Addendum Two.pdf
PDF 10 MB Posted
- Solicitation number
- RFB 785 2600000581 3
- Issued by
- Letcher County, Kentucky
About this file
This is Addendum Two to an Invitation to Bid (RFB-250-26) issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, for flood mitigation work at Fort Boonesborough State Park in Richmond, Kentucky. The addendum clarifies, corrects, and modifies the original bid documents dated March 31, 2026, and includes updated specifications and revised drawings for the Fort Boonesborough Campground Renovation project (account number 670-CC1F-FB24-00). The project scope encompasses interior finish carpentry, formed metal roof panels, formed metal wall panels, sheet metal flashing and trim, hollow metal doors and frames, carpet tile, facility packaged sewage pumping stations, and concrete paving. Key clarifications address project timeline extension (substantial completion set for February 28 with hard stop final completion date of March 31 with no extensions), specifications for roof and wall panels on the Electric Tower (includes steel wall girts for attachment), hot-dipped galvanized treatment for railings and ladders, scope confirmations for Division 8 (three new 3x7 hollow metal doors and frames) and Division 10 (no items included), fire ring installations at 167 RV campsites and 35 new primitive campsites with field location determination, and handling of rock or unsuitable soils encountered during construction treated as unclassified work. The addendum includes enclosures with nine specification sections and ten revised drawings (C101-C105, C400, C500, L403, L601, L700, S001-S003, S101, and S201-S301).
The bid documents establish design loads and criteria conforming to the International Building Code (IBC) 2015 Edition as amended by Kentucky, with specific requirements for floor live loads (60 PSF for elevated platforms), roof live loads (20 PSF non-reducible), snow loads (15 PSF ground load), wind loads (115 MPH ultimate design wind speed, 89 MPH nominal design wind speed), and seismic design criteria (Category C). Special inspections and testing requirements are mandated throughout construction, including geotechnical inspections, concrete testing, structural steel inspections with welding and bolting procedures, and non-destructive testing of welds. The contractor bears sole responsibility for design adequacy and safety of temporary structures, shoring, bracing, de-watering, and compliance with all OSHA safety regulations. Concrete specifications require compliance with ACI 318 standards, with reinforcing steel meeting ASTM A615 Grade 60 and structural steel conforming to ASTM designations (W-shapes in A992, angles and plates in A36, and HSS sections in A500 Grade C). All exterior exposed structural steel must be hot-dipped galvanized per ASTM A123, with field welds and damaged galvanizing receiving zinc-rich paint protection. The project timeline establishes a 200-day substantial completion period with February 28 as the completion date and March 31 as the hard-stop final completion date with no permitted extensions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_RFB_785_2600000581_1_SO_FORM.PDF | ||
| Final_RFB_785_2600000581_3_SO_FORM.PDF | ||
| Final_RFB_785_2600000581_2_SO_FORM.PDF | ||
| Addendum One.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-250-26
FOR: Flood Mitigation Fort Boonesborough State Park Department of Parks Richmond, Kentucky
DATE: May 27, 2026
RFB-785-2600000581
ADDENDUM NO. Two (2)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
Invitation to Bid No. RFB-250-26 For: Flood Mitigation Fort Boonesborough State Park Department of Parks Richmond, Kentucky
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
Parks East - Campground Renovations 670-CC1F-FB24-00 Fort Boonesborough
Kesler Simpson Architects, LLC 3728 Willow Ridge Road, Lexington, KY 40514 859-523-4324 www.ksa-llc.com
Fort Boonesborough Campground Renovation
ADDENDUM #2
This Addendum forms a part of Contract and clarifies, corrects or modifies original Bid Documents, dated March 31, 2026. Acknowledge receipt of this addendum in space provided on bid form. Failure to do so may subject bidder to disqualification.
ENCLOSURES – SPECIFICATIONS:
Specifications Section 062023 Interior Finish Carpentry
Specifications Section 074113.13 Formed Metal Roof Panels
Specifications Section 074213.13 Formed Metal Wall Panels
Specifications Section 076200 Sheet Metal Flashing and Trim
Specifications Section 081113 Hollow Metal Doors and Frames
Specifications Section 096813 Carpet Tile
Specifications Section 221343 Facility Packaged Sewage Pumping Stations
Specifications Section 321313 Concrete Paving
ENCLOSURES – REVISED ADDENDUM DRAWINGS:
C101
C102
C103
C104
C105
C400
C500
L403
L601
L700
Addendum 2 hydrant sketch
S001
S002
S003
S101
S201
S301
1. After reviewing the plans and the scope of work, especially for the asphalt and underground utilities, can additional days beyond the 200 days be added to this project for substantial completion?
• Yes. Substantial completion has been set to Feb 28th and Final Completion March
31st. This is a hard stop on the 31st with no extensions.
2. Table of Contents list 07 6200 Sheet Metal Flashing and Trim, however, I cannot find this specification in the spec book.
• Specifications attached
3. Is there a Basis of Design for the roof and wall panels of the Electric Tower? Type, gauge, etc.
• Wall panel and roof panel specification attached.
4. Is there a detail on the wall framing for the Electric Tower?
• Steel wall girts are to be provided for metal wall panel attachment. Revised structural drawing attached.
5. Does the steel, railing and ladder get painted? If so, can a spec be provided?
• Railing, landing and ladder should be hot dipped galvanized.
6. Please confirm the intended scope associated with Division 8 – Openings and Division 10 –
Specialties, as these scopes are not clearly broken out within the subcontractor listing and associated drawings/specifications.
• Div 8 – Three new 3x7 hollow metal doors and frames. Spec attached.
• Div 10 – No items.
7. Can you confirm whether any access control, low-voltage coordination, or specialty electrical components associated with openings are to be included within Division 8 scope or by others?
• No access control, low-voltage coordination, or specialty electrical components are in the scope of this project.
8. Please clarify if all restroom accessories, signage, fire extinguisher cabinets, and miscellaneous specialties shown in the drawings/specifications are intended to be included within Division 10.
• None of these items are to be included. The Architectural scope on existing buildings is interior wood siding in the Meeting Hall, Paint both bath houses, Paint and Carpet in the Rangers Station. Specifications attached.
9. Are there any additional addenda anticipated prior to bid date that may further clarify interior architectural scopes?
• Not at this time.
10. Layout & Material Note H states “All RV campsites to receive new fire rings”. Which campsites are considered RV?
• A: There are 167 RV campsites that shall receive new fire rings in addition to the
35 new primitive camp sites that should all receive new fire rings.
11. Detail J Note 2 states “Install location as noted on Detail B/L700”. There are 3 types of
Utility Pads and neither show the fire rings. Do all 3 types get a fire ring? Please clarify.
• A: Sheet L700 is reissued with this addendum, see for clarification. Fire rings to be field located and will be on the living room side of RV campsites (not in the utility areas).
12. Details I & J Note 3 says to refer to specifications for additional requirements. Will a specification be provided in the addendum?
• A: Sheet L700 is reissued with this addendum, see for clarification. There will be no additional Specification for the fire rings, Specifications noted for reference to other site construction requirements associated with installation of fire rings.
13. Since a Geotech report is not available, how do we handle any rock or unsuitable soils that may be encountered? Can an allowance be issued? It would be an unlevel playing field if each contractor had to make their own determination of “unknowns” without a report.
• DECA typically bids sites as Unclassified, granted there is sometimes a geotech report with it but it would be impossible to have enough geotech information to cover all of the new utility work here.
14. Spec Section 32 1313 Concrete Paving is missing from the specifications. Please provide.
• Specification attached.
DESIGN LOADS AND CRITERIA
ALL DESIGN AND CONSTRUCTION SHALL CONFORM TO THE REQUIREMENTS OF THE INTERNATIONAL
BUILDING CODE (IBC), 2015 EDITION, AS AMENDED BY THE STATE OF KENTUCKY.
FLOOR LIVE LOADS
THE FOLLOWING UNIFORM FLOOR LIVE LOADS WERE DETERMINED USING ASCE 7 CHAPTER 4 IN
ACCORDANCE WITH IBC SECTION 1607. LIVE LOADS ARE REDUCED WHERE ALLOWED BY THE
BUILDING CODE.
OCCUPANCY OR USE LOAD (PSF)
ELEVATED PLATFORM: 60
REFER TO IBC TABLE 1607.1 FOR RELEVANT CONCENTRATED LIVE LOADS.
ROOF LIVE LOADS
THE FOLLOWING UNIFORM ROOF LIVE LOADS WERE DETERMINED USING ASCE 7 CHAPTER 4 IN
ACCORDANCE WITH IBC SECTION 1607. LIVE LOADS ARE REDUCED WHERE ALLOWED BY THE
BUILDING CODE.
OCCUPANCY OR USE LOAD (PSF)
ROOF LIVE LOAD: 20 (NONREDUCIBLE)
SNOW LOADS
THE FOLLOWING SNOW LOAD FACTORS WERE DETERMINED USING ASCE 7 CHAPTER 7 IN
ACCORDANCE WITH IBC SECTION 1608.
Pg = 15 PSF
Ce = 1.0 Is = 1.0
Ct = 1.0 Pf = 10.5 PSF
Cs = 1.0
WIND LOADS
THE FOLLOWING WIND LOAD FACTORS WERE DETERMINED USING ASCE 7 CHAPTERS 26-31 IN
ACCORDANCE WITH IBC SECTION 1609.
ULTIMATE DESIGN WIND SPEED (Vult): 115 MPH
NOMINAL DESIGN WIND SPEED (Vasd): 89 MPH
RISK CATEGORY: II
WIND EXPOSURE CATEGORY: C
INTERNAL PRESSURE COEFFICIENT: 0.18
SEISMIC LOADS
THE FOLLOWING SEISMIC LOAD FACTORS WERE DETERMINED USING ASCE 7 CHAPTERS 11-23 IN
ACCORDANCE WITH IBC SECTION 1613.
SEISMIC DESIGN CATEGORY: C
RISK CATEGORY: II
IMPORTANCE FACTOR (Ie): 1.0
SITE CLASS: D
Ss = 0.194 g Sds = 0.207 g
S1 = 0.091 g Sd1 = 0.146 g
BASIC SEISMIC FORCE-RESISTING SYSTEM: STEEL SYSTEM NOT SPECIFICALLY DETAILED
FOR SEISMIC RESISTANCE
ANALYSIS PROCEDURE: EQUIVALENT LATERAL FORCE PROCEDURE
R = 3
Cs = 0.069 V = Cs x W (BASE SHEAR)
STORY DRIFTS
THE MAXIMUM ALLOWABLE LATERAL DISPLACEMENTS WITH RESPECT TO THE LEVEL BELOW (STORY
DRIFTS) ARE AS FOLLOWS:
WIND STORY DRIFT: 0.0025H
SEISMIC INELASTIC STORY DRIFT (Δie): 0.02H
SEISMIC ELASTIC STORY DRIFT (Δe): (Δie)/(Cd/Ie) Cd/Ie = 3
FUTURE BUILDING EXPANSION
NO PROVISIONS HAVE BEEN MADE FOR FUTURE HORIZONTAL OR VERTICAL BUILDING EXPANSION.
