA OUTLETS, AND FIRE

ALARM DEVICES SHALL CONSIST OF A BACK BOX WITH CONDUIT STUBBED ABOVE

THE ACCESSIBLE CEILING. VERIFY SIZE OF BACK BOX REQUIRED WITH DEVICE TO

BE INSTALLED.

13. ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES, AND EQUIPMENT SHALL BE

LABELED/LISTED BY A NORTH CAROLINA APPROVED THIRD PARTY TESTING AGENCY.

14. FURNISH AND INSTALL CONDUIT FROM BACK BOXES FOR THE FOLLOWING DEVICES

INTO THE ACCESSIBLE CEILING SPACE IN THE CORRIDOR, UNLESS NOTED

OTHERWISE:

3/4"C TV OUTLETS

3/4"C VOLUME CONTROLS

3/4"C TELEPHONE OUTLETS

3/4"C INFORMATION OUTLETS

3/4"C FIRE ALARM DEVICES

EX.

TVSS

EXISTING

MAIN SWTICHBOARD

480V/3-PHASE

2500A

EXISTING

NHG

480V/277 60A

EXISTING

MHG

480V/277 225A

EXISTING

225 KVA

XFMR

EXISTING

NLDP

208V/120 600A

EXISTING

NLG

208V/120 225A

(SECT 1) (SECT 2)

EXISTING

ELCOMM

208V/120

100A

EXISTING

ELG

208V/120 400A

EXISTING

112.5 KVA

XFMR

EXISTING

EHG

480V/277

250A EXISTING

ATS-E

250A

EXISTING

LSLG

208V/120 60A

EXISTING

15 KVA

XFMR

EXISTING

LSHG

480V/277

150A EXISTING

ATS-LS

150A

EXISTING

GDP

480V/277 600A

EX

EX. 1200A SE RATED

DISCONNECT

EX. FIRE

PUMP ATS.

EX. 125HP

FIRE PUMPEX.

300KW/375 KVA

GENERATOR

EXISTING

UTILITY XFMR

480V/3-PHASE

EXISTING

UTILITY

METER

EXEXEXEX

EX.

PULLBOX

EX

EX

EX

EX

EX

EXEX

EX

EX

EX

A. WHERE CONNECTED TO A 20A. BRANCH CIRCUIT SUPPLYING AN INDIVIDUAL

RECEPTACLE (SIMPLEX OR DUPLEX), THE RECEPTACLE SHALL BE RATED AT 20A.

B. PROVIDE HOUSEKEEPING PADS FOR ALL FLOOR MOUNTED AND GRADE MOUNTED

ELECTRICAL EQUIPMENT. REFER TO ELECTRICAL DETAIL DRAWINGS FOR

TRANSFORMER, GENERATOR, OR SWITCHGEAR PADS THAT MAY EXCEED

REQUIREMENTS LISTED IN SPECIFICATIONS.

C. CONTRACTOR SHALL REMOVED PAVED SURFACES AS NEEDED TO LOCATE, SPLICE

AND ROUTE EXISTING GENERATOR AND MANUAL TRANSFER SWITCH FEEDERS.

D. CONTRACTOR SHALL MATCH CONDUIT SIZE AND TYPE FOR EXISTING GENERATOR

FEEDERS TO THE GDP WHERE NEW UNDERGROUND FEEDERS ARE

INSTALLED/SPLICED.

E. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS.

POWER GENERAL NOTES

POWER KEYNOTES

1. CONTRACTOR SHALL SPLICE EXISTING FEEDERS FROM GENERATOR TO PANEL GDP .

2. EXTEND FEEDERS FROM GENERATOR TO NEW DOCKING STATION PULL BOX. THE

FEEDERS WILL CONNECT TO THE NEW MANUAL TRANSFER SWITCH.

