Addendum One.pdf
PDF 518 KB Posted
- Attached to
- RFB-255-23 Kewanee Road Slide HP AMLRP
- Solicitation number
- RFB-785-2300000733-2
- Issued by
- Pike County, Kentucky
About this file
This document is an Addendum to an Invitation to Bid (ITB) issued by the Commonwealth of Kentucky Department for Facilities and Support Services Division of Engineering and Contract Administration for the Kewanee Road Slide AML Project in Pike County, Kentucky. The addendum outlines changes to the specifications, drawings, and bid schedule, and extends the bid due date to May 25, 2023 at 10:30 AM Eastern Time. The project involves the construction of an earthen embankment to protect a roadway and rail line, including earthwork, drainage improvements, erosion control, revegetation, and access road repairs. The bid schedule includes 29 line items for various materials, equipment, and labor required to complete the project.
The bid pricing must adhere to Allowable Price Limits set for each item, and the contractor is required to submit an AML Contractor/Subcontractor Information Form with the bid. The contract length is 365 calendar days, and the contractor is responsible for obtaining all necessary permits, except for those specifically listed as being obtained by the agency. The document also includes detailed technical specifications and bid item descriptions for the various work components.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_RFB_785_2300000733_2_SO_FORM.PDF | ||
| Final_RFB_785_2300000733_1_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-255-23
FOR: Kewanee Road Slide
AML Project Pike County, Kentucky
DATE: May 19, 2023
ADDENDUM NO. One (1)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.
Item 2: Official Bid Date changed to May 25, 2023 @ 10:30 A.M. Eastern Time
Item 3: Bidders must use Revised 5/19/2023 Bid Schedule in lieu of previously issued.
END OF ADDENDUM
Invitation to Bid No. RFB-255-23 For: Kewanee Road Slide
AML Project Pike County, Kentucky
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
NO. ITEM M.O.P. UNIT QUANTITY * Low APL UNIT PRICE TOTAL
1 MOBILIZATION L.S. L.S. 1 X NA ≤ NA = 30,000.00$
2 *UTILITY RELOCATION/REPLACEMENT A.C.U. A.C.U. 1 X NA ≤ N/A = 15,000.00$
3 TRAFFIC CONTROL L.S. L.S. 1 X $500.00 ≤ NA = $
4 SITE PREPARATION U.P. ACRE 1.5 X $750.00 ≤ $ = $
5 SITE PREPARATION- WASTE AREAS U.P. ACRE 6 X $500.00 ≤ $ = $
6 GEO-GRID U.P. SY 575 X $2.00 ≤ $ = $
7 CLASS II BACKFILL U.P. TON 325 X $20.00 ≤ $ = $
8 SILT BARRIER - BALES & FENCE U.P. LF 2,100 X $1.00 ≤ $ = $
9 SILT TRAP - TYPE A & B U.P. EACH 1 X $500.00 ≤ $ = $
10 HOE RAM U.P. HOUR 500 X $75.00 ≤ $ = $
11 EARTHWORK (EMBANKMENT BENCHING) L.S. L.S. 1 X $500.00 ≤ N/A = $
12 EARTHWORK (CATCH BASIN) P.Q. CY 5,000 X $2.00 ≤ $ = $
13 EARTHWORK (MEASURED) U.P. CY 20,000 X $5.00 ≤ $ = $
14 EROSION CONTROL BLANKET- ECB U.P. SY 5,140 X $0.75 ≤ $ = $
15 CLASS III U.P. TON 450 X $20.00 ≤ $ = $
16 36" DIA. DWPP PIPE U.P. LF 200 X $60.00 ≤ $ = $
17 CONCRETE HEADWALL- PIPES ≤36" DIA. U.P. EACH 2 X $900.00 ≤ $ = $
18 CONCRETE ELL HEADWALL U.P. EACH 1 X $1,000.00 ≤ $ = $
19 SEEDBED PREPARATION U.P. ACRE 6 X $75.00 ≤ $ = $
20 AGRICULTURAL LIMESTONE U.P. TON 75 X $20.00 ≤ $ = $
21 FERTILIZER U.P. TON 12 X $600.00 ≤ $ = $
22 SEED U.P. LBS 480 X $4.00 ≤ $ = $
23 HYDROMULCH & HYDROSEEDING U.P. ACRE 1.5 X $500.00 ≤ $ = $
24 COVER CROP U.P. BUSHEL 20 X $10.00 ≤ $ = $
25 ROADWAY STONE U.P. TON 300 X $20.00 ≤ $ = $
26 BITUMINOUS REPAIR U.P. TON 325 X $80.00 ≤ $ = $
27 FLOWABLE FILL U.P. CY 20 X $35.00 ≤ $ = $
28 WOVEN-WIRE FENCE U.P. LF 200 X $15.00 ≤ $ = $
29 16 FOOT GATE U.P. EACH 1 X $300.00 ≤ $ = $
23025AMLBAML KEWANEE ROAD SLIDE HP (AML) RECLAMATION PROJECT
PIKE COUNTY, KENTUCKY
BID SCHEDULE
REVISED 5/19/2023
RFB-255-23
BID TOTAL = $
NOTE: THE AUTHENTICATION OF BID AND STATEMENT OF NON-COLLUSION AND NON-CONFLICT OF INTEREST PAGE MUST BE PROPERLY EXECUTED FOR THE TOTAL
BID AMOUNT TO BE VALID.
* Any Unit Price outside the Allowable Price Limit (APL) range may be considered an unbalanced bid and may have to be justified in writing if such bid is deemed the low responsive bid.
