This is Addendum Two to an Invitation to Bid (RFB-275-26) issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, in coordination with the Kentucky Division of Water Energy and Environmental Cabinet for the Rehabilitation of Willisburg Lake Dam located in Washington County, Kentucky. The addendum, dated June 15, 2026, clarifies specifications and construction requirements for the project and becomes binding upon any contract issued in response to the invitation to bid.
The addendum addresses two key inquiries from bidders regarding material substitutions and construction methodology. First, a request for substitution of culvert waterproofing materials with the MEL-ROL SYSTEM manufactured by W. R. Meadows was rejected because the proposed product does not meet the minimum puncture requirement of 60 pounds per ASTM E154 as specified in Section 07 13 26 of the Technical Specifications. Second, the addendum clarifies that driving of sheet piling, H-piles, or any other type of piling in the embankment is prohibited at all times during construction, including for temporary bracing purposes related to the culvert section beneath KY 555, as noted in Construction Restrictions Note 14 on Drawing A03. Bidders are required to conform to these clarifications and referenced attachments.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-275-26
FOR: Rehabilitation of Willisburg Lake Dam Kentucky Division of Water Energy and Environmental Cabinet Washington County, Kentucky
DATE: June 16, 2026
RFB-785-2600000643
ADDENDUM NO. Two (2)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
Invitation to Bid No. RFB-275-26 For: Rehabilitation of Willisburg Lake Dam Kentucky Division of Water Energy and Environmental Cabinet Washington County, Kentucky
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
ADDENDUM NO. Two (2)
Date: June 15, 2026
RFB – 275-26
Item 1: Questions and answers listed below:
Question 1: Request for material substitution for culvert water proofing materials per Section 07 13 26 of the Technical Specifications. The proposed product is MEL-ROL SYSTEM, manufactured by W. R.
Meadows.
Response: The proposed MEL-ROL SYSTEM, manufactured by W. R. Meadows, does not appear to meet the minimum puncture requirements of 60 pounds per ASTM E154 outlined in Section 07 13 26 of the Technical Specifications. Additional information about the material would be required because it does not meet the specified requirements for minimum puncture and therefore would not be an acceptable substitution given the limited information provided at this stage of the project (bidding).
Question 2: Can H-Piles for a soldier pile or lagging wall be driven into the dam specifically for the culvert section (Spillway Inlet) beneath KY 555?
Response: Driving of sheet piling, H-piles, or any other type of piling in the embankment is prohibited at all times during construction, including for the use of temporary bracing in accordance with the
Construction Restrictions, Note 14 shown on Drawing A03.
| Addendum Two |
| Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings. |
| END OF ADDENDUM |
Addendum_2_Response
File details come from the government source that posted it. Updated .