This Addendum No. 2, issued October 30, 2026, modifies and clarifies the Invitation for Bid (IFB) No. 2026-075 for the Union County Judicial Center Temporary Generator Connections project in Monroe, North Carolina. The addendum addresses 17 questions and answers regarding the scope of work, which involves providing and installing a Powertron or approved equal padmount rotary generator docking station (Manual Transfer Switch) rated at 480/277V, 600A, 3-phase, 4-wire with NEMA 4X enclosure. The project requires splicing existing generator feeders, routing new feeders to the docking station, and preparing infrastructure to accept a trailered backup generator via camlock connections. The sealed bid deadline remains unchanged at 10:00 a.m. local time on November 12, 2026, with bids submitted to Union County Procurement Department at 610 Patton Avenue, Monroe, NC 28112. The question submission deadline was October 20, 2026 at 5:00 p.m. Work must be completed within 45 calendar days from the Notice to Proceed issue date, with liquidated damages of $250 per calendar day assessed after the completion date. The addendum clarifies that the 45-day period begins from NTP issuance, not equipment delivery, and that the County will coordinate with the lowest bidder regarding material lead times and issue the NTP after the docking station is received.
The addendum provides critical technical clarifications including confirmation that the installation requires a padmount unit (not wall-mount), 304 stainless steel construction, 3-pole solid neutral configuration without neutral switching, phase-rotation monitoring capability, locking capability, and strip heater accessories. Security requirements include background checks processed by the Judicial Bureau with one week lead time, facility escorts, work hours starting after 9:00 a.m. in the sally port, and weekend scheduling for telehandler and concrete operations. Existing feeder conductors must undergo functional testing with insulation-resistance results documented in a written report, with any deficiencies due to pre-existing conditions considered additional work. The project involves removal and replacement of asphalt paving in kind using saw-cut patches without mill and overlay; striping must be restored if disturbed. The County will provide as-built drawings to the winning bidder and will coordinate power shutdown windows (weekends only), while the Owner maintains responsibility for fire-pump and life-safety impairment notifications and generator restart coordination. No modifications to specifications were made in this addendum; modifications to drawings include revised Sheet E001 reflecting the padmount design and clarifications, with existing drawing E6.1 included as attachment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum One.pdf | ||
| IFB 2026-075.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Invitation for Bid No. 2026-075
Union County Judicial Center
Temporary Generator Connections
ADDENDUM No. 2 ISSUE DATE: November 2, 2026
Responding Offerors on this project are hereby notified that this Addendum shall be made a part of the above named IFB document.
The following items add to, modify, and/or clarify the IFB documents and shall have the full force and effect of the original Documents. This Addendum shall be acknowledged by the Offeror in the IFB document.
ADDENDUM NO. 02
Union County Judicial Center Temporary Generator Connections Union County, Owner Project No.: 2026-075 Contract Document Date: August 04, 2026 Issue to: Bidders Addendum Date: October 30,2026
A. NOTICE TO BIDDER
1.1 This Addendum is issued pursuant to the Conditions of the Contract and is hereby made part of theContract Documents. The addendum serves to clarify, revise, and supersede information in the Project Manual, the Drawings, and previously issued Addenda. The Bidder shall acknowledge receipt of this Addendum in the appropriate space on the Bid Form. Failure to do so may subject the Bidder to disqualification. A list of attachments, if any, is part of this document.
1.2 Acknowledge receipt of this Addendum in the space provided in the Bid Form. Failure to do so may disqualify the Bidder.
1.3 The date for receipt of bids for this project is unchanged by this Addendum. Sealed Bids for
Union County Judicial Center Temporary Generator Connections will be received by the Union County Procurement Department until 10:00 AM local time on November 12, 2026 at 610 Patton Avenue Monroe, NC 28112.
1.4 All questions about the meaning or intent of the Bidding Documents are to be submitted in writing to the Procurement contact person listed on the cover page (Kyle.hodge@unioncountync.gov).
Deadline for questions is 5:00 PM local time on October 20, 2026. Questions will be addressed via Addenda no later than seven calendar days prior to the date for receipt of bids. All addenda and any associated contract document revisions will be posted to the following websites:
Union County, NC State IPS, Duncan Parnell Planroom.