RFB-255-23
Revised 5/10/2023
COR & BID & BMP 1
23025AMLBAML (Kewanee Road Slide) (AML) RECLAMATION PROJECT
PIKE COUNTY, KENTUCKY
Written Location Directions: From downtown Pikeville drive ~3 miles south on Hwy 23 until reaching Paul Davis Drive. Turn right, and drive ~0.25 miles until reaching Kewanee Road.
Turn left, travel 0.4 miles until reaching the site on the right. The coordinates: 37°26'26.00"N
82°31'23.33"W
To reach the off-site waste area (~6.0 acres), continue on Paul Davis Drive until reaching the
Kentucky Enterprise Industrial Park. The waste area is located on a flat area at coordinates
37°25'39.93"N 82°32'0.25"W
Basic Project Description: The proposed project (approximately 1.4 acres) consists construction of an earthen embankment. This will protect the roadway and rail line below. This will be paid for under the Earthwork (Catch Basin) bid item. This embankment will serve as a catch basin for slide material that will continue move downward from the upper part of the watershed. An Earthwork
(Embankment Benching) is included to over excavate and re-compact material the catch basin will be seated on. An earthwork (Measured) is included remove material from the site, and transport and place it in the designated waste area. A 36” DWPP pipe with headwalls will allow surface water to drain from the basin, through the embankment and daylight to a roadside ditch. A gravel
/ excavate rock road will lead to the top of the embankment, to allow the basin to be cleaned during large sliding events. Class III Backfill is included to protect the interior toe of the embankment from erosion. Hoe Ram is setup to excavate bedrock for construction of the basin. Class III bid item is included for a roadside ditch to allow for passage of surface water.
Erosion Control Blanket (ECB) is included to place on graded areas steeper than 3:1 to enhance a promote revegetation effort and limit erosion. A Silt Trap Type A & B is included to prevent erosion material from leaving the site. Silt Fence is included at both the site and waste to prevent erosion material from leave the site.
Site Preparation is setup at both the site and waste area to allow for proper earthwork excavation and placement. Seedbed Prep, Ag Lime, Fertilizer, & Seed is setup for revegetation of the waste area. Hydromulching & Hydroseeding is setup for revegetation of the site area, where the steepness and excavated rock area make this a more feasible method of revegetation. Cover Crop is included for reveg efforts during a winter shut down.
A bituminous bid item is setup to repair “in kind” damage to Kewanee Road, by normal reclamation activities. Roadway stone is included to maintain “in kind” gravel road in and out of the waste area.
Utility Relocation bid item is included to address “in kind” any utilities that may be disturbed by normal reclamation activities.
A woven wire fence and 16-foot gate are included as a security measure at the site after work is completed.
COR & BID & BMP 2
A. STANDARD DOCUMENTS
The AML Standard Details, Technical Specifications, and Bid Item Descriptions are posted on the
Division’s website at https://eec.ky.gov/Natural-Resources/Mining/Abandoned-Mine-
Lands/Pages/default.aspx
Once on the web page, please click “Contractor Information” tab located on the right side. AML standard technical specification and detail are located under this tab. Contractors are strongly encouraged to review the complete AML website for additional information.
B. ALLOWABLE PRICE LIMIT
Allowable Price Limit (APL) is part of the contract documents and is stated on the Bid Schedule. The
Unit Price (UP) / Lump Sum Price (LS) has a low value defined for each item on the Bid Schedule. Any
Unit Price / Lump Sum Price outside this value may be considered an unbalanced bid and may have to be justified in writing if such bid is deemed the low responsive bid. The CONTRACTOR is also cautioned that other considerations for rejection, notwithstanding the APL, may be enforced (e.g.
total bid price being excessively over the ENGINEER’S ESTIMATE).
C. CONTRACT LENGTH
All work shall be completed within THREE HUNDRED SIXTY FIVE (365) calendar days from the effective date of the Award of Contract. Within the bounds of prudent project performance, it shall be the responsibility of the CONTRACTOR to plan and implement construction sequences which follow the intent of these CONTRACT DOCUMENTS, particularly as, reflected in the Drawings and Special
Conditions and to protect any portion of the contract which may be completed before others.
D. CONTRACTOR’S INFORMATION SHEET
The AML CONTRACTOR/SUBCONTRACTOR INFORMATION FORM sheet must be filled out and submitted with the bid. Failure to submit the AML Contractor/SubContractor Information Form sheet with the bid will be the basis for declaring the bid “Non-Responsive”
E. SPECIAL CONDITIONS & PROJECT NOTES
- On occasion, a property owner may require a CONTRACTOR to add them on their General
Liability and/or Automobile Insurance as an “Additional Insured.” AML will inform the
CONTRACTOR when this requirement is being made by the property owner. In these cases, the
CONTRACTOR must submit to AML copies of their certificate of insurance documenting the
“Additional Insured” before they will be allowed to mobilize equipment and forces on to said properties. Any fees, rate increases, or other costs incurred by the CONTRACTOR for this requirement, if any, will be considered incidental to mobilization and as such no compensation will be made by AML. The “Additional Insured” must remain on the CONTRACTOR’s policy(s) for the full length of the contract.
- Add any special conditions, notes, exceptions to standard documents or write “None”.