COMPONENT AND CLADDING DESIGN WIND PRESSURES
ZONE
WIND
AREA
(SF)
PRESSURE (PSF)
ZONE
WIND
AREA
(SF)
PRESSURE (PSF)
(ROOF)
10 16 -31
(OVERHANG)
10 16 -45 20 16 -31 20 16 -44 50 16 -30 50 16 -43 100 16 -29 100 16 -42
(ROOF)
10 16 -52
(OVERHANG)
10 16 -45 20 16 -47 20 16 -44 50 16 -39 50 16 -43 100 16 -34 100 16 -42
(ROOF)
10 16 -78
(OVERHANG)
10 16 -73 20 16 -65 20 16 -58 50 16 -47 50 16 -37 100 16 -34 100 16 -21
(WALL)
10 28 -30 20 27 -29 50 25 -28 100 24 -26
(WALL)
10 28 -37 20 27 -35 50 25 -32 100 24 -29
DIAGRAM VARIABLES:
h = 20 FEET a = 3 FEET
1) GENERAL NOTES
A) SUBMITTALS
i) SHOP DRAWINGS SHALL BE SUBMITTED TO THE ARCHITECT PRIOR TO ANY FABRICATION OR
CONSTRUCTION FOR ALL STRUCTURAL ITEMS, INCLUDING THE FOLLOWING: CONCRETE OR
MASONRY REINFORCEMENT, PRECAST OR PRESTRESSED CONCRETE ITEMS, EMBEDDED STEEL
ITEMS, STRUCTURAL STEEL, STEEL JOISTS, STEEL DECK, SHEAR STUD LAYOUT, METAL
GRATING, GLUE-LAMINATED MEMBERS, CLADDING PANELS, AND STAIRS.
ii) IF THE SHOP DRAWINGS DIFFER FROM OR ADD TO THE DESIGN OF THE STRUCTURAL
DRAWINGS, THEY SHALL BEAR THE SEAL AND SIGNATURE OF THE REGISTERED PROFESSIONAL
ENGINEER LICENSED IN THE PROJECT STATE WHO IS RESPONSIBLE FOR THE DESIGN.
B) COMPONENTS DESIGNED BY OTHERS (DEFERRED SUBMITTALS)
i) PER IBC SECTION 107.3.4.1, DRAWINGS AND CALCULATIONS FOR THE DESIGN AND
FABRICATION OF THE ITEMS THAT ARE DESIGNED BY OTHERS SHALL BEAR THE SEAL AND
SIGNATURE OF THE REGISTERED PROFESSIONAL ENGINEER LICENSED IN THE PROJECT STATE
WHO IS RESPONSIBLE FOR THE DESIGN AND SHALL BE SUBMITTED TO THE ARCHITECT AND
THE BUILDING DEPARTMENT FOR REVIEW PRIOR TO FABRICATION.
ii) DEFERRED SUBMITTALS INCLUDE BUT ARE NOT LIMITED TO THE FOLLOWING:
(1) ACCESS LADDERS OR STAIRS
C) NONSTRUCTURAL COMPONENTS
i) DESIGN, DETAILING, AND ANCHORAGE OF ALL NONSTRUCTURAL COMPONENTS SHALL BE IN
ACCORDANCE WITH IBC SECTION 1613, ASCE 7 CHAPTER 13, AND THE PROJECT
SPECIFICATIONS. NONSTRUCTURAL COMPONENTS DESIGNED BY OTHERS SHALL NOT INDUCE
TORSIONAL LOADING INTO SUPPORTING STEEL STRUCTURAL MEMBERS WITHOUT ADDITIONAL
BRACING OF THOSE MEMBERS TO ELIMINATE TORSIONAL FORCES. TORSIONAL BRACING
SHALL BE DESIGNED BY THE NONSTRUCTURAL COMPONENT DESIGNER AND APPROVED BY THE
ENGINEER.
ii) DESIGN, DETAILING, AND CONSTRUCTION OF ALL NONSTRUCTURAL COMPONENTS WHICH
ATTACH TO STRUCTURE SHALL ACCOMMODATE CONSTRUCTION TOLERANCES AS
ESTABLISHED BY SPECIFICATIONS. ANY NONSTRUCTURAL COMPONENTS WHICH ATTACH TO
MORE THAN ONE LEVEL OF THE STRUCTURE SHALL ALSO ACCOMMODATE THE FOLLOWING
RELATIVE MOVEMENTS BETWEEN LEVELS WITHOUT DAMAGE TO THE NONSTRUCTURAL
COMPONENTS:
(1) VERTICAL DEFLECTION OF ±1 INCH DUE TO VARIABLE LIVE LOADS
(2) ELASTIC STORY DRIFT PER “STORY DRIFT” NOTE IN THE DESIGN LOADS
iii) IN ADDITION, NONSTRUCTURAL COMPONENTS ATTACHED TO MORE THAN ONE LEVEL SHALL
ACCOMMODATE AN INELASTIC STORY DRIFT PER “STORY DRIFT” SECTION (SEE “DESIGN
LOADS AND CRITERIA”) WITHOUT CREATING A LIFE SAFETY HAZARD.
iv) ACCESS LADDERS OR STAIRS DESIGNED BY OTHERS SHALL NOT INDUCE TORSIONAL LOADING
INTO SUPPORTING STRUCTURAL MEMBERS WITHOUT ADDITIONAL BRACING TO THOSE
MEMBERS. TORSIONAL BRACING SHALL BE DESIGNED BY THE STAIR DESIGNER AND
APPROVED BY THE EOR.
v) CLADDING DESIGNED BY OTHERS SHALL BE SUPPORTED AT EACH STORY TO BE CONSISTENT
WITH THE DESIGN OF THE BUILDING STRUCTURE. CLADDING DESIGNED BY OTHERS SHALL
NOT INDUCE TORSIONAL LOADING INTO SUPPORTING STEEL STRUCTURAL MEMBERS WITHOUT
ADDITIONAL BRACING OF THOSE MEMBERS TO ELIMINATE TORSIONAL FORCES, UNLESS
OTHERWISE APPROVED BY THE ARCHITECT. TORSIONAL BRACING SHALL BE DESIGNED BY THE
CLADDING DESIGNER AND APPROVED BY THE ENGINEER.
D) SPECIAL INSPECTIONS PER IBC CHAPTER 17 SHALL BE PERFORMED BY AN APPROVED TESTING
AGENCY AS INDICATED IN THE STATEMENT OF SPECIAL INSPECTIONS AND TESTING. ALL
PREPARED SOIL-BEARING SURFACES SHALL BE INSPECTED BY THE GEOTECHNICAL ENGINEER
PRIOR TO PLACEMENT OF REINFORCING STEEL. SOIL COMPACTION SHALL BE SUPERVISED BY AN
APPROVED TESTING AGENCY OR GEOTECHNICAL ENGINEER.
E) ALL FRAMING MEMBERS SHALL BE EQUALLY SPACED BETWEEN GRID LINES, COLUMNS, AND
DIMENSIONED FRAMING UNLESS NOTED OTHERWISE.
2) FOUNDATIONS
A) THE FOUNDATION DESIGN VALUES ARE BASED ON ALLOWABLE PRESUMPTIVE VALUES IN
CHAPTER 18 OF THE BUILDING CODE. SPECIAL INSPECTOR TO CONFIRM THAT SOILS
ENCOUNTERED IN THE FIELD ARE CONSISTENT WITH THESE ASSUMPTIONS AND THAT THEY ARE
PROPERLY PREPARED AND COMPACTED TO RECEIVE FOUNDATIONS SHOWN HEREIN.
B) THE CONTRACTOR SHALL THOROUGHLY FAMILIARIZE THEMSELVES WITH THE FINDINGS AND
RECOMMENDATIONS OF THE BUILDING CODE AND SHALL PERFORM ALL EARTHWORK
OPERATIONS AND FOUNDATION INSTALLATION OPERATIONS IN ACCORDANCE WITH THESE
RECOMMENDATIONS.
C) FOUNDATIONS ARE DESIGNED BASED ON THE FOLLOWING INFORMATION:
i) SPREAD FOOTINGS AND RETAINING WALLS: (SOIL BEARING)
NET ALLOWABLE BEARING PRESSURE: 1500 PSF
COEFFICIENT OF FRICTION
CONCRETE IN CONTACT WITH SOIL:
0.3
D) THE OWNER WILL RETAIN A QUALIFIED GEOTECHNICAL ENGINEER TO INSPECT ALL BEARING
SURFACES AND EARTHWORK OPERATIONS.
E) SITE PREPARATION ACTIVITIES WITHIN THE BUILDING LIMITS AND EXTENDING 10 FEET BEYOND SHALL BE MONITORED AND VERIFIED BY A REGISTERED GEOTECHNICAL ENGINEER LICENSED IN
THE PROJECT STATE. THE GEOTECHNICAL ENGINEER SHALL VERIFY THAT ACTUAL SITE
CONDITIONS ARE CONSISTENT WITH THE GEOTECHNICAL REPORT, THAT FILL PLACEMENT AND
COMPACTION, UNDERCUTTING, PROOFROLLING, SCARIFICATION, ETC., IS IN GENERAL
CONFORMANCE WITH THE BUILDING CODE AND THAT THE DESIGN PARAMETERS ARE OBTAINED.
F) PRIOR TO CONSTRUCTION OF ANY PERMANENT STRUCTURE, EXISTING SURFACE FILL, TOPSOIL
AND ORGANIC MATERIAL, WET, SOFT, LOOSE, OR UNDESIRABLE SOIL, AND OLD ABANDONED
CONCRETE AND UTILITIES SHALL BE REMOVED TO THE EXTENT RECOMMENDED BY THE BUILDING
CODE.
G) CONCRETE FOR FOOTINGS SHALL BE PLACED THE SAME DAY EXCAVATIONS ARE OPENED. IF THIS IS IMPOSSIBLE, STEPS SHALL BE TAKEN TO ADEQUATELY PROTECT THE OPEN EXCAVATION FROM
WEATHER.