B. QUESTION AND ANSWER SECTION
1. 00 11 16 §1.8; Bid Form (Time of Completion, Liquidated Damages); Agreement §4 & §17; 00
55 00 Notice to Proceed. The Bid Form says the bidder shall 'fully complete the Work within Forty-Five [45] calendar days' and 00 11 16 §1.8 says 'complete the Work within 45 calendar days', while the $250/day liquidated damages run to Substantial Completion and the Notice to Proceed form ties the 45 days to Substantial Completion. Please confirm which milestone the 45 days and the damages apply to. The Trystar TMTS-5 is built to order and, with the 15-day submittal review in 01 33 00, is unlikely to be delivered within 45 days of NTP. Will the County
(a) issue NTP after the MTS is delivered, or (b) set contract time at 45 days after equipment delivery? Please also confirm the LD amount (Bid Form reads 'Two Hundred Dollars [$250.00]').
Answer: The 45 days will start based off the issue date of the NTP; liquidated damages charges would start after the date for completion noted on the NTP. We will work with the lowest bidder on material lead times and issue the NTP after the lowest bidder has received the MTS so that the 45 days reflects actual work verse waiting on material.
2. E001 Det. 1 plan note ('Trystar Rotary WALLMOUNT'); E001 Det. 3 ('Trystar Rotary
PADMOUNT … TMTS-5 … NEMA 4X'); Power General Note B; 26 36 00 §3.01.F; 03 30 00 referenced but not issued The plan note calls for a wall-mount unit and the one-line calls for a pad-mount unit. Please confirm which is required. If pad-mounted: provide pad size, thickness, reinforcing and height above grade (Section 03 30 00 is referenced but not in the manual). If wall-mounted:
confirm the compound wall (precast/CMU) can carry the enclosure (Trystar large wall-mount is approx. 60"H x 48"W x 19.5"D) and whether an anchoring detail or structural review is required.
Answer: Plans revised for padmount docking station. Typical pad mount detail included in drawing revision.
3. E001 Det. 1; NEC 110.26; bid-walk measurement (about 5 ft from generator to compound wall) Please provide a dimensioned location and door orientation. A standard Trystar padmount is approx. 84"H x 48"W x 43"D and needs 3.5-4 ft of working space in front of the switch/camlock compartment (NEC 110.26), which will not fit in the ~5 ft between the generator and the compound wall. Also confirm where the portable generator trailer will park (inside the compound or in the sally port) and how the camlock cables reach the unit. Are any fence or gate modifications required, and by whom?
Answer: The design was modified to include Powertron or approved equal from the Contractor.
Powertron has MTS units with smaller footprints, but it is acceptable for the Contractor to submit alternate equipment for consideration by the Engineer of Record. If an alternate is proposed, it should be included in the Contractor’s bid package along with equipment information to confirm power requirements and physical dimensions.
The temporary generator will be brought in via trailer and parked with as much of the generator unit can fit within the generator area. It is understood and accepted by the County that the overhead door in the main courtyard areas closest to the generator areas will most likely be inaccessible while a temporary generator is installed. It is the intent of the project to keep one overhead door accessible.
4. E001 Det. 3 ('New Trystar docking station pull box, sized per NEC'); Keynotes 1-4; 26 05 19
§3.03.J.1; bid-walk note 'asphalt to be removed and replaced to place HH' Is the 'pull box' (a) an in-grade handhole at the splice point, (b) an above-grade NEMA 4X pull box at the docking station, or (c) both? Please give type, material, size, load rating (Tier 15/22) and location. Please also confirm that splicing the existing generator feeders inside an accessible in-grade handhole with UL 486D submersible connectors meets 26 05 19 §3.03.J.1 ('Make splices and taps only in accessible boxes').
Answer: As discussed during the site visit, the goal of the installation is to minimize trip hazards. So if the box is installed along a wall out of the walkable area, it can be above grade or on the wall. If it is to be installed in a walkway in between equipment where someone could trip on it, it should be flush with grade if it cannot be installed on the wall. As long as the paving material is not re-installed covering the box access and the top of the pull box is removable to access the conductors within, the installation meets the intent of 26 0519.
5. E001 Keynotes 1, 2, 3 & 5; Power General Note D; Det. 1 ('diagrammatic … contractor shall field verify') Please provide the existing generator-to-GDP feeder data: number of parallel sets, conductor size/material/insulation, EGC size, conduit size and type, burial depth, route, and the generator output breaker rating. Record drawings for the generator installation would answer most of this.
Answer: Please refer to Sheet E6.1 provided by the County for additional information. The
Contractor is responsible for verifying existing site conditions.
6. 01 10 00 §1.5 & §1.7; E001 Det. 2/3 (GDP feeds ATS-E, ATS-LS and the fire-pump ATS emergency source) Splicing the existing feeders takes the emergency generator out of service. Please confirm:
(a) the allowable outage window and duration (weekend or after-hours); (b) whether the contractor must provide a temporary generator during the outage (no connection point exists until the new docking station is complete); (c) that fire-pump/life-safety impairment, fire watch and notifications (Fire Marshal, Sheriff and court operations) are by the Owner; (d) that the Owner's generator service vendor will disable and re-enable the generator and attend the restart.
