Addendum One.pdf

PDF 2 MB Posted

Attached to
RFB-171-26 Parks General Butler Building Automation System
Solicitation number
RFB 785 2600000302 2
Issued by
Calloway County, Kentucky

About this file

Summary

This Addendum No. 1 pertains to a design change notification for an Invitation to Bid (RFB-171-26) issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, for the replacement of building automation systems at General Butler State Resort Park in Carrollton, Kentucky. The project involves the replacement of temperature control and HVAC systems across multiple buildings including the Main Lodge, Conference Center, Wood Wing Guest Building, and Woodland Business Building. The original bid date of January 22, 2026, has been moved to January 30, 2026, at 1:30 P.M. Eastern Time, with call-in information remaining unchanged. The addendum provides clarification on scope exclusions through redline markups on project drawings and specifications, utilizing 60% transparent red shaded boxes to indicate work, equipment, and systems explicitly excluded from the contract scope that shall not be priced or carried as alternates.

The addendum emphasizes that all work outside the 60% transparent red shaded boxes remains part of the Contract Documents and that contractors are responsible for reviewing all redline changes not marked as excluded scope and incorporating them into their bids accordingly. The document includes comprehensive mechanical and electrical schedules, control diagrams, and installation details for HVAC equipment including water source heat pumps, rooftop units, split systems, furnaces, boilers, cooling towers, and related controls integrated into a new Building Automation System (BAS) to be connected to an existing Kentucky State Parks cloud-based server. All other requirements of the drawings, specifications, and previously issued addenda remain unchanged and in full force, with bidders required to review all sheets in Addendum No. 1 to ensure proper interpretation of the revised scope and pricing exclusions.

View the file

Other files

File Type Posted
Final_RFB_785_2600000302_2_SO_FORM.PDF PDF
Final_RFB_785_2600000302_1_SO_FORM.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-171-26

FOR: Replace Building Automation Systems General Butler State Resort Park Department of Parks Carrollton, Kentucky

DATE: January 22, 2026

RFB-785-2600000302

ADDENDUM NO. One (1)

BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING

UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.

Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings.

Item 2: Official Bid Date has been moved to January 30, 2026, at 1:30 P.M. Eastern Time. Call in Information will remain the same.

END OF ADDENDUM

Invitation to Bid No. RFB-171-26 For: Replace Building Automation Systems General Butler State Resort Park Department of Parks Carrollton, Kentucky

Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration

Addendum #1 Summary:

Dear Bidders, This addendum is issued to clarify the intent of the redline mark-ups included in Addendum No. 1 Drawings for the General Butler – TCC Replacement project .

The redline mark-ups shown on the drawings are provided for coordination and scope clarification purposes only.

Please note the following key guidance when preparing pricing:

1. Redline Mark-Ups (General):

Redline revisions identify changes, clarifications, or areas of review relative to the previously issued documents. Contractors shall review all redline notes, callouts, and revisions on each affected sheet to understand the revised intent of the design.

2. 60% Transparent Red Boxes – Not in Scope:

Any work, keynotes, equipment, piping, ductwork, controls, devices, or systems enclosed within 60% transparent red shaded boxes is explicitly excluded from the project scope.

o Items shown within these shaded areas are not required, o Shall not be included in bids, and o Shall not be priced or carried as alternates.

3. Scope Outside Red Shaded Areas:

All work outside of the 60% transparent red shaded boxes remains part of the Contract Documents unless otherwise noted. Contractors are responsible for incorporating all applicable redline changes that are not shaded as excluded scope.

4. No Change to Remaining Contract Requirements:

Except as clarified above, all other requirements of the drawings, specifications, and previously issued addenda remain unchanged and in full force.

Bidders are responsible for reviewing all sheets included in Addendum No. 1 to ensure proper interpretation of the revised scope and pricing exclusions.

Should there be any questions regarding the intent of the redline mark-ups or shaded exclusions, submit requests for clarification in accordance with the Instructions to Bidders.

Sincerely, Gary Hagan , PE

HVAC HYDRONIC SYMBOLS AND ABBREVIATIONS

PIPING SYMBOLS

- GATE SOLENOID ACTUATED

VALVE

- CHECK VALVE

- TRIPLE DUTY VALVE

- THREE WAY AUTOMATIC

CONTROL VALVE

- THREE WAY SOLENOID

ACTUATED VALVE

- AUTOMATIC AIR VENT.

- MANUAL AIR VENT.

- SPHERICAL RUBBER

VIBRATION ISOLATOR

- STEEL FLEXIBLE CONNECTOR

- SUCTION DIFFUSER

TDV

AAV

MAV

- HEAT TRACE WITH JACKET FOR

EXTERIOR PIPING LINES

- FLOW SWITCH

HT

FS

AABC ASSOCIATED AIR BALANCE COUNCIL

ABV ABOVE

ACT ACOUSTICAL CEILING TILE

AD ACCESS DOOR

ADDT'L ADDITIONAL

AFF ABOVE FINISHED FLOOR

AMB AMBIENT

AUX CD AUXILIARY CONDENSATE

BOD BOTTOM OF DUCT

BPD BAROMETRIC OR BACKPRESSURE DAMPER

BFP BACKFLOW PREVENTOR

BHP BRAKE HORSEPOWER

BOP BOTTOM OF PIPE

BOS BOTTOM OF STEEL

BTUH BRITISH THERMAL UNITS PER HOUR

CA COMBUSTION AIR

CAD CEILING AIR DIFFUSER

CAL COMBUSTION AIR LOUVER

CD CONDENSATE DRAIN

CFM CUBIC FEET PER MINUTE

CONC CONCRETE

COND CONDENSING

CONN CONNECT

CONT CONTINUATION

CSR CEILING SUPPLY REGISTER

CO2 CARBON DIOXIDE SENSOR

CPVC CHLORINDATED POLY VINYL CHLORIDE

DB DRY BULB

dB DECIBEL

DDC DIRECT DIGITAL CONTROL

DIA DIAMETER

DIFF DIFFERENCE

DISC SW DISCONNECT SWITCH

DN DOWN

DP DEW POINT

DWG DRAWING

DTL DETAIL

DX DIRECT EXPANSION

EA EXHAUST AIR

EAL EXHAUST AIR LOUVER

EAR EXHAUST AIR REGISTER

EAT ENTERING AIR TEMPERATURE

EC ELECTRICAL CONTRACTOR

ELEV ELEVATION

EMS ENERGY MANAGEMENT SYSTEM

EEA EXISTING EXHAUST AIR (GRILLE)

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ERA EXISTING RETURN AIR (GRILLE/DIFFUSER)

ESA EXISTING SUPPLY AIR (GRILLE/DIFFUSER)

ESP EXTERNAL STATIC PRESSURE

EXIST EXISTING

FD FIRE DAMPER

FLR FLOOR

FPM FEET PER MINUTE

FRR FLOOR RETURN REGISTER

FSR FLOOR SUPPLY REGISTER

F&I FURNISHED & INSTALLED

FRPM FAN REVOLUTIONS PER MINUTE.

GA GAUGE

GC GENERAL CONTRACTOR

GPM GALLONS PER MINUTE

H HUMIDISTAT, RELATIVE HUMIDITY SENSOR

HEPA HIGH EFFICIENCY PARTICULATE AIR FILTER

HP HORSEPOWER

KW KILOWATT

LAT LEAVING AIR TEMPERATURE

LB POUND

LBG LINEAR BAR GRILLE

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAX MAXIMUM

MC MECHANICAL CONTRACTOR

MD MANUAL DAMPER

MFGR MANUFACTURER

MIN MINIMUM

NG NATURAL GAS

NIC NOT IN CONTRACT

NTS NOT TO SCALE

OA OUTSIDE AIR

OAL OUTDOOR AIR LOUVER

OBD OPPOSED BLADE DAMPER

OC ON CENTER

OF OVERFLOW

OPNG OPENING

ORIG ORIGINAL

ΔP PRESSURE DIFFERENCE

PC PLUMBING CONTRACTOR

PROVIDEFURNISH & INSTALL

QTY QUANTITY

RA RETURN AIR

RAG RETURN AIR GRILLE

RAR RETURN AIR REGISTER

RBF ROUTE BELOW FLOOR

RAF ROUTE ABOVE FLOOR

RAC ROUTE ABOVE CEILING

REF REFER/REFERENCE

RLINES REFRIGERANT LINES

REV ROOF EXHAUST VENTILATOR

SA SUPPLY AIR

SAR SUPPLY AIR REGISTER

SC SHADING COEFFICIENT

SD SPLITTER DAMPER

SD SMOKE DAMPER

M EXTERNAL STATIC PRESSURE

SMACNA

SHEET METAL & AIR CONDITIONING

CONTRACTORS NATIONAL ASSOC.

SPEC SPECIFICATION

ST SOUND TRAP

SQ FT SQUARE FEET

SQ IN SQUARE INCHES

STN SECTION

T THERMOSTAT

Ts TEMPERATURE SENSOR

TCC

TEMPERATURE CONTROL

CONTRACTOR

ΔT TEMPERATURE DIFFERENCE

TAG TRANSFER AIR GRILLE

TOS TOP OF STEEL

TV TURNING VANE

TYP TYPICAL

T&P TEMPERATURE AND PRESSURE

UG UNDERGROUND

VFD VARIABLE FREQUENCY DRIVE

VSD VARIABLE SPEED DRIVE

VTR VENT THROUGH ROOF

WB WET BULB

WG WATER GAUGE

WRG WALL RETURN AIR GRILLE

WRR WALL RETURN AIR REGISTER

WSR WALL SUPPLY REGISTER

AAV AUTOMATIC AIR VENT

BD BLOW-DOWN PIPING

BFP BOILER FEED PUMP

BFV BUTTERFLY VALVE

CDWR CONDENSER WATER RETURN

CDWS CONDENSER WATER SUPPLY

CHR CHILLED/HOT WATER RETURN

CHS CHILLED/HOT WATER SUPPLY

CHWP CHILLED/HOT WATER PUMP

CDR CONDENSATE RETURN

CTR COOLING TOWER RETURN

CTS COOLING TOWER SUPPLY

CWR CHILLED WATER RETURN

CWS CHILLED WATER SUPPLY

EWT ENTERING WATER TEMPERATURE

FT HD FEET HEAD

FS FLOW SWITCH

FW FEEDWATER

FWP FEED WATER PUMP

F&T FLOAT AND THERMOSTATIC

GLY GLYCOL

GV GATE VALVE

HPS HIGH PRESSURE STEAM

HW HOT WATER

HWR HOT WATER RETURN

HWS HOT WATER SUPPLY

LPS LOW PRESSURE STEAM

LWT LEAVING WATER TEMPERATURE

MPS MEDIUM PRESSURE STEAM

MV MOTORIZED VALVE

NC NORMALLY CLOSED

NO NORMALLY OPEN

NPSH NET POSITIVE SUCTION HEAD

OS&Y OUTSIDE SCREW & YOLK

PRV PRESSURE REDUCING VALVE

PSIA POUNDS/SQUARE INCH - ABSOLUTE

PSIG POUNDS/SQUARE INCH - GAUGE

PVC POLYVINYL CHLORIDE

RED REDUCER

TDH TOTAL DYNAMIC HEAD

TOL THREAD-O-LET

TXV THERMAL EXPANSION VALVE

VB VACUUM BREAKER

WC WATER CHILLER

ZV ZONE VALVE

• SYMBOLS USED BUT NOT LISTED HERE SHALL BE DEFINED ELSEWHERE IN THE BID DOCUMENTS. IF NOT, CONTACT THE

ENGINEER FOR CLARIFICATION PRIOR TO BID OPENING.