- Add Bid Item descriptions that are contrary to standards notes.
https://eec.ky.gov/Natural-Resources/Mining/Abandoned-Mine-Lands/Pages/default.aspx https://eec.ky.gov/Natural-Resources/Mining/Abandoned-Mine-Lands/Pages/default.aspx
COR & BID & BMP 3
F. PERMITS & FEES – AML will be responsible for obtaining any permits that are checked below.
(check all that apply)
☒KYTC Encroachment Permit
☒KY DOW Water Permits
☒USACE Permit
The CONTRACTOR is responsible for all other permits and/or fees necessary to begin the project.
The CONTRACTOR is advised that on occasion, other permits and/or fees may be required by federal, state, and local government(s). Other types of permits and/or fees are not the responsibility of AML and as such, these will be the complete and total responsibility of the CONTRACTOR to obtain. These must be obtained before AML will allow mobilization of equipment and forces on to said properties. All costs associated with other permits or fees will be the responsibility of the
CONTRACTOR. Please refer to “General Provisions” in the AML Technical Specifications.
COR & BID & BMP 4
BID ITEM DESCRIPTION
23025AMLBAML KEWANEE ROAD SLIDE AML RECLAMATION PROJECT
PIKE COUNTY, KENTUCKY
NO ITEM DESCRIPTION
1. MOBILIZATION This item consists of the mobilization and demobilization of the
CONTRACTOR’S forces and equipment in accordance with the
“Mobilization/Demobilization” AML Standard Technical Specification. The amount of this bid item is not to exceed 5 percent of the bid price sum.
Measurement: Not Applicable.
Payment: Payment shall be made at increments set in the AML Technical
Specifications totaling the Lump Sum price.
2. UTILITY
RELOCATION /
REPLACEMENT
This consists of furnishing all materials, equipment, and labor necessary to replace utilities damaged by construction or relocate any utilities that are in the construction area in accordance with the “Utility Relocation” AML Standard
Technical Specification. The CONTRACTOR is required to supply the
ENGINEER with all documentation to support cost incurred to qualify for reimbursement.
Special Considerations: None
Major Incidentals: These will be listed in writing by the ENGINEER prior to beginning the work.
Measurement: Not Applicable.
Payment: Payment shall be made for Actual Documented Costs for
“UTILITY RELOCATION/REPLACEMENT” approved by the
ENGINEER. The payment shall be a direct reimbursement for actual documented costs to the CONTRACTOR in accordance with the “General
Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, equipment, materials, and incidentals.
3. TRAFFIC CONTROL This item consists of maintaining and controlling traffic on existing roads
(public and private) affected by this project as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Traffic Control” AML
Standard Technical Specification. Appropriate signs shall be erected at the project limits and flag persons shall be used as needed.
Special Considerations: None
Major Incidentals: Signs, flaggers, steel plates, immediately clearing debris from roadway.
Measurement: Not Applicable.
Payment: Payment shall be made at the Lump Sum price bid for “TRAFFIC
CONTROL” in accordance with the “General Provisions” AML Standard
Technical Specification. Such payment shall constitute full compensation for materials, equipment, labor, and incidentals.
COR & BID & BMP 5
4. SITE PREPARATION This item of work shall consist of furnishing all materials, equipment, and labor as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Site Preparation” AML Standard Technical Specification.
Special Considerations: Trees are to be burned on site.
Major Incidentals: Clearing, grubbing, windrowing, burning, pipe removal and disposal, pipe cleanout, temporary diversion ditch construction, domestic debris removal and disposal, concrete & bituminous asphalt debris removal and disposal, access improvement/construction, in-kind fence repair/replacement, and temporary stream diversion.
Measurement: Actual Quantities shall be measured with a handheld GPS and rounded up to the next whole 0.5 acre actually cleared and grubbed (excludes slurry and refuse areas.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “SITE PREPARATION” in accordance with the
“General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and other items necessary to complete the work.
5. SITE
PREPARATION-
WASTE AREAS
This item of work shall consist of furnishing all materials, equipment, and labor as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Site Preparation” AML Standard Technical Specification.
Special Considerations: None
Major Incidentals: Clearing, grubbing, windrowing, burning, pipe removal and disposal, pipe cleanout, temporary diversion ditch construction, domestic debris removal and disposal, access improvement/construction, in-kind fence repair/replacement.
Measurement: Actual Quantities shall be measured with a handheld GPS and rounded up to the next whole 0.5 acre actually cleared and grubbed (excludes slurry and refuse areas).
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “SITE PREPARATION- WASTE AREAS” in accordance with the “General Provisions” AML Standard Technical
Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and other items necessary to complete the work.
COR & BID & BMP 6
6. GEOGRID This item consist of furnishing all materials, equipment, and labor, necessary to install geogrid, including all labor, materials, and accessories as depicted on the
Drawings and as directed by the ENGINEER in accordance with “Geo-grid”
AML Standard Technical Specification. All geo-grid is bi-axial, except for tails behind Non-reinforced Block Walls- Type I.
Special Considerations: None
Inspector Notes: Collect manufacturer certificates for each unit.
Major Incidentals: Staples
Measurement: Actual Quantities shall be measured as the next whole square yard installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “GEOGRID” in accordance with the “General
7. CLASS II BACKFILL This item consists of furnishing all materials, equipment, and labor necessary to place Class II aggregate as depicted on the Drawings and as directed by the
ENGINEER in accordance with the “Crushed Aggregate and Channel Lining”
AML Standard Technical Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) of each type of aggregate installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “CLASS II BACKFILL" in accordance with the
“General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and incidentals.
