Kingsley Area Schools has issued an Addendum (No. 1) to a Request for Proposals (RFP) for a Roof Replacement project at Kingsley Middle School, located at 403 Blair Street in Kingsley, Michigan. The addendum, dated May 16, 2025, modifies the original RFP from May 9, 2025, and provides updated specifications for a comprehensive roof replacement. The project involves replacing roofing materials across approximately 74,626 square feet of roof space, including various roof types such as EPDM membrane, rigid insulation, metal decking, and some asphalt shingle areas. The addendum includes two specific allowances: $122,500 for replacing 35 existing roof drains at $3,500 per location, and $40,000 for unforeseen conditions, with unused portions of these allowances to be credited back to the school district.
The proposal requires contractors to use either Carlisle ESP or Firestone Master Contractors, with no substitutions allowed. Bidders must provide detailed information about their business organization, experience with public school improvements, current workload, insurance coverage, and approach to the roof replacement. The RFP emphasizes the need for minimal disruption to school operations, as some work may occur while school is in session. Contractors are required to verify all existing conditions, remove existing membranes while preserving existing insulation, and ensure that all work complies with manufacturer requirements. The project includes raising existing equipment curbs, providing proper flashing, and maintaining existing warranties on unmodified roof areas.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Roof Replacement RFP with attachments.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KINGSLEY AREA SCHOOLS
402 Fenton Street Kingsley, MI 49649
Superintendent: Joshua T. Rothwell jrothwell@kingsleyschools.org
(231) 263-5261 Ext. 1104
Kingsley Area Schools and the community share the responsibility of educating all students to become productive citizens and lifelong learners.
MAY 16, 2025
ADDENDUM NO. 1 TO
ROOF REPLACEMENT REQUEST FOR PROPOSALS
This Addendum amends the Kingsley Area Schools Roof Replacement Request for Proposals, dated May 9, 2025 (the “RFP”), as follows:
1. The following shall be inserted as Section 2.2.4.3:
Any manufacturers not listed within the drawings and specifications included in Attachment E and/or Exhibit “2” shall be bid as a voluntary alternate and outlined as such on the Proposal Form.
2. The following shall be inserted as Section 2.2.4.4:
Proposers must include the following allowances with their Proposals, consistent with those listed on Sheet A3.2 in Exhibit “2” attached hereto:
2.2.4.4.1: Allowance 1: Proposer to include $122,500.00 allowance to replace existing roof drains with new sump and complete drain assembly based on $3,500.00 per location at 35 locations.
2.2.4.4.2: Allowance 2: Proposer to include $40,000.00 allowance for unforeseen conditions.
Unused portions of allowances shall be returned to the School District as a credit.
3. The Proposal Form included as Attachment C shall be replaced with and superseded by the Amended Proposal Form attached hereto as Exhibit “1”.
4. The drawings and specifications, dated January 6, 2025, consisting of three (3) pages, included within Attachment E of the RFP, are hereby replaced with and superseded by the drawings and specifications, dated May 15, 2025, attached hereto as Exhibit “2”. All other pages provided within Attachment E of the RFP shall remain the same.
The RFP is modified as set forth in this Addendum. The original RFP documents and any previously issued addenda remain in full force and effect, except as modified by this Addendum, which is hereby made part of the RFP. Respondent shall take this Addendum into consideration when preparing and submitting its Proposal and must acknowledge receipt of this Addendum in its Proposal. The Proposal submittal deadline remains the same and is not changed by this Addendum.
mailto:jrothwell@kingsleyschools.org
Exhibit “1” Amended Proposal Form
This Proposal has been prepared to provide the School District with all the information requested in the RFP.