• LIST OF ABBREVIATIONS, ACRONYMS, AND SYMBOLS IS A STANDARD LIST. NOT ALL SYMBOLS ARE USED ON THIS PROJECT.

NOTE:

THERMOSTAT

CONNECT NEW MATERIAL TO EXISTING

MATERIAL

SUPPLY / OUTSIDE AIR DUCT UP

SUPPLY / OUTSIDE AIR DUCT DOWN.

RETURN AIR DUCT UP.

RETURN AIR DUCT DOWN.

EXHAUST / COMBUSTION AIR DUCT UP.

EXHAUST / COMBUSTION AIR DUCT DUCT

DOWN.

DUCT OFFSET UP OR DOWN WITH TWO

SMOOTH RADIUS FITTINGS.

MANUAL VOLUME DAMPER (OPPOSED

BLADE)

- BRANCH DUCT TAKE-OFF WITH

BALANCING DAMPER; REFER TO DETAILS

HEREIN FOR FITTING REQUIREMENTS.

- CEILING AIR DIFFUSER

- EXHAUST AIR GRILLE

- LINEAR SLOT DIFFUSER

(SUPPLY OR RETURN)

- FIRE DAMPER - (VERTICAL OR

HORIZONTAL). INCLUDE DUCT ACCESS

DOOR & CEILING/WALL ACCESS DOOR.

- FIRE / SMOKE COMBINATION DAMPER -

(VERTICAL OR HORIZONTAL). INCLUDE

DUCT ACCESS DOOR & CEILING/WALL

ACCESS DOOR.

- MOTOR OPERATED DAMPER - LOCATE IN

ACCESSIBLE LOCATION. WHERE

INSTALLED BEHIND DRYWALL, PROVIDE

ACCESS DOOR IN CEILING/WALL.

- CONDENSATE DRAIN PIPING; USE

SANITARY WASTE FITTING. (45° WYES;

DO NOT USE 90° ELLS OR TEES)

- PIPE UP

- PIPE DOWN

CD

DUCTWORK AND ACCESSORIES

ELBOW WITH TURNING VANES

• SYMBOLS USED BUT NOT LISTED HERE SHALL BE DEFINED ELSEWHERE IN THE BID DOCUMENTS. IF NOT, CONTACT THE

ENGINEER FOR CLARIFICATION PRIOR TO BID OPENING.

• LIST OF ABBREVIATIONS, ACRONYMS, AND SYMBOLS IS A STANDARD LIST. NOT ALL SYMBOLS ARE USED ON THIS PROJECT.

NOTE:

PIPING ABBREVIATIONS

HVAC AIRSIDE SYMBOLS AND ABBREVIATIONS

DUCTWORK AND ACCESSORIES ABBREVIATIONS

T

- RETURN AIR GRILLE

- PRESSURE RELIEF VALVE

A. WHERE PIPING, DUCTWORK, ETC. IS SHOWN TO BE REMOVED, IT APPLIES

ONLY TO LINES SERVING FIXTURES, SUPPLIES, RETURNS, OUTLETS,

EQUIPMENT, ETC. WHICH ARE TO BE REMOVED. DO NOT DISCONNECT ANY

MAINS OR BRANCH LINES SERVING ITEMS WHICH ARE TO REMAIN.

B. CARE SHOULD BE TAKEN BY ALL CONTRACTORS TO AVOID DAMAGING OR

DISTURBING EXISTING CONSTRUCTION WHICH IS INDICATED TO REMAIN.

CONTRACTORS SHALL BE RESPONSIBLE FOR MAKING ANY REPAIRS

NECESSARY TO RECTIFY DAMAGE AND RESTORE EXISTING

CONSTRUCTION TO UNDAMAGED STATE UPON COMPLETION OF WORK AT

NO EXPENSE TO THE OWNER.

C. ALL CONTRACTORS SHALL THOROUGHLY FAMILIARIZE THEMSELVES WITH

ALL ARCHITECTURAL DRAWINGS AND DETAILS PRIOR TO BEGINNING

CONSTRUCTION FOR COORDINATION OF ALL DEMOLITION WORK FOR EACH

RESPECTIVE TRADE.

D. PRIOR TO BEGINNING DEMOLITION WORK, EACH TRADE SHALL BE

RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS AS REQUIRED BY

LOCAL AND STATE AUTHORITIES, CODES AND ORDINANCES.

E. ALL CONTRACTORS SHALL REFER TO NEW CONSTRUCTION DRAWINGS

AND SPECIFICATIONS PRIOR TO BEGINNING DEMOLITION WORK FOR

COORDINATION WITH SAME.

F. UNLESS NOTED OTHERWISE, SHOWN OR SPECIFIED, ALL MATERIALS AND

EQUIPMENT REMOVED OR DEMOLISHED (EXCEPT THAT WHICH IS TO BE

SALVAGED OR RELOCATED) AS DIRECTED BY DRAWINGS AND

SPECIFICATIONS, SHALL BECOME THE PROPERTY OF THE CONTRACTOR

AND SHALL BE LEGALLY DISPOSED OF.

G. ALL PIPING, ETC. WHICH IS REQUIRED TO BE CUT SHALL BE CUT FLUSH

WITH FINISHED FLOORS/WALLS. ALL CUTTING AND PATCHING OF EXISTING

FLOORS/WALLS SHALL BE BY EACH CONTRACTOR.

H. CONTRACTOR SHALL GIVE A MINIMUM NOTICE OF 48 HOURS TO GENERAL

CONTRACTOR AND OWNER PRIOR TO SHUT-DOWN OF ANY EXISTING

UTILITIES, PIPING SYSTEMS, ETC.

I. CONTRACTOR SHALL VISIT SITE PRIOR TO SUBMITTING BID TO CONFIRM

EXISTING CONDITIONS INDICATED. CONTRACTOR SHALL INCLUDE ALL

REQUIRED DEMOLITION.

J. THE FOLLOWING LIST OF ITEMS SHALL BE TURNED OVER TO THE OWNER

WHEN REMOVED FROM SERVICE: VALVE AND DAMPER ACTUATORS,

TRANSDUCERS, CONTROL PANELS, CONTROL MODULES, AND POWER

TRANSFORMERS.

GENERAL DEMOLITION NOTES

- BALL VALVE

- GLOBE VALVE

- GLOBE VALVE WITH

OUTSIDE SCREW & YOKE

- GATE VALVE

- GATE VALVE WITH

OUTSIDE SCREW & YOKE

- GATE AUTOMATIC

CONTROL VALVE

- PIPING WITH

DIRECTION OF FLOW

- PIPING DOWN

- PIPING UP

- BUTTERFLY VALVE -

PIPES 2 1/2" AND LARGER

- BUTTERFLY AUTOMATIC

CONTROL VALVE

- BUTTERFLY SOLENOID

ACTUATED VALVE

FS

FD

DN

UP

M

ALL EXISTING HVAC EQUIPMENT TO REMAIN SHALL BE PRE-TESTED.

REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

AABC REPORTS SHALL BE PROVIDED FOR EXISTING EQUIPMENT,

EACH AIR TERMINAL UNIT, WATER PRESSURE RATES, AIR PRESSURE

RATES, AIRFLOW RATES, AND WATER FLOW RATES FOR EACH

TERMINAL UNIT/AHU.

UPON COMPLETION OF NEW WORK, EACH SYSTEM SHALL BE

RETESTED AND ANY DEVIATIONS FROM DESIGN OR ORIGINAL VALUES

SHALL BE NOTED. WHERE POSSIBLE PROVIDE RECOMMENDATIONS

TO CORRECT DEVIATIONS

EXISTING AIR DISTRIBUTION DRAWINGS WILL BE PROVIDED FOR TAB

CONTRACTORS USE.

TEST & BALANCE NOTES

LIMIT OF DEMOLITION

A. ENGINEERS WILL MAKE PERIODIC VISITS DURING CONSTRUCTION TO REVIEW INSTALLATION COMPLIANCE WITH

DRAWINGS, DETAILS, AND SPECIFICATIONS. ANY DEVIATIONS FROM THE DRAWINGS, DETAILS, AND SPECIFICATIONS

SHALL BE CORRECTED AT NO ADDITIONAL COST AND NO ADDITIONAL TIME TO THE CONSTRUCTION SCHEDULE. THE

ENGINEER WILL NOT INDICATE ALL LOCATIONS OF THE DEVIATIONS, IT IS THE CONTRACTOR’S RESPONSIBILITY TO

INSTALL THE SYSTEMS IN COMPLIANCE WITH THE DRAWINGS, DETAILS, AND SPECIFICATIONS. THE CONTRACTOR

SHALL CORRECT ALL DEVIATIONS, EVEN IF THEY ARE NOT SPECIFICALLY INDICATED IN FIELD REPORTS AND/OR

PUNCH LISTS.

B. HVAC CONTRACTOR SHALL COORDINATE DUCT, DIFFUSERS, REGISTERS AND GRILLES WITH LIGHT FIXTURE AND

SPRINKLER HEAD LOCATIONS.

C. CONTRACTOR SHALL COORDINATE ROUTING OF DUCTWORK WITH ALL OTHER TRADES PRIOR TO COMMENCING

INSTALLATION.

D. CONTRACTORS SHALL COORDINATE NEW/RE-WORKED DUCTWORK WITH EXISTING BEAMS, JOISTS, ETC. TO AVOID

CONFLICTS. ADJUST DUCT ROUTING AS REQUIRED TO ACCOMMODATE EXISTING STRUCTURAL CONDITIONS.

E. ALL DUCT PENETRATIONS THROUGH FIRE RATED WALLS, CEILINGS, AND FLOORS TO BE FIRESTOPPED. ALL

PENETRATIONS THROUGH NON-FIRE RATED FLOORS SHALL BE FIRESTOPPED IN ACCORDANCE WITH LOCATION

CODES.

F. FLEXIBLE DUCT TO BE A MAXIMUM OF 5'-0" IN LENGTH UNLESS OTHERWISE NOTED. CRIMPING OF FLEXIBLE DUCT

WILL NOT BE ACCEPTED.

G. ALL DIFFUSERS, REGISTERS, AND GRILLES SHALL BE FURNISHED WITH OPPOSED BLADE DAMPERS UNLESS

OTHERWISE NOTED. SURFACE MOUNTED CEILING DIFFUSERS SHALL BE PROVIDED WITH FULLY INSULATED BACKING.

H. ALL DUCTS PENETRATING FIRE RATED WALLS, CEILINGS, ETC. TO HAVE FIRE DAMPERS AND ACCESS DOORS.

REFERENCE HVAC SPECIFICATIONS.