COR & BID & BMP 7
SILT CONTROL
8. SILT BARRIER–
BALES & FENCE
This item consists of furnishing all materials, equipment, and labor necessary to maintain silt control as depicted on the Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with the “Silt Control” AML
Standard Technical Specification. Hay/straw bales shall be placed with an overlap equal to 0.4 bales per linear foot of silt control fencing. Silt fence shall be trenched and removed at the end of the project. Failure to remove silt control fence (geotextile fabrics) shall result in forfeiture of demobilization.
Special Considerations: None
Major Incidentals: Maintenance, silt fence trenching and removal
Measurement: Actual Quantities shall be measured as the next whole linear foot installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “SILT BARRIER - BALES & FENCE" in accordance with the “General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for materials, equipment, labor, and
9. SILT CONTROL –
TRAP TYPE A & B
This item consist of furnishing all materials, equipment, and labor necessary to maintain silt control as depicted on the Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with “Silt Control” AML
Standard Technical Specifications. When a 3:1 length to width ratio is not possible install baffles or turbidity curtains.
Special Considerations: None
Major Incidentals: Excavation, rock, baffles/turbidity curtains, maintenance
Measurement: Actual Quantities shall be measured as “EACH” unit installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “SILT CONTROL – TRAP TYPE A & B” in accordance with the “General Provisions” AML Standard Technical
Specification. Such payment shall constitute full compensation for materials, equipment, labor, and incidentals.
EARTHWORK
COR & BID & BMP 8
10. HOE RAM This item consist of furnishing all materials, equipment, and labor necessary to accomplish the required excavation of rock utilizing a hoe ram as depicted on the Drawings and as directed by the ENGINEER in accordance with the
“Equipment” AML Standard Technical Specification.
Special Considerations: None
Major Incidentals: Equipment, operator, fuel, maintenance items
Measurement: Actual Quantities shall be measured as the next whole equipment hour when required to construct ditches and other features approved by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “HOE RAM” in accordance with the “General constitute full compensation for materials, equipment, labor and incidentals.
11. EARTHWORK
(EMBANKMENT
BENCHING)
This item consist of furnishing all materials, equipment, and labor necessary for excavation of materials as required to construct walls and other features as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Earthwork” AML Standard Technical Specification.
Special Considerations: Any temporary pipe that may be needed to keep the surface work out of the Earthwork Area(s) will be considered incidental to earthwork efforts.
Major Incidentals: Excavation, transportation, placement, compaction of all excavated materials including rock ditches constructed without hoe ram.
Measurement: Not applicable.
Payment: Payment shall be made at the Lump Sum price bid for
“EARTHWORK (EMBANKMENT BENCHING)” in accordance with the
“General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and other items necessary to complete the work.
COR & BID & BMP 9
12. EARTHWORK
(CATCH BASIN)
This item consist of furnishing all materials, equipment, and labor necessary to accomplish the required excavation of material to the lines and grades as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Earthwork” AML Standard Technical Specification.
Special Considerations: Maximum Compactive Effort. Any temporary pipe that may be needed to keep the surface work out of the Earthwork
Area(s) will be considered incidental to earthwork efforts.
Major Incidentals: Excavation, transportation, placement, compaction of all excavated materials including rock ditches constructed without hoe ram.
Measurement: No measurements will be made unless the ENGINEER significantly revises the dimensions of the work area(s).
Payment: Payment shall be the product of the Plan Quantity Volume and the
Unit Price bid for “EARTHWORK (CATCH BASIN)” in accordance with the “General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and other items necessary to complete the work—this includes all transportation and gradework efforts associated with designated waste areas.
13. EARTHWORK
(MEASURED)
This item consist of furnishing all materials, equipment, and labor necessary to accomplish the required excavation of material to the lines and grades shown as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Earthwork” AML Standard Technical Specification.
Special Considerations: Any temporary pipe that may be needed to keep the surface work out of the Earthwork Area(s) will be considered incidental to earthwork efforts.
Major Incidentals: Excavation, transportation, placement, compaction of all excavated materials including rock ditches constructed without hoe ram.
Measurement: Actual Quantities shall be measured at the Waste Area
(Embankment) as the next whole cubic yard excavated calculated using
"before and after" field-run surveys ONLY.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “EARTHWORK” in accordance with the “General
Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and other items necessary to complete the work; this includes all transportation of excavated materials as required and gradework efforts associated with designated waste areas.
COR & BID & BMP 10
DRAINAGE CONTROL
SURFACE DRAINAGE
14. EROSION
CONTROL
BLANKET-ECB
(BENCHES,
DITCHES, &
SLOPES)
This item consist of furnishing all materials, equipment, and labor necessary to install all types of erosion control blanket (ECB) as depicted on the Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with the “Erosion Control Blanket” AML Standard Technical Specification.
Subgrade preparation shall be incidental. Placement of ECB for slope protection will also be covered by this bid item.
Special Considerations: ENTIRE FACE OF THE EMBANKMENT
CATCH BASIN SHALL RECEIVE EROSION CONTROL BLANKET.
Major Incidentals: Excavation, subgrade preparation
Measurement: Actual Quantities shall be measured as the next whole square yard, including overlaps, installed and approved by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “EROSION CONTROL BLANKET-ECB” in accordance with the “General Provisions” AML Standard Technical
Specification. Such payment shall constitute full compensation full compensation for all labor, materials, equipment, and incidentals.