H) FOOTINGS SHALL BE SUPPORTED ON SOIL PREPARED PER THE BUILDING CODE. EXCAVATE AND
REPLACE EXISTING LOOSE OR WEATHERED SOILS OR UNCERTIFIED FILL IN ACCORDANCE WITH
THE GEOTECHNICAL ENGINEER’S RECOMMENDATIONS. GEOTECHNICAL ENGINEER TO VERIFY
ACTUAL DEPTH AND EXTENT OF REMOVED SOIL IN THE FIELD DURING GRADING AND
EXCAVATION.
I) ENGINEERED FILL & BACKFILL SHALL BE PLACED AND COMPACTED ACCORDING TO THE
RECOMMENDATIONS OF THE BUILDING CODE.
J) ALL FOOTING EXCAVATIONS SHALL BE INSPECTED BY A GEOTECHNICAL ENGINEER BEFORE THE CONCRETE IS PLACED. THE ADEQUACY OF THE BEARING SURFACE SHALL BE DETERMINED BY THE
GEOTECHNICAL ENGINEER. ALL GEOTECHNICAL FIELD REPORTS SHALL BE SUBMITTED TO THE
ARCHITECT/ENGINEER.
K) THE DESIGN ADEQUACY AND SAFETY OF TEMPORARY RETAINING STRUCTURES, SHORING OF
TRENCHES, ETC., REQUIRED TO CONSTRUCT THE FOUNDATION SYSTEM IS THE SOLE
RESPONSIBILITY OF THE CONTRACTOR.
L) CONTRACTOR TO PROVIDE FOR DESIGN AND INSTALLATION OF ALL CRIBBING, SHEATHING, AND
SHORING REQUIRED AND SHALL BE SOLELY RESPONSIBLE FOR ALL EXCAVATION PROCEDURES
INCLUDING LAGGING, SHORING, AND PROTECTION OF ADJACENT PROPERTY, STRUCTURES,
STREETS, AND UTILITIES IN ACCORDANCE WITH ALL NATIONAL, STATE, AND LOCAL SAFETY
ORDINANCES.
M) CONTRACTOR TO PROVIDE FOR DE-WATERING OF EXCAVATIONS FROM SURFACE WATER,
GROUND WATER, AND/OR SEEPAGE.
N) EXCAVATIONS SHALL BE PROPERLY BACKFILLED. DO NOT PLACE BACKFILL BEHIND RETAINING
WALLS BEFORE CONCRETE OR GROUT HAS ATTAINED FULL DESIGN STRENGTH. CONTRACTOR
SHALL BRACE OR PROTECT ALL BUILDING AND PIT WALLS BELOW GRADE FROM LATERAL LOADS
UNTIL ATTACHING FLOORS ARE COMPLETELY IN PLACE AND HAVE ATTAINED FULL DESIGN
STRENGTH. CONTRACTOR SHALL PROVIDE FOR DESIGN, PERMITS, AND INSTALLATION OF SUCH
BRACING.
O) FOOTING BACKFILL AND UTILITY TRENCH BACKFILL WITHIN BUILDING AREA SHALL BE
MECHANICALLY COMPACTED IN LAYERS IN ACCORDANCE WITH THE BUILDING CODE AND
APPROVED BY THE GEOTECHNICAL ENGINEER. FLOODING WILL NOT BE PERMITTED AS A MEANS
OF COMPACTION. ENGINEERED FILLS SHALL BE INSPECTED BY THE GEOTECHNICAL ENGINEER.
P) DO NOT LOCATE UTILITIES BENEATH FOOTINGS. STEP FOOTINGS ACCORDING TO THE TYPICAL
DETAILS AND PROVIDE SLEEVES IN FOUNDATION WALL FOR UTILITIES.
3) CAST-IN-PLACE CONCRETE
A) CONCRETE WORK SHALL CONFORM TO ALL REQUIREMENTS OF IBC CHAPTER 19 AND ACI 318.
B) CONCRETE MIXTURES
i) NORMAL WEIGHT CONCRETE MIXTURES SHALL CONFORM TO THE FOLLOWING REQUIREMENTS:
CONCRETE MIXTURES
f’c
(PSI)
TEST AGE
(DAYS)
EXPOSURE CLASS USE
4,000 28 F1 S0 W0 C0 CONCRETE SLAB OVER METAL DECK
4,500 28 F2 S0 W1 C1 FOUNDATIONS AND PIERS
ii) CONCRETE MIXTURES SHALL CONFORM TO THE MOST STRINGENT REQUIREMENTS FOR
EXPOSURE CLASSES SPECIFIED IN THE TABLE ABOVE AND ACI 318 TABLE 19.3.2.1.
iii) WATER-REDUCING ADMIXTURES MAY BE INCORPORATED IN CONCRETE MIX DESIGNS BUT
SHALL CONFORM TO ASTM C494 AND BE USED IN STRICT ACCORDANCE WITH THE
MANUFACTURER’S RECOMMENDATIONS. CaCl2 OR OTHER WATER-SOLUBLE CHLORIDE
ADMIXTURES SHALL NOT BE USED.
iv) WATER/CEMENTITIOUS MATERIALS RATIO SHALL BE MEASURED BY WEIGHT AND SHALL BE
BASED ON TOTAL CEMENTITIOUS MATERIAL. WATER/CEMENTITIOUS MATERIALS RATIO AND
WATER CONTENT SHALL BE DETERMINED BY THE SUPPLIER BASED ON STRENGTH
REQUIREMENTS AND SHALL NOT EXCEED THE MAXIMUM WATER/CEMENTITIOUS MATERIAL
RATIO AND/OR WATER CONTENT IF SHOWN ABOVE OR IN ACI 318 TABLE 19.3.2.1 FOR THE
EXPOSURE CLASSES LISTED.
v) FIELD-MEASURED SLUMP SHALL CONFORM TO THE SUBMITTED CONCRETE MIX DESIGN.
TOLERANCE OF SLUMP SHALL CONFORM TO ASTM C94.
vi) ALL CONCRETE SUBJECT TO EXPOSURE CLASSES F1, F2, OR F3 SHALL BE AIR ENTRAINED. AIR-
ENTRAINING AGENTS SHALL CONFORM TO ASTM C260. THE AMOUNT OF ENTRAINED AIR
SHALL BE ACCORDING TO ACI 318 TABLE 19.3.3.1 WITH A FIELD TOLERANCE OF ±1.5
PERCENT BY VOLUME. THE AMOUNT OF ENTRAINED AIR SHALL BE MEASURED IN THE FIELD AT
THE DISCHARGE FROM THE TRUCK.
vii) MAXIMUM CONCRETE SLUMP SHALL BE 4” WITHOUT A HIGH-RANGE WATER REDUCING
ADMIXTURE (HRWR) OR 8” WITH A HRWR ADMIXTURE AT POINT OR DEPOSIT. SIZE OF
AGGREGATE AND GRADATION SHALL CONFORM TO ASTM C33 FOR NORMAL WEIGHT
CONCRETE. THE COMBINED TOTAL MASS PERCENT OF DELETERIOUS SUBSTANCES,
INCLUDING, BUT NOT LIMITED TO, COAL AND LIGNITE, FOR BOTH COARSE AND FINE
AGGREGATES SHALL BE LIMITED TO 0.5% AS DETERMINED BY ASTM C123.
viii) PORTLAND CEMENT SHALL CONFORM TO ASTM C150, TYPE I/II FOR ALL CONCRETE.
ix) AGGREGATE FOR LIGHTWEIGHT (115 PCF) CONCRETE SHALL BE EXPANDED SHALE
CONFORMING TO ASTM A330 AND PROJECT SPECIFICATIONS.
C) MEASURING, MIXING, TRANSPORTING, AND PLACING OF CONCRETE SHALL BE IN ACCORDANCE
WITH ACI 304R. CONCRETE SHALL BE MECHANICALLY VIBRATED.
i) SURFACES OF CONCRETE SLABS ON GRADE SHALL BE KEPT CONTINUOUSLY MOIST FOR NOT
LESS THAN SEVEN DAYS WITH WATER, CONTINUOUS WATER-FOG SPRAY, OR WATER-
SATURATED ABSORPTIVE COVER.
ii) IF THE AIR TEMPERATURE WILL EXCEED 75° F WITHIN 48 HOURS OF PLACING CONCRETE, A
MOIST CURE SHALL BE APPLIED TO THE CONCRETE FOR A PERIOD OF 36 HOURS AFTER
FINISHING CONCRETE SURFACES. REFER TO THE SPECIFICATIONS FOR CURING
REQUIREMENTS.
D) CURING COMPOUND SHALL CONFORM TO FEDERAL SPECIFICATION TT-C800A, AND ASTM C309.
THE MATERIAL SHALL BE EQUAL TO SONNEBORN KURE-N-SEAL, BASF MASTERSEAL, BY BASF, OR
W.R. GRACE CLEAR SEAL.
E) ALL VERTICAL CONCRETE SURFACES SHALL BE FORMED. HOWEVER, VERTICAL SURFACES OF
FOOTINGS/GRADE BEAMS MAY BE EARTH-FORMED IF THE SOIL IS SUFFICIENTLY STIFF TO
PREVENT CAVE-INS.
F) SLABS, GRADE BEAMS, AND FOOTINGS SHALL HAVE NO HORIZONTAL JOINTS. ANY STOP IN
CONCRETE WORK MUST BE MADE WITH VERTICAL KEYED BULKHEADS. REINFORCEMENT SHALL
CONTINUE THROUGH JOINTS.
G) BEFORE PLACING CONCRETE, THE CONTRACTOR SHALL NOTIFY ALL SUBCONTRACTORS TO BE
SURE ALL SLEEVES, CONDUIT, CHASES, ETC. ARE PROPERLY INSTALLED. THE CONTRACTOR
SHALL NOTIFY THE ARCHITECT/EOR/SPECIAL INSPECTOR AS SOON AS PRACTICAL, BUT AT LEAST
24 HOURS PRIOR TO PLACING CONCRETE TO ALLOW FOR INSPECTION OF REINFORCING AND
EMBEDDED ITEMS.
H) PROVIDE SLEEVES FOR MECHANICAL, PLUMBING, AND ELECTRICAL OPENINGS IN CONCRETE
BEFORE PLACING. DO NOT CUT ANY REINFORCING WHICH MAY CONFLICT. CORING IN CONCRETE
IS PERMITTED WITH APPROVAL OF EOR. NOTIFY THE EOR IN ADVANCE OF CONDITIONS NOT
SHOWN ON THE DRAWINGS. SEE THESE DRAWINGS FOR ADDITIONAL RESTRICTIONS ON THE
PLACEMENTS OF OPENINGS IN SLABS AND WALLS.
I) CONCRETE FILL OVER METAL DECK SHALL BE SCREED TO A CONSTANT THICKNESS AS SPECIFIED
IN THE DECKING SCHEDULE.