I. THE MECHANICAL CONTRACTOR SHALL PROVIDE STARTERS FOR ALL HVAC EQUIPMENT. THE ELECTRICAL

CONTRACTOR SHALL MOUNT AND CONNECT STARTERS.

J. ALL DUCT CONNECTIONS TO AIR HANDLING EQUIPMENT (FANS, ETC.) SHALL HAVE NEOPRENE FLEXIBLE

CONNECTIONS FURNISHED AND INSTALLED COMPLETE BY THE MECHANICAL CONTRACTOR.

K. ALL 90 DEGREE ELBOWS SHALL BE INSTALLED WITH TURNING VANES; UNLESS OTHERWISE NOTED. THIS INCLUDES

VERTICAL AND SINGLE LINE ELBOWS ON THE FLOOR PLANS WHERE TURNING VANES ARE NOT SHOWN.

L. ALL EXHAUST DISCHARGES AND GAS FLUES WHERE INDICATED SHALL BE LOCATED A MINIMUM OF 10'-0" AWAY FROM

OUTSIDE AND COMBUSTION AIR INTAKES UNLESS LOCAL AND STATE CODES MANDATE ADDITIONAL DISTANCE.

M. CONTRACTOR SHALL VERIFY ELECTRICAL CHARACTERISTICS OF ALL MECHANICAL EQUIPMENT WITH THE

ELECTRICAL CONTRACTOR PRIOR TO PLACING EQUIPMENT ON ORDER.

N. WHERE WALL TYPE LOUVERS ARE INDICATED, MECHANICAL CONTRACTOR SHALL SEAL WATER-TIGHT ALL AROUND

LOUVER WITH SILICON CAULKING. CONTRACTOR SHALL COORDINATE PAINTING REQUIREMENTS FOR LOUVERS

WITH GENERAL CONTRACTOR PRIOR TO SUBMITTING BID.

O. EACH CONTRACTOR SHALL SEAL ALL EXTERIOR WALL PENETRATIONS IN WATER-TIGHT MANNER. CONTRACTOR

SHALL INSTALL PIPE SLEEVES IN ALL EXTERIOR WALL/FOUNDATION PENETRATIONS. CUTTING AND SLEEVING FOR

INSTALLATION SHALL BE COORDINATED WITH GENERAL CONTRACTOR AND ARCHITECT PRIOR TO COMMENCING

WORK.

P. INSTALL BALANCING DAMPERS IN ALL BRANCH DUCTS (SA/RA/OA/EA SYSTEMS). BALANCING DAMPERS SHALL BE

INSTALLED WITH INSULATION STANDOFFS AND LOCKING QUADRANTS FOR BALANCING.

Q. THERMOSTATS, TEMPERATURE SENSORS, TRANSFORMERS AND LOW VOLTAGE WIRING SHALL BE FURNISHED AND

INSTALLED BY THE TEMPERATURE CONTROLS CONTRACTOR. THERMOSTATS/SENSORS TO BE MOUNTED AT 44" AFF

TO CENTER OF DEVICE.

R. ALL WORK SHALL BE IN ACCORDANCE WITH THE LATEST INTERNATIONAL ENERGY CONSERVATION CODE, NATIONAL

ELECTRIC CODE, NFPA, ALL LOCAL AND STATE CODES.

S. ELECTRICAL CONTRACTOR SHALL VISIT AND EXAMINE THE SITE PRIOR TO SUBMITTING BID TO BECOME FAMILIAR

WITH EXISTING CONDITIONS. NO ALLOWANCE SHALL BE MADE FOR EXISTING CONDITIONS NOT KNOWN TO THE

CONTRACTOR.

T. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FEES, PERMITS AND LICENSES FOR THE COMPLETE

INSTALLATION OF HIS WORK. DRAWINGS ARE DIAGRAMMATIC REPRESENTATION OF THE WORK AND INDICATES

GENERAL ARRANGEMENT. SEE ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONS.

U. ALL SYSTEMS, EQUIPMENT AND MATERIALS ARE TO BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER. WORK

NOT MEETING THIS CRITERION SHALL BE REMOVED AND REINSTALLED SATISFACTORILY. FINAL DETERMINATION OF

THE ACCEPTABILITY OF THE QUALITY OF WORK RESIDES WITH THE ENGINEER.

V. PROVIDE DETAILED SHOP DRAWINGS TO ENGINEERS PRIOR TO PURCHASING AND INSTALLING ANY EQUIPMENT.

W. DO NOT SCALE FROM DRAWINGS, AS PRINTING DISTORTS SCALE. WORK SHALL BE LAID OUT FROM DIMENSIONED

DRAWINGS, OR DIMENSIONS SUPPLIED TO THE CONTRACTOR.

X. WHERE INTERRUPTING AN EXISTING UTILITY OR SERVICE DELIBERATELY OR ACCIDENTALLY, THE RESPONSIBLE

CONTRACTOR SHALL WORK CONTINUOUSLY AS NEEDED TO RESTORE SAME, PROVIDING PREMIUM TIME AS NEEDED.

Y. ALL MATERIALS FURNISHED AND ALL WORK INSTALLED SHALL COMPLY WITH THE CURRENT EDITION OF THE

NATIONAL ELECTRICAL CODES, NATIONAL FIRE CODES OF THE NATIONAL FIRE PROTECTION ASSOCIATION, THE

REQUIREMENTS OF LOCAL UTILITY COMPANIES, AND WITH THE REQUIREMENTS OF ALL GOVERNMENTAL AGENCIES

OR DEPARTMENTS HAVING JURISDICTION. IF ANY CONFLICTS OR DISCREPANCIES OCCUR THE MOST STRINGENT

SHALL APPLY.

Z. FOR BRANCH CIRCUIT REQUIRING A NEUTRAL CONDUCTOR, A DEDICATED NEUTRAL CONDUCTOR SHALL BE

PROVIDED.

AA. INSTALL EQUIPMENT, MATERIALS, ETC., IN STRICT ACCORD WITH MANUFACTURERS' RECOMMENDATIONS AND

DIRECTIONS. IF IN CONFLICT WITH THE DESIGN INDICATED IN CONTRACT DOCUMENTS, ADVISE THE ENGINEERS

PRIOR TO INSTALLATION FOR CLARIFICATION.

AB. COORDINATE EXACT PHASING OF ALL WORK WITH GENERAL CONTRACTOR.

AC. ELECTRICAL CONTRACTOR SHALL VERIFY EXACT MOUNTING LOCATION AND CONNECTION REQUIREMENTS OF ALL

PLUMBING/MECHANICAL EQUIPMENT WITH PLUMBING/MECHANICAL CONTRACTOR PRIOR TO ROUGH-IN.

AD. CONDUCTORS SHALL BE COPPER RATED NOT LESS THAN 600VOLTS, MINIMUM WIRE SIZE SHALL BE #12 AWG, TYPE

THHN OR THWN UNLESS OTHERWISE NOTED.

AE. E.C SHALL PROVIDE A TYPED LEDGER/CIRCUIT DIRECTORY IN PANELBOARD INDICATING TYPE OF LOAD AND

LOCATION FOR EACH BRANCH CIRCUIT BREAKER. PROVIDE ENGRAVED PHENOLIC NAMEPLATES FOR ALL

PANELBOARDS & DISCONNECT SWITCHES, UNLESS OTHERWISE NOTED.

AF. DISCONNECT SWITCHES, STARTERS, AND ASSOCAITED ELECTRICAL EQUIPMENT SERVING HVAC UNITS SHALL BE

MOUNTED ON WALLS OR PROVIDED WITH INDIVIDUAL STRUCTURAL SUPPORTS. ELECTRICAL EQUIPMENT SHALL

NOT BE MOUNTED DIRECTLY ON EQUIPMENT. ALL STRUCTURAL SUPPORTS FOR ELECTRICAL EQUIPMENT SHALL BE

PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR. ELECTRICAL CONTRACTOR SHALL INCLUDE DESIGN FOR

ALL STRUCTURAL SUPPORT.

AG. ANY VIBRATING, OSCILLATING OR OTHER NOISE OR MOTION PRODUCING EQUIPMENT SHALL BE ISOLATED FROM

SURROUNDING SYSTEMS IN AN APPROVED MANNER. NOISY OR STRUCTURALLY DAMAGING INSTALLATIONS SHALL

BE SATISFACTORILY REPLACED OR REPAIRED AT THE INSTALLING CONTRACTORS' EXPENSE. THE FINAL DECISION

ON THE SUITABILITY OF A PARTICULAR INSTALLATION'S ACCEPTABILITY SHALL BE THAT OF THE ENGINEER.

AH. DEVIATIONS IN SIZES, CAPACITIES, FIT, FINISH, ETC., FOR EQUIPMENT FROM THAT PRIME SPECIFIED SHALL BE THE

RESPONSIBILITY OF THE PURCHASER OF THAT EQUIPMENT. ANY PROVISIONS REQUIRED TO ACCOMMODATE A

DEVIATION, WHETHER APPROVED BY THE ENGINEERS OR NOT, SHALL BE THE RESPONSIBILITY OF THE PURCHASER.

AI. ALL EXPOSED EQUIPMENT, MATERIALS, WIRING AND CABLING INSTALLED IN AIR-PLENUMS SHALL BE

"PLENUM-RATED".

AJ. FOR THE PURPOSES OF THESE DOCUMENTS, THE TERM "PROVIDE" SHALL BE INTERPRETED BY THE CONTRACTOR

AS "FURNISH AND INSTALL THE SPECIFIED SCOPE OF WORK, INCLUDING THE SUPPLY OF ALL MATERIALS AND

EQUIPMENT AS WELL AS THE COMPLETE INSTALLATION AND INTEGRATION INTO THIS PROJECT AND SHALL BE MADE

READY FOR ITS INTENDED USE.

AK. ELECTRICAL CONTRACTOR SHALL PROVIDE LAMICOID LABEL FOR ALL CONTROL PANELS, STARTERS, DISCONNECT

SWITCHES FOR HVAC UNITS AS WELL AS ON THE HVAC UNITS ASSOCIATED WITH THIS PROJECT INDICATING PANEL

FED FROM, CIRCUIT NUMBER AND BREAKER SIZE.

AL. NO MORE THAN THREE (3) PHASE CONDUCTORS SHALL BE COMBINED PER CONDUIT WITHOUT DERATING PER NEC.

ALL CONDUCTORS ARE COPPER.

AM. AMPACITY OF CONDUCTORS ARE SIZED BASED UPON NEC TABLE 310.16 USING 75 DEGREE COLUMN. CONTRACTOR

SHALL USE 60 DEGREE COLUMN FOR EQUIPMENT MARKED FOR USE WITH 60 DEGREE.

AN. VOLTAGE DROP SHALL BE CALCULATED PER NEC FOR CONDUCTORS EXCEEDING 50'-0" ON 120 VOLT AND 100'-0" ON

277 VOLT BRANCH CIRCUITS AND FEEDERS. ADJUST CONDUCTOR SIZE TO MEET NEC REQUIREMENTS.

AO. CONDUIT LISTED IS THE MINIMUM EMT SIZE ALLOWED BY NEC FOR THW/THHN INSULATED WIRE.