Answer: Any power shutdowns will need to be performed on weekends. Durations shall be coordinated with the County.
7. E001 Det. 3; 26 36 00 §2.01; 26 05 26 §2.01.E; 26 05 53 §2.01.A.1.a; 26 32 13 & 26 36 33 referenced but not issued Please confirm: (a) 3-pole (solid neutral) or 4-pole (switched neutral)? Are existing ATS-E, ATS-LS and the fire-pump ATS 3- or 4-pole, and is the generator neutral bonded at the generator? (b) Camlock arrangement for 600A (Series 16, two per phase plus two neutral and ground) for the temporary-generator input and the load-bank output. (c) Is overcurrent protection required in the docking station (TMTS-5 vs. TMTS-6)? (d) Required SCCR/withstand rating and the protective device it is based on. (e) 304 or 316 stainless. (f) Accessories required (phase-rotation monitor, Kirk-key interlock, strip heater, padlocking).
Answers:
(a) 3-pole (solid neutral) or 4-pole (switched neutral)? Are existing ATS-E, ATS-LS and the fire-pump ATS 3- or 4-pole, and is the generator neutral bonded at the generator?
Response: The County will provide as built drawings for the winning bidder to confirm this requirement. The MTS will not switch neutrals.
(b) Camlock arrangement for 600A (Series 16, two per phase plus two neutral and ground) for the temporary-generator input and the load-bank output.
Response: The County will provide as built drawings for the winning bidder to confirm this requirement.
(c) Is overcurrent protection required in the docking station (TMTS-5 vs. TMTS-6)?
Response: Please assume the temporary generator is provided with overcurrent protection and no overcurrent protection is needed at the docking station.
(d) Required SCCR/withstand rating and the protective device it is based on.
Response: Match the existing generator and generator distribution panel breaker ratings.
35,000kA.
(e) 304 or 316 stainless.
Response: The material of construction can be 304 stainless steel.
(f) Accessories required (phase-rotation monitor, Kirk-key interlock, strip heater, padlocking).
Response: Include phase-rotation, ability to lock enclosure and strip heater.
8. 26 05 26 §2.01.D-E & §3.02; NEC 700.3(F)
Is a grounding electrode required at the docking station for the portable generator connection, and does the 5-ohm fall-of-potential requirement apply to it? Please confirm the bonding and marking requirements for the portable source.
Answer: The temporary generator docking station MTS will not switch neutrals. Equipment should be bonded and marked per NEC 702.
9. Keynotes 1-3; 26 05 19 §3.04
What insulation-resistance acceptance criteria apply to the existing feeder conductors being spliced? If existing conductors fail testing or are damaged, please confirm replacement is extra work. Would the Engineer accept re-pulling new continuous conductors from the generator breaker to the MTS (in lieu of the eight generator-side splices) where the existing conduit allows?
Answer: A functional test is desired by the County that will require coordination with the County for testing date/time. Contractor will furnish all equipment required to perform the test. The test does not have to be a third party NETA testing firm. A written report documenting results along with pass/fail status for insulation resistance, phase rotation, ground resistance and no load operation is acceptable.
10. Keynotes 1-3; 26 05 19 §3.04
What insulation-resistance acceptance criteria apply to the existing feeder conductors being spliced? If existing conductors fail testing or are damaged, please confirm replacement is extra work. Would the Engineer accept re-pulling new continuous conductors from the generator breaker to the MTS (in lieu of the eight generator-side splices) where the existing conduit allows?
Answer: Existing feeder conductors shall be insulation-resistance tested prior to splicing, with results evaluated against applicable manufacturer recommendations and project specifications. Any existing conductors found to be damaged or failing acceptable test criteria shall be brought to the Engineer’s attention for evaluation along with the industry-applicable standard to which they pass or fail. Replacement of existing conductors due to pre-existing deficiencies is considered additional work which will be coordinated in contract between the County and the Contractor.
11. Keynote 4; Power General Note C; 01 73 29; 01 74 19 §3.3.B
Please confirm the pavement section to replace 'in kind' (asphalt thickness and base), that a saw-cut patch is acceptable (no mill and overlay), whether disturbed striping must be restored, and any limits of disturbance in the compound or sally port.
Answer: A saw cut patch is acceptable. Striping shall be restored if disturbed. It is expected that the only paved surfaces that will be disturbed are next to the existing generator in order to connect to the existing generator feeder.