J) INTERIOR SLABS SHALL RECEIVE A HARD-TROWELED FINISH. EXTERIOR SLABS SHALL RECEIVE A
LIGHT BROOM FINISH.
K) EXPOSED EDGES AND CORNERS OF THE CONCRETE SHALL HAVE A 3/4” CHAMFER AT 45° UNLESS
NOTED OTHERWISE.
L) REMOVE ANY LAITANCE, ROUGHEN TO 1/4” AMPLITUDE AND CLEAN ALL CONCRETE SURFACES
AGAINST WHICH NEW CONCRETE IS TO BE PLACED.
M) SHOTCRETE SHALL CONFORM TO ACI 506R, ACI 506.2, AND IBC CHAPTER 19. SHOTCRETE MIX
DESIGN, APPLICATION, NOZZLEMAN’S QUALIFICATIONS, AND TEST PROCEDURE SHALL BE IN
STRICT CONFORMANCE WITH THESE PUBLICATIONS.
N) REINFORCING STEEL
DEFORMED BARS ASTM A615, GRADE 60
WELDED WIRE REINFORCEMENT (WWR) ASTM A1064
HEADED DEFORMED BARS ASTM A970, HEAD TYPE HA
ADHESIVE REINFORCING DOWELS (ARD) ASTM A615, GRADE 60
ADHESIVE AS REQUIRED PER
POST-INSTALLED ANCHORS
THREADED ARD DEFORMED BAR ANCHOR (DBR) A706
O) REINFORCING SHALL BE SUPPORTED AS SPECIFIED BY THE PROJECT SPECIFICATIONS AND THE
CRSI MANUAL OF STANDARD PRACTICE. REINFORCING STEEL SHALL BE DETAILED IN
ACCORDANCE WITH ACI STANDARD OF PRACTICE AS OUTLINED IN ACI 315.
P) LAP ALL REINFORCING BARS AS NOTED ON THE DRAWINGS. WHERE SPLICE LENGTH IS NOT
SHOWN, USE REINFORCING BAR SPLICE LENGTH SCHEDULE BELOW. MECHANICAL SPLICES
CALLED OUT ON THE PLANS SHALL BE TYPE 1, UNLESS OTHERWISE NOTED. TYPE 1 SPLICES
SHALL DEVELOP 125 PERCENT OF THE YIELD CAPACITY OF THE SPLICED BARS IN BOTH TENSION AND COMPRESSION. TYPE 2 SPLICES SHALL DEVELOP THE SPECIFIED TENSILE STRENGTH OF THE SPLICED BARS IN TENSION IN ADDITION TO MEETING TYPE 1 SPLICE REQUIREMENTS. SUBMIT
ICC-ES OR IAPMO UES REPORT VALID FOR THE BUILDING CODE DEMONSTRATING COMPLIANCE
OF COUPLES WITH THESE REQUIREMENTS.
REINFORCING BAR SPLICE LENGTH SCHEDULE
T E N
S
IO
N
S P L
IC
E f' c p s i)
BAR SIZE GR60 3 4 5 6 7 8 9 10 11
BAR DIAMETER db (in)
0.375 0.500 0.625 0.750 0.875 1.000 1.128 1.270 1.410
C L A S S
B
0 TOP BAR 2'-4" 3'-1" 3'-10" 4'-8" 6'-9" 7'-9" 8'-8" 9'-10" 10'-11"
BOTTOM BAR 1'-9" 2'-4" 3'-0" 3'-7" 5'-2" 5'-11" 6'-8" 9'-6" 8'-4"
0 TOP BAR 2'-0" 2'-8" 3'-4" 4'-0" 5'-10" 6'-8" 7'-6" 8'-6" 9'-5"
BOTTOM BAR 1'-6" 2'-1" 2'-7" 3'-1" 4'-6" 5'-2" 5'-10" 6'-6" 7'-3"
0 TOP BAR 1'-10" 2'-5" 3'-0" 3'-7" 5'-3" 6'-0" 6'-9" 7'-7" 8'-5"
BOTTOM BAR 1'-5" 1'-10" 2'-4" 2'-9" 4'-0" 4'-7" 5'-2" 5'-10" 6'-6"
NOTES:
1. ALL REINFORCING MUST MEET ONE OF THE FOLLOWING CONDITIONS:
A. CASE 1: THE CLEAR SPACING OF THE BARS BEING DEVELOPED OR SPLICED IS NOT MORE
THAN ONE BAR DIAMETER (db), CLEAR COVER NOT LESS THAN ONE BAR DIAMETER (db)
B. CASE 2: THE CLEAR SPACING OF THE BARS BEING SPLICED IS NOT MORE THAN TWO BAR
DIAMETERS (db) AND THE CLEAR COVER IS NOT LESS THAN ONE BAR DIAMETER (db).
2. THE ABOVE VALUES ARE FOR NORMAL WEIGHT CONCRETE.
3. THE ABOVE VALUES ARE FOR UNCOATED REINFORCEMENT.
4. TOP BARS ARE HORIZONTAL REINFORCMENT WITH MORE THAN 12" OF NEW CONCRETE PLACED
BELOW THE BAR.
5. BOTTOM BARS ARE ALL VERTICAL BARS, AND HORIZONTAL REINFORCEMENT WITH LESS THAN 12"
OF NEW CONCRETE PLACED BELOW THE BAR.
Q) AT THE CONTRACTOR’S OPTION AND WITH THE ARCHITECT’S APPROVAL, HEADED DEFORMED
BARS MAY BE USED IN LIEU OF LAP SPLICES. USE OF HEADED DEFORMED BARS IS SUBJECT TO
CONFORMANCE WITH ACI 318 SECTION 25.4.4. USE OF MECHANICAL SPLICES IS SUBJECT TO
CONFORMANCE WITH ACI 318 SECTION 18.2.7 AND REQUIRES SUBMITTAL OF AN ICC-ES OR
IAPMO UES REPORT VALID FOR THE BUILDING CODE.
R) PROVIDE BAR SUPPORTS AND SPACERS IN ACCORDANCE WITH ACI DETAILING MANUAL. ALL BAR SUPPORTS IN AREAS WHERE CONCRETE WILL BE EXPOSED SHALL HAVE PLASTIC FEET. PRECAST CONCRETE (f’c = 3,000 PSI) BLOCKS 3”x3”x3” SHALL BE USED TO SUPPORT REINFORCING OFF OF
THE GROUND. AT ALL OTHER LOCATIONS, CHAIRS OR STANDEES SHALL BE USED. LIFTING OF
HOOK IS NOT PERMITTED.
S) DETAILING, FABRICATION, AND PLACING OF REINFORCING SHALL CONFORM TO APPLICABLE
PROVISIONS OF ACI 315 AND ACI 318.
T) ALL REINFORCING SHALL BE CLEAN OF RUST, GREASE, SOIL, OR OTHER MATERIALS THAT MAY
IMPAIR BOND.
U) REINFORCING BAR MAY BE BENT ONCE, AND THE BEND SHALL BE MADE COLD.
V) BAR SPLICES SHALL BE CLASS B AS INDICATED ON THE SCHEDULE IN THE TYPICAL DETAILS.
W) WWR SPLICES SHALL BE LAPPED FOR A MINIMUM OF ONE WIRE SPACING PLUS 2” OR 8”,
WHICHEVER IS LARGER.
X) SPREAD BARS AROUND SMALL OPENINGS AND SLEEVES IN SLABS AND WALLS WHERE POSSIBLE
AND WHERE BAR SPACING WILL NOT EXCEED 1.5 TIMES THE NORMAL SPACING. DISCONTINUE
BARS AT LARGE OPENINGS WHERE NECESSARY AND PROVIDE AN AREA OF REINFORCEMENT
EQUAL TO THE INTERRUPTED REINFORCEMENT EACH SIDE OF THE OPENING (CLASS B LAP
SPLICED). HOLES LARGER THAN 12” IN ANY DIRECTION SHALL HAVE (1)#5x5’-0” DIAGONAL BAR
IN BOTH FACES AT EACH CORNER.
Y) PIER REINFORCEMENT SHALL BE DOWELED TO THE FOOTING. PROVIDE DOWELS EQUAL IN SIZE, NUMBER, AND GRADE TO THE PIER REINFORCEMENT UNLESS OTHERWISE NOTED. DOWELS
SHALL BE HOOKED 90° AT THE BOTTOM LEVEL OF FOOTING REINFORCEMENT. DOWELS SHALL BE
LAPPED WITH THE PIER REINFORCEMENT.
Z) PIER REINFORCEMENT SHALL BE THE SAME SIZE, NUMBER, AND GRADE AS THE
COLUMN/PILASTER REINFORCING, UNLESS OTHERWISE NOTED.
AA) REINFORCING BARS SHALL BE IN PLACE AND SECURED PRIOR TO POURING CONCRETE. STICKING
OF REINFORCING BARS IS NOT PERMITTED.
BB) REINFORCING BAR SHOP DRAWINGS SHALL SHOW NUMBER, SIZE, AND LOCATION OF BARS, AS WELL AS LAP LENGTH AND CLEAR COVER. DETAILING SHALL BE IN ACCORDANCE WITH ACI SP-66 (04)
CC) DOWEL BAR SPLICER/DOWEL BAR REPLACEMENT (DBR) SHALL DEVELOP AT LEAST 125% OF THE YIELD STRENGTH OF THE REINFORCING STEEL (GRADE 60 REINFORCING STEEL). SUBMIT ICC-ES
REPORT VALID FOR THE BUILDING CODE DEMONSTRATING COMPLIANCE OF COUPLERS WITH
THESE REQUIREMENTS.
DD)ALL WELDED WIRE REINFORCEMENT IN SLABS ON GRADE AND ELEVATED SLABS SHALL BE
SUPPORTED BY CHAIRS, BOLSTERS, OR OTHER APPROVED SUPPORTING DEVICES. “PULLING-UP”
OF MESH AFTER CONCRETE HAS BEEN PLACED IS NOT ACCEPTABLE.