AP. EC SHALL COORDINATE WITH THE TCC FOR ALL 120V REQUIREMENTS TO CONTROLS AND INSTRUMENTATION FIELD

DEVICES AND EQUIPMENT PRIOR TO BID. EC SHALL PROVIDE ALL 120V CONNECTIONS AS NEEDED FROM EXISTING

120V CIRCUIT SERVING DEVICES BEING REPLACED OR FROM THE NEAREST CIRCUIT AVAILABLE. PRIOR TO

CONNECTING TO EXISTING CIRCUIT, EC SHALL MEASURE EXISTING CIRCUIT LOAD TO VERIFY THE ADDITIONAL LOAD

WILL NOT EXCEED 15A CONNECTED.

GENERAL PROJECT NOTES

ME010

MECHANICAL & ELECTRICAL INFORMATION

11/15/2025

10/10/202511/15/2025

WATER SOURCE HEAT PUMP SCHEDULE

MARK TONS

AIRFLOW FAN

GPM

WPD

(FT HD)

HEATING (WATER)

VOLTAGE MCA MOCP REMARKSSA

CFM

RA

CFM

OA

CFM

ESP

IN WG

FAN

SPEED

HP OR

HIGH

STATIC

OPTION

EAT °F

SENSIBLE

(MBH)

TOTAL

(MBH)

LAT °F

HEAT REJ

(MBH)

EAT °F MBH

LAT

°F

HEAT ABS

(MBH)

AC-2 20 8,000 6,000 2,000 2 1537 7.5 HP 60 17.6 79 203.3 257.4 58 307.1 55 195 77 136 208/3Ø/60 86.23 A 110 A 2, 3, 5, 6, 10, 11

GENERAL NOTES:

A. ESP DOES NOT INCLUDE INTERNAL PRESSURE LOSSES FOR COIL, FILTER OR CABINET CONFIGURATION

B. MOTORS ARE TO BE ECM WITH A MINIMUM OF 3 SPEED SETTINGS; UNLESS OTHERWISE SPECIFICALLY NOTED.

C. CAPACITIES INDICATED BASED ON 80°F EWT FOR COOLING, BASED ON 65°F EWT FOR HEATING.

D. FLEX HOSE KIT SIZE SHALL MATCH PIPE SIZE ON FLOOR PLANS. PROVIDE A CONCENTRIC REDUCER TO WSHP CONNECTION SIZE.

E. PROVIDE WITH SOUND ATTENUATION REDUCTION PACKAGE INCLUDING COMPRESSOR DISCHARGE MUFFLER, VIBRATION ISOLATION TO COMPRESSOR, WATER REFRIGERANT COIL, INSULATED COMPRESSOR ENCLOSURE AND UNIT BASE STIFFENERS.

F. LOW VOLTAGE TERMINAL STRIP FOR BAS CONTROL.

G. UNITS 7.5 TONS AND LARGER SHALL BE EQUIPED WITH DUAL COMPRESSORS AND CAPACITY MODULATION STRATEGY THAT ALLOWS OPERATION AT 20% CAPACITY.

H. BASIS OF DESIGN: TRANE. ADDITIONAL MFGRS TO BE VERIFIED BY MC: JCI, TRANE, BOSCH, DAIKIN

I. REFERENCE SPECIFICATION FOR ADDITIONAL REQUIREMENTS.

J. WARRANTY: 3 YEAR PARTS AND LABOR. 5 YEAR COMPRESSOR.

K. EXISTING CONDENSER LOOP IS 40% PROPYLENE GLYCOL WITH 90°F EWT IN COOLING AND 45°F EWT IN HEATING.

REMARKS:

1. HORIZONTAL SUSPENDED UNIT; REFER TO FLOOR PLAN FOR DISCHARGE/INLET CONFIGURATION.

2. FLOOR SET VERTICAL UNIT; REFER TO FLOOR PLAN FOR DISCHARGE/INLET CONFIGURATION.

3. LINE SIZE SOLENOID VALVE, SLOW CLOSING, FAST OPENING.

4. END OF RUN UNIT; PROVIDE LINE SIZE THREE WAY SOLENOID VALVE.

5. UNIT SHALL BE PROVIDED WITH HOT GAS REHEAT SYSTEM FOR DEHUMIDIFICATION. HUMIDITY SENSORS SHALL BE LOCATED IN RETURN DUCTWORK FOR DEHUMIDIFICATION CONTROL.

6. WHERE VARIOUS LEAVING/RETURN AIR CONFIGURATIONS ARE REQUIRED. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO COORDINATE CONFIGURATION WITH ROOM LAYOUT.

7. DCV WITH CO2; REFER TO CONTROL DIAGRAM FOR MORE INFORMATION.

8. NOT USED

9. OA PROVIDED AT ROOM NEUTRAL FROM DOAU.

10. OA IS AMBIENT OUTDOOR AIR.

11. PROVIDE PREMIUIM EFFICIENCY MOTOR AND VFD DRIVE FOR FAN.

SCH2078

AIRSIDE INSULATION SCHEDULE

SYSTEM LOCATION INSULATED MATERIAL THICKNESS

INSTALLED

R-VALUE

INSULATION

JACKET

VAPOR

BARRIER

REMARKS

HVAC AIR SIDE:

SUPPLY AIR (50°F TO 65°F) INDOOR YES MINERAL FIBER 1" 4 FSK YES

SUPPLY AIR (50°F TO 65°F)

OUTDOOR

(ZONE 1 - 4)

YES ELASTOMERIC FOAM 3" 8 MTL YES

SUPPLY AIR (68°F & ABOVE)

OUTDOOR

(ZONE 1 - 4)

YES ELASTOMERIC FOAM 3" 8 MTL NO

RETURN AIR INDOOR YES MINERAL FIBER 1" 4 FSK NO

RETURN AIR

OUTDOOR

(ZONE 1 - 4)

YES ELASTOMERIC FOAM 3" 8 MTL NO

EXHAUST AIR INDOOR

YES,

SEE NOTE 4

MINERAL FIBER 1" 4 FSK NO 4

EXHAUST AIR OUTDOOR NO - - - - -

KITCHEN / GREASE EXHAUST ALL YES

FIRE-PROOF PRODUCT RATED;

ASTM E2336

FSK NO

MAKE-UP AIR (68°F to 105°F) INDOOR YES MINERAL FIBER 3" 6 FSK NO

MAKE-UP AIR (95°F & ABOVE) OUTDOOR YES ELASTOMERIC FOAM 3" 8 MTL NO

OUTSIDE AIR (AMBIENT) ALL YES MINERAL FIBER 1" 4 FSK NO

COMBUSTION AIR ALL YES MINERAL FIBER 1" 4 FSK NO 5

HVAC FLUID SIDE:

CONDENSATE LINES YES CLOSED CELL ELASTOMERIC 1/2" NONE YES 5

R.LINES - 1-1/4" AND SMALLER INDOOR YES CLOSED CELL ELASTOMERIC 1" NONE NO 3

R.LINES - 1-1/4" AND SMALLER OUTDOOR YES CLOSED CELL ELASTOMERIC 1" PVC YES

GENERAL NOTES:

A. REFERENCE FLOOR PLAN AND DRAWING DETAILS FOR SPECIAL CONDITIONS.

B. JACKET:

ASJ = ALL SERVICE JACKET

FSK = FOIL SCRIM KRAFT

MTL= METAL LAMINATE WITH FACTORY APPLIED ADHESIVE

LMN = FACTORY APPLIED EMBOSSED WHITE LAMINATE

C. INSULATION INSTALLED OUTDOORS SHALL BE PROVIDED WITH A WEATHER PROOF JACKET.

D. INSULATION THICKNESS IS BASED ON 1.0 PCF.

E. INSTALLED R-VALUE IS THE INSULATION REQUIREMENT AFTER COMPRESSION IN FIELD.

F. THIS SCHEDULE DOES NOT APPLY TO DOUBLE WALL DUCTWORK. REFER TO KEY NOTES OR DUCT MATERIAL SCHEDULE FOR DOUBLE WALL INSULATION REQUIREMENTS.

H. REFERENCE SPECIFICATION FOR ADDITIONAL REQUIREMENTS

REMARKS:

1. ATTIC SPACES ARE UNCONDITIONED AND VENTILATED SPACES THAT ARE OUTSIDE THE INSULATED PERIMETER OF THE BUILDING.

2. COAT WITH ANTI-MICROBIAL SEALANT. SEALANT SHALL ALSO BIND LOOSE FIBERS.

3. WHERE DUCT PENETRATES WALL, INSULATION CAN BE REDUCED TO 1" THICKNESS.

4. AT EXTERIOR WALLS/ROOF PENETRATIONS, EXHAUST AIR DUCTS SHALL BE EXTERNALLY INSULATED FOR THE FIRST (15) FIFTEEN FEET.

5. INSULATION IS REQUIRED FOR METAL DUCT/PIPE AND IS NOT REQUIRED ON PVC, CPVC, OR FABRIC DUCT.

SCH2040

SPLIT SYSTEM FURNACE SCHEDULE

(D/X COOLING WITH INDIRECT GAS FIRED HEAT)

MARK

FURNACE (FAC) CONDENSING UNIT

REMARKS

CFM COOLING FAN HEATING

VOLTAGE MCA MOCP MBH VOLTAGE MCA MOCP

SA RA OA

SENSIBLE

(MBH)

TOTAL (MBH) EAT LAT ESP HP FRPM MBH IN MBH OUT EAT LAT

GF-1A / CU-1A 900 725 175 22 34 79 / 66 55 / 55 0.8 1 1075 120 113.4 58 100 120/1Ø/60 14.1 15 36 208/3Ø/60 16.6 25 ALL

GF-1B / CU-1B 900 725 175 22 34 79 / 66 55 / 55 0.8 1 1075 120 113.4 58 100 120/1Ø/60 14.1 15 36 208/3Ø/60 16.6 25 ALL

GENERAL NOTES: ALL OUTDOOR AND INDOOR COMPONENTS TO BE OF THE SAME MANUFACTURERS. FURNISH UNITS WITH THE FOLLOWING.

A. MC SHALL SIZE R.LINES AND PROVIDE ALL ACCESSORIES REQUIRED BY MANUFACTURER TO MEET SCHEDULED CAPACITES WITH EXTENDED REFRIGERANT PIPE LENGTHS. R.LINE LOSS TO BE ADDED TO CAPACITY SCHEDULED.

B. INDOOR UNIT SHALL BE FURNISHED WITH THE FOLLOWING:

1. ELECTRICTRONIC IGNITION PILOT

2. AGA APPROVAL AND RATING

3. 100% SAFETY SHUT-OFF

4. FAN LIMIT CONTROL

5. FAN PRESSURE LOSS DOES NOT INCLUDE COOLING COIL AND FILTER PRESSURE LOSSES. MC SHALL CONSULT MFGR TO OBTAIN A FAN THAT WILL MEET THE TOTAL STATIC PRESSUREOF THE SYSTEM AT MEDIUM SPEED.