The undersigned certifies that the RFP has been carefully examined and that the Proposal contained herein meets or exceeds the scope of services as outlined therein, all of which shall be completed within the required Project schedule. The undersigned further certifies that, if it has any objection to the requirements of the RFP, or if it wishes to add to or delete therefrom (including, but not limited to, the proposed contract language), such objections and/or modifications are stated below:
Proposal Amount: $__________________________________ Proposal Amount Breakdown:
• Cost of Labor: $_____________
• Cost of Materials & Equipment: $_____________
• Required Allowances:
o Per Section 2.2.4.4.1: $122,500.00 o Per Section 2.2.4.4.2: $40,000.00
• Other Costs: $_____________
Explanation of Proposal Amount (voluntary but recommended):
Voluntary Alternate(s):___________________________________________________________
Please check one: Proposer [ ___ has / ___ has not] requested, received and reviewed all clarifications and addenda applicable to this RFP.
Signed this ____ day of ______________, 2025.
Firm Name: __________________________________________________________________
Address:________________________________________________________________________________ Phone Number: __________________________ Fax Number: _______________________
Proposer shall provide necessary information including but not limited to the information below. Proposer can attach additional pages as necessary to provide additional information or explanation.
Kingsley Area Schools
REQUEST FOR PROPOSALS FOR
ROOF REPLACEMENT
PROPOSAL DETAILS
I. CONTRACTOR INFORMATION
The following information will be considered by the District for the purpose of determining the Contractor's “responsibility” and present capability to perform the work. The District's determination is not limited to the information below or any other information required by this RFP.
Name of Firm: __________________________________________________ Year Established: ________________________________________________ Address: _______________________________________________________ Telephone Number: ______________________________________________ Facsimile Number: _______________________________________________ Contact Person Email Address: _____________________________________
A. BUSINESS ORGANIZATION
1. Individual Partnership Corporation Other
2. Years firm has provided services: __________________
3. List Principals and officers of the firm:
4. List the various professional and support staff positions and number of personnel in each position in your firm.
Professional Staff Number Support Staff Number
5. Provide a brief history of your firm’s experience with public school improvements, if any.
6. List subcontractors or consultants outside your firm you propose using to provide services not available in your firm.
Number of Times Firm Name City/State Specialty Affiliated With You
1.
2.
3.
4.
7. What is your firm’s present workload?
Number of Projects $ Value
Provide a list of all scheduled projects and unscheduled projects currently being handled by your firm, including an indication of percentage of completion for each project.
8. What is your General Liability Insurance coverage:
a. Total amount of protection provided.
b. Amount of deductible, if any.
c. Name, address, phone #, and contact person of Insurance Company.
d. Are the costs of this coverage included in your Fee Proposal? If not, what is that additional cost?
9. Have you had mediation, litigation, arbitration or a claim filed against or settled with your firm by an educational client, or have you filed or settled the same against an educational client? If yes, explain each in detail.
10. Have you had mediation, litigation, arbitration or a claim filed against or settled with your company by any client outside of the educational market or have you filed the same against any other client? If yes, explain each in detail.
11. Has your firm ever been terminated, for cause or for convenience, prior to completion of a project or has your firm ever terminated a contractor contract, for cause or for convenience, prior to completion of a project? If yes, explain each in detail.
B. APPROACH TO ROOF REPLACEMENT
1. Describe in detail, the process you will follow to commence the work on the Project.
2. List what you consider to be the best project you have worked on (as applicable):
Project Name:
School District:
Contact:
Phone Number:
Total Cost:
Square Footage:
Cost per Square Foot:
# of Change Orders:
Cost of Change Orders:
Date Completed:
Project Architect:
Why do you consider this school to be your firm’s best work?
3. List the top five exceptional educational features of improvements completed by your firm.
4. Describe the method(s) of budget/cost control, quality control, and time schedule adherence you will use for the Project.
5. List the steps in your standard change order procedure, your criteria used to determine whether
Additional Service fees will be charged and for change orders, and your fee schedule for change orders.
6. Describe how your firm stays up-to-date on applicable legal and regulatory requirements applicable to school improvements.
8. Some of the work may occur while school is in session. Describe how your firm will minimize any interruptions to our day-to-day operations.
9. List the five (5) most recent school projects for which your firm has acted as Contractor, including a general description of the project and contact information for your primary contact with the school district (as applicable).