EE) REINFORCING STEEL SHALL HAVE PROTECTION AS FOLLOWS, UNLESS NOTED OTHERWISE:
USE COVER
BEAM STIRRUPS AND COLUMN TIES 1 1/2”
SLAB-ON-GRADE MID-DEPTH
STRUCTURAL SLAB-ON-GRADE BOTTOM BARS 2”
WALL BARS INTERIOR 3/4"
WALL BARS EXPOSED TO EARTH OR WEATHER 1 1/2" (#5 AND SMALLER)
2” (#6 AND LARGER)
FOOTING, PILE CAP, GRADE BEAM BOTTOM BARS 3” (CAST AGAINST EARTH)
FOOTING, PILE CAP, GRADE BEAM TOP BARS 1 1/2" (#5 AND SMALLER)
2” (#6 AND LARGER)
FF) WELDING OF REINFORCING, WHERE APPROVED BY THE EOR, SHALL BE PERFORMED USING LOW
HYDROGEN ELECTRODES AND PREHEATED IN ACCORDANCE WITH AWS D1.4. WELDERS AND
WELDING PROCEDURES SHALL BE QUALIFIED IN ACCORDANCE WITH AWS D1.4. MATERIALS
SHALL CONFORM TO THE FOLLOWING:
(1) REINFORCING BARS TO BE WELDED: ASTM A706, GRADE 60, LOW ALLOY
(2) WELDING ELECTRODES: E80XX
GG)NON-SHRINK GROUT
i) BASE PLATE GROUT SHALL BE NONSHRINK TYPE WITH MINIMUM f’c = 8,000 PSI. ALL OTHER NONSHRINK GROUT SHALL HAVE MINIMUM f’c = 5,000 PSI.
4) STRUCTURAL STEEL
A) STRUCTURAL STEEL SHALL BE DETAILED, FABRICATED, AND ERECTED BY AN APPROVED AND LICENSED FABRICATOR IN ACCORDANCE WITH IBC CHAPTER 22, AISC 360, AISC 303, AND AWS.
B) STRUCTURAL STEEL SHALL CONFORM TO THE ASTM DESIGNATIONS INDICATED BELOW (UNO):
ANGLES, CHANNELS A36
W SHAPES, WT SHAPES A992
PLATES, UNO A36
PLATES (50 KSI WHERE NOTED) A572 GR50
CONNECTION PLATES AND MISC., UNO A36
ROUND HSS A500 GR C
SQUARE AND RECTANGULAR HSS A500 GR C
PIPE A53 GR B
HIGH STRENGTH CONVENTIONAL BOLTS F3125: GR A325
(GR A490 WHERE NOTED)
HIGH STRENGTH TENSION-CONTROL (TC) BOLTS F3125: GR F1852
(GR F2280 WHERE NOTED)
THREADED ROD A36
HEAVY HEX NUTS A563
HARDENED STEEL WASHER F436
ANCHOR RODS F1554: GR 36
(GR 55 WHERE NOTED)
PLAIN WASHER F844
HEADED STUDS ANCHORS AND SHEAR STUDS A108
DEFORMED BAR ANCHOR STUDS A706
C) CONNECTIONS NOT INDICATED ON THE CONTRACT DRAWINGS SHALL BE DESIGNED BY A
STRUCTURAL ENGINEER LICENSED IN THE PROJECT STATE, RETAINED BY THE STEEL
FABRICATOR. ALL CALCULATIONS AND SHOP DRAWINGS SHALL HAVE A COVER SHEET DULY
STAMPED AND SIGNED BY THE REGISTERED STRUCTURAL ENGINEER LICENSED IN THE PROJECT
STATE AND SUBMITTED FOR REVIEW TO THE ARCHITECT/ENGINEER. STAMPING AND SIGNING OF
SHOP DRAWINGS SHALL BE FOR THE EXCLUSIVE PURPOSE OF CERTIFYING THAT THE
CONNECTIONS ARE DETAILED AS PER THE DESIGN PERFORMED BY THE REGISTERED
STRUCTURAL ENGINEER. FAILURE TO SUBMIT STAMPED AND SIGNED CALCULATIONS AND
STAMPED AND SIGNED SHOP DRAWINGS SHALL BE SUFFICIENT CAUSE FOR REJECTION OF SHOP
DRAWINGS.
D) THE CONTRACTOR SHALL BE LIABLE FOR DIMENSIONS, FIT, TOLERANCES, FABRICATION, AND
ERECTION.
E) LENGTH OF CONNECTION ANGLES FOR BEAM-TO-COLUMN OR BEAM-TO-BEAM CONNECTIONS
SHALL BE THE LARGEST STANDARD LENGTH LESS THAN OR EQUAL TO THE “T” DIMENSION OF
THE BEAM. STANDARD LENGTHS AND AVAILABLE STRENGTH OF CONNECTION ANGLES ARE
FOUND IN TABLES 10-1 THRU 10-3 OF THE AISC STEEL CONSTRUCTION MANUAL.
F) BOLTS SHALL BE MINIMUM 3/4" DIAMETER ASTM A325-N (UNO), TIGHTENED BY AN APPROVED
AISC METHOD. BOLT HOLES IN STEEL FOR HIGH STRENGTH BOLTED CONNECTIONS SHALL BE
1/16” LARGER IN DIAMETER THAN BOLT DIAMETER.
G) TENSION CONTROL (TC) BOLTS MAY BE USED AT CONTRACTOR’S OPTION WHERE PRETENSIONED
BOLTS ARE REQUIRED PER RCSC.
H) REENTRANT CORNERS SHALL HAVE 3/4" MINIMUM RADIUS.
I) WELDING IS TO BE DONE BY AWS CERTIFIED WELDERS USING E70XX ELECTRODES (UNO).
WELDS SHALL BE PREQUALIFIED BY AWS. WELDING SHALL BE IN STRICT ADHERENCE TO A
WRITTEN WELDING PROCEDURE SPECIFICATION (WPS) PER AWS D1.1. WELDING PARAMETERS
SHALL BE WITHIN THE ELECTRODE MANUFACTURER’S RECOMMENDATIONS. WELDING
PROCEDURES SHALL BE SUBMITTED TO THE OWNER’S TESTING AGENCY FOR REVIEW BEFORE
STARTING FABRICATION OR ERECTION. FIELD WELDING SYMBOLS HAVE NOT NECESSARILY BEEN
INDICATED ON THE DRAWINGS. WHERE SHOWN, PROPER FIELD WELDING PER AWS D1.1 SHALL
BE USED. WHERE NO FIELD WELDING SYMBOLS ARE SHOWN, IT IS THE CONTRACTOR’S
RESPONSIBILITY TO COORDINATE THE USE OF SHOP AND FIELD WELDS TO FACILITATE THE
STRUCTURAL STEEL ERECTION.
J) PARTIAL PENETRATION GROOVE WELD SIZES SHOWN ON THE DRAWINGS REFER TO EFFECTIVE
THROAT THICKNESS, SHOWN AS (E). SHOP WELDS SHALL BE MADE USING GMAW, FCAW, OR
SAW WELDING PROCESSES. FIELD WELDS SHALL BE MADE USING EITHER FCAW OR THE SMAW
WELDING PROCESSES. FILLER METALS SHALL COMPLY WITH THE AWS D1.1, TABLE 3.1, “PRE-
QUALIFIED BASE METAL-FILLER METAL COMBINATIONS FOR MATCHING STRENGTH”.
K) SHOP DRAWINGS SHALL SHOW ALL WELDING WITH AWS A2.4 SYMBOLS. WELDS SHOWN ON THE
CONTRACT DRAWINGS ARE MINIMUM SIZES FOR STRENGTH. INCREASE WELD SIZE TO AWS
MINIMUM SIZE BASED ON THICKNESS OF THE MATERIAL BEING WELDED. MINIMUM WELD SIZE
SHALL BE 3/16” FOR MATERIAL THICKNESS 3/16” AND GREATER.
L) BACKUP BARS MAY REMAIN IN PLACE UNLESS NOTED ON PLANS, OR WHEN ULTRASONIC TEST
INDICATES A POSSIBLE WELD DEFECT. IF DEFECTS ARE INDICATED, BACKUP BAR IS TO BE
REMOVED AND ROOT INSPECTED. IF DEFECTS ARE FOUND, THEY ARE TO BE REMOVED BY
BACKGOUGING TO SOUND MATERIAL. CLEAN AND REPAIR WELD TO SPECIFIED SIZE PER AWS.
M) THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE JOINT PREPARATIONS AND WELDING
PROCEDURES THAT INCLUDE BUT ARE NOT LIMITED TO: REQUIRED ROOT OPENINGS, ROOT FACE
DIMENSIONS, GROOVE ANGLES, BACKING BARS, COPES, SURFACE ROUGHNESS VALUES, AND
TAPERS OF UNEQUAL PARTS.
N) STRUCTURAL STEEL DESIGN, FABRICATION, AND ERECTION SHALL CONFORM TO THE
REQUIREMENTS OF IBC CHAPTER 22. MEMBERS ARE TO BE ERECTED WITH NATURAL MILL
CAMBER OR INDUCED CAMBER UP, UNLESS OTHERWISE NOTED ON PLANS. SUBSTITUTION OF
MEMBER SIZES OR STEEL GRADED IS NOT ALLOWED WITHOUT PRIOR APPROVAL BY THE
ENGINEER OF RECORD. A MINIMUM OF TWO BOLTS IS REQUIRED FOR ALL BEAM CONNECTIONS.
ALTERNATIVE CONNECTIONS TO THOSE SHOWN ON THESE DRAWINGS REQUIRE PRIOR
APPROVAL BY THE ENGINEER OF RECORD.
O) WELD LENGTHS CALLED FOR ON PLANS ARE THE NET EFFECTIVE LENGTH REQUIRED. WHERE
FILLET WELD SYMBOL IS GIVEN WITHOUT INDICATION OF SIZE, USE MINIMUM SIZE WELDS AS
SPECIFIED IN AISC 360-10 TABLE J2.4.
P) THE USE OF E70-T4 WELDING WIRE IS NOT ALLOWED FOR ANY APPLICATION.
Q) ALL WELD FILLER MATERIAL SHALL HAVE A MINIMUM CHARPY V-NOTCH (CVN) VALUE OF 20 FT-LB
AT A TEMPERATURE OF 0° F.
R) STEEL FRAMEWORK SHALL NOT BE ASSUMED STRUCTURALLY STABLE UNTIL ALL MEMBERS ARE IN
PLACE AND CONNECTIONS ARE INSTALLED. ANY USE OF THE PARTIALLY ERECTED FRAMEWORK
FOR TEMPORARY SUPPORT OF ANY KIND SHALL BE DONE ONLY AT THE CONTRACTOR’S RISK.
S) PROVIDE VERTICAL WEB STIFFENERS ON EACH SIDE OF WEB BEAM AT ALL POINTS SUBJECTED
TO CONCENTRATED LOADS, SUCH AS COLUMN RESTING ON BEAM. THE STIFFENERS SHALL
EXTEND TO FULL DEPTH OF BEAM AND THE BOUNDARY OF FLANGE WITH MINIMUM THICKNESS
OF 3/8”.
T) BURNING OF HOLES IN STRUCTURAL STEEL IS NOT PERMITTED WITHOUT PRIOR APPROVAL OF
THE ENGINEER OR RECORD.