6. INDOOR FAN MOTOR RELAYS AND NECESSARY INTERLOCKING CONTROLS FOR OUTDOOR AND INDOOR OPERATION

7. UL LISTED COMPONENTS AND REFRIGERANT.

8. NONFERROUS DRAIN PAN AND CONNECTION.

9. INSULATED CABINET AND BAKED ENAMEL EXTERIOR FINNISH.

C. OUTDOOR UNIT SHALL BE FURNISHED WITH THE FOLLOWING:

1. WEATHERPROOF BAKED ENAMEL HOUSING WITH TOP DISCHARGE.

2. UL LISTED ELECTRICAL IN NEMA ENCLOSURE AND FACTORY WIRED UNITS RATED IN ACCORDANCE WITH AHRI 210, 340.

3. FACTORY ASSEMBLED AND TESTED HERMETIC COMPRESSOR. CONDENSER COIL. CONTROLS, AND CABINET RATED IN ACCORDANCE WITH AHRI STANDARD 210, 340, AND 270.

5. UNITS TO HAVE HIGH/LOW PRESSURE SWITCHES, ANTI-SHORT CYCLING DEVICE AND OVERLOAD PROTECTION.

6. LIQUID/SUCTION LINE SERVICE VALVES.

7. REFRIGERANT TO BE FACTORY TESTED AND CHARGED.

8. UNIT TO OPERATE AT PLUS/MINUS TEN PERCENT (+10%) OF RATED VOLTAGE.

9. SEER NOT LESS THAN 13

10. CONDENSER HAIL GUARDS

D. WARRANTY:

1. FURNACE: 10 YEAR HEAT EXCHANGER WARRANTY, 3 YEAR ON CONTROL BOARD,1 YEAR PARTS AND LABOR.

2. CONDENSING UNIT: 5 YEAR COMPRESSOR,1 YEAR PARTS AND LABOR.

E. DESIGN BASIS: TRANE. ADDITIONAL MFGRS TO BE VERFIED BY MC: CARRIER, YORK

F. REFERENCE SPECIFICATION FOR ADDITIONAL REQUIREMENTS

REMARKS:

1. VERTICAL AHU CONFIGURATION.

2. ECM MOTOR.

3. SIDE OR BOTTOM RETURN AIR DUCT CONNECTION COLLAR.

4. ONE INCH (1") DISPOSABLE FILTER & FILTER RACK. UPON COMPLETION OF THE PROJECT, CLEAN FILTERS SHALL BE INSTALLED.

5. CU WITH LOW AMBIENT COOLING TO 0°F.

6. PROVIDE TWINNING KIT.

SCH2056

HYDRONIC INSULATION SCHEDULE

SYSTEM LOCATION PIPE SIZE INSULATED MATERIAL THICKNESS

CONDUCTIVITY BTU

IN/ (H SF °F)

JACKET

VAPOR

BARRIER

HWS/HWR (105°F TO 200°F) INDOOR

1/2" TO 1-1/4" YES PREFORMED PIPE WRAP 1-1/2" 0.25-0.29 FSK NO

1-1/2" TO 8" YES PREFORMED PIPE WRAP 2" 0.25-0.29 FSK NO

HWS/HWR (105°F TO 200°F) OUTDOOR

1/2" TO 1-1/4" YES ELASTOMERIC WRAP 2" 0.25-0.29 ALUM NO

1-1/2" TO 8" YES ELASTOMERIC WRAP 2-1/2" 0.25-0.29 ALUM NO

CDS/CDR (45°F TO 105°F) GLYCOL FILLED ALL SIZES NO -- -- -- -- --

GENERAL NOTES:

A. REFERENCE SPECIFICATION FOR ADDITIONAL INSULATION REQUIREMENTS. REFERENCE FLOOR PLAN AND DRAWING DETAILS FOR SPECIAL CONDITIONS.

B. JACKET:

ASJ = ALL SERVICE JACKET

FSK = FOIL SCRIM KRAFT

MTL= METAL LAMINATE WITH FACTORY APPLIED ADHESIVE

LMN = FACTORY APPLIED EMBOSSED WHITE LAMINATE

C. INSULATION INSTALLED OUTDOORS SHALL BE PROVIDED WITH A WEATHER PROOF JACKET.

D. CHEMICAL TREATMENT PIPING AND MAKE UP WATER PIPING SHALL BE INSULATED TO MATCH THE SYSTEM INSULATION REQUIREMENTS HEREIN.

E. HYDRONIC SPECIALITIES, TANKS, AND EQUIPMENT ARE TO BE INSULATED TO MATCH THE SYSTEM INSULATION REQUIREMENTS HEREIN.

G. REFERENCE SPECIFICATION FOR ADDITIONAL REQUIREMENTS

REMARKS:

1. XXX

SCH2041

DUCT SILENCER SCHEDULE

MARK

BASIS OF

DESIGN

SYSTEM TYPE

FACE DIMENSIONS

(W X H)

OVERALL

LENGTH

CFM VELOCITY FPM PD

INSERTION LOSS (OCTAVE BAND) dB

REMARKS

63 Hz 125 Hz 250 Hz 500 Hz 1000 Hz 2000 Hz 4000 Hz 8000 Hz

ST-2 S SUPPLY AIR RECT 48"X16" 36 INCH 8000 1500 0.82 5 9 15 30 37 35 27 17 ALL

GENERAL NOTES:

A. DESIGN BASIS: IAC ACOUSTICS. ADDITIONAL MFGRS TO BE VERFIED BY MC: PRICE, RUSKIN

REMARKS:

1. RECTANGULAR INLET, RECTANGULAR OUTLET DUCT CONNECTIONS.

2. 22 GAUGE GALVANIZED SHEET METAL CASING WITH MASTIC FILLED SEAMS.

4. FIELD VERIFY HEIGHT AND FIT IN SHOP DRAWINGS COORDINATION PRIOR TO ORDERING SILENCERS.

5. RECTANGULAR DUCT FLANGE CONNECTIONS.

SCH2021

AIR DISTRIBUTION SCHEDULE

MARK

NECK / NOMINAL

SIZE

FACE SIZE CFM RANGE

MAX PD

(IN WG)

NOISE LEVEL

(NC / FPM)

STYLE MFR / MODEL

S-1 6"Ø

24" X 24"

0-99 H: 0.24

V: 0.043

H: --

V: NC-16

4 CONE PRICE / SCDA

S-2 8"Ø 100-249 H: 0.063

V: 0.104

H: NC-17

V: NC-27

S-3 10"Ø 250-399 H: 0.075

V: 0.122

H: NC-20

V: NC-29

S-4 12"Ø 400-599 H: 0.086

V: 0.141

H: NC-22

V: NC-31

S-5 14"Ø 600-899 H: 0.128

V: 0.209

H: NC-28

V: NC-35

R-1 / E-1 10"Ø 12" X 12" 0-300 0.013 300

CEILING EGG CRATE

WITH FRAME

PRICE / 80

SERIES

R-2 / E-2 12"Ø 24" X 12" 301-500 0.013 300

R-3 / E-3 14"Ø 24" X 24" 501-1000 0.013 300

R-4 / E-4 16"Ø TO 18"Ø 24" X 48" 1001-2000 0.013 300

R-5 / E-5 10" X 6" 10" X 6" 0-99 0.035 300

FIXED BLADE

45 DEG.

DEFLECTION 3/4"

BLADE SPACING

PRICE / 630

SERIES

R-6 / E-6 16" X 8" 16" X 8" 100-249 0.035 300

R-7 / E-7 18" X 12" 18" X 12" 250-399 0.035 300

R-8 / E-8 28" X 14" 28" X 14" 400-599 0.035 300

R-9 / E-9 40" X 18" 40" X 18" 1000-2000 0.062 400

GENERAL NOTES:

A. MANUFACTURER AND MODEL NUMBER LISTED IS BASIS OF DESIGN. PROVIDE PRODUCT WITH EQUAL PERFORMANCE AND SIZE.

B. COORDINATE MOUNTING TYPE WITH CEILING PLANS PRIOR TO ORDERING; REFER TO ARCHITECTURAL DRAWINGS.

C. ALL TYPES AND SIZES MAY NOT APPLY.

D. SYMBOL INDICATED ON DRAWING MAY NOT DEPICT ACTUAL SIZE; GRAPHICS MAY BE SHOWN LARGER FOR CLARITY ONLY.

E. NOISE LEVEL: "H" DENOTES DATA WITH HORIZONTAL THROW PATTERN. "V" DENOTES DATA WITH VERTICAL THROW PATTERN.

F. MANUFACTURERS: NAILOR, TITUS, TUTTLE & BAILEY, PRICE.

DIFFUSERS:

F. WHITE BAKED ENAMEL FINISH.

G. OPPOSED BLADE DAMPER ADJUSTABLE THROUGH THE FACE OF OUTLET.

H. SLOT DIFFUSERS MAY REQUIRE FIELD FABRICATED PLENUMS TO FIT; REFERENCE FLOOR PLAN FOR KEY NOTES WHERE FACTORY OR FIELD PLENUMS

ARE REQUIRED.

I. PROVIDE INSULATION BACKING FOR DIFFUSERS; INSULATION R-VALUE TO MATCH SYSTEM TYPE ON INSULATION SCHEDULE.

RETURN/EXHAUST AIR:

J. ALL GRILLES TO BE FURNISHED WITH BORDER/FRAME.

K. ALL GRILLES TO BE STEEL CONSTRUCTION, WHITE BAKED ENAMEL FINISH, WITH 1/2" X 1/2" EGG-CRATE GRID SPACING & 45 DEGREE DEFLECTION.

SCH2020

ME020

MECHANICAL SCHEDULES10/10/2025

10/10/2025

CONDENSATE DRAIN DETAIL

SCALE: NONE

UNION CLEANOUT:

FOR PVC CD, USE DIVERSITECH A/C EASY TEE

FOR COPPER CD, USE THREADED CAP;

REFER TO PIPE MATERIAL SCHEDULE FOR MATERIAL

TYPES ALLOWED ON EACH SYSTEM

FULL SIZE OF DRAIN

CONNECTION

PLUMBING HUB DRAIN; REFER

TO PLUMBING DRAWINGS FOR

LOCATION

MIN. 2" AIR

GAP

P-TRAP

2 IN. MIN.

COOLING COIL DRAIN

PAN

NOTE:

MC TO FURNISH ONE PORTABLE DRAIN GUN WITH TAPERED

FITTING TEE ON 3/8" TO 3/4" DRAIN OPENING. INCLUDE TWO

CO2 CARTRIDGES FOR EACH CONDENSATE TRAP ON

PROJECT.