Project #1 Name:
Contact:
Phone Number:
Total Cost:
Square Footage:
Cost per Square Foot:
# of Change Orders:
Cost of Change Orders:
Project #2 Name:
Contact:
Phone Number:
Total Cost:
Square Footage:
Cost per Square Foot:
# of Change Orders:
Cost of Change Orders:
Date Completed:
Project Architect:
Project #3 Name:
School District:
Contact:
Phone Number:
Total Cost:
Square Footage:
Cost per Square Foot:
# of Change Orders:
Cost of Change Orders:
Date Completed:
Project Architect:
Project #4 Name:
School District:
Contact:
Phone Number:
Total Cost:
Square Footage:
Cost per Square Foot:
# of Change Orders:
Cost of Change Orders:
Date Completed:
Project Architect:
Project #5 Name:
School District:
Contact:
Phone Number:
Total Cost:
Square Footage:
Cost per Square Foot:
# of Change Orders:
Cost of Change Orders:
Project Architect:
Exhibit “2” May 15, 2025 Drawings and Specifications
CURRENT REVISION DATE
ISSUES ISSUE DATE
Project Number:
m .e
.p en gi n ee rs st ru ct u ra l en gi n ee rs si te
/c iv il en gi n ee rs
CALL 231 946 1234
10241 E. Cherry Bend Rd.
TRAVERSE CITY MI. 49684
ENV-ARCH.COM
5/15/2025 8:14:30 AM
A0.1
Kingsley Middle School
PRELIMINARY//NOT
FOR
CONSTRUCTION
403 Blair St, Kingsley, MI 49649
24-22
12/05/24
Preliminary 1/6/25
Composite Roof Plan
Roof Details
ARCHITECTURAL
A3.2
A3.3
Revisions 3/4/25
Bid Set Addendum #1 5/15/25
APPROX. EX. GAS LINE
APPROX. EX. GAS LINE
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RDRD RD
RD
RD
RD RD
RDRD
RD
RDRDRD
RDRD
RD
RD
RD
RD
A P P R O
X
E X
E X P
JO
IN
T
A P P R O
X
E X
E X P
JO
IN
T
A P P R O
X
E X
E X P
JO
IN
T
RTU
RTU
RTU
A3.3
SIM.
A3.3
SIM.
A3.3
A3.3
TYP.
A3.3
TYP.
A3.3
SIM.
A3.3
SIM.
A3.3
SIM.
A3.3
A3.3
A3.3
SIM.
A3.3
SIM.
A3.3
SIM.
A3.3
SIM.
A3.3
SIM.
A3.3
SIM.
A3.3
SIM.
A3.3
A3.3
A3.3
SIM.
A3.3
SIM.
A3.3
SIM.
A3.3
SIM.
A3.3
A3.3
SIM.
A3.3
A3.3
SIM.
A3.3
SIM.
A3.3
SIM.
A3.3
A3.3
SIM.
A3.3
A3.3
A3.3
SIM.
A3.3
A3.3
SIM.
A3.3
A3.3
SIM.
A3.3
A3.3
SIM.
A3.3
A3.3
SIM.
A3.3
A3.3
SIM.
A3.3
SIM.
A3.3
A3.3
A3.3
A3.3
A3.3
SIM.
A3.3
SIM.
A3.3
SIM.
A3.3
SIM.
A3.3
SIM.
A3.3
SIM.
A3.3
SIM.
A3.3
SIM.
A3.3
A3.3
A3.3
A3.3
A3.3
SLOPED STRUCTURE
SADDLE
ADD
NAILERS
AS REQ.