12. E001 Det. 1; 01 73 00
Are record drawings available for underground utilities in the compound and sally port (storm drain, fire/domestic water, telecom, grounding)? County-owned lines are not located by NC 811.
Answer: Existing drawings will be provided to the lowest bidder. It will be the responsibility of the lowest bidder to hire a private locator to locate secondary existing lines not located by NC 811.
13. NEC 700.3(F) (2020); 26 36 00 §2.01.N; E001 shows no control wiring
NEC 700.3(F) requires the permanent switching means to include a contact point that annunciates at a location remote from the generator, or at another facility monitoring system, when the permanent emergency source is disconnected. E001 shows no annunciation wiring. Where should this alarm report – the generator's existing remote annunciator (through a spare controller input), the BAS, or the fire alarm panel – and who programs the receiving system? Is any other MTS position wiring required (for example a start inhibit)?
Answer: Generator’s existing remote annunciator.
14. 26 05 19 §2.02.H
The specification requires integrally colored insulation (brown/orange/yellow/gray). For 350 kcmil, may we use black insulation with phase-identification tape at every termination and splice (NEC 215.12(C) permits marking tape for phase identification; 200.6(B) permits gray marking of 4 AWG and larger neutrals at terminations), matching the existing feeder?
Answer: Yes, phasing tape on black insulated conductors is acceptable.
15. 01 10 00 §1.6-1.7; work is inside the secured sally port
Please confirm security requirements (background checks – who processes them and lead time; ID badges; escorts; tool control), work hours in the sally port, truck parking/staging, and access for a telehandler and a ready-mix truck to set a ~1,500-lb docking station and place the pad.
(1) Background checks – Judicial Bureau responsibility (1 week lead time)
(2) Escorts – Facilities Maintenance Technician
(3) Work hours – Start work after 9:00AM
(4) Parking – One truck inside intake, one truck outside intake
(5) Telehandler and Ready-mix truck – any work done with the telehandler and concrete pouring needs to be done on a weekend.
16. 00 52 00 Agreement, Exhibit A §I.D-G and §II.J
Exhibit A lists Professional, Pollution, Cyber ($1M/$3M) and Abuse & Molestation coverage and flows insurance requirements down to subcontractors. Please confirm these four coverages are not required of the electrical subcontractor for this construction-only scope, or are waived by the County Risk Manager.
Answer: The contractor is required to carry the type and limits of coverage listed in the small construction agreement. If the contractor assigns or subcontracts any work, the contractor shall ensure that the subcontractor maintains the (same) required insurance coverages and includes additional insured endorsements
17 IFB cover page; 00 11 13; 00 11 16 §1.3.4.a; 00 01 01; E001 title block & Det. 1 scale
(1) Bid date: Nov 09 (cover) vs. Nov 12 (00 11 13, 00 11 16). (2) Question deadline: Oct 20, 5:00 PM (00 11 13) vs. 10 days before bid opening (00 11 16 §1.3.4.a). (3) Address:
400 N. Main St. (manual) vs. 500 North Main St. (E001 title block). (4) Det. 1 is labeled 1- 1/2" = 1'-0" and cannot be scaled – please provide dimensions. (5) 00 11 13 titles the work 'Temporary Generator Controls'.
(1) Official Bid opening date is November 12th; an addendum was issued to replace the cover page with the correct date.
(2) 10 Days before bid opening
(3) Address for the project is 400 N. Main Street. Union County’s Official address is 500 N. Main Street.
(4) Drawing is not to scale (NTS.) Drawing has been changes to reflect NTS.
(5) Temporary Generator Connections is the official title of work
C. MODIFICATIONS TO DRAWINGS
1.5 Sheet E001 - ELECTRICAL PLAN, RISER, NOTES AND ABBREVIATIONS 1 – modified to include clarifications to questions.
D. MODIFICATIONS TO SPECIFICATIONS
1.6 None.
E. ATTACHMENTS
1.7 Existing drawing E6.1 inlcluded. Sheet E001 included.
END OF ADDENDUM
GENERAL ELECTRICAL NOTES
1. ALL WORK TO COMPLY WITH ALL APPLICABLE CODES AND REGULATIONS ADOPTED
BY THE AHJ FOR THE PROJECT LOCATION, INCLUDING (NOT LIMITED TO) 2020
NATIONAL ELECTRICAL CODES, BUILDING CODES, ENERGY CODES, ETC.
2. COORDINATE INSTALLATION WITH ARCHITECTURAL PLANS, ELEVATIONS, AND
REFLECTED CEILING PLANS FOR DEVICE AND FIXTURE PLACEMENT, AS WELL AS FIRE
RATED PARTITIONS, EXPANSION JOINTS, ETC.