3. CONTRACTOR SHALL ROUTE MANUAL TRANSFER SWITCH OUTGOING FEEDERS TO AND

SPLICE THEM WITH THE EXISTING GENERATOR UNDERGROUND FEEDERS ROUTED TO

THE EXISTING GDP.

4. CONTRACTOR SHALL REMOVE PAVED SURFACES AS NEEDED TO LOCATE, SPLICE AND

ROUTE EXISTING GENERATOR AND MANUAL TRANSFER SWITCH FEEDERS.

CONTRACTOR SHALL REPLACE PAVED SURFACES IN KIND.

5. CONTRACTOR SHALL MATCH CONDUIT SIZE AND TYPE FOR EXISTING GENERATOR

FEEDERS TO THE GDP WHERE NEW UNDERGROUND FEEDERS ARE

INSTALLED/SPLICED.

EXISTING

CHILLER

TOWER CT-1

EXISTING

EMERGENCY GENERATOR

GENERAC SERIES 2000

MODEL # 3533300100

300 KW, 375 KVA

480V/3-PHASE

451.0A

EXISTING ELECTRICAL ROOM

SPD XFMR

EX. NLDP

EX. NLG (SECT 1 & 2)

EX. 225KVA XFMR

EX. 2500A MSB

EX. ELG

(SECT 1 & 2)

EX.

112.5KVA

XFMR

EX. EHG

EX. LSLG

EX.

15KVA

XFMR

EX. LSHGEX. ATS-LS

EX.

GDP

EX. MHG

EX. NHG

EX. CT-1

DIAGRAMMATIC EXISTING

UNDERGROUND FEEDER ROUTE

FROM PANEL GDP TO EXISTING

GENERATOR. CONTRACTOR

SHALL FIELD VERIFY.

PROPOSED LOCATION OF NEW POWERTRON (OR APPROVED EQUAL)

ROTARY PADMOUNT GENERATOR DOCKING STATION/ MANUAL

TRANSFER SWITCH FOR PORTABLE TEMPORARY GENERATOR

CONNECTION TO BE FURNISHED AND INSTALLED BY CONTRACTOR.

REFER TO PARTIAL RISER FOR ADDITIONAL INFORMATION.

EXISTING

GDP

480V/277 600A

EX

EX. 1200A SE RATED

DISCONNECT

EX. FIRE

PUMP ATS.

EX. 125HP

FIRE PUMPEX.

300KW/375 KVA

GENERATOR

EX

EX

NEW POWERTRON (OR APPROVED

EQUAL) PADMOUNT DOCKING

STATION/ MANUAL TRANSFER

SWITCH

480/277V, 600A, 3PH, 4W,

NEMA 4X ENCLOSURE

NEW DOCKING STATION

PULL BOX. SIZED PER

NEC.

EX

EX

FROM EXISTING

UTILITY TRANSFORMER

4 5

ANCHOR BOLT SIZE, QUANTITY

AND SPACING AS REQUIRED

BY EQUIPMENT SELECTED

(TYP)

EXISTING ASPHALT

#4 @ 12" EW

CENTERED

FRAME TO EDGE OF PAD

3" MIN FROM EQUIP VERIFY DIMENSION

WITH EQUIP MANUF

ROUGHEN SLAB

3/4" CHAMFER TYP

4"

DRAWN BY

PROFESSIONAL

PROJECT MANAGER

PROJECT NUMBER

CHECKED BY

7 6 5 4 3 2 1

A B

C D

E

7 6 5 4 3 2 1

ISSUANCE

P R

O G

R E

S S

IV

E

A R

C H

IT

E

C T

U R

E E

N G

IN

E

E R

IN

G

P

.C

T H

IS

D

O C

U M

E N

T H

A S

B E

E N

P R

E P

A R

E D

B Y

P R

O G

R E

S S

IV

E

A R

C H

IT

E

C T

U R

E E

N G

IN

E

E R

IN

G

P .C

A

S A

N

IN

S T

R U

M E

N T

O F

S E

R V

IC

E

, A N

D P

R O

G R

E S

S

IV

E A

R C

H

IT

E C

T U

R E

E N

G

IN

E E

R

IN

G

P .C

. S H

A

LL

R E

T A

IN

A

LL

C

O M

M O

N L

A W

, S T

A T

U T

O R

Y A

N D

O T

H E

R R

E S

E R

V E

D R

IG

H

T S

IN

C

LU

D

IN

G

T H

E C

O P

Y R

IG

H

T T

H E

R E

T O

/2

9/

:3 1:

