This document is an Addendum to Invitation to Bid No. RFB-284-23 issued by the Commonwealth of Kentucky Department for Facilities and Support Services Division of Engineering and Contract Administration for the Outwood Rescare Fire Water Storage Rescare Community Living project in Christian County, Kentucky. The addendum includes changes to the specifications and drawings, such as modifying the water tower height dimensions, changing the valve vault details, and adding an altitude valve requirement. Additional information is provided, including the project budget of $1,068,375, a plan holders list available at Lynn Imaging, contractor responsibility for state and local taxes, a pending FAA obstruction analysis, and a 4-6 week review period for potential State Fire Marshall approval. The addendum also includes updates to the painting specification, such as the deletion of certain sections and the addition of a new section for the steel water storage tank painting.

The painting specification outlines the surface preparation, coating systems, and performance requirements for both the tank interior and exterior. The interior coating system is a high-build, zinc/epoxy system, while the exterior uses a traditional zinc/epoxy/urethane system. The document also includes details on application methods, testing, and warranty requirements.

View the file

Other files

File Type Posted
Final_RFB_785_2300000831_3_SO_FORM.PDF PDF
Addendum Three.pdf PDF
Addendum One .pdf PDF
Final_RFB_785_2300000831_2_SO_FORM.PDF PDF
Final_RFB_785_2300000831_1_SO_FORM.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-284-23

FOR: Outwood Rescare Fire Water Storage Rescare Community Living Cabinet for Health and Family Services Christian County, Kentucky

DATE: July 6, 2023

RFB-785-2300000831

ADDENDUM NO. Two (2)

BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING

UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.

Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.

END OF ADDENDUM

Invitation to Bid No. RFB-284-23 For: Outwood Rescare Fire Water Storage Rescare Community Living Cabinet for Health and Family Services Christian County, Kentucky

Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration

RFB-284-23 CHFS- OUT Repair/Replace Water Towers

PADUCAH, KY.

BFW ENGINEERING & TESTING, INC PROJECT NO. 22420

ADDENDUM 1.0

July 6 ,2003

The following Addendum Items shall be made part of the Contract Documents for the referenced project.

SHEETS

Sheet C2 (Elevation view) DELETE Dimension “74.0’ height to low water level.”

Sheet C2(Elevation view) ADD Dimension “90.0’ height to low water level.”

Sheet C2 (Elevation view) DELETE Dimension “90.0’ height to high water level.”

Sheet C2 (Elevation view) ADD Dimension “approximately 106.00” heigh to high water level.”

Sheet C 2.1 (Detail 4 -5’ X 6’ Precast Valve Vault) DELETE Concrete block valve supports.

Sheet C2.1 (Detail 4-5’ X 6’ Precast Valve Vault) ADD Concrete Block or adjustable steel pipe/ valve supports.

Sheet C2.1 (Detail 4-5’ X 6’ Precast Valve Vault) DELETE 3” Double check valve assembly.

Sheet C2.1 (Detail 4-5’ X 6’ Precast Valve Vault) ADD 3” RPZ Backflow preventer.

Sheet E0.1 The heaters shall be installed by the tank installer separately from the mixing system, The mixing system and the heaters installed within the tank will require two separate power connections.

ADDITIONAL INFORMATIONAL ITEMS

The budget is $1,068,375.

Plan holders list can be viewed at Lynn Imaging

Contractor is responsible for state and local taxes.

An Obstruction Evaluation/Airport Airspace Analysis has been submitted to the FAA. The results are not back yet.

Riser is anticipated wet.

Possible State Fire Marshall approval needed. Approximately 4–6-week review period. No other permits anticipated.

There is no buy America, build America requirements for this project however, American made and more specifically KY made/supplied are encouraged.

SPECIFICATIONS

Section 09 97 1: Delete specification in its entirely.

Section 09 97 13 24 4: Add specification. Attachment #1

Section 331116: Paragraph 2.10 ADD Altitude Valve. Attachment #2

Section 331619: Paragraph 2.3, A 4, ADD Caldwell Tanks, Inc. 4000 Tower Road, Louisville, KY

40219. Phone 502-964-3361

Section 331619: Paragraph 2.3, C.15 DELETE words “safety cages” from paragraph.

Section 331619: Paragraph 3.3, 2 DELETE Field welds: Test and inspect according to AWA D-100, section 111.