3. COORDINATE INSTALLATION OF MECHANICAL EQUIPMENT POWER CONNECTIONS
WITH MECHANICAL/PLUMBING PLANS, SCHEDULES AND PRODUCT DATA SUBMITTALS.
4. COORDINATE INSTALLATION WITH VENDOR/ CONTRACTOR SHOP DRAWINGS WHERE
APPROPRIATE.
5. FIELD COORDINATE INSTALLATION WITH THE INSTALLATION OF OTHER TRADES TO
AVOID CLASHES AND CONFLICTS.
6. WHERE MOUNTING HEIGHTS ARE SHOWN, THEY ARE TO BE CONSIDERED TO BE TO
THE CENTER OF THE DEVICE, UNLESS NOTED OTHERWISE.
7. ALL CONDUCTORS OPERATING AT 50 VOLTS OR GREATER SHALL BE IN RACEWAY OR
PART OF A LISTED CABLE ASSEMBLY SUITABLE FOR THE INSTALLED PURPOSE AND
LOCATION, AND ALLOWED BY PROJECT SPECIFICATIONS.
8. ALL CABLES AND CONDUCTORS OPERATING AT LESS THAN 50 VOLTS SHALL BE IN
RACEWAY WHERE INSTALLED WITHIN WALLS OR INACCESSIBLE SPACES. CABLES
ABOVE ACCESSIBLE CEILINGS MAY BE ROUTED IN CABLE SUPPORT HOOKS/RINGS.
CABLES TO BE ROUTED IN CABLE TRAY WHERE SHOWN.
9. FOR 20 AMPERE, 120 VOLT BRANCH CIRCUITS, USE #10 AWG CONDUCTORS FOR
BRANCH CIRCUITS LONGER THAN 75 FEET AND #8 AWG CONDUCTORS FOR BRANCH
CIRCUITS LONGER THAN 150 FEET, UNO. THIS SHALL BE REQUIRED FOR THE ENTIRE
LENGTH OF THE CIRCUIT.
10. FOR 20 AMPERE, 277 VOLT BRANCH CIRCUITS, USE #10 AWG CONDUCTORS FOR
BRANCH CIRCUITS LONGER THAN 150 FEET, UNO. THIS SHALL BE REQUIRED FOR THE
ENTIRE LENGTH OF THE CIRCUIT.
11. WHERE CONFLICTS EXIST IN DRAWINGS OR BETWEEN DRAWINGS AND
SPECIFICATIONS, ISSUE REQUEST FOR INTERPRETATION TO DESIGN TEAM FOR
CLARIFICATION PRIOR TO INSTALLATION.
12. TV OUTLETS, VOLUME CONTROLS, TELEPHONE OUTLETS, DATA OUTLETS, AND FIRE
ALARM DEVICES SHALL CONSIST OF A BACK BOX WITH CONDUIT STUBBED ABOVE
THE ACCESSIBLE CEILING. VERIFY SIZE OF BACK BOX REQUIRED WITH DEVICE TO
BE INSTALLED.
13. ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES, AND EQUIPMENT SHALL BE
LABELED/LISTED BY A NORTH CAROLINA APPROVED THIRD PARTY TESTING AGENCY.
14. FURNISH AND INSTALL CONDUIT FROM BACK BOXES FOR THE FOLLOWING DEVICES
INTO THE ACCESSIBLE CEILING SPACE IN THE CORRIDOR, UNLESS NOTED
OTHERWISE:
3/4"C TV OUTLETS
3/4"C VOLUME CONTROLS
3/4"C TELEPHONE OUTLETS
3/4"C INFORMATION OUTLETS
3/4"C FIRE ALARM DEVICES
EX.
TVSS
EXISTING
MAIN SWTICHBOARD
480V/3-PHASE
2500A
EXISTING
NHG
480V/277 60A
EXISTING
MHG
480V/277 225A
EXISTING
225 KVA
XFMR
EXISTING
NLDP
208V/120 600A
EXISTING
NLG
208V/120 225A
(SECT 1) (SECT 2)
EXISTING
ELCOMM
208V/120
100A
EXISTING
ELG
208V/120 400A
EXISTING
112.5 KVA
XFMR
EXISTING
EHG
480V/277
250A EXISTING
ATS-E
250A
EXISTING
LSLG
208V/120 60A
EXISTING
15 KVA
XFMR
EXISTING
LSHG
480V/277
150A EXISTING
ATS-LS
150A
EXISTING
GDP
480V/277 600A
EX
EX. 1200A SE RATED
DISCONNECT
EX. FIRE
PUMP ATS.