15. CLASS III
(DITCHES,
ANCHORS, DRAINS,
& BUTTRESSES)
This item consist of furnishing all materials, equipment, and labor necessary to install Class II and Class III rock as depicted on the Drawings, AML Standard
Details, and as directed by the ENGINEER in accordance with “Crushed
Aggregate and Channel Lining” and “Ditches” AML Standard Technical
Specifications. Subgrade preparation shall be incidental. For channels with acid mine drainage DAML will use the current Limestone Sample Results published by the KY Department of Agriculture to determine an effective weight when material is from a source with < 85% calcium carbonate.
Special Considerations: None
Inspector Notes: Collect supplier tickets.
Major Incidentals: Excavation, subgrade preparation
Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) installed and accepted by the
ENGINEER. Material for treating AMD and not meeting the 85% minimum is adjusted by multiplying the weight ticket tons by the ratio of the report %
CaCO3 (as Calcium %) to the 85% minimum, rounded to the nearest ton.
Material exceeding the 85% minimum is not adjusted.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “CLASS III” in accordance with the “General constitute full compensation for all labor, materials, equipment, and incidentals.
COR & BID & BMP 11
16.
36” DIA. DWPP PIPE This item consists of furnishing all materials, equipment, and labor, necessary to install the dual wall polypropylene pipe as depicted on the Drawings, AML
Standard Details, and as directed by the ENGINEER in accordance with the
“Crushed Aggregate and Channel Lining”, “Grout Products”, and “Pipe” AML
Standard Technical Specifications.
Special Considerations: None
Inspector Notes: Collect manufacturer certificates for each unit.
Major Incidentals: Excavation, bedding, aggregate backfill to 1’ over top of pipe, steel plates for access maintenance.
Measurement: Actual Quantities shall be measured as the next whole linear foot installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “DWPP PIPE” in accordance with the “General
17. CONCRETE
HEADWALL- PIPES
≤36” DIA.
This item consists of furnishing all materials, equipment, and labor, necessary to construct the headwalls as depicted on the Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with the “Concrete
Headwalls” AML Standard Technical Specification. Units cast in the field require fiber, pre-cast units require manufacturer certification that concrete meets or exceeds required strength.
Special Considerations: None
Inspector Notes: For pre-cast units collect manufacturer certificate (includes strength of concrete used).
Major Incidentals: Concrete, steel reinforcement, fiber, grout, formwork, dissipaters, backfill
Measurement: Actual Quantities shall be measured as “EACH” unit installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities installed and the Unit Price for “CONCRETE HEADWALL- PIPES ≤36”
DIA.” in accordance with the “General Provisions” AML Standard Technical materials, equipment, and incidentals.
COR & BID & BMP 12
18. CONCRETE ELL
HEADWALL
This item consists of furnishing all materials, equipment, and labor, necessary to construct the headwalls as depicted on the Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with the “Concrete
Headwalls” AML Standard Technical Specification. Units cast in the field require fiber, pre-cast units require manufacturer certification that concrete meets or exceeds required strength.
Special Considerations: None
Inspector Notes: For pre-cast units collect manufacturer certificate (includes strength of concrete used).
Major Incidentals: Concrete, steel reinforcement, fiber, grout, formwork, dissipaters, backfill
Measurement: Actual Quantities shall be measured as “EACH” unit installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities installed and the Unit Price for “CONCRETE ELL HEADWALL.” in accordance with the “General Provisions” AML Standard Technical materials, equipment, and incidentals.
SUBSIDENCE, PORTAL CLOSURES, & HIGHWALLS
COR & BID & BMP 13
REVEGETATION
19. SEEDBED
PREPARATION
This item shall consist of furnishing all materials, equipment, and labor for the purpose of revegetation of the disturbed areas as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Revegetation” AML
Standard Technical Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured to the next whole full acre approved by and accepted by the ENGINEER.
Payment: Payment for revegetation shall the product of the Actual Accepted
Quantities and the respective Unit Price bid for "SEEDBED
PREPARATION” in accordance with the “General Provisions” AML
Standard Technical Specification. Such payment shall constitute full compensation for all materials, labor, equipment, and incidentals.
20. AGRICULTURAL
LIMESTONE
These items shall consist of furnishing all materials, equipment, and labor for the purpose of revegetation of the disturbed areas as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Revegetation”
AML Standard Technical Specification. DAML will use the current Limestone
Sample Results published by the KY Department of Agriculture to determine a
Relative Neutralizing Value (RNV) for weight adjustment.
Special Considerations: None
Inspector Notes: Collect supplier tickets.
Major Incidentals: Application and incorporation
Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) of appropriately sized 85% calcium carbonate (min.) aggregate installed and accepted by the ENGINEER. Material not meeting the minimum sizing and/or calcium carbonate content will be adjusted by multiplying the weight ticket tons supplied by the ratio of the RNV to the minimum RNV rounded to the nearest ton. Material meeting or exceeding all the minimum values is not adjusted.
Payment: Payment for revegetation shall the product of the Actual Accepted
Quantities and the respective Unit Price bid for "AGRICULTURAL
LIMESTONE” in accordance with the “General Provisions” AML Standard
Technical Specification. Such payment shall constitute full compensation for all materials, labor, equipment, and incidentals.
COR & BID & BMP 14
21. FERTILIZER
and as directed by the ENGINEER in accordance with the “Revegetation”
AML Standard Technical Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured to the next whole half ton approved by and accepted by the ENGINEER.
Payment: Payment for revegetation shall the product of the Actual Accepted
Quantities and the respective Unit Price bid for "FERTILIZER” in accordance with the “General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all materials, labor, equipment, and incidentals.