2 IN. MIN.

DTL2083

1/8" SLOPE PER 12"

RETURN

SUPPLY

W

OG

C O

IL

WSHP HOSE KIT DETAIL

SCALE: NONE

FULL PORT BALL

VALVE WITH

MEMORY STOP

Y STRAINER WITH BLOW DOWN

VALVE WITH HOSE CONNECTION

REFER TO

SPECIFICATIONS FOR

PIPING MATERIAL

FSWT

UNION

FSWT

UNION

2 WAY AUTOMATIC

TEMPERATURE

CONTROL VALVE (60

PSIG CLOSE OFF

PRESSURE)

TEMPERATURE AND

PRESSURE GAUGE

WELLS (TYPICAL)

MEASURFLO WITH

TEMPERATURE AND

PRESSURE GAUGE

WELLS

DTL2186

DETAIL "A"

DETAIL "A"

REFRIGERANT LINE/CONDUIT PIPE PORTAL CURB DETAIL

SCALE: NONE

ABS PIPE PORTAL

COVER

GASKETED FASTENERS

MINIMUM TWO PER SIDE

STAINLESS CLAMP

FASTENERS

APPROXIMATELY 8"

O.C.

PIPE PORTAL

CURB BY M.C.

RIGID INSULATION

ROOF SHEATHING

WOOD FRAMING

LOOSE BATT

INSULATION

SUPPORT PIPES FROM STRUCTURE

PIPE PORTAL CAP

WATER CUT-OFF

MASTIC

FASTEN PER

ARCHITECTS

REQUIREMENTS

SINGLE PLY ROOF

MEMBRANE

LAP SEALANT

HOT AIR WELD

BONDING ADHESIVE

BASE MEMBRANE ATTACHMENT

REQUIRED FOR ROOF SYSTEM

ROOFING CONTRACTOR TO FLASH

AND COUNTERFLASH ALL ROOF

PENETRATIONS; COORDINATE

WITH G.C PRIOR TO SUBMITTING

BID

SNAP CAP

TO LOCK

NOTE:

MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL PIPE CURB; SIMILAR TO

PORTALS PLUS PIPE CURB OR EQUAL. COORDINATE SIZE OF CURB WITH ELECTRICAL

CONTRACTOR SO AS TO PROVIDE ADEQUATE CLEARANCE FOR REFRIGERANT LINES

AND CONDUIT.

DTL2124

FINISHED FLOOR

FURNACE

COOLING

COIL

VERTICAL GAS FURNACE WITH COOLING COIL DETAIL

SCALE: NONE

EXTEND REFRIGERANT LINES

AND CONNECT TO

CONDENSING UNIT COIL ON

ROOF

COOLING COIL

CONDENSATE DRAIN TRAP

CONDENSATE DRAIN

LINE; SPILL TO EXISTING

FLOOR DRAIN IN ROOM

1" THICK

NEOPRENE

VIBRATION

ISOLATORS

SUPPLY AIR DUCT;

PROVIDE TRANSITION

FROM UNIT TO DUCT SIZE

ON FLOOR PLANS

NEOPRENE FLEXIBLE

CONNECTOR

FLUE AND VENT;

TERMINATE WITH

CONCENTRIC VENT

KIT AT ROOF. REFER

TO VENT DETAIL

HORIZONTAL FILTER

HOUSING WITH RACK AND

DOOR GASKETS MCDANIELS

OR EQUAL

DTL2109

BLOWER

ACCESS

SUPPLY

AIR

VERTICAL WATER SOURCE HEAT PUMP DETAIL

SCALE: NONE

NEOPRENE FLEX

CONNECTION

EXISTING HOUSEKEEPING

PAD. INCREASE EXISTING

PAD DIMENSIONS TO BE 3"

LARGER THAN NEW UNIT,

ON ALL SIDES.

ELECTRICAL

CONNECTION

COMPRESSOR / CONTROL

ACCESS

CONDENSATE DRAIN LINE

CONNECTION. WITH

P-TRAP REFER TO FLOOR

PLAN FOR DRAIN LINE

ROUTING ISOLATOR

RETURN AIR PLENUM OR

DUCTWORK

FILTER HOUSING WITH

RACK AND DOOR GASKETS

"MCDANIEL ACG" OR

EQUAL

FLOAT SWITCH

AUXILIARY DRAIN PAN

SUPPLY/RETURN HOSE KIT

WITH SHUT-OFF VALVES

SW/RW

DTL2106

TWINNED FURNACE WITH COOLING COIL DETAIL

SCALE: NONE

TOP

SIDE

BOTTOM

FRONT

2'-10

2'-0

2'-01

2'-41

1'-11 4"

1'-8

1 12 2

4 4

3 3

1 1

2 2

0'-11

0'-1 4"

1'-63

1'-2 " 1'-01

FURNACE DRAIN

0'-43

1. FURNACE

2. COOLING COIL

3. RETURN OPENING

4. FLUE IN / OUT

5. REFRIGERANT LINE CONNECTIONS

6. COOLING COIL DRAIN

7. FURNACE DRAIN

INSTALLED WEIGHT: 160 LBS. FURNACE

65 LBS. COOLING COIL

FURNACE

COOLING COIL

TOP / BOTTOM

SIDE FRONT

2'-01

2'-2

1'-73 " 1'-103

1'-91

2'-0 2"

FURNACE / COOLING COIL

TWINNED CONFIGURATION

FURNACE

COOLING

COIL

CONDENSATE DRAIN

LINE; SPILL TO

EXISTING FLOOR

DRAIN IN ROOM

(AC-2)

AIR CONDITIONING UNIT AC-2 DETAIL

SCALE: NONE

6'-2

1'-6"

2'-0"

3'-0"

2'-0"

2'-7 2"

0'-1"

5'-8"

2'-3

0'-2 2"

0'-4 4"

1'-0

1'-11 2"

1-1/2" WATER OUT

3/4" DRAIN

1-1/2" WATER IN

1. TOP OPENINGS 15-5/8" X 15-7/8"

2. RETURN OPENING 74-1/2" X 38-7/8"

3. CONTROL PANEL

2'-71 " 1'-63

0'-11

EXISTING HOUSEKEEPING

PAD. INCREASE EXISTING

PAD DIMENSIONS TO BE 3"

LARGER THAN NEW UNIT,

ON ALL SIDES.

MASONRY WALL RA GRILLE INSTALLATION DETAIL

SCALE: NONE

EXISTING SPLIT FACE

MASONRY BLOCK

WALL

2" X 8" X 3

16" WALL WELDED TUBE

STEEL TO FRAME OPENING.

PAINT TO MATCH LOBBY DOOR /

WINDOW FRAMES

RIGID RECTANGULAR DUCT.

RA GRILL SHALL BE MOUNTED

TO TUBE STEEL FRAME USING

SCREW FASTENERS.

PAINT TO MATCH LOBBY DOOR

/ WINDOW FRAMES

BOTTOM COURSE OF

MASONRY BLOCK

WALL SHALL REMAIN

EXISTING SLAB FLOOR

1" INTERNAL LINER WITH

ANTI-MICROBIAL COATING

PROVIDE PLASTIC OR STEEL

BLOCKING TO SUPPORT

FREE END OF DUCT

90 DEGREE MITRED ELBOW WITH

TURNING VANES

NOTE:

MASONRY BLOCK WALL SHALL BE CUT TO PRECISE WELDED FRAME SIZE. NO SAW

OVER CUTTING ON CORRIDOR SIDE OF WALL IS ALLOWED. FRAME SHALL BE

INSTALLED WITH 1/16" TOLERANCE CLEARANCE.

INSTALLATION SHALL BE OF SIMILAR APPEARANCE TO TRANSFER GRILLE INSTALLED

BELOW THE WINDOW IN THE LOBBY.

PAINT CUT EDGES OF MASONRY OPENING TO MATCH WALL COLOR.

PROVIDE DUCT STRAP AND

FASTEN TO WALL

FRAME SHALL BE

FASTENED TO MASONRY

BLOCK WALL WITH (5) 1/2"

SLEEVE ANCHORS PER

SIDE

ME030

MECHANICAL DETAILS10/10/2025

10/10/2025

11/15/2025

11/15/2025 hcien Text Box

AC-2

hcien Text Box AC-1,3,4,5,6,7,8,9 existing hose kits and circuit setters remain.

hcien Text Box

CT-1

MSB

FACP PU2-A/B

DWH-1/2

PU1-A/B

B-1/2

CUH-1

CUH-1

IU-X

64"X14" (E) SA

"X

E

"X

E

36"X10" (E

) SA

24"X8" (E

) SA

36"X10" (E

) SA

36"X10" (E

) SA

24"X8" (E

) SA

24"X8" (E

) SA

18"X10" (E) OA

C U

H -1

RHC

4" CDWR

3" CDWS

2" HWS

3" HWR

4" CDWR

3" CDWS

2-1/2" HWS

3" HWR

4" CDWR

3" CDWS

2-1/2" HWS

2-1/2" HWR

2" CDWR

4" CDWS

3" HWS

1" HWR

2" CDWR

4" CDWS

3" HWS

1" HWR

2" CDWR

4" CDWS

3" HWS

3/4" HWR

3/4" HWS/R

4" CDWR

1-1/4" HWS

3" HWR

3" CDWR

3" CDWS

2" HWS

2" HWR

CDW

R CDW

S

HW

S HW

RCDW

R

CDW

S

HW

S

HW

R

C D

W R

C D

W

SH

W S

H W

R

CDWR

CDWS

HWS

HWR

C D

W R

C D

W

SH

W S

H W

R

CDWR

CDWS HWS

HWR

C D

W R H W

S H

W R

CDWR HWS

HWR

2-1/2" CDWS/R UP

1" HWS/R UP

2-1/2" CDWS/R UP

2-1/2" HWS/R UP

30X12" (E

18"X12" (E

30X12" (E) SA UP

18"X12" (E) SA UP

36"X12" (E) SA UP (AC-3)

36"X12" (E) SA

"X

(E

S A

"X

(E

S A

S T

ST

12"X10"

(E) OA

"X

(E

S A

15"X10" (E) SA

26"X10" (E) SA

"X

(E

S A

"X

(E

S A

"X

(E

S A

15"X10" (E) SA

15"X10" (E) SA

15"X10" (E) SA

18"X12" (E) SA

12"X12" (E) SA

15"X10" (E) SA

46"X16" SA UP

(AC-2)

HOOD MUA

HOOD MUA HOOD EXHAUST

HOOD

EXHAUST

UP TO EF-1

HOOD MUA

10"x10" (E

) SA

(E) OAL

30"X12"

525 CFM

(E) OAL

54"X12"

975 CFM

ROOM IS A RETURN

AIR PLENUM

ROOM IS A RETURN

AIR PLENUM

ROOM IS A RETURN

AIR PLENUM

ROOM IS A RETURN

AIR PLENUM

30"X42" OAL

2,800 CFM

18"X18" (E) OA

10"X12" (E) OA TO AC-6

8"X12" (E) OA TO AC-7

25"X12" RA UP

(AC-2)

24"X24" OAL

2,110 CFM

FCU

FCU

FTR FTR

16"X12" EA UP

HOOD MUA

HOOD EA

AC-6

AC-7

AC-9

CT-1

VF-1

FAN COIL

PU-4A

(SERVES VF-1)