EX. 125HP
FIRE PUMPEX.
300KW/375 KVA
GENERATOR
EXISTING
UTILITY XFMR
480V/3-PHASE
EXISTING
UTILITY
METER
EXEXEXEX
EX.
PULLBOX
EX
EX
EX
EX
EX
EXEX
EX
EX
EX
A. WHERE CONNECTED TO A 20A. BRANCH CIRCUIT SUPPLYING AN INDIVIDUAL
RECEPTACLE (SIMPLEX OR DUPLEX), THE RECEPTACLE SHALL BE RATED AT 20A.
B. PROVIDE HOUSEKEEPING PADS FOR ALL FLOOR MOUNTED AND GRADE MOUNTED
ELECTRICAL EQUIPMENT. REFER TO ELECTRICAL DETAIL DRAWINGS FOR
TRANSFORMER, GENERATOR, OR SWITCHGEAR PADS THAT MAY EXCEED
REQUIREMENTS LISTED IN SPECIFICATIONS.
C. CONTRACTOR SHALL REMOVED PAVED SURFACES AS NEEDED TO LOCATE, SPLICE
AND ROUTE EXISTING GENERATOR AND MANUAL TRANSFER SWITCH FEEDERS.
D. CONTRACTOR SHALL MATCH CONDUIT SIZE AND TYPE FOR EXISTING GENERATOR
FEEDERS TO THE GDP WHERE NEW UNDERGROUND FEEDERS ARE
INSTALLED/SPLICED.
E. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS.
POWER GENERAL NOTES
POWER KEYNOTES
1. CONTRACTOR SHALL SPLICE EXISTING FEEDERS FROM GENERATOR TO PANEL GDP .
2. EXTEND FEEDERS FROM GENERATOR TO NEW DOCKING STATION PULL BOX. THE
FEEDERS WILL CONNECT TO THE NEW MANUAL TRANSFER SWITCH.
3. CONTRACTOR SHALL ROUTE MANUAL TRANSFER SWITCH OUTGOING FEEDERS TO AND
SPLICE THEM WITH THE EXISTING GENERATOR UNDERGROUND FEEDERS ROUTED TO
THE EXISTING GDP.
4. CONTRACTOR SHALL REMOVE PAVED SURFACES AS NEEDED TO LOCATE, SPLICE AND
ROUTE EXISTING GENERATOR AND MANUAL TRANSFER SWITCH FEEDERS.
CONTRACTOR SHALL REPLACE PAVED SURFACES IN KIND.
5. CONTRACTOR SHALL MATCH CONDUIT SIZE AND TYPE FOR EXISTING GENERATOR
FEEDERS TO THE GDP WHERE NEW UNDERGROUND FEEDERS ARE
INSTALLED/SPLICED.
EXISTING
CHILLER
TOWER CT-1
EXISTING
EMERGENCY GENERATOR
GENERAC SERIES 2000
MODEL # 3533300100
300 KW, 375 KVA
480V/3-PHASE
451.0A
EXISTING ELECTRICAL ROOM
SPD XFMR
EX. NLDP
EX. NLG (SECT 1 & 2)
EX. 225KVA XFMR
EX. 2500A MSB
EX. ELG
(SECT 1 & 2)
EX.
112.5KVA
XFMR
EX. EHG
EX. LSLG
EX.
15KVA
XFMR
EX. LSHGEX. ATS-LS
EX.
GDP
EX. MHG
EX. NHG
EX. CT-1
DIAGRAMMATIC EXISTING
UNDERGROUND FEEDER ROUTE
FROM PANEL GDP TO EXISTING
GENERATOR. CONTRACTOR
SHALL FIELD VERIFY.
PROPOSED LOCATION OF NEW POWERTRON (OR APPROVED EQUAL)
ROTARY PADMOUNT GENERATOR DOCKING STATION/ MANUAL
TRANSFER SWITCH FOR PORTABLE TEMPORARY GENERATOR
CONNECTION TO BE FURNISHED AND INSTALLED BY CONTRACTOR.
REFER TO PARTIAL RISER FOR ADDITIONAL INFORMATION.
EXISTING
GDP
480V/277 600A
EX
EX. 1200A SE RATED
DISCONNECT
EX. FIRE
PUMP ATS.
EX. 125HP
FIRE PUMPEX.
300KW/375 KVA
GENERATOR
EX
EX
NEW POWERTRON (OR APPROVED
EQUAL) PADMOUNT DOCKING
STATION/ MANUAL TRANSFER
SWITCH
480/277V, 600A, 3PH, 4W,
NEMA 4X ENCLOSURE
NEW DOCKING STATION
PULL BOX. SIZED PER
NEC.