22. SEED
and as directed by the ENGINEER in accordance with the “Revegetation”
AML Standard Technical Specification. Seed mixture will be listed on the
Drawings, Project Description, and/or Special Conditions.
Special Considerations: None
Inspector Notes: Collect manufacturer certificates for each unit.
Major Incidentals:
Measurement: Actual Quantities shall be measured to the next whole pound of pure live seed approved by and accepted by the ENGINEER.
Payment: Payment for revegetation shall the product of the Actual Accepted
Quantities and the respective Unit Price bid for "SEED” in accordance with the
“General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all materials, labor, equipment, and
23. HYDROMULCH &
HYDROSEEDING
and as directed by the ENGINEER in accordance with the “Revegetation”
AML Standard Technical Specification.
Special Considerations: None
Major Incidentals: Seed, fertilizer, agriculture lime, and mulch
Measurement: Actual Quantities shall be measured to the next half acre approved and accepted by the ENGINEER.
Payment: Payment for revegetation shall the product of the Actual Accepted
Quantities and the respective Unit Price bid for “HYDROMULCH &
HYDROSEEDING” in accordance with the “General Provisions” AML
Standard Technical Specification. Such payment shall constitute full compensation for all materials, labor, equipment, and incidentals.
COR & BID & BMP 15
24. COVER CROP
and as directed by the ENGINEER in accordance with the “Revegetation”
AML Standard Technical Specification. Cover crop will be winter wheat in the fall and winter and German Foxtail Millet in the spring and summer months.
Special Considerations: None
Measurement: Actual Quantities shall be measured to the next whole bushel approved by and accepted by the ENGINEER.
Payment: Payment for revegetation shall the product of the Actual Accepted
Quantities and the respective Unit Price bid for “COVER CROP” in accordance with the “General Provisions” AML Standard Technical
Specification. Such payment shall constitute full compensation for all materials, labor, equipment, and incidentals.
ACCESS REPAIR & SAFETY
25. ROADWAY STONE This item shall consist furnishing all materials, equipment, and labor necessary to place and compact as necessary the various gradations of stone as depicted on the Drawings and as directed by the ENGINEER in accordance with the
“Crushed Aggregate and Channel Lining” AML Standard Technical
Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) of each type of channel lining, and/or aggregate installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “ROADWAY STONE” in accordance with the “General
26. BITUMINOUS
REPAIR
This item shall consist of furnishing all materials, equipment, and labor necessary to repair bituminous surfaces damaged by construction activities as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Bituminous Repair” AML Standard Technical Specification.
Removal and disposal of old materials are covered under the site preparation bid item.
Special Considerations: None
Major Incidentals: DGA, subgrade preparations, materials, placement
Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) of bituminous placed and accepted by the
ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and
Unit Price bid for “BITUMINOUS REPAIR” in accordance with the “General
COR & BID & BMP 16
27. FLOWABLE FILL This item shall consist of furnishing all materials, equipment, and labor for the purpose of backfilling culverts across roadways and at headwalls as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Grout
Products” AML Standard Technical Specification.
Special Considerations: None
Major Incidentals: Steel plates for traffic.
Measurement: Actual quantities shall be measured as the next whole cubic yard installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and
Unit Price bid for “FLOWABLE FILL” in accordance with the “General
28. WOVEN WIRE
FENCE
This item shall consist of furnishing all materials, equipment, and labor necessary to construct a chain-link safety fence as depicted on the Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with the “Fence” AML Standard Technical Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured to the next whole linear feet of fence installed and accepted by the ENGINEER.
Payment: Payment shall be the product of Actual Accepted Quantities and the
Unit Price bid for “WOVEN WIRE FENCE” in accordance with the “General
29. 16 FOOT GATE This item of work shall consist of furnishing all materials, equipment, and labor necessary for access gate installation/construction as depicted on the Drawings and as directed by the ENGINEER in accordance with “Access Gate” AML
Standard Technical Specification.
Special Considerations: None
Major Incidentals: Materials (gate, post, hardware, concrete), placement
Measurement: Actual Quantities shall be measurement as “EACH” gate installed and accepted by the ENGINEER.
Payment: Payment shall be the product of Actual Accepted Quantities and the
Unit Price bid for "16 FOOT GATE” in accordance with the “General
COR & BID & BMP 17
Erosion and Sediment Control
Best Management Practices (BMP) Plan
January 2017
COR & BID & BMP 18
OVERVIEW
This Best Management Practices (BMP) plan is a guide for Kentucky Division of Abandoned
Mine Lands (DAML) projects. It contains information regarding preventing, reducing and controlling erosion, sediment, and pollutant runoff from Abandoned Mine Land (AML)
Reclamation and Acid Mine Drainage (AMD) Abatement project construction sites. The information in this BMP will aid DAML staff and contractors in selecting, installing, and maintaining erosion prevention and sediment control measures during the different stages of construction. This BMP plan, in accordance with DAML Technical Specifications and Standard
Drawings, is intended to protect Kentucky’s streams from potential water quality impacts resulting from DAML projects.
This general BMP document is to outline the various pollution prevention measures used on
AML Reclamation or AMD Abatement Projects. The primary sources of pollutants are solids mobilized during storm events and precipitants from mineralized mine drainage. Other sources of pollutants include oil/fuel/grease from servicing and operating construction equipment, concrete washout water, sanitary wastes, and trash/debris.
