COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-212-25

FOR: Bradley Hall Plumbing Upgrade Morehead Youth Development Center Department of Juvenile Justice Morehead, Kentucky

DATE: April 26, 2025

RFB-785-2500000584

ADDENDUM NO. One (1)

BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING

UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.

Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.

Item 2: Official Bid Date has been moved to May 6, 2025, at 1:30 P.M. Eastern Time

END OF ADDENDUM

Invitation to Bid No. RFB-212-25 For: Bradley Hall Plumbing Upgrade Morehead Youth Development Center Department of Juvenile Justice Morehead, Kentucky

Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration

Commonwealth of Kentucky

Bradley Hall

Plumbing Upgrade 2431-4104-70

DLZ

1950 Haggard Court

Lexington, Kentucky 40505

April 24, 2025

ADDENDUM NO. 1

RE: Commonwealth of Kentucky

Plumbing Upgrade

Project Number: 523-CB7V ARCH DJJ

TO: All Bidders and others to whom Plans and Specifications for the above referenced

Project have been issued.

The items included in this Addendum are to become a part of the original Drawings and Project Manual as if included herein. Only these items are to be altered. The remainder of the original Drawings and Project

Manual remain valid in their entirety.

PROJECT MANUAL

ITEM NO. 1. TOC

a. SECTION 012300 – ALTERNATES deleted from TOC.

ITEM NO. 2. Division 01

a. Section 012300 – Alternates: Section deleted.

DRAWINGS

ITEM NO. 3. AD2.1 – FIRST FLOOR PLAN - REMOVAL

a. Change the existing ceiling in LIBRARY/VISITOR 134 from suspended acoustical to gypsum board.

ITEM NO. 4. A2.2 – SECOND FLOOR PLAN AND REFLECTED CEILING PLAN

a. Modify the configuration of STAFF TOILET 205

ITEM NO. 5. A3.1 – ROOM FINISH, PARTITION & DOOD SCHEDULES

a. Delete GENERAL NOTE “F”.

ITEM NO. 6. PD2.0 – FIRST FLOOR SANITARY & VENT PLUMBING REMOVAL PLAN

a. Modify the required demolition for configuration of new STAFF TOILET 205

ITEM NO. 7. P2.0 – FIRST FLOOR SANITARY & VENT INSTALLATION PLAN

a. Modify the configuration of sanitary piping of STAFF TOILET 205

ITEM NO. 8. P2.1 – DOMESTIC INSTALLATION PLAN

a. Modify the configuration of sanitary and domestic piping to STAFF TOILET 205

b. Modify the piping and configuration of shower in TOILET 217

ITEM NO. 9. P3.1 – OVERALL SANITARY / VENT RISER DIAGRAM

a. Modify the configuration of STAFF TOILET 205

b. Modify the shower configuration in TOILET 217

ITEM NO. 10. P3.2 SANITARY AND VENT RISER DIAGRAM – 2

b. Modify the shower configuration in TOILET 217

ITEM NO. 11. ED2.1 – FIRST FLOOR POWER AND LIGHTING PLAN – REMOVALS

a. Modify work in LIBRARY/VISITOR 134

ITEM NO. 12. E2.1 – FIRST FLOOR POWER AND LIGHTING PLANS – INSTALLATION

a. Modify work in LIBRARY/VISITOR 134

ITEM NO. 13. E2.2– SECOND FLOOR POWER AND LIGHTING PLANS – INSTALLATION

CONTRACTOR QUESTIONS

1. First floor Removal. There are a couple locations that show can lights as (ETR).

ANSWER – The (ETR) is a reference to the lighting control station within each room and not the lighting fixtures. The lighting fixtures are covered by the Keynote #022608.

2. Second Floor Plan is calling for a replacement of the can light for a 2x2 troffer

ANSWER – Correct, the existing can lights are being replaced.

3. That would be understandable, except that the notes provided say to re-install existing fixtures (260508) and to provide new lighting (260507).

ANSWER – Keynote #260508 should be revised as follows “Re-install new ceiling lighting fixtures in the approximate same location as removed lighting fixtures, control as indicated

ATTACHMENTS:

PROJECT MANUAL

1. NO ITEMS

DRAWINGS

1. AD2.1 – FIRST FLOOR REMOVAL PLAN AND REFLECTED CEILING PLAN

2. A2.2 – SECOND FLOOR PLAN AND REFLECTED CEILING PLAN

3. A3.1 – ROOM FINISH, PARTITION & DOOD SCHEDULES

4. PD2.0 – FIRST FLOOR SANITARY & VENT PLUMBING REMOVAL PLAN

5. P2.0 – FIRST FLOOR SANITARY & VENT INSTALLATION PLAN

6. P2.1 – DOMESTIC INSTALLATION PLAN

7. P3.1 – SANITARY AND VENT RISER DIAGRAM – 1

8. P3.2 – SANITARY AND VENT RISER DIAGRAM – 2

9. M2.1 – MECHANICAL DUCTWORK PLAN

10. ED2.1 – FIRST FLOOR POWER AND LIGHTING PLAN – REMOVALS

11. E2.1 – FIRST FLOOR POWER AND LIGHTING PLANS – INSTALLATION

12. E2.2– SECOND FLOOR POWER AND LIGHTING PLANS – INSTALLATION

END OF ADDENDUM No. 1