SADDLE
SADDLE
SADDLE
SADDLE
SADDLE
SADDLE
ROOF TYPE LEGEND
60MIL REINFORCED EPDM ON 1 1/2" RIGID INSULATION FASTENED OVER
EXISTING 4 1/2" RIGID INSULATION AND 2" TECTUM DECKING
±16,328 SF
60MIL REINFORCED EPDM ON 1 1/2" RIGID INSULATION FASTENED OVER
EXISTING 4 1/2" RIGID INSULATION AND 1 1/2" MTL DECK
±46,649 SF
60MIL REINFORCED EPDM ON 1" RIGID INSULATION FASTENED OVER EXISTING
5" RIGID INSULATION AND 3/4" WOOD DECKING
±8,282 SF
ASPHALT SHINGLES OVER ROOFING UNDERLAYMENT OVER EX. PLYWOOD
ROOF SHEATHING, ICE AND WATER SHIELD WHERE REQ. ±2,350 SF
60MIL REINFORCED EPDM ON TAPERED RIGID INSULATION OVER EXISTING 1
1/2" MTL DECK
±1,017 SF
NEW ROOF SADDLE, SLOPE TO ROOF DRAIN
CALL 231 946 1234
10241 E. Cherry Bend Rd.
TRAVERSE CITY MI. 49684
ENV-ARCH.COM
CURRENT REVISION DATE
ISSUES ISSUE DATE
Project Number:
5/15/2025 8:12:42 AM
A3.2
Composite Roof Plan
Kingsley Middle
School
403 Blair St, Kingsley, MI 49649
24-22
PRELIMINARY//NOT
FOR
CONSTRUCTION
09/19/24
1/16" = 1'-0"
Compostie Roof Plan
NOTE:
-VERIFY ALL PENETRATIONS AND EXISTING CONDITIONS, MOST PENETRATIONS ARE INDICATED ON THIS DRAWING, HOWEVER, CONTRACTOR MUST FIELD VERIFY ALL PENETRATIONS AND EXISTING CONDITIONS.
-ALL EXISTING MEMBRANES TO BE REMOVED. EXISTING INSULATION TO REMAIN.
-EXISTING FASCIA/GRAVEL STOP TO BE REMOVED AT AREAS OF NEW WORK.
-SQUARE FOOTAGES AND DIMENSIONS GIVEN ARE APPROXIMATES, CONTRACTOR TO VERIFY.
- PROVIDE BACKER ROD AND SEALANT AS REQUIRED.
-ALL DETAILS SHALL CONFORM WITH INSTALLING CONTRACTORS MANUFACTURER REQUIREMENTS.
-EXISTING ROOF AREAS TO REMAIN SHALL NOT BE COMPROMISED IN ANY FASHION TO IMPACT EXISTING
WARRANTY.
-PENETRATIONS AND SPECIFIC DETAILS SHALL BE PROVIDED TO ARCHITECT DURING SHOP DRAWING
REVIEW.
-RAISE EXISTING CURBS FOR ALL ROOFTOP EQUIP. AND OTHER PENETRATIONS TO MAINTAIN A MIN. OF 8"
CLEAR TO NEW ROOF LEVEL.
-CARLISLE ESP AND FIRESTONE MASTER CONTRACTOS ONLY - NO SUBSTITUTIONS
-CONTRACTOR TO INCLUDE $122,500 ALLOWANCE ADDITION TO REPLACE EXISTING ROOF DRAINS WITH
NEW SUMP AND ROOF DRAINS AT $3,500 PER DRAIN. TOTAL EXISTING DRAINS = 35
-CONTRACTOR TO INCLUDE $40,000 ALLOWANCE FOR UNFORSEEN COINDITIONS.
-UNUSED PORTION OF ALLOWANCES SHALL BE RETURNED TO OWNER AS A CREDIT.
SLOPED STRUCTURE
Preliminary 1/6/25
Revisions 3/4/25
Bid Set Addendum #1 5/15/25
/2
/2
/2
/2
/2
/2
/2
/2
/2
/2
/2
/2
/2
/2
/2
V .I
.F
/2
" 1
/2
/2
/2
V .I
.F
/4
/2
/2
/2
/2
/2
/2
/4
/4
4" V.I.F.