EROSION PREVENTION AND SEDIMENT CONTROL MEASURES
Plans for Reclamation and AMD abatement construction projects will include erosion control measures on the planview sheets when possible, and will depict Disturbed Drainage Areas
(DDAs) and related information. The construction notes and project description may describe other control measures. The Contractor and Engineer may select an additional BMP for the project as the project changes and construction progresses. Projects that do not have DDAs annotated in the plans will employ the same concepts selecting and implementing this general
BMP plan.
Address disturbed areas or sources of sediments by the most effective means in the specific work area. Direct non-storm water discharges to sediment basins/traps or to a filter fence enclosure in a flat vegetated infiltration area or filtered via another approved commercial product. All deep mine and surface impoundment water will be tested and treated, when as necessary, to meet the
DAML Water-Treatment and Disposal Technical Specification unless stricter limitations are listed in an existing Total Daily Maximum Load (TMDL) limit.
PERMITS
The DAML shall review each project during project development to determine whether any permits are required to implement the project work. When a permit is required, DAML will make every effort to obtain the permit prior to letting the project for bidding. Permit specific conditions shall trump any standard conditions and/or practices. All permits must be maintained onsite and produced when requested by regulatory authorizes inducing representative of the permitting authority.
Common permits types for DAML projects:
COR & BID & BMP 19
• 401 Water Quality Certification (WQC) o Issued by the KY Division of Water
• 402 KY Pollution Discharge Elimination System (KPDES) o DAML activities are covered under the AML KPDES General Permit
• 404 US Army Corps of Engineers (USACE) o Issued by the US Army Corps of Engineers- Nashville District, Louisville District, or Huntington District (Depending upon major drainage basin)
• KY Stream Construction (Floodplain) o Issued by the KY Division of Water
• Local Floodplain Permit o Issued by the County/Municipality
• Local Storm Water Construction o Issued by the County/Municipality
A) Field Review Walk-Thru:
The DAML will conduct a project review between the Project Engineer, Construction Branch
Personnel, Project Design Technician, and Field Office Staff, to review the construction plans and identify any changes needed prior to letting the project for bidding. The group will evaluate the locations and types of site specific BMP and any other erosion prevention and sediment control measures chosen for incorporation into the final design plans.
B) Site Visit Meeting
DAML will present the project specific BMP and permit requirements/conditions to the potential contractors during the site visit meeting.
C) Pre-Construction Conference
Prior to the actual beginning of the project, DAML will hold a pre-construction conference between representatives of the DAML, the Contractor, including any Subcontractors, as well as other interested agencies and parties. Items discussed will include the time and sequence for construction, planned methods of operation, payment, and other relevant questions including any permit requirements and the erosion and sediment control plan.
D) Construction Access
This is the first land-disturbing activity. Construction entrances shall be a minimum of twenty
(20) feet wide by fifty (50) feet long, measured from the shoulder of the public road, and consist of No. 2 aggregate over a heavy weight non-woven filter fabric base. As soon as construction begins, stabilize bare areas with gravel and temporary mulch and/or vegetation.
E) Clearing and Grubbing
Use the following techniques for clearing and grubbing activities:
COR & BID & BMP 20
1) Leave areas undisturbed when possible.
2) Construct silt basins to provide silt volume for large areas.
3) Construct Silt Trap(s) Type A for small areas.
4) Construct Type B silt traps for areas with rapid runoff and sediment-laden runoff.
5) All silt traps should have a 3:1 flow length to width ratio. Add spreader bars, baffles, or turbidity curtains to maintain the flow path ratio when site conditions require traps sizes smaller than the standard detail dimensions.
6) Install geotextile bags and/or rock checks in front of existing drop inlets.
7) Construct diversion ditches to catch sheet runoff and carry it to basins or traps or to divert it around areas to be disturbed.
8) Maintain brush and/or other barriers to slow and/or divert runoff.
9) Construct silt fences/hay bales to catch sheet runoff on short slopes. For longer slopes, multiple rows of silt fence/hay bales may be considered.
10) Apply temporarily mulch to area not actively being disturbed or for any area left undisturbed for fourteen (14) days.
11) Employ non-standard or innovative methods.
F) Stream Crossings / Work Along Streams
1) Temporary low-water stream crossings follow the guidelines included in the DAML
Technical Specifications and those established by the KY Division of Water Floodplain
Management Section. Removal of a temporary crossing may be required to accommodate large storm events.
2) Do not completely block stream flow (even temporary). Instead, utilize some form of pass thru mechanism during all AML projects.
3) Work within a stream channel shall not cause flooding of properties upstream, downstream or within the project area or cause downstream water quality degradation. Minimize equipment contact time with the stream water by diverting water around equipment working in or along streams.
4) No flowing water will interact with any uncured concrete placed in the stream channel.
5) Divert all stream water around the work areas in accordance to methods listed in the DAML
Stream Protection & Relocation technical specification, AML Standard Details Section 60, and as by the appropriate permit guidelines.
6) Temporary out of channel stream diversion must use one of the three approved methods:
pipe diversion, sandbag/stone channel diversion, and/or fabric-based channel diversion.
Do not construct any temporarily diverted channel on bare, erodible soil. No temporary diversion shall be permanent without a 401, 404, and other appropriate permits.
COR & BID & BMP 21
G) Deep Mine and Surface Water Impoundments
The DAML Resident Inspector will test the mine water from deep mines and surface impoundments on the project area to determine the pH and total iron content. Treat the water until it meets the DAML Water-Treatment and Disposal Technical Specification or an existing TMDL, whichever is stricter, before release through a silt control structure(s).