Section 331619: Paragraph 3.3,2 ADD Shop and field welds: Contractor Provide third party testing for all welds, test and inspect according to AWWA D-100 section 11.

Section 331619: Paragraph 3.3,3 ADD Contractor provides all concrete testing via third party testing and inspection company.

END OF ADDENDUM 1.0

BFW # 22420 CHFS – Out Repair/Replace Water Tower

729CA030W3100

STEEL WATER STORAGE TANK PAINTING 099714 - 1

SECTION 09 97 13 24 4 - STEEL WATER STORAGE TANK PAINTING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Surface preparation.

2. Coating and Painting tank interior and exterior.

1.2 SUBMITTALS

A. Product Data: Manufacturer information on finishing products.

B. Samples:

1. Manufacturer’s standard color cards illustrating range of colors available for each scheduled surface finishing product.

C. Manufacturer's Certificate: Products must meet or exceed specified requirements established by the basis the basis of design.

D. Manufacturer Instructions: Special surface preparation procedures, substrate conditions requiring special attention.

E. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections.

F. Qualifications Statements:

1. Qualifications for manufacturer and applicator.

2. Manufacturer's approval of applicator.

1.3 QUALITY ASSURANCE

A. Comply with AWWA D102.

B. Materials in Contact with Firewater.

C. Obtain paint products from single source for Work specified in this Section.

D. Perform Work according to OSHA and EPA standards.

E. Applicator: Company specializing in performing Work of this Section with three years' experience and approved by manufacturer.

STEEL WATER STORAGE TANK PAINTING 099714 - 2

1.4 DELIVERY, STORAGE, AND HANDLING

A. Container Labeling: Include manufacturer's name, type of coating, brand name, lot number, brand code, coverage, surface preparation, drying time, cleanup requirements, color designation, and instructions for mixing and reducing.

B. Store materials in ventilated area and otherwise according to manufacturer instructions.

C. Protection:

1. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas.

2. Provide additional protection according to manufacturer instructions.

1.5 AMBIENT CONDITIONS

A. Apply paint only when temperature of steel or paint is greater than 5 degrees F above dew point and risings.

B. Do not apply paint in rain, snow, fog or mist, or when steel surface temperature is below dew point resulting in condensation.

C. Do not apply materials when surface and ambient temperatures are outside temperature ranges indicated by paint product manufacturer.

D. Prevent rapid changes in temperature during curing and thermal shock cracks in finish material.

1.6 WARRANTY

A. Furnish one year manufacturer's warranty for paints.

B. Warranty Inspection: Warranty inspection shall be conducted during the eleventh month following acceptance of all coating and painting work. All defective work shall be repaired in accordance with this specification and to the satisfaction of the Engineer and/ or Owner.

PART 2 - PRODUCTS

2.1 PERFORMANCE AND DESIGN CRITERIA

A. Exterior Paint Performance Test Requirements:

1. Phohesion:

a. Method: ASTM-G85

b. Paint system applied to sandblasted steel panels SSPC-SP

c. Requirements: No blistering, cracking, RUSTING or delamination of film of film and no rust creepage at the scribe after 3,000 hours of exposure (TR7235).

STEEL WATER STORAGE TANK PAINTING 099714 - 3

2. Hardness:

a. Method: Comply with ASTM D3363.

b. Requirements: Minimum 3B.

3. Humidity:

a. Method: Comply with ASTM D4585.

b. Requirements: No blistering, cracking, softening or delamination of film after

5,000 hours of exposure.

2.2 PAINT

A. Manufacturers:

1. TNEMEC (Basis of Design) Local Contact: Justin Taute 615-333-1000.

2. Sherwin Williams

3. PPG

2.3 MATERIALS

SHOP- Primer

A. Surface Preparation: Prepare all welds as per NACE SP0178, Designation D. Abrasive blast all surfaces as per SSPC- SP10 Near- White Metal Blast Cleaning. A minimum angular profile of 1.5 miles as per ASTM D 4417, Method C or NACE Standard RP0287 is required. All surfaces must be clean dry and free if contaminants.