/2
CALL 231 946 1234
10241 E. Cherry Bend Rd.
TRAVERSE CITY MI. 49684
ENV-ARCH.COM
CURRENT REVISION DATE
ISSUES ISSUE DATE
Project Number:
5/15/2025 8:11:21 AM
A3.3
Roof Details
Kingsley Middle
School
403 Blair St, Kingsley, MI 49649
24-22
PRELIMINARY//NOT
FOR
CONSTRUCTION
12/05/24
3/4" = 1'-0"
Typ. Roof Sump Retrofit
3/4" = 1'-0"
Gym Roof Detail 1
3/4" = 1'-0"
Gym Roof Detail 2
3/4" = 1'-0"
Gym Roof Detail 3
3/4" = 1'-0"
Roof Transition Detail 1
3/4" = 1'-0"
Gym Lower Roof Detail 1
3/4" = 1'-0"
Gym Lower Roof Detail 2
3/4" = 1'-0"
Classroom Roof Detal 1
3/4" = 1'-0"
Classroom Roof Detail 2
3/4" = 1'-0"
Office Roof Transition Detail 1
3/4" = 1'-0"
Office Roof Transition Detail 2
3/4" = 1'-0"
Office Roof Detail
3/4" = 1'-0"
Weight Training Roof Detail 1
3/4" = 1'-0"
North Classroom Roof Detail 1
3/4" = 1'-0"
North Classroom Roof Detail 2
3/4" = 1'-0"
Shingle Roof Detail 1
3/4" = 1'-0"
Shingle Roof Detail 2
3/4" = 1'-0"
Shingle Roof Detail 3
EXISTING 2" TECTUM OR
1 1/2" MTL DECK
NEW REINFORCED EPDM
MEMBRANE ON
1 1/2" RIGID POLYISO
TAPERED INSUL. TO DRAIN,
TYP.
ROOF SUMP,SEE ROOF PLAN
FOR APPOX. LOCATION.
NEW REINFORCED EPDM MEMBRANE ON 1 1/2" RIGID POLYISO FASTENED
OVER EXISTING 4 1/2" INSUL. ON 2" TECTUM ROOF DECK
EXISTING WALL
CONSTRUCTION
NEW PRE-FIN. MTL WRAPPED
PRESSURE TREATED
2X BLOCKING
EXISTING STRUCTURE
NEW REINFORCED EPDM MEMBRANE ON 1 1/2" RIGID POLYISO FASTENED
OVER EXISTING 4 1/2" RIGID INSUL ON 2" TECTUM ROOF DECK
EXISTING 2X TREATED
BLOCKING
NEW PRE-FIN. MTL WRAPPED
PRESSURE TREATED
2X BLOCKING
EXISTING WALL
CONSTRUCTION
EXISTING 2" TECTUM DECKING
NEW REINFORCED EPDM MEMBRANE ON 1 1/2" RIGID POLYISO FASTENED
OVER EXISTING 4 1/2" RIGID INSUL ON 2" TECTUM ROOF DECK
NEW PRE-FIN. MTL WRAPPED
PRESSURE TREATED
2X BLOCKING
EXISTING STRUCTURE
EXISTING 2" TECTUM DECKING
EXISTING WALL
CONSTRUCTION
NEW REINFORCED EPDM MEMBRANE ON 1 1/2" RIGID
POLYISO FASTENED OVER EXISTING
4 1/2" RIGID INSUL
ON 2" TECTUM ROOF DECK
EXISTING STRUCTURE
EXISTING 2" TECTUM DECKING
EXISTING WALL CONSTRUCTION
NEW PRE-FIN. MTL FLASHING
NEW REINFORCED EPDM MEMBRANE ON 6" RIGID
POLYISO FASTENED OVER EXISTING 2"
TECTUM ROOF DECK
EXISTING STRUCTURE
EXISTING 1 1/2" METAL DECKING
MEMBRANE CONT'S. BEHIND WALL FLASHING
NEW 2X PRESSURE TREATED BLOCKING
AS REQUIRED.
NEW PRE-FIN. MTL THRU WALL FLASHING
ON EXISTING MASONRY WALL CONSTRUCTION
NEW REINFORCED EPDM MEMBRANE ON 1 1/2" RIGID
POLYISO OVER EXISTING 4 1/2" RIGID INSUL
ON 1 1/2" MTL. DECK
EXISTING STRUCTURE
EXISTING 1 1/2" MTL. DECK
EXISTING WALL CONSTRUCTION
MEMBRANE CONT'S. UP ROOF CANT AND EXISTING
WALL CONSTRUCTION
NEW 2X PRESSURE TREATED BLOCKING
AS REQUIRED.
