Addendum Four Emars.pdf
PDF 95 KB Posted
- Solicitation number
- RFB 785 2600000643 8
- Issued by
- Wayne County, Kentucky
About this file
This is an addendum to an Invitation to Bid issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, in conjunction with the Kentucky Division of Water, Energy and Environmental Cabinet, for the rehabilitation of Willisburg Lake Dam located in Washington County, Kentucky. The addendum, designated as Addendum No. Four, was issued on July 22, 2026, and pertains to RFB-275-26 (RFB-785-2600000643). Bidders are required to conform to all changes outlined in the attached addendum, which includes additions, deletions, and modifications to specifications and drawings. The complete addendum documentation is available in the plan room.
No specific information regarding pricing terms, set-asides, award dates, contract terms, or funding sources is provided in this addendum document. The addendum serves solely to notify bidders of the existence of changes to the original solicitation and directs them to reference the complete addendum materials for detailed modifications to project specifications and technical requirements.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-275-26
FOR: Rehabilitation of Willisburg Lake Dam Kentucky Division of Water Energy and Environmental Cabinet Washington County, Kentucky
DATE: July 22, 2026
RFB-785-2600000643
ADDENDUM NO. Four (4)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings. The entire addendum can be found on the plan room.
END OF ADDENDUM
Invitation to Bid No. RFB-275-26 For: Rehabilitation of Willisburg Lake Dam Kentucky Division of Water Energy and Environmental Cabinet Washington County, Kentucky
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
| Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings. The entire addendum can be found on the plan room. |
| END OF ADDENDUM |
File details come from the government source that posted it. Updated .