U) MAINTAIN WORK IN A SAFE A STABLE CONDITION DURING ERECTION. PROVIDE TEMPORARY
SHORING AND BRACING MEMBERS AS REQUIRED, WITH CONNECTIONS OF SUFFICIENT
STRENGTH TO BEAR IMPOSED LOADS. REMOVE TEMPORARY MEMBERS AND CONNECTIONS WHEN
PERMANENT MEMBERS ARE IN PLACE AND FINAL CONNECTIONS ARE MADE. PROVIDE TEMPORARY
GUY LINES TO ACHIEVE PROPER ALIGNMENT AND STABILITY OF THE STRUCTURE AS ERECTION
PROCEEDS.
V) HIGH STRENGTH BOLTED CONNECTIONS AND WELDED CONNECTIONS SHALL BE INSPECTED BY
THE SPECIAL STRUCTURAL INSPECTOR. ALL COMPLETE-PENETRATION WELDS SHALL BE
ULTRASONICALLY TESTED BY A QUALIFIED INSPECTOR. INSPECTION AND TESTING WILL BE PAID
FOR BY THE OWNER.
W) ALL EXTERIOR EXPOSED STRUCTURAL STEEL SHALL BE HOT-DIPPED GALVANIZED PER ASTM
A123, UNO BY ARCHITECT. FIELD WELDS AND DAMAGED GALVANIZING SHALL BE COATED WITH
A ZINC-RICH PAINT, MINIMUM 2 MIL THICK, APPLIED TO A CLEAN, DRY STEEL SURFACE BY
EITHER A BRUSH OR SPRAY. ZINC-RICH PAINTS MUST CONTAIN EITHER BETWEEN 65% TO 69%
METALLIC ZINC BY WEIGHT OR GREATER THAN 92% METALLIC ZINC BY WEIGHT IN THE DRY
FILM.
X) AFTER MATERIAL HAS BEEN PROPERLY CLEANED AND TREATED, APPLY SHOP PRIME COAT TO ALL
SURFACES, EXCEPT THOSE INTENDED FOR EMBEDMENT INTO CONCRETE OR TO RECEIVE FIELD
WELDING, SLIP CRITICAL BOLTS, OR CEMENTITIOUS FIREPROOFING. PROVIDE “TOUCH-UP” AT
SITE. MINIMUM DRY FILM THICKNESS SHALL BE 1.5 MIL.
Y) ANCHOR RODS
i) ANCHOR RODS SHALL CONFORM TO F1554, GR36, UNO WITH HEAVY HEX NUTS AND PLAIN
WASHERS.
ii) PROVIDE DOUBLE HEAVY HEX NUTS, JAMMED, AT ENDS EMBEDDED IN CONCRETE OR TACK
WELD SINGLE NUT TO END OF ROD.
iii) ANCHOR RODS SHALL HAVE SUFFICIENT LENGTH TO PROVIDE THE MINIMUM EMBEDMENT
SHOWN ON THE CONTRACT DRAWINGS.
iv) ANCHOR RODS SHALL BE INSTALLED TO A SNUG-TIGHT CONDITION.
v) NO HEATING OR BENDING OF ANCHOR RODS IS PERMITTED.
vi) NO ENLARGEMENT OF ANCHOR ROD HOLES, BEYOND THE AISC-SPECIFIED HOLE DIAMETER, IS
PERMITTED.
Z) HEADED STUDS
i) HEADED STUDS WELDED TO BEAMS OR FOR CONCRETE CONNECTIONS SHALL BE TRU-WELD
STUD”, TRU-WELD DIVISION OF TFP CORPORATION, MEDINA, OHIO OR “NELSON STUD”,
NELSON STUD WELDING, INC, ELYRIA, OHIO, OR APPROVED EQUAL.
ii) HEADED STUDS TO BE USED AS CONCRETE ANCHORS OR SHEAR STUDS SHALL BE
AUTOMATICALLY END WELDED IN SHOP OR FIELD WITH EQUIPMENT RECOMMENDED BY
MANUFACTURER OF STUDS. THE SPECIFIED LENGTH IS THE AFTER-WELD LENGTH (AWL).
iii) HEADED STUDS MATERIAL, WELDING, AND INSPECTION SHALL BE IN ACCORDANCE WITH AWS
“STRUCTURAL WELDING CODE”, AWS D1.1, LATEST REVISION.
AA) DEFORMED BAR ANCHORS
i) DEFORMED BAR ANCHORS (DBA) SHALL BE “D6L DEFORMED BAR STUD ANCHOR”, NELSON
STUD WELDING, INC, ELYRIA, OHIO, PER ICC ESR-2907 UNLESS NOTED OTHERWISE.
ii) ANCHORS SHALL BE AUTOMATICALLY END WELDED IN SHOP OR FIELD WITH EQUIPMENT
RECOMMENDED BY MANUFACTURER OF STUDS.
BB) STAIRS
i) UNLESS SHOWN AND DETAILED IN THE STRUCTURAL DRAWINGS, ALL STAIRS ARE TO
CONSIST OF A PREFABRICATED AND PRE-ENGINEERED STAIR AND LANDING SYSTEM THAT IS
TO BE DESIGNED BY THE STAIR SUPPLIER. ALL STAIRS AND THEIR CONNECTIONS TO THE
PRIMARY STRUCTURE SHALL BE DESIGNED TO MEET THE REQUIREMENTS OF THE BUILDING
CODE FOR BOTH LATERAL AND VERTICAL LOADS.
ii) SEE ARCHITECT FOR STAIR LAYOUT, DIMENSIONS, AND CONFIGURATIONS OF RISE AND RUN.
THE STAIR MANUFACTURER SHALL DESIGN AND PROVIDE ALL COMPONENTS NECESSARY FOR
BOTH GRAVITY AND LATERAL SUPPORT OF THE STAIRS AND LANDINGS, INCLUDING, BUT NOT
LIMITED TO: POSTS, HANGERS, BRACES, CONNECTIONS TO PRIMARY STRUCTURE, AND
MISCELLANEOUS STEEL REQUIRED FOR PROPER INSTALLATION OF THE STAIRS. THE STAIR
SUPPLIER SHALL SUBMIT CALCULATIONS AND DRAWINGS THAT INDICATE THE MAXIMUM AND
MINIMUM IMPOSED LOADS APPLIED TO THE PRIMARY STRUCTURE. SHOP DRAWINGS AND
CALCULATIONS SHALL BE STAMPED & SIGNED BY A REGISTERED PROFESSIONAL ENGINEER
LICENSED IN THE PROJECT STATE AND SUBMITTED FOR REVIEW.
5) POST-INSTALLED ANCHORS
A) PROVIDE POST-INSTALLED ANCHORS PER THE FOLLOWING (UNO):
i) CONCRETE (CRACKED OR UNCRACKED)
(1) EXPANSION ANCHOR: HILTI KWIK BOLT TZ2 (ICC-ES ESR-4266)
(2) EXPANSION ANCHOR: SIMPSON STRONG-TIE STRONG-BOLT 2 (ICC-ES ESR-3037)
(3) SCREW ANCHOR: HILTI KWIK HUS-EZ
(4) SCREW ANCHOR: SIMPSON STRONG-TIE TITEN HD (ICC-ES ESR-1056)
(5) ADHESIVE ANCHOR: HILTI HIT-HY 200 V3 + HAS THREADED ROD (ICC-ES ESR-4878)
(6) ADHESIVE ANCHOR: SIMPSON STRONG-TIE SET 3G + F1554 GR. 36 THREADED ROD (ICC-
ES ESR-4844)
(7) SHALLOW EMBEDMENT ANCHOR: HILTI HDI-P TZ (ICC-ES ESR-4236)
B) ALL ANCHORS SHALL BE INSTALLED IN ACCORDANCE WITH THE SUPPLIER’S RECOMMENDATIONS.
C) ADHESIVE ANCHORS SHALL NOT BE INSTALLED PRIOR TO THE CONCRETE REACHING AN AGE OF
21 DAYS. EXPANSION ANCHORS SHALL NOT BE INSTALLED PRIOR TO THE CONCRETE REACHING
AN AGE OF 28 DAYS.
D) USE OF ALTERNATE PRODUCTS OR POST-INSTALLED ANCHORS AT LOCATIONS NOT SHOWN IN
THESE DRAWINGS IS SUBJECT TO THE APPROVAL OF THE ENGINEER OF RECORD. SUBMIT
PROPOSED ANCHORS TO THE ENGINEER WITH AN ICC-ES REPORT VALID FOR THE REFERENCED
BUILDING CODE. THE SUBMITTED ICC-ES REPORT SHALL DEMONSTRATE THAT THE ANCHORS ARE
SUITABLE FOR USE IN BASE MATERIAL. WHERE ANCHORS RESIST SEISMIC LOADS, SUBMITTED
ICC-ES REPORT SHALL DEMONSTRATE THAT ANCHORS ARE SUITABLE FOR THE RESISTANCE OF
SEISMIC LOADS.
6) METAL ROOF DECK
A) METAL ROOF DECKING SHALL BE FLAT-ROLLED, GALVANIZED SHEETS OF STRUCTURAL QUALITY, MEETING THE REQUIREMENTS OF ASTM A653-11 AND FACTORY GALVANIZED, COMPLYING WITH
ASTM A924-13, COATING CLASS G90.
B) 1 1/2" METAL ROOF DECK SHALL BE TYPE B, 22 GA GALVANIZED STEEL DECKING WITH A
FABRICATED DEPTH OF 1 1/2" AND A VALLEY SPACING OF 6”, TYPE 1.5B-36 AS MANUFACTURED BY VULCRAFT (ICC ESR-1227) OR APPROVED EQUAL. DECKING SHALL BE STRUCTURAL QUALITY GRADE 50 OR HIGHER, WITH Fy = 50,000 PSI MIN. DECKING SHALL BE FASTENED TO STEEL
SUPPORTING MEMBERS AND BOUNDARIES AT 12” ON CENTER, MAXIMUM SPACING, WITH #12
SELF-TAPPING METAL SCREWS. SIDE LAPS OF ADJACENT UNITS SHALL BE FASTENED AT 12” ON
CENTER, MAXIMUM SPACING, WITH #10 TEK METAL SCREWS.
C) SHEETS SHALL BE CONTINUOUS FOR AT LEAST THREE SPANS WHERE POSSIBLE.
D) ACCESSORIES SHALL BE STANDARD WITH THE MANUFACTURER AND SHALL BE FURNISHED AS
NECESSARY TO COMPLETE THE ROOF DECK INSTALLATION.
E) PROVIDE MANUFACTURER’S STANDARD 14 GA GALVANIZED SUMP PANS FOR EACH ROOF DRAIN.
COORDINATE TYPE AND LOCATIONS WITH ARCHITECTURAL AND MECHANICAL DRAWINGS AND
SPECIFICATIONS.