NEW REINFORCED EPDM MEMBRANE ON 1 1/2" RIGID
POLYISO FASTENED OVER EXISTING 4 1/2" RIGID INSUL.
ON 1 1/2" MTL. DECK
NEW REINFORCED EPDM MEMBRANE ON 1 1/2" RIGID
POLYISO FASTENED OVER EXISTING 4 1/2" RIGID INSUL
ON 1 1/2" MTL. DECK
EXISTING WALL CONSTRUCTION
NEW 2X PRESSURE TREATED
BLOCKING AS REQUIRED.
NEW PRE-FIN. MTL FASCIA / DRIP EDGE
(MATCH EXISTING FINISH)
EXISTING STRUCTURE
NEW REINFORCED EPDM MEMBRANE ON 1 1/2" RIGID
POLYISO FASTENED OVER EXISTING 4 1/2" RIGID INSUL
ON 1 1/2" MTL. DECK
EXISTING WALL CONSTRUCTION
NEW 2X PRESSURE TREATED
BLOCKING AS REQUIRED.
EXISTING STRUCTURE
NEW REINFORCED EPDM MEMBRANE ON 6" RIGID
POLYISO FASTENED OVER EXISTING 1 1/2"
MTL. DECK
EXISTING WALL CONSTRUCTION
NEW 2X PRESSURE TREATED
BLOCKING AS REQUIRED.
EXISTING STRUCTURE
NEW REINFORCED EPDM MEMBRANE CONT'S.
OVER TREATED BLOCKING.
LAP OVER MEMBRANE
NEW REINFORCED EPDM MEMBRANE ON 1 1/2" RIGID
POLYISO FASTENED OVER EXISTING
4 1/2" RIGID INSUL ON 1 1/2" MTL. DECK
EXISTING STRUCTURE
EXISTING 1 1/2" MTL. DECK
EXISTING WALL CONSTRUCTION
NEW 2X PRESSURE TREATED BLOCKING
AS REQUIRED.
NEW PRE-FIN. MTL FASCIA /DRIP EDGE
ROOF MEMBRANE CONT'S BEHIND.
(MATCH EXISTING FINISH)
NEW REINFORCED EPDM MEMBRANE ON 1 1/2"
RIGID POLYISO FASTENED OVER
EXISTING 4 1/2" RIGID INSUL ON
1 1/2" MTL. DECK
NEW REINFORCED EPDM MEMBRANE ON
1 1/2" RIGID POLYISO FASTENED OVER
EXISTING 4 1/2" RIGID INSUL ON 1 1/2"
MTL. DECK
EXISTING STRUCTURE
EXISTING 1 1/2" MTL. DECK
EXISTING WALL CONSTRUCTION
NEW 2X PRESSURE TREATED BLOCKING
AS REQUIRED.
NEW REINFORCED EPDM MEMBRANE ON 1 1/2" RIGID
POLYISO FASTENED OVER EXISTING 4 1/2" RIGID INSUL
ON 1 1/2" MTL. DECK. TAPERED TOWARD DRAIN
EXISTING STRUCTURE
EXISTING 1 1/2" MTL. DECK
EXISTING WALL CONSTRUCTION
NEW 2X PRESSURE TREATED BLOCKING
AS REQUIRED.
NEW REINFORCED EPDM MEMBRANE ON 1" RIGID
POLYISO FASTENE OVER EXISTING 5" RIGID INSUL
ON 3/4" WD. DECK
EXISTING STRUCTURE
EXISTING 3/4" WD. DECK
EXISTING WALL CONSTRUCTION
NEW 2X PRESSURE TREATED
BLOCKING AS REQUIRED.
NEW PRE-FIN. MTL FASCIA /
DRIP EDGE
(MATCH EXISTING FINISH)
NEW REINFORCED EPDM MEMBRANE ON 1" RIGID
POLYISO FASTENED OVER EXISTING 5" RIGID INSUL
ON 3/4" WD. DECK
EXISTING STRUCTURE
EXISTING 3/4" WD. DECK
EXISTING WALL CONSTRUCTION
NEW 2X PRESSURE TREATED
BLOCKING AS REQUIRED.