EX
EX
FROM EXISTING
UTILITY TRANSFORMER
4 5
ANCHOR BOLT SIZE, QUANTITY
AND SPACING AS REQUIRED
BY EQUIPMENT SELECTED
(TYP)
EXISTING ASPHALT
#4 @ 12" EW
CENTERED
FRAME TO EDGE OF PAD
3" MIN FROM EQUIP VERIFY DIMENSION
WITH EQUIP MANUF
ROUGHEN SLAB
3/4" CHAMFER TYP
4"
DRAWN BY
PROFESSIONAL
PROJECT MANAGER
PROJECT NUMBER
CHECKED BY
7 6 5 4 3 2 1
A B
C D
E
7 6 5 4 3 2 1
ISSUANCE
P R
O G
R E
S S
IV
E
A R
C H
IT
E
C T
U R
E E
N G
IN
E
E R
IN
G
P
.C
T H
IS
D
O C
U M
E N
T H
A S
B E
E N
P R
E P
A R
E D
B Y
P R
O G
R E
S S
IV
E
A R
C H
IT
E
C T
U R
E E
N G
IN
E
E R
IN
G
P .C
A
S A
N
IN
S T
R U
M E
N T
O F
S E
R V
IC
E
, A N
D P
R O
G R
E S
S
IV
E A
R C
H
IT
E C
T U
R E
E N
G
IN
E E
R
IN
G
P .C
. S H
A
LL
R E
T A
IN
A
LL
C
O M
M O
N L
A W
, S T
A T
U T
O R
Y A
N D
O T
H E
R R
E S
E R
V E
D R
IG
H
T S
IN
C
LU
D
IN
G
T H
E C
O P
Y R
IG
H
T T
H E
R E
T O
/2
9/
:3 1:
P
M A ut od es k
D oc s:
//9
U ni on
C ou nt y
Ju di ci al
C en te r T em p
G en
C o/
U
C T
E M
P G
E N
E
LE
C
T .rv t
ELECTRICAL
PLAN, RISER,
NOTES AND
ABBREVIATIONS
E001
U N
IO
N
C O
U N
T Y
J U
D
IC
IA
L
C E
N T
E R
T E
M P
O R
A R
Y G
E N
E R
A T
O R
C O
N N
E C
T
IO
N
N
O R
T H
M A
IN
S
T R
E E
T M
O N
R O
E
N C
D. HARRIS-WILLIAMS
DANE STIVERS, PE
DANE STIVERS, PE
96520013
DANE STIVERS, PE
E
E
L E
C T
R
IC
A L
P L
A N
, R
IS
E R
, N O
T E
S A
N D
A B
B R
E V
IA
T
IO
N
S
.2
.0
ELECTRICAL ABBREVIATIONS
A AMPERES
ACU AIR CONDITIONING UNIT
AFG ABOVE FINISH GRADE
AHJ AUTHORITY HAVING JURISDICTION
AHU AIR HANDLING UNIT
AL ALUMINUM
AP ACCESS PANEL
APPROX APPROXIMATE
ATS AUTOMATIC TRANSFER SWITCH
AUX AUXILARY
AWG AMERICAN WIRE GAUGE
B BOILER
BAS BUILDING AUTOMATION SYSTEM
BF BARRIER FREE
BFG BELOW FINISHED GRADE
BMS BUILDING MANAGEMENT SYSTEM
BOD BOTTOM OF DEVICE
BSMT BASEMENT
C CONDUIT
CATV COMMUNITY ANTENNA TELEVISION
CB CIRCUIT BREAKER
CCTV CLOSED-CIRCUIT TELEVISION
CF CEILING FAN
CH CABINET HEATER
CL CENTERLINE
CLR CLEAR, CLEARANCE
CMPR COMPRESSOR
CONV CONVECTOR
CP CIRCULATING PUMP
CR CARD READER
CT COOLING TOWER
CU COPPER
DEPT DEPARTMENT
DET DETAIL
DISC DISCONNECT
DIST DISTRIBUTION
DW DISHWASHER
DWH DOMESTIC WATER HEATER
EF EXHAUST FAN
ELEC ELECTRIC, ELECTRICAL
ELEV ELEVATOR
EM EMERGENCY
EMS ENERGY MANAGEMENT SYSTEM
EMT ELECTRICAL METALLIC TUBING
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
F FAHRENHEIT
FA FIRE ALARM
FACP FIRE ALARM CONTROL PANEL
FBO FURNISHED BY OTHERS
FC FLEXIBLE CONNECTION
FDS FUSED DISCONNECT SWITCH
FIXT FIXTURE
FL FLUORESCENT
FLA FULL LOAD AMPS
FLEX FLEXIBLE
FMC FLEXIBLE METAL CONDUIT
FURN FURNISH, FURNISHED
GALV GALVANIZED
NOT TO SCALE
PARTIAL EXISTING ELECTRICAL ONE-LINE DIAGRAM
10/30/2026 CONSTRUCTION
NOT TO SCALE
FIRST FLOOR POWER PLAN