B. Primer: Tnemec Series 94-H2O Hydro-Zinc applied at 2.5 to 3.5 dry mils. Tnemec 41-49, 41-2 or 41-3 Thinner

TANK INTERIOR COATING SYSTEMS – WETTED AREAS

A. High-Build, Zinc/Epoxy System:

1. Surface Preparation Prior to Abrasive Blast Cleaning: Weld flux and spatter shall be removed by power tool cleaning. Sharp projections shall be ground to a smooth contour. All welds shall be ground to a smooth contour as per NACE Standard SP0178, Designation D.

2. Surface Preparation: Clean all bare metal, welded areas and damaged shop primer as per SSPC-SP10 Near-White Metal Blast Cleaning. A minimum angular profile of

1.5 mils as per ASTM D 4417, Method C or NACE Standard RP0287 is required.

All surfaces must be clean dry and free of contaminants.

3. Coating System:

http://www.specagent.com/LookUp/?ulid=7985&mf=04&src=wd

STEEL WATER STORAGE TANK PAINTING 099714 - 4

Field Spot Primer: Tnemec Series 94-H2O Hydro-Zinc applied at 2.5 to 3.5 dry mils applied to all bare metal. Thin only with approved thinner, Tnemec 41-49, 41-2 or 41-3 Thinner.

Stripe Coat: Tnemec Series 21 Epoxoline applied by brush and scrubbed into all weld seams. In addition to weld seams, all edges, corners, bolts, rivets, pits shall receive a stripe coat.

2nd Coat: Tnemec Series 21 Epoxoline applied at 12.0 to 16.0 dry mils.

Total dry film thickness shall be a minimum of 14.5 mils.

TANK EXTERIOR COATING SYSTEMS

A. Traditional Zinc/Epoxy/Urethane System:

as per SSPC-SP6 Commercial Blast Cleaning. A minimum angular profile of 1.5 mils as per ASTM D 4417, Method C or NACE Standard RP0287 is required. All surfaces must be clean dry and free of contaminants.

Field Spot Primer: Tnemec Series 94-H2O Hydro-Zinc applied at 2.5 to 3.5 dry mils

2nd Coat: Tnemec Series N69-Color Hi-Build Epoxoline II applied at 3.0 to

5.0 dry mils; color to be selected by Tnemec. Thin only with ap-proved thinner, Tnemec 41-4 Thinner.

3rd Coat: Tnemec Series 1094-Color Endura-Shield applied at 2.0 to 3.0 dry mils. Thin only with approved thinner, Tnemec 41-10 Thinner for spray, brush or roller.

Total dry film thickness shall be a minimum of 7.5 mils.

STEEL WATER STORAGE TANK PAINTING 099714 - 5

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that surfaces are ready to receive Work as indicated by product manufacturer.

B. Examine surfaces scheduled to be finished prior to commencement of Work, and report conditions capable of affecting proper application.

3.2 PREPARATION

A. Protection:

1. Exterior Tank:

a. Cover tank vents without sealing tight to prevent contamination of tank interior.

b. Maintain ventilation of tank interior.

2. Cleaning and painting tank exterior after tank is filled is not permitted.

B. Tank Interior Work:

1. Ventilate tank interior to remove dust, fumes, and volatile gases as required by authorities having jurisdiction.

2. Provide minimum lighting level of 20 fc measured at substrate surface.

3. Keep manholes and other vent openings open during cleaning, surface preparation, painting and curing operations.

4. Provide Architect/Engineer and laboratory personnel required to enter tank during cleaning or painting operations with safety equipment required by authorities having jurisdiction.

C. Protect surfaces from rapid curing caused by wind or sun exposure.

D. Prevent rapid changes in temperature during curing and thermal shock cracks in finish material.

E. Prepare tank interior metal surfaces according to SSPC-SP 10.

F. Prepare tank exterior metal surfaces according to SSPC-SP 6.

3.3 APPLICATION

A. According to manufacturer instructions and SSPC-PA 1.

B. Coat prepared surfaces with one coat of primer during same day surface is prepared; reprepare surfaces if the cleanliness standard is lost prior to application of the primer.

C. Thinning:

1. Do not thin paint except if approved by Architect/Engineer.

STEEL WATER STORAGE TANK PAINTING 099714 - 6

2. Thin paint according to manufacturer instructions.

D. Coats:

1. Apply paint at manufacturer's recommended application rate.

a) Exterior: Minimum system thickness: 7.5 MILS cdy film thickness

b) Interior: Minimum system thickness: 14.5 MILS dry film thickness

2. Allow minimum 24 hours between coats.

3.4 FIELD QUALITY CONTROL

A. Notify Architect/Engineer minimum three days in advance, to permit observation of cleaned surfaces prior to application of each coat of paint prior to subsequent paint applications.