NEW ASPHALT SHINGLE ROOFING OVER ROOFING
UNDERLAYMENT ON EXISTING 5/8" SHEATHING
EXISTING ROOF TRUSS
EXISTING WALL CONSTRUCTION
EXISTING 5/8" ROOF SHEATHING
ICE AND WATER SHIELD CONT'S.
4'-0" FROM EDGE OF ROOF
NEW ASPHALT SHINGLE ROOFING OVER ROOFING
UNDERLAYMENT ON EXISTING 5/8" SHEATHING
EXISTING ROOF TRUSS
EXISTING MECH LOUVER
EXISTING 5/8" ROOF SHEATHING
ICE AND WATER SHIELD CONT'S.
4'-0" FROM EDGE OF ROOF
NEW ASPHALT SHINGLE ROOFING OVER ROOFING
UNDERLAYMENT ON EXISTING 5/8" SHEATHING
EXISTING ROOF TRUSS
EXISTING 5/8" ROOF SHEATHING
ROOFING UNDERLAYMENT CONT'S UP WALL
BEHIND REGLET AND THRU-WALL FLASHING
EXISTING WALL CONSTRUCTION
NEW PRE-FIN. MTL FASCIA / DRIP EDGE
(MATCH EXISTING FINISH)
NEW PRE-FIN. MTL FASCIA / DRIP EDGE
(MATCH EXISTING FINISH)
NEW PRE-FIN. MTL FASCIA / DRIP EDGE
(MATCH EXISTING FINISH)
NEW PRE-FIN. MTL FASCIA / DRIP EDGE
(MATCH EXISTING FINISH)NEW PRE-FIN. MTL FASCIA / DRIP EDGE
(MATCH EXISTING FINISH)
NEW PRE-FIN. MTL FASCIA / DRIP EDGE
(MATCH EXISTING FINISH)
NEW PRE-FIN. MTL FASCIA / DRIP EDGE
(MATCH EXISTING FINISH)
NEW PRE-FIN. MTL FASCIA /
DRIP EDGE
(MATCH EXISTING FINISH)
3/4" = 1'-0"
Expansion Joint Detail
NEW REINFORCED EPDM
MEMBRANE ON 1 1/2" RIGID
POLYISO FASTENED OVER
EXISTING 4 1/2" RIGID INSUL ON
1 1/2" MTL. DECK
EXISTING ROOF DECKING
NEW 2X PRESSURE TREATED
BLOCKING AS REQUIRED.
BALCO ROOF EXPANSION
JOINT BRBA ROOF TO ROOF BELLOW
BLACK EPDM COVER W/ CLOSED CELL FOAM
ALUMINUM FLANGES
NOTE: AREAS SHOWN IN GRAY
REPRESENT EXISTING CONSTRUCTION.
MEMBRANE CONT'S. BEHIND WALL FLASHING
EMERGENCY OVERFLOW DRAIN
MEMBRANE FLASHING
Preliminary 1/6/25
NEW 2X PRESSURE TREATED BLOCKING AS
REQUIRED.
NEW 2X PRESSURE TREATED BLOCKING AS
REQUIRED.
NEW 2X PRESSURE TREATED BLOCKING AS
REQUIRED.
Revisions 3/4/25
Bid Set Addendum #1 5/15/25
| ADDENDUM_Roof RFP_Kingsley_05162025.pdf |
| Kingsley Middle School Roofing_Addendum#1_5-15-25.pdf |
| Kingsley Middle School_Addendum #1_A0.1 Cover Sheet |
| Sheets |
| A0.1 - Cover Sheet |
| Kingsley Middle School_Addendum #1_A3.2 Composite Roof Plan |
| Sheets |
| A0.1 - Cover Sheet |
| A3.2 - Composite Roof Plan |
| A3.3 - Roof Details |
| Kingsley Middle School_Addendum #1_A3-3 Roof Details |
| Sheets |
| A0.1 - Cover Sheet |
| A3.2 - Composite Roof Plan |
| A3.3 - Roof Details |
File details come from the government source that posted it. Updated .