Addendum One.pdf
PDF 79 KB Posted
- Solicitation number
- RFB-785-2500000584-3
- Issued by
- Oldham County, Kentucky
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_RFB_785_2500000584_3_SO_FORM.PDF | ||
| Final_RFB_785_2500000584_2_SO_FORM.PDF | ||
| Final_RFB_785_2500000584_1_SO_FORM.PDF | ||
| Addendum Two .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-212-25
FOR: Bradley Hall Plumbing Upgrade Morehead Youth Development Center Department of Juvenile Justice Morehead, Kentucky
DATE: April 26, 2025
RFB-785-2500000584
ADDENDUM NO. One (1)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.
Item 2: Official Bid Date has been moved to May 6, 2025, at 1:30 P.M. Eastern Time
END OF ADDENDUM
Invitation to Bid No. RFB-212-25 For: Bradley Hall Plumbing Upgrade Morehead Youth Development Center Department of Juvenile Justice Morehead, Kentucky
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
Commonwealth of Kentucky
Bradley Hall
Plumbing Upgrade 2431-4104-70
DLZ
1950 Haggard Court
Lexington, Kentucky 40505
April 24, 2025
ADDENDUM NO. 1
RE: Commonwealth of Kentucky
Plumbing Upgrade
Project Number: 523-CB7V ARCH DJJ
TO: All Bidders and others to whom Plans and Specifications for the above referenced
Project have been issued.
The items included in this Addendum are to become a part of the original Drawings and Project Manual as if included herein. Only these items are to be altered. The remainder of the original Drawings and Project
Manual remain valid in their entirety.
PROJECT MANUAL
ITEM NO. 1. TOC
a. SECTION 012300 – ALTERNATES deleted from TOC.
ITEM NO. 2. Division 01
a. Section 012300 – Alternates: Section deleted.
DRAWINGS
ITEM NO. 3. AD2.1 – FIRST FLOOR PLAN - REMOVAL
a. Change the existing ceiling in LIBRARY/VISITOR 134 from suspended acoustical to gypsum board.
ITEM NO. 4. A2.2 – SECOND FLOOR PLAN AND REFLECTED CEILING PLAN
a. Modify the configuration of STAFF TOILET 205
ITEM NO. 5. A3.1 – ROOM FINISH, PARTITION & DOOD SCHEDULES
a. Delete GENERAL NOTE “F”.
ITEM NO. 6. PD2.0 – FIRST FLOOR SANITARY & VENT PLUMBING REMOVAL PLAN
a. Modify the required demolition for configuration of new STAFF TOILET 205
ITEM NO. 7. P2.0 – FIRST FLOOR SANITARY & VENT INSTALLATION PLAN
a. Modify the configuration of sanitary piping of STAFF TOILET 205
ITEM NO. 8. P2.1 – DOMESTIC INSTALLATION PLAN
a. Modify the configuration of sanitary and domestic piping to STAFF TOILET 205
b. Modify the piping and configuration of shower in TOILET 217
ITEM NO. 9. P3.1 – OVERALL SANITARY / VENT RISER DIAGRAM
a. Modify the configuration of STAFF TOILET 205
b. Modify the shower configuration in TOILET 217
ITEM NO. 10. P3.2 SANITARY AND VENT RISER DIAGRAM – 2
b. Modify the shower configuration in TOILET 217
ITEM NO. 11. ED2.1 – FIRST FLOOR POWER AND LIGHTING PLAN – REMOVALS
a. Modify work in LIBRARY/VISITOR 134
ITEM NO. 12. E2.1 – FIRST FLOOR POWER AND LIGHTING PLANS – INSTALLATION
a. Modify work in LIBRARY/VISITOR 134
ITEM NO. 13. E2.2– SECOND FLOOR POWER AND LIGHTING PLANS – INSTALLATION
CONTRACTOR QUESTIONS
1. First floor Removal. There are a couple locations that show can lights as (ETR).
ANSWER – The (ETR) is a reference to the lighting control station within each room and not the lighting fixtures. The lighting fixtures are covered by the Keynote #022608.
2. Second Floor Plan is calling for a replacement of the can light for a 2x2 troffer
ANSWER – Correct, the existing can lights are being replaced.
3. That would be understandable, except that the notes provided say to re-install existing fixtures (260508) and to provide new lighting (260507).
ANSWER – Keynote #260508 should be revised as follows “Re-install new ceiling lighting fixtures in the approximate same location as removed lighting fixtures, control as indicated
ATTACHMENTS:
PROJECT MANUAL
1. NO ITEMS
DRAWINGS
1. AD2.1 – FIRST FLOOR REMOVAL PLAN AND REFLECTED CEILING PLAN
2. A2.2 – SECOND FLOOR PLAN AND REFLECTED CEILING PLAN
3. A3.1 – ROOM FINISH, PARTITION & DOOD SCHEDULES
4. PD2.0 – FIRST FLOOR SANITARY & VENT PLUMBING REMOVAL PLAN
5. P2.0 – FIRST FLOOR SANITARY & VENT INSTALLATION PLAN
6. P2.1 – DOMESTIC INSTALLATION PLAN
7. P3.1 – SANITARY AND VENT RISER DIAGRAM – 1
8. P3.2 – SANITARY AND VENT RISER DIAGRAM – 2
9. M2.1 – MECHANICAL DUCTWORK PLAN
10. ED2.1 – FIRST FLOOR POWER AND LIGHTING PLAN – REMOVALS
11. E2.1 – FIRST FLOOR POWER AND LIGHTING PLANS – INSTALLATION
12. E2.2– SECOND FLOOR POWER AND LIGHTING PLANS – INSTALLATION
END OF ADDENDUM No. 1