F) MINIMUM END LAP SHALL BE 2” CENTERED OVER SUPPORTS.
G) WELDING OF STEEL DECK SHALL BE PERFORMED BY CERTIFIED LIGHT GAUGE STEEL WELDERS IN
ACCORDANCE WITH AWS “SPECIFICATIONS FOR WELDING SHEET STEEL IN STRUCTURES”, AWS
D1.3, LATEST REVISION.
H) SUSPENDED CEILINGS, LIGHT FIXTURES, PIPES, DUCTS, MECHANICAL OR ELECTRICAL
EQUIPMENT, OR OTHER UTILITIES SHALL NOT BE SUPPORTED BY THE NONCOMPOSITE STEEL
ROOF DECK WITHOUT THE APPROVAL OF THE ENGINEER.
I) HOLES OR COMBINATIONS OF HOLES IN NONCOMPOSITE STEEL ROOF DECK WHICH CUT TWO
WEBS CLOSER THAN 24” OC IN ANY SPAN REQUIRE DECK REINFORCEMENT. SEE TYPICAL
DETAILS FOR REINFORCEMENT.
J) ATTENTION IS CALLED TO THE FACT THAT THE METAL ROOF DECK IS DESIGNED FOR DIAPHRAGM
ACTION. THEREFORE, ADDED CARE MUST BE TAKEN TO ENSURE PROPER INSTALLATION
PROCEDURES ARE FOLLOWED.
K) A SPECIAL STRUCTURAL INSPECTOR WILL BE RETAINED BY THE OWNER TO ENSURE THAT THE DECK IS FASTENED PROPERLY PRIOR TO PLACEMENT OF COVER MATERIALS. WRITTEN APPROVAL OF DECK INSTALLATION MUST BE SUBMITTED TO THE ARCHITECT/EOR PRIOR TO COVERING THE
DECK.
7) METAL FLOOR DECK
A) METAL FLOOR DECKING SHALL BE FLAT-ROLLED, GALVANIZED SHEETS OF STRUCTURAL QUALITY, MEETING THE REQUIREMENTS OF ASTM A653-11 AND FACTORY GALVANIZED, COMPLYING WITH
ASTM A924, COATING CLASS G60.
0.6h
0.6h
.2 h
.6 h
1'
1 1
0.6h
0.2h
ROOF ZONES
a a
WALL ZONES OVERHANGS PARAPETS
h
45 5
500 W Jefferson Street Suite 2200 Louisville, KY 40202
O: 502.325.0100 www.kpff.com
Consulting Engineers DESCRIPTION OF REVISION
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING
FRANKFORT, KENTUCKY
DECA LOG #
DRAWING NO.
AS BUILT DATE
DATE
DESCRIPTION OF REVISION DATE
KESLER SIMPSON ARCHITECTS, LLC
3728 WILLOW RIDGE RD
859.523.4324
DRAWING INFORMATION
A&E FILE NO.
DRAWING DATE
DRAWN BY
CHECKED BY
PHASE
RTA DATE
ACCOUNT NO.
REVISION HISTORY OF DRAWINGS
RTA
PHASE A SUBMITTAL 12/12
PHASE C SUBMITTAL 3/31
2026-03-31
RTA SUBMITTAL 3/31
ADDENDA 2 5/26
S001
GENERAL NOTES
FT BOONESBOROUGH
2500501
2026-05-26
RA
CD
05/2 6/26
REQUIRED GEOTECHNICAL SPECIAL INSPECTIONS
SYSTEM OR MATERIAL
INSPECTION
REMARKS
I B
C R
E F E R
E N
C E
C O
D E
O R
T A
N D
A
D
E
F E
R E
N C
E
C O
N T
I N
U O
U S
P E
R I O
D I C
SOILS
VERIFY MATERIALS BELOW
SHALLOW FOUNDATIONS ARE
ADEQUATE TO ACHIEVE THE
DESIGN BEARING CAPACITY.
TB
1705.6 1705.6
G E O
T E C
H N
IC
A L R
E P O
R T
-- X
BY THE GEOTECHNICAL ENGINEER
VERIFY EXCAVATIONS ARE
EXTENDED TO PROPER DEPTH AND
HAVE REACHED PROPER MATERIAL.
-- X
PERFORM CLASSIFICATION AND
TESTING OF COMPACTED FILL
MATERIALS.
-- X
VERIFY USE OF PROPER
MATERIALS, DENSITIES AND LIFT
THICKNESSES DURING PLACEMENT
AND COMPACTION OF COMPACTED
FILL.
X --
PRIOR TO PLACEMENT OF
COMPACTED FILL, INSPECT
SUBGRADE AND VERIFY THAT SITE
HAS BEEN PREPARED PROPERLY.
-- X
STATEMENT OF SPECIAL INSPECTION AND TESTING NOTES:
# SPECIAL INSPECTIONS SHALL CONFORM TO CHAPTER 17 OF THE INTERNATIONAL BUILDING CODE
(IBC) AND THE REFERENCE CODES AND STANDARDS LISTED IN CHAPTER 35.
# INSPECTIONS AND ASSOCIATED TESTING SHALL BE PERFORMED BY AN APPROVED QUALIFIED
TESTING AND INSPECTING AGENCY MEETING THE REQUIREMENTS OF ASTM E329 (MATERIALS), ASTM
D3740 (SOILS), ASTM C1077 (CONCRETE), ASTM A880 (STEEL), AND ASTM E543 (NON-
DESTRUCTIVE). THE TESTING AND INSPECTING AGENCY SHALL FURNISH TO THE
ARCHITECT/ENGINEER A COPY OF THEIR SCOPE OF ACCREDITATION. SPECIAL INSPECTORS SHALL BE CERTIFIED BY THE BUILDING OFFICIAL. WELDING INSPECTORS SHALL BE QUALIFIED PER SECTION
6.1.4.1.1 OF AWS D1.1.
# THE SPECIAL INSPECTOR SHALL OBSERVE THE INDICATED WORK FOR COMPLIANCE WITH THE
APPROVED CONSTRUCTION DOCUMENTS. ALL DISCREPANCIES SHALL BE BROUGHT TO THE
ATTENTION OF THE CONTRACTOR FOR CORRECTION AND NOTED IN THE INSPECTION REPORTS.
ISSUES REQUIRING IMMEDIATE CORRECTIVE ACTIONS OR ENGINEERING INPUT ARE TO BE BROUGHT
TO THE ENGINEER'S ATTENTION IMMEDIATELY UPON DISCOVERY.
# THE SPECIAL INSPECTOR SHALL FURNISH INSPECTION REPORTS FOR EACH INSPECTION TO THE
BUILDING OFFICIAL, ARCHITECT/ENGINEER, CONTRACTOR, AND OWNER. THE TESTING AND
INSPECTING AGENCY SHALL SUBMIT A FINAL REPORT STATING THAT THE WORK REQUIRING SPECIAL
INSPECTION WAS INSPECTED AND IS IN CONFORMANCE WITH THE APPROVED CONSTRUCTION
DOCUMENTS AND THAT ALL DISCREPANCIES NOTED IN THE INSPECTION REPORTS HAVE BEEN
CORRECTED.
# CONTINUOUS SPECIAL INSPECTION: SPECIAL INSPECTION BY THE SPECIAL INSPECTOR WHO IS PRESENT WHEN AND WHERE THE WORK TO BE INSPECTED IS BEING PERFORMED. PERIODIC SPECIAL INSPECTION: SPECIAL INSPECTION BY THE SPECIAL INSPECTOR WHO IS INTERMITTENTLY PRESENT
WHERE THE WORK TO BE INSPECTED HAS BEEN OR IS BEING PERFORMED.
# WHERE PERIODIC INSPECTION IS ALLOWED IN ACCORDANCE WITH THE ANCHOR ICC/IAPMO
EVALUATION REPORT, INSPECTIONS SHALL BE AS FOLLOWS:
- FOR ALL ANCHORS, PRIOR TO CONCEALMENT, VERIFY:ANCHOR TYPE, ANCHOR DIMENSIONS,
ANCHOR SPACING AND EDGE DISTANCE.
- FOR EACH ANCHOR TYPE AND SIZE, INSPECTOR SHALL BE ONSITE TO CONTINUOUSLY INSPECT A
MINIMUM OF THE FIRST 10 ANCHORS INSTALLED BY EACH INSTALLER FOR CONFORMANCE WITH
ICC/IAPMO EVALUATION REPORT. PROVIDED ALL ANCHORS ARE INSTALLED CORRECTLY PER
MANUFACTURER'S INSTRUCTIONS, PROVIDE PERIODIC INSPECTION ON A MINIMUM OF 10% OF
THE NEXT 1000 ANCHORS BY EACH INSTALLER AND A MINIMUM OF 5% OF THE REMAINING
ANCHORS BY EACH INSTALLER. INSPECTIONS SHALL OCCUR A MINIMUM OF ONCE PER WEEK AT A RANDOM TIME WHILE ANCHOR INSTALLATION IS ONGOING. ANY NON-COMPLIANCE ISSUES SHALL
RESET THE INSPECTION REQUIREMENTS TO TEN (10) CONTINUOUS INSPECTIONS. NON-
COMPLIANT ANCHORS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER OF RECORD FOR REVIEW AND SHALL BE BROUGHT INTO COMPLIANCE BY EITHER TESTING OR RE-INSTALLATION.
# OBSERVE: OBSERVE THESE ITEMS ON A RANDOM BASIS. OPERATIONS NEED NOT BE DELAYED
PENDING THESE INSPECTIONS.
PERFORM: PERFORM THESE TASKS FOR EACH ELEMENT.
# INDICATED CONCRETE TESTING MEETS MINIMUM REQUIREMENTS FOR STRUCTURAL TESTING TO BE PROVIDED BY THE APPROVED QUALIFIED TESTING AND INSPECTING AGENCY. ADDITIONAL TESTING
FOR CONSTRUCTION CONSIDERATIONS ARE NOT INDICATED AND SHALL BE DETERMINED BY THE
CONTRACTOR AND PROVIDED AT CONTRACTOR'S EXPENSE.
REQUIRED FABRICATION SPECIAL INSPECTIONS
SYSTEM OR MATERIAL
INSPECTION
REMARKS
I B
C R
E F E R
E N
C E
C O
D E
A
N D
A
F E
R E
N C
E
C O
N T
I N
U O
U S
P E
R I O
D I C
INSPECTION IN FABRICATION SHOP
.2
.5
WHERE FABRICATION OF
STRUCTURAL, LOAD-BEARING OR
LATERAL LOAD-RESISTING
MEMBERS OR ASSEMBLIES IS
BEING PERFORMED ON THE
PREMISES OF A FABRICATOR'S
SHOP, SPECIAL INSPECTION OF
THE FABRICATED ITEMS SHALL BE
AS REQUIRED BY TABLE 2 AND AS
REQUIRED ELSEWHERE IN THE
STATEMENT OF SPECIAL
INSPECTIONS. REFERENCE
SECTION 1704.2.5.1 FOR
APPROVED FABRICATOR
EXCEPTION.