ELECTRICAL ABBREVIATIONS
GEN GENERATOR
GFI GROUND FAULT CIRCUIT INTERRUPTOR
GND GROUND
HP HORSEPOWER
HTG HEATING
HTR HEATER
HV HIGH VOLTAGE
IBC INTERNATIONAL BUILDING CODE
IG ISOLATED GROUND
IMC INTERMEDIATE METAL CONDUIT
JBOX JUNCTION BOX
KVA KILOVOLT-AMPERES
KW KILOWATTS
KWH KILOWATT-HOURS
LEED LEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN
LTG LIGHTING
LV LOW VOLTAGE
MC MECHANICAL CONTRACTOR
MCA MINIMUM CIRCUIT AMPS
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MD MOTORIZED DAMPER
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MFDS MAIN FUSED DISCONNECT SWITCH
MH MANHOLE
MLO MAIN LUGS ONLY
MOP MAXIMUM OVERCURRENT PROTECTION
MSBD MAIN SWITCH BOARD
MT MOUNT
MTR MOTOR, MOTORIZED
MTS MANUAL TRANSFER SWITCH
NEMA NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION
NL NIGHT-LIGHT
OH OVERHEAD
OHD OVERHEAD DOOR
P PUMP
PH PHASE
PNL PANEL
PP POWER POLE
PRI PRIMARY
PVC POLYVINYL CHLORIDE
PWR POWER
RECEPT RECEPTACLE
RTU ROOFTOP UNIT
TEL TELEPHONE
TR TAMPER RESISTANT
TV TELEVISION
UE UNDERGROUND ELECTRICAL
UG UNDERGROUND
UH UNIT HEATER
V VOLTS
VA VOLT-AMPERES
VFD VARIABLE FREQUENCY DRIVE
W WATTS
WH WATER HEATER
XFER TRANSFER
XFMR TRANSFORMER
Ø PHASE
NOT TO SCALE
PARTIAL NEW ELECTRICAL ONE-LINE DIAGRAM
NOT TO SCALE
TYPICAL SLAB ON GRADE EQUIPMENT BASE
This item has been electronically signed and sealed by Dane A. Stivers using a Digital Signature and date. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
10/30/2026 2:47:23 PM
G
1J U S\
0\
D W
G \d e 6_
1.
dw g, /3 1/
:5
7:
P M
, P D
F
XC
ha ng e 3.
project number
SPECIFICALLY REFERENCED BY THIS CPR.
PROCEEDING WITH ANY WORK NOT
INCORPORATED INTO THE CONTRACT BEFORE
THAT PREVIOUS CHANGES HAVE BEEN
PREVIOUSLY MADE ON THIS SHEET. VERIFY
THIS DRAWING REFLECTS ALL CHANGES
includes sheets sheet number date revisions cpr number checked by
2001 By drawn by
FreemanWhite, Inc.
C seals date
Charlotte, NC 282735665
704.523.2230 phone
704.523.2235 fax
POWER
RISER
DIAGRAM
JTS
JTW
E6.1
| 00 91 13 Addenda Cover Page |
| Addenda 02_ UCJC Temp. Gen. Connec_ |
| A. NOTICE TO BIDDER |
| B. QUESTION AND ANSWER SECTION |
| C. MODIFICATIONS TO DRAWINGS |
| 1.5 Sheet E001 - ELECTRICAL PLAN, RISER, NOTES AND ABBREVIATIONS 1 – modified to include clarifications to questions. |
| D. MODIFICATIONS TO Specifications |
| 1.6 None. |
| E. ATTACHMENTs |
| 1.7 Existing drawing E6.1 inlcluded. Sheet E001 included. |
| END OF ADDENDUM |
| E6.1 |
| d-e6_1 |
| Oce9400II |
| E001 - ELECTRICAL PLAN, RISER, NOTES AND ABBREVIATIONS 1.pdf |
| Sheets |
| E001 - ELECTRICAL PLAN, RISER, NOTES AND ABBREVIATIONS |
File details come from the government source that posted it. Updated .