Monitoring & Recording
The DAML Inspector will maintain a log of the pH and total iron content results prior to releasing and during each release day. Perform a minimum of two (2) tests downstream each day to ensure the maintenance of water quality during release and is not degrading the receiving stream.
Types of structures/facilities include:
1) Silt Traps Type A (20’L x 5’W x 2’D min dugout)
2) Silt Traps Type B (20’L x 5’W x 2’D min dugout with rock berm)
3) Silt Check - Rock checks with filter fabric core lining installed in channels and in front of pipes
4) Temporary silt control fence with Class II filter berm
5) Sediment collection bags
H) Cut and Fill and Placement of Drainage Structures
Areas at final grade will be seeded and mulched within five (5) days. Soil stock piles and areas that are not at final grade but where construction will cease for a period of fourteen (14) days or longer, shall receive temporary mulch no later than fourteen (14) days from the last construction activity in that area.
Types of structures/facilities include:
1) Silt Traps Type B (20’L x 5’W x 2’D min dugout with rock berm)
2) Silt Checks - Bags in front of pipes after they are placed
3) Channel lining
4) Erosion control blanket
5) Temporary mulch and/or seeding for areas where construction activities will be ceased for
14 days or more
6) Non-standard or innovative methods
I) Temporary Shutdown
Items to be completed prior to shutdown include:
1) Clean out behind, repair or replace silt fence and/or hay bales
2) Clean out all silt traps
COR & BID & BMP 22
3) Apply temporary mulch and track into the soil
4) Sow cover crop (weather permitting)
J) Finish Work
1) Establish permanent seeding and protection
2) Remove non-permanent silt checks from ditches and drains if protected with other BMPs sufficient to control erosion and vegetation is established.
3) Remove non-permanent silt traps and basins.
4) Remove geotextile silt fence.
5) Planting trees and/or shrubs where they are included in the project.
6) Clean out behind, repair, and/or replace bale silt barriers
7) Clean out all permanent silt traps and basins
K) Post-Construction
The Contractor shall assume responsibility for all workmanship and materials for a period of one year from the date of final payment, as directed by the Contract Documents. Any work found to be defective due to failure to comply with the provisions and intent of the Contract Documents shall be corrected at the Contractor's expense. Problems determined not to be created by the landowner or due to the Contractor will be addressed by the DAML for a period of up to three years, pending available funding.
OTHER CONTROL MEASURES
L) Solid Materials
No solid materials, including rock and building materials, shall be discharged into waters of the
U.S. except as authorized by the Clean Water Act (CWA) Section 401 and Section 404 permits.
M) Waste Materials
Collect and store waste materials that may leach pollutants (paint and paint containers, caulk tubes, oil/grease containers, liquids of any kind, soluble materials, etc.) in appropriate covered waste containers. Remove waste containers from the project site frequently as to not allow wastes to become a source of pollution. Instruct all personnel regarding the correct procedure for waste disposal and dispose of wastes in accordance with appropriate regulations.
N) Hazardous Waste
Manage and dispose of hazardous waste materials in the manner specified by local or state regulation. Notify the Resident Inspector if there are any hazardous wastes generated, and provide a plan for the management and disposal of such materials. Instruct site personnel with regard to proper storage and handling of hazardous wastes when required and use the practices to reduce the risks associated with all hazardous materials. Keep products in original containers
COR & BID & BMP 23
unless they are not re-sealable with the original labels and material safety data sheets (MSDS) will be reviewed and retained.
O) Spill Prevention
Use good housekeeping and material management practices to reduce the risk of spills or other exposure of materials and substances to the weather and/or runoff. Manufacturers' recommended methods for spill cleanup will be maintained on site and readily available upon request. Make personnel aware of procedures and the location of the information and cleanup supplies.
Equipment and materials will include as appropriate, brooms, dust pans, mops, rags, gloves, oil absorbents, sand, sawdust, and plastic and metal trash containers.
Clean up all spills immediately after discovery. Keep the spill area well ventilated. Personnel will wear appropriate protective clothing to prevent injury from contract with a hazardous substance. Report spills of toxic or hazardous material to the appropriate state/local agency as required by KRS 224 and applicable federal law. Wastes from spill cleanup will be disposed of in accordance with appropriate regulations. The spill prevention plan will be adjusted, as needed, to prevent spills from reoccurring and improve spill response and cleanup.
P) Petroleum Products
Monitor vehicles and equipment fueled and maintained on site for leaks, and receive regular preventative maintenance to reduce the chance of leakage. Protect petroleum products onsite will be stored in tightly sealed, clearly labeled containers from exposure to weather. The
CONTRACTOR shall not have a total of over 1,300 gallons of petroleum products on site at any given time.
Q) Fertilizers
Store fertilizers in a covered area away from water. Transfer the contents of any partially used bag of fertilizer to a sealable plastic bin to avoid spills. Once applied, work into the soil and apply mulch to limit exposure to storm water.
R) Concrete Truck Washout
Concrete truck mixers and chutes will not be washed on pavement, near storm drain inlets, or within seventy (75) feet of any ditch, stream, wetland, lake, or sinkhole. Where possible, discharge excess concrete and wash water to areas prepared for pouring new concrete, flat areas to be paved that are away from ditches or drainage system features, or other locations that will not drain off site. Where this approach is not possible, excavate a shallow earthen washbasin away from ditches to receive the wash water.
INSPECTIONS
Use inspection and maintenance practices to maintain erosion and sediment controls:
COR & BID…
This is the start of the file's text. The full file is on GovTribe.