REQUIRED CONCRETE SPECIAL INSPECTIONS
SYSTEM OR MATERIAL
INSPECTION
REMARKS
I B
C R
E F E R
E N
C E
C O
D E
A
N D
A
F E
R E
N C
E
C O
N T
I N
U O
U S
P E
R I O
D I C
INSPECT REINFORCEMENT,
INCLUDING EMBEDMENTS, AND
VERIFY PLACEMENT.
TB 1705.3 (1)
1705.3 1908.4
A C I
.2
-2 .3
.6
.1 -2
.6
.3
.8
.1
.3
TOLERANCE AND REINFORCING
PLACEMENT PER ACI 318: 26.6
INSPECTION OF REINFORCING
STEEL WELDING
TB 1705.3 (2)
1705.3.1
A C I
.6
.4 A W
S D
.4
-- X EXCEPT AS NOTED OTHERWISE
MATERIAL VERIFICATION OF WELD
FILLER METALS
1705.3.1 -- X
MANUFACTURER'S CERTIFIED TEST
REPORTS
VERIFYING USE OF PROPER
WELDING PROCEDURE
SPECIFICATIONS
-- X
COPY OF WELDING PROCEDURE
SPECIFICATIONS
VERIFYING WELDER
QUALIFICATIONS
-- X COPY OF QUALIFICATION CARDS
VERIFY WELDABILITY OF
REINFORCING STEEL OTHER THAN
ASTM A 706
TB 1705.3
(2.a)
A W
S D
.4
A C I
.6
.4 -- X CERTIFIED MILL TEST REPORTS
INSPECT SINGLE PASS FILLET
WELDS, MAXIMUM 5/16"
TB 1705.3
(2.b)
-- X --
INSPECT ALL OTHER WELDS
TB 1705.3
(2.c) X --
ALL WELDS VISUALLY INSPECTED
PER AWS D1.4: 7.5
INSPECT ANCHORS CAST IN
CONCRETE
WAC
51-50-1705
A C I
.8
.2
X --
ALL ANCHORS SHALL BE VISUALLY
INSPECTED
INSPECT ANCHORS POST-INSTALLED IN HARDENED CONCRETE MEMBERS:
ADHESIVE ANCHORS INSTALLED IN
HORIZONTALLY OR UPWARDLY
INCLINED ORIENTATIONS TO
RESIST SUSTAINED TENSION
LOADS.
WAC
51-50-1705
A C I
.4
IC
C /I
A P M
O E
V A L U
A T
IO
N R
E P O
R T
A C I
.8
.2 .4
.1
.3
X --
REFER TO ANCHOR CALLOUTS FOR
SUSTAINED TENSION (ST)
DESIGNATION
MECHANICAL ANCHORS AND
ADHESIVE ANCHORS NOT DEFINED
ABOVE.
WAC
51-50-1705
A C I
.4
IC
C /I
A P M
O E
V A L U
A T
IO
N R
E P O
R T
A C I
.2
.1
.3
X
N O
T E
ALL ANCHORS SHALL BE VISUALLY
INSPECTED
VERIFY USE OF REQUIRED DESIGN
MIX.
TB 1705.3(5)
1705.3
1908.2 1908.3
A C
I
.4
.3 -2
.4
.4
.1
.3
-- X --
PRIOR TO CONCRETE PLACEMENT,
FABRICATE SPECIMENS FOR
STRENGTH TESTS, PERFORM SLUMP
AND AIR CONTENT TESTS, AND
DETERMINE THE TEMPERATURE OF
THE CONCRETE.
TB 1705.3(6)
1908.10
A S T M
C
A S T M
C
A C I
.4
.1
X -- --
INSPECT CONCRETE AND
SHOTCRETE PLACEMENT FOR
PROPER APPLICATION
TECHNIQUES.
TB 1705.3(7)
1705.3
1908.6-8
A C I
.5
.1
.3
X -- --
VERIFY CURING METHOD AND
DURATION OF CURING FOR EACH
MEMBER.
A C I
.1
.3
.3 b ) -- X --
VERIFY MAINTENANCE OF
SPECIFIED CURING TEMPERATURE
AND TECHNIQUES.
TB 1705.3(8)
1705.3 1908.9
A C I
.5
.3 -2
.5
.5
.1
.3
-- X --
INSPECT ERECTION OF PRECAST
CONCRETE MEMBERS.
TB
1705.3(10)
1705.3
A C I
.9
.1
.3
-- X
ALL CONNECTIONS VISUALLY
INSPECTED, REFER TO ANCHOR
AND WELDING REQUIREMENTS.
VERIFY IN-SITU CONCRETE
STRENGTH, PRIOR TO REMOVAL OF
SHORES AND FORMS FROM BEAMS
AND STRUCTURAL SLABS.
TB
1705.3(11)
1705.3
A C I
.1
.2
.1
.2
.1
.3
-- X --
INSPECT FORMWORK FOR SHAPE,
LOCATION AND DIMENSIONS OF
THE CONCRETE MEMBER BEING
FORMED
TB
1705.3(12)
1705.3
A C
I
.1
.1
.2 (b
-- X --
INSPECT REINFORCING STEEL
MECHANICAL COUPLERS,
TERMINATORS AND FORM SAVERS
IC
C /I
A P M
V A L U
A T
IO
P O
R T S
VISUALLY INSPECT FOR CORRECT
ASSEMBLY AND LOCATION
REQUIRED STRUCTURAL STEEL SPECIAL INSPECTIONS
SYSTEM OR MATERIAL
INSPECTION
REMARKS
I B
C R
E F E R
E N
C E
C O
D E
A
N D
A
F E
R E
N C
E
C O
N T
I N
U O
U S
P E
R I O
D I C
INSPECTION TASKS PRIOR TO WELDING:
WELDING PROCEDURE
SPECIFICATIONS (WPS) AVAILABLE
1705.2
A
IS
C
T B N
.4
-1 A
IS
C
N .4
-- X --
MANUFACTURER CERTIFICATIONS
FOR WELDING CONSUMABLES
AVAILABLE
-- X --
MATERIAL IDENTIFICATION
(TYPE/GRADE)
X -- --
WELDER IDENTIFICATION SYSTEM X -- --
CONFIGURATION AND FINISH OF
ACCESS HOLES
X -- --
FIT-UP OF FILLET WELDS:
DIMENSIONS (ALIGNMENT, GAPS
AT ROOT), CLEANLINESS
(CONDITION OF STEEL SURFACES),
TACKING (TACK WELD QUALITY
AND LOCATION), BACKING TYPE
AND FIT (IF APPLICABLE)
X -- --
CHECK WELDING EQUIPMENT -- --
FABRICATOR OR ERECTOR SHALL
OBSERVE
INSPECTION TASKS DURING WELDING:
USE OF QUALIFIED WELDERS
1705.2
A
IS
C
T B N
.4
-2 A
IS
C
N .4
X -- --
CONTROL AND HANDLING OF
WELDING CONSUMABLES:
PACKAGING, EXPOSURE CONTROL
X -- --
NO WELDING OVER CRACKED TACK
WELDS
X -- --
ENVIRONMENTAL CONDITIONS:
WIND SPEED WITHIN LIMITS,
PRECIPITATION AND TEMPERATURE
X -- --
WPS FOLLOWED: SETTINGS ON
WELDING EQUIPMENT, TRAVEL
SPEED, SELECTED WELDING
MATERIALS, SHIELDING GAS
TYPE/FLOW RATE, PREHEAT
APPLIED, INTERPASS TEMPERATURE
MAINTAINED (MIN./MAX.), PROPER
POSITION (F, V, H, OH)
X -- --
WELDING TECHNIQUES: INTERPASS
AND FINAL CLEANING, EACH PASS
WITHIN PROFILE LIMITATIONS,
EACH PASS MEETS QUALITY
REQUIREMENTS
X -- --
INSPECTION TASKS AFTER WELDING:
WELDS CLEANED
1705.2
A
IS
C
T B N
.4
-3 A
IS
C
N .4
X -- --
SIZE, LENGTH AND LOCATION OF
WELDS
-- X --
WELDS MEET VISUAL ACCEPTANCE
CRITERIA: CRACK PROHIBITION,
WELD/BASE-METAL FUSION,
CRATER CROSS SECTION, WELD
PROFILES, WELD SIZE, UNDERCUT,
POROSITY
-- X --
ARC STRIKES -- X --
K-AREA -- X --
BACKING REMOVED AND WELD
TABS REMOVED (IF REQUIRED)
-- X --
REPAIR ACTIVITIES -- X --
DOCUMENT ACCEPTANCE OR
REJECTION OF WELDED JOINT OR
MEMBER
-- X --
INSPECTION TASKS PRIOR TO BOLTING:
MANUFACTURER'S CERTIFICATIONS
AVAILABLE FOR FASTENER
MATERIALS
1705.2
A
IS
C
T B N
.6
-1 A
IS
C
N .4
-- X --
FASTENERS MARKED IN
ACCORDANCE WITH ASTM
REQUIREMENTS
X -- --
PROPER FASTENERS SELECTED FOR
THE JOINT DETAIL (GRADE, TYPE,
BOLT LENGTH IF THREADS ARE TO
BE EXCLUDED FROM SHEAR PLANE)
X -- --
PROPER BOLTING PROCEDURE FOR
JOINT DETAIL
X -- --
CONNECTING ELEMENTS,
INCLUDING THE APPROPRIATE
FAYING SURFACE CONDITION AND
HOLE PREPARATION, IF SPECIFIED,
MEET APPLICABLE REQUIREMENTS
X -- --
PRE-INSTALLATION VERIFICATION
TESTING BY INSTALLATION
PERSONNEL OBSERVED AND
DOCUMENTED FOR FASTENER
ASSEMBLIES AND METHODS USED
X -- --
PROPER STORAGE PROVIDED FOR
BOLTS, NUTS, WASHERS AND
OTHER FASTENER COMPONENTS
X -- --
INSPECTION TASKS DURING BOLTING:
FASTENER ASSEMBLIES, OF
SUITABLE CONDITION, PLACED IN
ALL HOLES AND WASHERS (IF
REQUIRED) ARE POSITIONED AS
REQUIRED
1705.2
A
IS
C
T B N
.6
-2 A
IS
C
N .
This is the start of the file's text. The full file is on GovTribe.