Addendum Two.pdf
PDF 118 KB Posted
- Attached to
- RFB-278-24 Argo McClure Renovation Phase 5
- Solicitation number
- RFB 785 2400000744 3
- Issued by
- Breathitt County, Kentucky
About this file
This addendum document is issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, regarding Invitation to Bid No. RFB-278-24 for the Argo McClure Renovation Phase 5 at the Kentucky School for the Deaf in Danville, Kentucky. The project involves construction renovation work, with specifications and drawings to be referenced through Lynn Imaging. The official bid date has been moved to Thursday, June 27, 2024, at 1:30 P.M. Eastern Time. Bidders are required to acknowledge receipt of this addendum in their proposal submissions and must conform to all changes outlined in the addendum, which become binding upon the contract.
The addendum addresses a potential issue regarding the dust collection system component of the project, which may experience extended lead times for parts delivery. Should the dust collection system lead time prevent the General Contractor from meeting the current substantial completion date, additional contract days will be granted exclusively for installation of the dust collection system and only for work directly affected by the delay. All other project work unaffected by the dust collection system delay will remain subject to the original substantial completion deadline. Bidders are directed to Lynn Imaging's Planroom for additional specification and drawing details, and the addendum becomes part of the contract documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_RFB_785_2400000744_2_SO_FORM.PDF | ||
| Addendum One .pdf | ||
| Final_RFB_785_2400000744_3_SO_FORM.PDF | ||
| Final_RFB_785_2400000744_1_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-278-24
FOR: Argo McClure Renovation Phase 5
Kentucky School for the Deaf Danville, Kentucky
DATE: June 20, 2024
RFB-785-2400000744
ADDENDUM NO. Two (2)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1:
Item 2:
Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.
Official Bid date has been moved to June 27, 2024 at 1:30 P.M. Eastern Time.
END OF ADDENDUM
Invitation to Bid No. RFB-278-24 For: Argo McClure Renovation Phase 5
Kentucky School for the Deaf Danville, Kentucky
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
1 | P a g e
ADDENDUM NO. 2
July 18, 2024
To: All Planholders
From: Nomi Design
Re: KSD Argo McClure Renovation Phase 5
540-CAWL-SD18-00
This addendum contains (1) 8 ½” x 11” page
The purpose of this addendum is to clarify further requirements of the construction documents.
The contractors shall be governed by the information in the addendum as if included in the drawings / specifications. The addendum will become part of the contract documents. The bidders shall acknowledge receipt of the addendum in their form of proposal.
GENERAL ITEMS
AD2.1 BID DATE: The bid date has been moved to Thursday, June 27th. Refer to Lynn
Imaging’s Planroom for the exact time.
AD2.2 DUST COLLECTION SYSTEM: Parts for the dust collection system could possibly have a longer than expected lead time for delivery. If there is a dust collection system lead time that makes it impossible for the General Contractor to meet the current substantial completion date additional days will be added to the contract for the installation of the dust collection system. Only the scope of work for this project that is directly affected by the dust collection system delay will be provided additional days to complete. Work unaffected by the lead time delay will be held to the original Substantial Completion
Date.
ATTACHMENTS:
Specifications:
None
Drawings:
None
END OF ADDENDUM NO. 2
| Addendum Two |
| KSD ARGO ADDENDUM NO 2 TEXT 20240618 |
File details come from the government source that posted it. Updated .