P

M A ut od es k

D oc s:

//9

U ni on

C ou nt y

Ju di ci al

C en te r T em p

G en

C o/

U

C T

E M

P G

E N

E

LE

C

T .rv t

ELECTRICAL

PLAN, RISER,

NOTES AND

ABBREVIATIONS

E001

U N

IO

N

C O

U N

T Y

J U

D

IC

IA

L

C E

N T

E R

T E

M P

O R

A R

Y G

E N

E R

A T

O R

C O

N N

E C

T

IO

N

N

O R

T H

M A

IN

S

T R

E E

T M

O N

R O

E

N C

D. HARRIS-WILLIAMS

DANE STIVERS, PE

DANE STIVERS, PE

96520013

DANE STIVERS, PE

E

E

L E

C T

R

IC

A L

P L

A N

, R

IS

E R

, N O

T E

S A

N D

A B

B R

E V

IA

T

IO

N

S

.2

.0

ELECTRICAL ABBREVIATIONS

A AMPERES

ACU AIR CONDITIONING UNIT

AFG ABOVE FINISH GRADE

AHJ AUTHORITY HAVING JURISDICTION

AHU AIR HANDLING UNIT

AL ALUMINUM

AP ACCESS PANEL

APPROX APPROXIMATE

ATS AUTOMATIC TRANSFER SWITCH

AUX AUXILARY

AWG AMERICAN WIRE GAUGE

B BOILER

BAS BUILDING AUTOMATION SYSTEM

BF BARRIER FREE

BFG BELOW FINISHED GRADE

BMS BUILDING MANAGEMENT SYSTEM

BOD BOTTOM OF DEVICE

BSMT BASEMENT

C CONDUIT

CATV COMMUNITY ANTENNA TELEVISION

CB CIRCUIT BREAKER

CCTV CLOSED-CIRCUIT TELEVISION

CF CEILING FAN

CH CABINET HEATER

CL CENTERLINE

CLR CLEAR, CLEARANCE

CMPR COMPRESSOR

CONV CONVECTOR

CP CIRCULATING PUMP

CR CARD READER

CT COOLING TOWER

CU COPPER

DEPT DEPARTMENT

DET DETAIL

DISC DISCONNECT

DIST DISTRIBUTION

DW DISHWASHER

DWH DOMESTIC WATER HEATER

EF EXHAUST FAN

ELEC ELECTRIC, ELECTRICAL

ELEV ELEVATOR

EM EMERGENCY

EMS ENERGY MANAGEMENT SYSTEM

EMT ELECTRICAL METALLIC TUBING

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

F FAHRENHEIT

FA FIRE ALARM

FACP FIRE ALARM CONTROL PANEL

FBO FURNISHED BY OTHERS

FC FLEXIBLE CONNECTION

FDS FUSED DISCONNECT SWITCH

FIXT FIXTURE

FL FLUORESCENT

FLA FULL LOAD AMPS

FLEX FLEXIBLE

FMC FLEXIBLE METAL CONDUIT

FURN FURNISH, FURNISHED

GALV GALVANIZED

NOT TO SCALE

PARTIAL EXISTING ELECTRICAL ONE-LINE DIAGRAM

10/30/2026 CONSTRUCTION

NOT TO SCALE

FIRST FLOOR POWER PLAN

ELECTRICAL ABBREVIATIONS

GEN GENERATOR

GFI GROUND FAULT CIRCUIT INTERRUPTOR

GND GROUND

HP HORSEPOWER

HTG HEATING

HTR HEATER

HV HIGH VOLTAGE

IBC INTERNATIONAL BUILDING CODE

IG ISOLATED GROUND

IMC INTERMEDIATE METAL CONDUIT

JBOX JUNCTION BOX

KVA KILOVOLT-AMPERES

KW KILOWATTS

KWH KILOWATT-HOURS

LEED LEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN

