This document is an Addendum to Invitation to Bid No. RFB-35-24 for the John Stafford Phase III AML Project in Pike County, Kentucky, issued by the Commonwealth of Kentucky Department for Facilities and Support Services Division of Engineering and Contract Administration. The Addendum outlines changes to the specifications and drawings, as well as a revised bid schedule. The project involves various site preparation, earthwork, erosion control, and revegetation activities. Key items and quantities include structure removal/replacement (10,000 A.C.U.), silt barrier (400 LF), subdrain (280 LF), and roadway stone (250 TON). The bid is due on a date not specified in the Addendum.
The Revised Bid Schedule provides unit prices and total bid amounts for the various work items. The bid total is $23,009. Certain unit prices may be subject to an Allowable Price Limit (APL) range, and any prices outside that range may require justification. No information is provided regarding pricing terms, set asides, incumbents, funding sources, or any other salient commercial details.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_RFB_785_2400000045_2_SO_FORM.PDF | ||
| Final_RFB_785_2400000045_1_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-35-24
FOR: John Stafford Phase III AML Project Pike County, Kentucky
DATE: August 21, 2023
ADDENDUM NO. One (1)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.
Item 2: Bidders must use Revised Bid Schedule in lieu of previously issued
Item 3: Revised Plans
END OF ADDENDUM
Invitation to Bid No. RFB-35-24 For: John Stafford Phase III AML Project Pike County, Kentucky
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
NO. ITEM M.O.P. UNIT QUANTITY * Low APL UNIT PRICE TOTAL
1 MOBILIZATION L.S. L.S. 1.0 X NA ≤ N/A = 12,500.00$
2 UTILITY RELOCATION/REPLACEMENT A.C.U. A.C.U. 2,000.0 X NA ≤ 1.00$ = 2,000.00$
3 STRUCTURE REMOVAL/REPLACEMENT A.C.U. A.C.U. 10,000.0 X NA ≤ 1.00$ = 10,000.00$
4 SITE PREPARATION U.P. ACRE 0.5 X $750.00 ≤ $ = $
5 SITE PREPARATION- WASTE AREAS U.P. ACRE 0.5 X $750.00 ≤ $ = $
6 CONCRETE- NON-FORMED & NON-FINISHED U.P. CY 20.0 X $100.00 ≤ $ = $
7 SILT BARRIER - BALES & FENCE U.P. LF 400.0 X $1.00 ≤ $ = $
8 HOE RAM U.P. HOUR 40.0 X $60.00 ≤ $ = $
9 EARTHWORK (LUMP SUM) L.S. L.S. 1.0 X $500.00 ≤ $ = $
10 EROSION CONTROL BLANKET- ECB U.P. SY 500.0 X $0.75 ≤ $ = $
11 SUBDRAIN U.P. LF 280.0 X $15.00 ≤ $ = $
12 SUBDRAIN CONCRETE COLLARS U.P. EACH 1.0 X $50.00 ≤ $ = $
13 8" DIA. HDPE PIPE- STANDARD U.P. LF 20.0 X $0.00 ≤ $ = $
14 ROCK DRILLING (12" Dia.) U.P. LF 590.0 X $0.00 ≤ $ = $
15 SCHEDULE 80 PIPE U.P. LF 1,180.0 X $10.00 ≤ $ = $
16 STEEL PANELS U.P. SF 2,320.0 X $10.00 ≤ $ = $
17 SEEDBED PREPARATION U.P. ACRE 1.0 X $75.00 ≤ $ = $
18 AGRICULTURAL LIMESTONE U.P. TON 10.0 X $20.00 ≤ $ = $
19 FERTILIZER U.P. TON 1.0 X $600.00 ≤ $ = $
20 SEED U.P. LBS 80.0 X $4.00 ≤ $ = $
21 MULCH- STRAW & HAY U.P. ACRE 1.0 X $100.00 ≤ $ = $
22 HYDROMULCH & HYDROSEEDING U.P. ACRE 0.5 X $500.00 ≤ $ = $
23 COVER CROP U.P. BUSHEL 1.0 X $10.00 ≤ $ = $
24 ROADWAY STONE U.P. TON 250.0 X $20.00 ≤ $ = $
25 BITUMINOUS REPAIR U.P. TON 175.0 X $90.00 ≤ $ = $
26 BAT MITIGATION FEE U.P. LS 1.0 X $0.00 ≤ N/A = 4,350.00$
BID TOTAL = $
23009AMLBAML JOHN STAFFORD PHASE III (AML) RECLAMATION PROJECT
PIKE COUNTY, KENTUCKY
NOTE: THE AUTHENTICATION OF BID AND STATEMENT OF NON-COLLUSION AND NON-CONFLICT OF INTEREST PAGE MUST BE PROPERLY EXECUTED FOR THE TOTAL BID
AMOUNT TO BE VALID.
* Any Unit Price outside the Allowable Price Limit (APL) range may be considered an unbalanced bid and may have to be justified in writing if such bid is deemed the low responsive bid.
REVISED BID SCHEDULE 8/21/2023
Text
Text
Text
Text
Text
| Addendum One |
| 23009AMLBAML John Stafford Phase III A1 REVISED Bid Schedule |
| 23009AMLBAML John Stafford Phase III A1 Revised Plan Set |
File details come from the government source that posted it. Updated .