T

T

T

T

AC-1

AC-6

AC-7

AC-5

64"X18" SA

64"X14" SA

EF-4

ESA

ESA

ESA

ESA

ESA

ESA

ESA

ESA

ESA

ESA

ESA

ESA

534 ESA

ERA

1200 ERA

ESA

ESA

ESA

ESA

ESA

ESA

ESA

ESA

ESA

ESA

ESA

ESA

ESA

ESA

ESA

ESA

EEA

EEA

EEA

EEA

ESA

ESA

ESA

ESA

ESA

ESA

ESA

ESA

ESA

ESA

ESA

ESA

M

M M

M

T

T

T

AC-1 TCCP

Ds

T

T

T

T

AC-2

RHC

BAS-1

HPWLS, HHWS, & VF-1

TCCP'S

AC-9

TCCP

AC-5

TCCP

AC-6 TCCP

AC-7 TCCP

M

M

1 1

1. EXISTING EQUIPMENT TO BE REMOVED. PERFORM PRE-TEST ON EQUIPMENT PRIOR TO

REMOVAL. MEASURE AIR FLOW AND STATIC PRESSURES ON THE UNIT (OA, SA, RA)

2. EXISTING THERMOSTAT TO BE REMOVED AND REPLACED WITH NEW. EXISTING BACKBOX,

CONDUIT, AND RACEWAYS SHALL REMAIN UNLESS NOTED OTHERWISE. (TYPICAL)

3. HALF-TONE INDICATES EXISTING TO REMAIN. (TYPICAL)

4. REMOVE TO EXTENT SHOWN. (TYPICAL)

5. SOUND TRAP TO BE REMOVED AND REPLACED WITH NEW.

6. CUT PIPING FOR REMOVAL OF UNIT. PREPARE PIPES FOR RECONNECTION.

7. EXISTING TEMPERATURE CONTROL PANEL (TCCP), BACKPLATE, WIRING, CONDUIT, AND

RELAYS TO BE REMOVED AND REPLACED WITH NEW. EXISTING 120V POWER SHALL REMAIN.

8. MC SHALL REMOVE EXISTING MANUAL / MOTORIZED DAMPER AND REPLACE WITH NEW.

9. EXISTING SYSTEM SHALL BE TESTED AND REPORT SUBMITTED FOR TOTAL BUILDING AIR

BALANCE STUDY.

10. EXISTING DUCT SMOKE DETECTOR TO BE REMOVED AND REPLACED WITH NEW.

11. NOT USED.

12. EXISTING FRONT END BAS SYSTEM SHALL BE REMOVED COMPLETE. EXISTING 120V POWER

SUPPLY TO REMAIN AND BE REUSED. NOT USED.

13. MC SHALL REMOVE EXISTING MANUAL / MOTORIZED DAMPER COMPLETE. CONDUIT, WIRING, BACK-BOX AND POWER SHALL BE REMOVED BACK TO TCCP AND/OR POWER PANEL.

14. REMOVE ABANDONED PIPING BACK TO MAIN AND CAP.

15. EXISTING RACEWAY TO BE ABANDONED IN PLACE.

16. TCC SHALL REMOVE EXISTING CONTROL WIRING WHERE INIDICATED.

17. TCC SHALL INSTALL NEW WIRELESS THERMOSTAT IN EXISTING LOCATION.

18. NOT USED.

19. THE MC SHALL REMOVE AND INTALL NEW TCC FURNISHED MOTORIZED CONTROL VALVES FOR

HEATING COIL. THE TCC SHALL COORDINATE WITH THE EC WHERE CONDUIT AND BACK

BOXES ARE REQUIRED. THE TCC SHALL INTEGRATE THE HEATING COIL EQUIPMENT INTO THE

BAS. REFER TO THE CONTROLS DRAWINGS.

20. EXISTING SCREWS ATTACHING OA DUCT TO AHU SHALL BE REMOVED. MC SHALL INSTALL

FLOOR MOUNTED DUCT SUPPORT OR SUSPEND FROM STRUCTURE ABOVE. LATERAL

BRACING SHALL BE PROVIDED TO PREVENT SWAYING. REFER TO SPECIFCATIONS.

21. CAP EXISTING DUCT / PIPE.

22. PROVIDE NEW EQUIPMENT. REFER TO DETAILS.

23. INDICATES MANUFACTURER REQUIRED SERVICE CLEARANCE. MC SHALL INSTALL EQUIPMENT

TO MEET MANUFACTURER REQUIRED SERVICE CLEARANCE. (TYPICAL)

24. SUPPORT WITH RUBBER BLOCKS AND CHANNEL SUPPORTS, DURABLOK OR EQUAL.

SUPPORTS SHALL BE INSTALLED AT EVERY 6'-0" AND AT EACH CHANGE IN DIRECTION.

25. NOT USED.

26. NEW SOUND TRAP. REFER TO SCHEDULE.

27. PROVIDE COPPER CONDENSATE TRAP AND EXTEND CONDENSATE DRAIN PIPE AND SPILL TO

EXISTING FLOOR DRAIN. REFER TO CONDENSATE TRAP DETAIL. (TYPICAL)

28. EXTEND SW / RW TO WSHP AND CONNECT WITH HOSE KIT. REFER TO WSHP HOSE KIT DETAIL.

(TYPICAL)

29. CONNECT WSHP SUPPLY CONNECTION TO DUCT MAIN WITH BEVELED TAP.

30. INSTALL NEW 24V LOW LEAKAGE (GASKETED) MOTOR OPERATED DAMPER AND MANUAL

BALANCING DAMPER. CONNECT DAMPER TO UNIT CONTROLLER.

31. TCC TO REMOVE AND REPLACE EXISTING THERMOSTAT WITH NEW. PROVIDE NEW WIRING

FOR BAS CONTROL.. (TYPICAL)

32. PROVIDE NEW TCCP AND CONTROLS COMPONENTS FOR INTEGRATION INTO NEW BAS

SYSTEM. REFER TO CONTROL DIAGRAMS.

33. MC SHALL INSTALL NEW DUCT MOUNTED SMOKE DETECTOR, FURNISHED BY EC.

34. ALL NEW SA/RA DUCT SHALL BE INSULATED. REFER TO DUCT INSULATION SCHEDULE FOR

REQUIREMENTS.

35. INTEGRATE INTO EXISTING KENTUCKY STATE PARKS CLOUD BASED SERVER. PROVIDE NEW

BACNET ROUTER.

HVAC KEY NOTES:

ELECTRICAL KEY NOTES:

1. DISCONNECT EXISTING 120V CIRCUIT SERVING EXISTING TEMPERATURE CONTROLS

PANEL/EQUIPMENT SCHEDULED TO BE REMOVED. INTERECEPT AND EXTEND EXISTING

CIRCUIT AS REQUIRED AND TERMINATE TO NEW PANEL/EQUIPMENT. WHERE EXISTING 120V

IS NOT AVAILABLE, EXTEND TO NEAREST 120V CIRCUIT - PRIOR TO CONNECTING TO

EXISTING CIRCUIT, ELECTRICAL CONTRACTOR SHALL MEASURE EXISTING CIRCUIT LOAD

TO VERIFY THE ADDITIONAL LOAD WILL NOT EXCEED 15A CONNECTED.

2. REMOVE EXISTING CONDUIT AND WIRING SERVING EQUIPMENT BEING REPLACED

COMPLETELY BACK TO SOURCE.

3. PROVIDE NEW FEEDER (3) #2 PHASE CONDUCTORS, (1) #6 GROUND, IN 1-1/4” CONDUIT

FROM NEW CIRCUIT BREAKER IN THE SWITCHBOARD 'MSB' LOCATED IN MECHANICAL ROOM

G19 TO NEW DISCONNECT SWITCH SERVING AC-2 AND FROM DISCONNECT SWITCH TO NEW

AC-2 UNIT. FINAL CONNECTION TO THE UNIT SHALL BE FLEXIBLE CONDUIT FOR REDUCED

VIBRATION. CONTRACTOR SHALL FIELD VERIFY BEST ROUTING PATH FOR FEEDER PRIOR

TO BID. RE-WORK EXISTING CEILINGS AS NEEDED TO INSTALL FEEDER.

4. EXISTING CIRCUIT BREAKER PREVIOUSLY SERVING AC-2 IN PANEL ‘KDP 2’ SHALL BE

TURNED OFF AND SHALL BE RE-LABELED AS “SPARE”.

5. PROVIDE NEW 110A/3P HACR TYPE CIRCUIT BREAKER IN EXISTING SQUARE D, QED

SWITCHBOARD 'MSB'. NEW CIRCUIT BREAKER SHALL BE COMPATIBLE WITH THE EXISTING

EQUIPMENT. KAIC RATING SHALL MATCH EXISTING.

6. REMOVE EXISTING DISCONNECT SWITCH SERVING HVAC UNIT BEING REPLACED.

7. EC SHALL INSTALL MC FURNISHED VFD. FIELD VERIFY BEST MOUNTING LOCATION.

DISCONNECT SWITCH SHALL BE INSTALLED IN AN ACCESSIBLE LOCATION AND WITHIN LINE

OF SIGHT OF THE UNIT. NEC CLEARANCES SHALL BE MAINTAINED.

8. DISCONNECT DUCT SMOKE DETECTOR AND REMOVE FIRE ALARM CONNECTION REFER TO

NEW WORK PLANS FOR ADDITIONAL REQUIREMENTS. NEW DUCT SMOKE DETECTOR SHALL

BE FURNISHED AND CONNECTED TO THE EXISTING FIRE ALARM SYSTEM BY THE

ELECTRICAL CONTRACTOR. EC SHALL PROVIDE CONDUIT AND WIRING AND ENSURE

COMPATIBILITY WITH EXISTING SYSTEM. ALL WORK SHALL BE PERFORMED BY A NICET

CERTIFIED TECHNICIAN THAT IS APPROVED BY THE EXISTING FIRE ALARM SYSTEM

MANUFACTURER TO WORK ON THEIR SYSTEM. DUCT SMOKE DETECTOR SHALL ALARM AND

SHUT-DOWN UNIT UPON DETECTION OF SMOKE. COORDINATE INSTALLATION OF DUCT

SMOKE DETECTOR AND ASSOCIATED WORK AMONGST TRADES PRIOR TO START OF WORK.

NOTE: SOME NOTES DO NOT APPLY TO THIS SHEET AND ARE NOT USED.

T

PTAC

PTAC

EXISTING

RACEWAY

EXISTING

WIRING

EXISTING

ACCESS

PANEL

WIRING FROM

ADJACENT

GUEST ROOM

WIRING TO

ADJACENT

GUEST ROOM

17 16

A. PROVIDE NEW TCCP AND CONTROLS COMPONENTS FOR WOODLAND

BUSINESS BUILDING FAN COIL UNITS (QTY 2) AND ERV UNIT (QTY 1) (UNITS

ADDED UNDER A SEPARATE CONTRACT). DISCONNECT EXISTING 120V

CIRCUIT SERVING EXISTING TEMPERATURE CONTROLS PANEL/EQUIPMENT

SCHEDULED TO BE REMOVED. INTERECEPT AND EXTEND EXISTING CIRCUIT

AS REQUIRED AND TERMINATE TO NEW PANEL/EQUIPMENT. WHERE EXISTING

120V IS NOT AVAILABLE, EXTEND TO NEAREST 120V CIRCUIT - PRIOR TO

CONNECTING TO EXISTING CIRCUIT, ELECTRICAL CONTRACTOR SHALL

MEASURE EXISTING CIRCUIT LOAD TO VERIFY THE ADDITIONAL LOAD WILL

NOT EXCEED 15A CONNECTED.