B. Perform wet film thickness test.

3.5 CLEANING

A. Collect waste material capable of constituting fire hazard, place in closed metal containers, and remove daily from site.

END OF SECTION 099714

STEEL WATER STORAGE TANK PAINTING 099714 - 1

SECTION 09 97 13 24 4 - STEEL WATER STORAGE TANK PAINTING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Surface preparation.

2. Coating and Painting tank interior and exterior.

1.2 SUBMITTALS

A. Product Data: Manufacturer information on finishing products.

B. Samples:

1. Manufacturer’s standard color cards illustrating range of colors available for each scheduled surface finishing product.

C. Manufacturer's Certificate: Products must meet or exceed specified requirements established by the basis the basis of design.

D. Manufacturer Instructions: Special surface preparation procedures, substrate conditions requiring special attention.

E. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections.

F. Qualifications Statements:

1. Qualifications for manufacturer and applicator.

2. Manufacturer's approval of applicator.

1.3 QUALITY ASSURANCE

A. Comply with AWWA D102.

B. Materials in Contact with Firewater.

C. Obtain paint products from single source for Work specified in this Section.

D. Perform Work according to OSHA and EPA standards.

E. Applicator: Company specializing in performing Work of this Section with three years' experience and approved by manufacturer.

STEEL WATER STORAGE TANK PAINTING 099714 - 2

1.4 DELIVERY, STORAGE, AND HANDLING

A. Container Labeling: Include manufacturer's name, type of coating, brand name, lot number, brand code, coverage, surface preparation, drying time, cleanup requirements, color designation, and instructions for mixing and reducing.

B. Store materials in ventilated area and otherwise according to manufacturer instructions.

C. Protection:

1. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas.

2. Provide additional protection according to manufacturer instructions.

1.5 AMBIENT CONDITIONS

A. Apply paint only when temperature of steel or paint is greater than 5 degrees F above dew point and risings.

B. Do not apply paint in rain, snow, fog or mist, or when steel surface temperature is below dew point resulting in condensation.

C. Do not apply materials when surface and ambient temperatures are outside temperature ranges indicated by paint product manufacturer.

D. Prevent rapid changes in temperature during curing and thermal shock cracks in finish material.

1.6 WARRANTY

A. Furnish one year manufacturer's warranty for paints.

B. Warranty Inspection: Warranty inspection shall be conducted during the eleventh month following acceptance of all coating and painting work. All defective work shall be repaired in accordance with this specification and to the satisfaction of the Engineer and/ or Owner.

PART 2 - PRODUCTS

2.1 PERFORMANCE AND DESIGN CRITERIA

A. Exterior Paint Performance Test Requirements:

1. Phohesion:

a. Method: ASTM-G85

b. Paint system applied to sandblasted steel panels SSPC-SP

c. Requirements: No blistering, cracking, RUSTING or delamination of film of film and no rust creepage at the scribe after 3,000 hours of exposure (TR7235).

STEEL WATER STORAGE TANK PAINTING 099714 - 3

2. Hardness:

a. Method: Comply with ASTM D3363.

b. Requirements: Minimum 3B.

3. Humidity:

a. Method: Comply with ASTM D4585.

b. Requirements: No blistering, cracking, softening or delamination of film after

5,000 hours of exposure.

2.2 PAINT

A. Manufacturers:

1. TNEMEC (Basis of Design) Local Contact: Justin Taute 615-333-1000.

2. Sherwin Williams

3. PPG

2.3 MATERIALS

SHOP- Primer

A. Surface Preparation: Prepare all welds as per NACE SP0178, Designation D. Abrasive blast all surfaces as per SSPC- SP10 Near- White Metal Blast Cleaning. A minimum angular profile of 1.5 miles as per ASTM D 4417, Method C or NACE Standard RP0287 is required. All surfaces must be clean dry and free if contaminants.

B. Primer: Tnemec Series 94-H2O Hydro-Zinc applied at 2.5 to 3.5 dry mils. Tnemec 41-49, 41-2 or 41-3 Thinner

TANK INTERIOR COATING SYSTEMS – WETTED AREAS

A. High-Build, Zinc/Epoxy System:

as per SSPC-SP10 Near-White Metal Blast Cleaning. A minimum angular profile of

1.5 mils as per ASTM D 4417, Method C or NACE Standard RP0287 is required.

All surfaces must be clean dry and free of contaminants.

http://www.specagent.com/LookUp/?ulid=7985&mf=04&src=wd

STEEL WATER STORAGE TANK PAINTING 099714 - 4

Field Spot Primer: Tnemec Series 94-H2O Hydro-Zinc applied at 2.5 to 3.5 dry mils

Stripe Coat: Tnemec Series 21 Epoxoline applied by brush and scrubbed into all weld seams. In addition to weld seams, all edges, corners, bolts, rivets, pits shall receive a stripe coat.

2nd Coat: Tnemec Series 21 Epoxoline applied at 12.0 to 16.0 dry mils.

Total dry film thickness shall be a minimum of 14.5 mils.

TANK EXTERIOR COATING SYSTEMS

A. Traditional Zinc/Epoxy/Urethane System:

as per SSPC-SP6 Commercial Blast Cleaning. A minimum angular profile of 1.5 mils as per ASTM D 4417, Method C or NACE Standard RP0287 is required. All surfaces must be clean dry and free of contaminants.

Field Spot Primer: Tnemec Series 94-H2O Hydro-Zinc applied at 2.5 to 3.5 dry mils

2nd Coat: Tnemec Series N69-Color Hi-Build Epoxoline II applied at 3.0 to

5.0 dry mils; color to be selected by Tnemec. Thin only with ap-proved thinner, Tnemec 41-4 Thinner.

3rd Coat: Tnemec Series 1094-Color Endura-Shield applied at 2.0 to 3.0 dry mils. Thin only with approved thinner, Tnemec 41-10 Thinner for spray, brush or roller.

Total dry film thickness shall be a minimum of 7.5 mils.

STEEL WATER STORAGE TANK PAINTING 099714 - 5

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that surfaces are ready to receive Work as indicated by product manufacturer.

B. Examine surfaces scheduled to be finished prior to commencement of Work, and report conditions capable of affecting proper application.

3.2 PREPARATION

A. Protection:

1. Exterior Tank:

a. Cover tank vents without sealing tight to prevent contamination of tank interior.

b. Maintain ventilation of tank interior.

2. Cleaning and painting tank exterior after tank is filled is not permitted.

B. Tank Interior Work:

1. Ventilate tank interior to remove dust, fumes, and volatile gases as required by authorities having jurisdiction.

2. Provide minimum lighting level of 20 fc measured at substrate surface.

3. Keep manholes and other vent openings open during cleaning, surface preparation, painting and curing operations.

4. Provide Architect/Engineer and laboratory personnel required to enter tank during cleaning or painting operations with safety equipment required by authorities having jurisdiction.

C. Protect surfaces from rapid curing caused by wind or sun exposure.

D. Prevent rapid changes in temperature during curing and thermal shock cracks in finish material.

E. Prepare tank interior metal surfaces according to SSPC-SP 10.

F. Prepare tank exterior metal surfaces according to SSPC-SP 6.

3.3 APPLICATION

A. According to manufacturer instructions and SSPC-PA 1.

B. Coat prepared surfaces with one coat of primer during same day surface is prepared; reprepare surfaces if the cleanliness standard is lost prior to application of the primer.

C. Thinning:

1. Do not thin paint except if approved by Architect/Engineer.

STEEL WATER STORAGE TANK PAINTING 099714 - 6

2. Thin paint according to manufacturer instructions.

D. Coats:

1. Apply paint at manufacturer's recommended application rate.

a) Exterior: Minimum system thickness: 7.5 MILS cdy film thickness

b) Interior: Minimum system thickness: 14.5 MILS dry film thickness

2. Allow minimum 24 hours between coats.

3.4 FIELD QUALITY CONTROL

A. Notify Architect/Engineer minimum three days in advance, to permit observation of cleaned surfaces prior to application of each coat of paint prior to subsequent paint applications.

B. Perform wet film thickness test.

3.5 CLEANING

A. Collect waste material capable of constituting fire hazard, place in closed metal containers, and remove daily from site.

END OF SECTION 099714