LTG LIGHTING

LV LOW VOLTAGE

MC MECHANICAL CONTRACTOR

MCA MINIMUM CIRCUIT AMPS

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MD MOTORIZED DAMPER

MDP MAIN DISTRIBUTION PANEL

MECH MECHANICAL

MFDS MAIN FUSED DISCONNECT SWITCH

MH MANHOLE

MLO MAIN LUGS ONLY

MOP MAXIMUM OVERCURRENT PROTECTION

MSBD MAIN SWITCH BOARD

MT MOUNT

MTR MOTOR, MOTORIZED

MTS MANUAL TRANSFER SWITCH

NEMA NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION

NL NIGHT-LIGHT

OH OVERHEAD

OHD OVERHEAD DOOR

P PUMP

PH PHASE

PNL PANEL

PP POWER POLE

PRI PRIMARY

PVC POLYVINYL CHLORIDE

PWR POWER

RECEPT RECEPTACLE

RTU ROOFTOP UNIT

TEL TELEPHONE

TR TAMPER RESISTANT

TV TELEVISION

UE UNDERGROUND ELECTRICAL

UG UNDERGROUND

UH UNIT HEATER

V VOLTS

VA VOLT-AMPERES

VFD VARIABLE FREQUENCY DRIVE

W WATTS

WH WATER HEATER

XFER TRANSFER

XFMR TRANSFORMER

Ø PHASE

NOT TO SCALE

PARTIAL NEW ELECTRICAL ONE-LINE DIAGRAM

NOT TO SCALE

TYPICAL SLAB ON GRADE EQUIPMENT BASE

This item has been electronically signed and sealed by Dane A. Stivers using a Digital Signature and date. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

10/30/2026 2:47:23 PM

G

1J U S\

0\

D W

G \d e 6_

1.

dw g, /3 1/

:5

7:

P M

, P D

F

XC

ha ng e 3.

project number

SPECIFICALLY REFERENCED BY THIS CPR.

PROCEEDING WITH ANY WORK NOT

INCORPORATED INTO THE CONTRACT BEFORE

THAT PREVIOUS CHANGES HAVE BEEN

PREVIOUSLY MADE ON THIS SHEET. VERIFY

THIS DRAWING REFLECTS ALL CHANGES

includes sheets sheet number date revisions cpr number checked by

2001 By drawn by

FreemanWhite, Inc.

C seals date

Charlotte, NC 282735665

704.523.2230 phone

704.523.2235 fax

POWER

RISER

DIAGRAM

JTS

JTW

E6.1

00 91 13 Addenda Cover Page
Addenda 02_ UCJC Temp. Gen. Connec_
A. NOTICE TO BIDDER
B. QUESTION AND ANSWER SECTION
C. MODIFICATIONS TO DRAWINGS
1.5 Sheet E001 - ELECTRICAL PLAN, RISER, NOTES AND ABBREVIATIONS 1 – modified to include clarifications to questions.
D. MODIFICATIONS TO Specifications
1.6 None.
E. ATTACHMENTs
1.7 Existing drawing E6.1 inlcluded. Sheet E001 included.
END OF ADDENDUM
E6.1
d-e6_1
Oce9400II
E001 - ELECTRICAL PLAN, RISER, NOTES AND ABBREVIATIONS 1.pdf
Sheets
E001 - ELECTRICAL PLAN, RISER, NOTES AND ABBREVIATIONS

File details come from the government source that posted it. Updated .