WOODLAND BUSINESS BLDG NOTES:

KEYPLAN

CONFERENCE CENTER

MAIN LODGE

WOOD WING GUEST BUILDING

(NOT SHOWN IN PLANS)

G U

E S

T R

M S

GUEST RMS

G U

ES

T

R M

S

WOODLAND BUSINESS BUILDING

(NOT SHOWN IN PLANS)

SCALE: 1/8" = 1'-0"

NORTH

ME100

ML

MAIN LODGE BASEMENT FLOOR PLAN - MECH & ELEC

SCALE: 1/4" = 1'-0"

COUNT INCLUDES MAIN LODGE (SHOWN) AND

WOOD WING GUEST BUILDING (NOT SHOWN)

10/10/2025

10/10/2025

11/15/2025

11/15/2025 hcien Callout Inspect existing Control Valve. Replace as necessary for proper control should valve be in disrepair.

hcien Text Box hcien Text Box hcien Text Box hcien Text Box hcien Callout Temp and Humidity Sensors Only. BAS Front end should monitor and have graphic for each lodge room.

hcien Callout 33 Rooms in Wood Wing hcien Callout Above Ceiling hcien Callout New IT Room and location of ALC Main Server hcien Rectangle hcien Callout Mount Condenser for Mini-Split on outside wall provided with decorative cover.

Electrical Circuit shall be ran and held tight on outside wall of Cooling Tower Room, and fed through existing sleeves. Circuit shall fed from nearby electrical Switchboard MSB. Provide a 208V 30A/2P Breaker hcien Arrow hcien Line hcien Line hcien Line hcien Ellipse hcien Text Box hcien Text Box

AC-4

CU FOR

WALK-INS

COOL/FREEZ

EF-1

CU-X

CUH-1

CUH-1

CUH-1

CUH-1

CU-3

CU-2

CU-1

WFC-2

WFC-1

WFC-2

WFC-3

16"X36" (E

46"X16" (E

24"X18" (E) SA

36"X24" (E)

T

T T

T

2-1/2" CDWS/R DOWN

1" HWS/R DOWN

46"X26" (E

12"x12" (E ) O

A TO AC-8

M

M

M

ST

36"X12" (E) SA DOWN

30X12" (E) SA DN

18"X12" (E) SA DN

40"X20" RA OPENING IN SHAFT

FOR RETURN AIR PATH BACK TO

UNIT

T

C D

W R

C D

W S

H W

S H

W R

ROOM IS A RETURN

AIR PLENUM

18"X24" OAL

900 CFM

14"X14" (E) OA DUCT

AC-4

TCCP

FCU

FCU

FTR FTR

T

AC-3 TCCP

AC-3 36"X24"

T

FLAT ROOF

ESA

ESA

ERA

ESA

ESA

M

DS

AC-3

T

AC-3 TCCP

AC-4

TCCP

T T

T

T

19 19

1. EXISTING EQUIPMENT TO BE REMOVED. PERFORM PRE-TEST ON EQUIPMENT PRIOR TO

REMOVAL. MEASURE AIR FLOW AND STATIC PRESSURES ON THE UNIT (OA, SA, RA)

2. EXISTING THERMOSTAT TO BE REMOVED AND REPLACED WITH NEW. EXISTING BACKBOX,

CONDUIT, AND RACEWAYS SHALL REMAIN UNLESS NOTED OTHERWISE. (TYPICAL)

3. HALF-TONE INDICATES EXISTING TO REMAIN. (TYPICAL)

4. REMOVE TO EXTENT SHOWN. (TYPICAL)

5. SOUND TRAP TO BE REMOVED AND REPLACED WITH NEW.

6. CUT PIPING FOR REMOVAL OF UNIT. PREPARE PIPES FOR RECONNECTION.

7. EXISTING TEMPERATURE CONTROL PANEL (TCCP), BACKPLATE, WIRING, CONDUIT, AND

RELAYS TO BE REMOVED AND REPLACED WITH NEW. EXISTING 120V POWER SHALL REMAIN.

8. MC SHALL REMOVE EXISTING MANUAL / MOTORIZED DAMPER AND REPLACE WITH NEW.

9. EXISTING SYSTEM SHALL BE TESTED AND REPORT SUBMITTED FOR TOTAL BUILDING AIR

BALANCE STUDY.

10. EXISTING DUCT SMOKE DETECTOR TO BE REMOVED AND REPLACED WITH NEW.

11. NOT USED.

12. EXISTING FRONT END BAS SYSTEM SHALL BE REMOVED COMPLETE. EXISTING 120V POWER

SUPPLY TO REMAIN AND BE REUSED. NOT USED.

13. MC SHALL REMOVE EXISTING MANUAL / MOTORIZED DAMPER COMPLETE. CONDUIT, WIRING, BACK-BOX AND POWER SHALL BE REMOVED BACK TO TCCP AND/OR POWER PANEL.

14. REMOVE ABANDONED PIPING BACK TO MAIN AND CAP.

15. EXISTING RACEWAY TO BE ABANDONED IN PLACE.

16. TCC SHALL REMOVE EXISTING CONTROL WIRING WHERE INIDICATED.

17. TCC SHALL INSTALL NEW WIRELESS THERMOSTAT IN EXISTING LOCATION.

18. NOT USED.

19. THE MC SHALL REMOVE AND INTALL NEW TCC FURNISHED MOTORIZED CONTROL VALVES FOR

HEATING COIL. THE TCC SHALL COORDINATE WITH THE EC WHERE CONDUIT AND BACK

BOXES ARE REQUIRED. THE TCC SHALL INTEGRATE THE HEATING COIL EQUIPMENT INTO THE

BAS. REFER TO THE CONTROLS DRAWINGS.

20. EXISTING SCREWS ATTACHING OA DUCT TO AHU SHALL BE REMOVED. MC SHALL INSTALL

FLOOR MOUNTED DUCT SUPPORT OR SUSPEND FROM STRUCTURE ABOVE. LATERAL

BRACING SHALL BE PROVIDED TO PREVENT SWAYING. REFER TO SPECIFCATIONS.

21. CAP EXISTING DUCT / PIPE.

22. PROVIDE NEW EQUIPMENT. REFER TO DETAILS.

23. INDICATES MANUFACTURER REQUIRED SERVICE CLEARANCE. MC SHALL INSTALL EQUIPMENT

TO MEET MANUFACTURER REQUIRED SERVICE CLEARANCE. (TYPICAL)

24. SUPPORT WITH RUBBER BLOCKS AND CHANNEL SUPPORTS, DURABLOK OR EQUAL.

SUPPORTS SHALL BE INSTALLED AT EVERY 6'-0" AND AT EACH CHANGE IN DIRECTION.

25. NOT USED.

26. NEW SOUND TRAP. REFER TO SCHEDULE.

27. PROVIDE COPPER CONDENSATE TRAP AND EXTEND CONDENSATE DRAIN PIPE AND SPILL TO

EXISTING FLOOR DRAIN. REFER TO CONDENSATE TRAP DETAIL. (TYPICAL)

28. EXTEND SW / RW TO WSHP AND CONNECT WITH HOSE KIT. REFER TO WSHP HOSE KIT DETAIL.

(TYPICAL)

29. CONNECT WSHP SUPPLY CONNECTION TO DUCT MAIN WITH BEVELED TAP.

30. INSTALL NEW 24V LOW LEAKAGE (GASKETED) MOTOR OPERATED DAMPER AND MANUAL

BALANCING DAMPER. CONNECT DAMPER TO UNIT CONTROLLER.

31. TCC TO REMOVE AND REPLACE EXISTING THERMOSTAT WITH NEW. PROVIDE NEW WIRING

FOR BAS CONTROL.. (TYPICAL)

32. PROVIDE NEW TCCP AND CONTROLS COMPONENTS FOR INTEGRATION INTO NEW BAS

SYSTEM. REFER TO CONTROL DIAGRAMS.

33. MC SHALL INSTALL NEW DUCT MOUNTED SMOKE DETECTOR, FURNISHED BY EC.

34. ALL NEW SA/RA DUCT SHALL BE INSULATED. REFER TO DUCT INSULATION SCHEDULE FOR

REQUIREMENTS.

35. INTEGRATE INTO EXISTING KENTUCKY STATE PARKS CLOUD BASED SERVER. PROVIDE NEW

BACNET ROUTER.

HVAC KEY NOTES:

ELECTRICAL KEY NOTES:

1. DISCONNECT EXISTING 120V CIRCUIT SERVING EXISTING TEMPERATURE CONTROLS

PANEL/EQUIPMENT SCHEDULED TO BE REMOVED. INTERECEPT AND EXTEND EXISTING

CIRCUIT AS REQUIRED AND TERMINATE TO NEW PANEL/EQUIPMENT. WHERE EXISTING 120V

IS NOT AVAILABLE, EXTEND TO NEAREST 120V CIRCUIT - PRIOR TO CONNECTING TO

EXISTING CIRCUIT, ELECTRICAL CONTRACTOR SHALL MEASURE EXISTING CIRCUIT LOAD

TO VERIFY THE ADDITIONAL LOAD WILL NOT EXCEED 15A CONNECTED.

2. REMOVE EXISTING CONDUIT AND WIRING SERVING EQUIPMENT BEING REPLACED

COMPLETELY BACK TO SOURCE.

3. PROVIDE NEW FEEDER (3) #2 PHASE CONDUCTORS, (1) #6 GROUND, IN 1-1/4” CONDUIT

FROM NEW CIRCUIT BREAKER IN THE SWITCHBOARD 'MSB' LOCATED IN MECHANICAL ROOM

G19 TO NEW DISCONNECT SWITCH SERVING AC-2 AND FROM DISCONNECT SWITCH TO NEW

AC-2 UNIT. FINAL CONNECTION TO THE UNIT SHALL BE FLEXIBLE CONDUIT FOR REDUCED

VIBRATION. CONTRACTOR SHALL FIELD VERIFY BEST ROUTING PATH FOR FEEDER PRIOR

TO BID. RE-WORK EXISTING CEILINGS AS NEEDED TO INSTALL FEEDER.

4. EXISTING CIRCUIT BREAKER PREVIOUSLY SERVING AC-2 IN PANEL ‘KDP 2’ SHALL BE

TURNED OFF AND SHALL BE RE-LABELED AS “SPARE”.

5. PROVIDE NEW 110A/3P HACR TYPE CIRCUIT BREAKER IN EXISTING SQUARE D, QED

SWITCHBOARD 'MSB'. NEW CIRCUIT BREAKER SHALL BE COMPATIBLE WITH THE EXISTING

EQUIPMENT. KAIC RATING SHALL MATCH EXISTING.

6. REMOVE EXISTING DISCONNECT SWITCH SERVING HVAC UNIT BEING REPLACED.

7. EC SHALL INSTALL MC FURNISHED VFD.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .