Addendum One.pdf
PDF 594 KB Posted
- Solicitation number
- RFB 785 2600000482 2
- Issued by
- Nelson County, Kentucky
About this file
This Addendum One document, issued by the Commonwealth of Kentucky Department for Facilities and Support Services Division of Engineering and Contract Administration, provides revisions to Invitation to Bid No. RFB-237-26 for the Re-Advertising of RFB-176-26 23117 AMLBAML AML Project in Pike County, Kentucky. The project encompasses an 8.6-acre site with 4 acres of expected disturbance, plus a 2.2-acre offsite waste area with 1 acre of expected disturbance, located at 1664 Frozen Creek, Raccoon, KY 41557 (coordinates 37.4842, -82.4500). The scope of work includes 44 line items covering mobilization, utility relocation/replacement, landscape allowance, structure removal/replacement, site preparation, tree chipping, debris disposal, reinforcing steel, concrete work, filter fabric, geogrid installation, multiple stone backfill types, silt barriers, earthwork, drainage control, erosion control blankets, subsurface drains, HDPE and DWPP pipe installation, drop boxes, concrete headwalls, culvert debris barriers, concrete block walls, portal closures, revegetation activities (seedbed preparation, limestone, fertilizer, seed, mulch, and cover crop), roadway repairs, fencing, and related access and safety improvements. All work must be completed within 180 calendar days from the effective date of contract award. The addendum requires bidders to use the Revised Bid Schedule dated 4/13/2026 and submit the AML Contractor/Subcontractor Information Form with their bids under penalty of declaring the submission non-responsive.
The bid schedule establishes unit prices and quantities for each line item, with allowable price limits (APL) specified for items where unit prices must fall within defined ranges to avoid classification as unbalanced bids. Significantly low or high values may require written justification if the bid is deemed the lowest responsive. Bidders must comply with Davis-Bacon Scale Wages for all contractors and subcontractors, with the Department of Labor determining final wage rates if employment categories are not specified in contract documents. The Commonwealth of Kentucky, through the Abandoned Mine Lands (AML) program, is responsible for obtaining KYTC Encroachment Permits, Kentucky Division of Water permits, and USACE permits, while contractors assume responsibility for all other required permits and associated fees. The project is subject to comprehensive erosion and sediment control best management practices (BMPs) outlined in a detailed plan addressing construction access, clearing and grubbing, stream crossings, water treatment, waste management, spill prevention, and post-construction maintenance with one-year warranty obligations for workmanship and materials, with DAML addressing defects not caused by the contractor or landowner for up to three years pending available funding.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_RFB_785_2600000482_2_SO_FORM.PDF | ||
| Final_RFB_785_2600000482_1_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-237-26
FOR: Re-Ad of RFB-176-26
23117 AMLBAML
AML Project Pike County, Kentucky
DATE: April 13, 2026
RFB-785-2600000482
ADDENDUM NO. One (1)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings.
Item 2: Bidders must use Revised Bid Schedule 4/13/2026, in lieu of previously issued.
END OF ADDENDUM
Invitation to Bid No. RFB-237-26 For: Re-Ad of RFB-176-26
23117 AMLBAML
AML Project Pike County, Kentucky
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
NO. ITEM M.O.P. UNIT QUANTITY * Low APL UNIT PRICE TOTAL
1 MOBILIZATION L.S. L.S. 1.0 X NA ≤ NA = 25,000.00$
2 UTILITY RELOCATION/REPLACEMENT A.C.U. A.C.U. 10,000.0 X NA ≤ 1.00$ = 10,000.00$
3 LANDSCAPE ALLOWANCE A.C.U. A.C.U. 5,000.0 X NA ≤ 1.00$ = 5,000.00$
4 STRUCTURE REMOVAL/REPLACEMENT A.C.U. A.C.U. 20,000.0 X NA ≤ 1.00$ = 20,000.00$
5 SITE PREPARATION U.P. ACRE 4.0 X $750.00 ≤ $ = $
6 SITE PREPARATION- WASTE AREAS U.P. ACRE 1.0 X $750.00 ≤ $ = $
7 TREE CHIPPING U.P. ACRE 1.0 X $1,000.00 ≤ $ = $
DOMESTIC, INDUSTRIAL, & MINING DEBRIS
DISPOSAL
U.P. TON 10.0 X $8.00 ≤ $ = $
9 60 KSI REINFORCING STEEL U.P. LBS 125.0 X $0.75 ≤ $ = $
10 CONCRETE- FORMED & FINISHED U.P. CY 15.0 X $170.00 ≤ $ = $
11 FILTER FABRIC U.P. SY 40.0 X $0.50 ≤ $ = $
12 GEO-GRID U.P. SY 3,740.0 X $2.00 ≤ $ = $
13 NO. 57 STONE BACKFILL U.P. TON 50.0 X $15.00 ≤ $ = $
14 NO. 2 STONE BACKFILL U.P. TON 25.0 X $15.00 ≤ $ = $
15 CLASS II BACKFILL U.P. TON 50.0 X $20.00 ≤ $ = $
16 SILT BARRIER - BALES & FENCE U.P. LF 500.0 X $1.00 ≤ $ = $
17 HOE RAM U.P. HOUR 60.0 X $60.00 ≤ $ = $
18 EARTHWORK (PLAN QUANTITY) P.Q. CY 500.0 X $1.00 ≤ $ = $
19 EROSION CONTROL BLANKET- ECB U.P. SY 2,150.0 X $0.75 ≤ $ = $
20 CLASS II / III U.P. TON 1,975.0 X $20.00 ≤ $ = $
21 CONCRETE BLOCK- TIED MAT U.P. SF 600.0 X $4.50 ≤ $ = $
22 RETAINING WALL SUBDRAIN U.P. LF 90.0 X $15.00 ≤ $ = $
23 SUBDRAIN U.P. LF 1,525.0 X $15.00 ≤ $ = $
24 12" DIA. HDPE PIPE- STANDARD U.P. LF 20.0 X $0.00 ≤ $ = $
25 18" DIA. HDPE PIPE- STANDARD U.P. LF 120.0 X $10.00 ≤ $ = $
26 18" DIA. DWPP PIPE U.P. LF 80.0 X $0.00 ≤ $ = $
27 DROP BOX- CONCRETE U.P. EACH 2.0 X $1,250.00 ≤ $ = $
28 CONCRETE HEADWALL- PIPES ≤36" DIA. U.P. EACH 8.0 X $900.00 ≤ $ = $
29 CULVERT DEBRIS BARRIER U.P. EACH 2.0 X $500.00 ≤ $ = $
NON-REINFORCED CONCRETE BLOCK WALL-
TYPE I
U.P. SF 360.0 X $15.00 ≤ $ = $
31 PORTAL CLOSURE U.P. EACH 5.0 X $1,000.00 ≤ $ = $
32 SEEDBED PREPARATION U.P. ACRE 2.0 X $75.00 ≤ $ = $
23117AMLBAML RECLAMATION PROJECT
PIKE COUNTY, KENTUCKY
BID SCHEDULE
REVISED BID SCHEDULE 4/13/2026
RFB-237-26
33 AGRICULTURAL LIMESTONE U.P. TON 25.0 X $20.00 ≤ $ = $
34 FERTILIZER U.P. TON 1.0 X $600.00 ≤ $ = $
35 SEED U.P. LBS 160.0 X $4.00 ≤ $ = $
36 MULCH- STRAW & HAY U.P. ACRE 2.0 X $100.00 ≤ $ = $
37 COVER CROP U.P. BUSHEL 5.0 X $10.00 ≤ $ = $
38 RESIDENTIAL SEEDING U.P. ACRE 2.0 X $500.00 ≤ $ = $
39 DENSE GRADE AGGREGATE U.P. TON 50.0 X $20.00 ≤ $ = $
40 ROADWAY STONE U.P. TON 400.0 X $20.00 ≤ $ = $
41 BITUMINOUS REPAIR U.P. TON 200.0 X $90.00 ≤ $ = $
42 FLOWABLE FILL U.P. CY 10.0 X $35.00 ≤ $ = $
43 CHAIN-LINK FENCE U.P. LF 90.0 X $15.00 ≤ $ = $
44 WOVEN-WIRE FENCE U.P. LF 200.0 X $15.00 ≤ $ = $
BID TOTAL = $
NOTE: THE AUTHENTICATION OF BID AND STATEMENT OF NON-COLLUSION AND NON-CONFLICT OF INTEREST PAGE MUST BE PROPERLY EXECUTED FOR THE TOTAL BID
AMOUNT TO BE VALID.
* Any Unit Price outside the Allowable Price Limit (APL) range may be considered an unbalanced bid and may have to be justified in writing if such bid is deemed the low responsive bid.
REVISED BID SCHEDULE 4/13/2026 RFB-237-26
Revised 12/11/2024
COR & BID & BMP 1
23117AMLBAML RECLAMATION PROJECT
PIKE COUNTY, KENTUCKY
The address is 1664 Frozen Creek, Racoon, KY 41557, the coordinates are 37.4842, -82.4500. Project limits include 8.6 acres, with an expected disturbance of 4 acres within project boundaries. Project limits for the offsite waste area includes 2.2 acres, with an expected disturbance of 1 acre.
There is a significant amount of water that is draining from the mine bench causing problems (small slides, mold, drainage, etc.) the proposed plans is to control the water and get it into Frozen creek which is across the road. Access to the bench will be via the gravel driveway down the road from the residence, used to access another residence at the bench level. At this residence, there is drainage from behind the driveway from an old closed portal which is saturating the area and flowing along the driveway. Water has also caused a small slip on the hill adjacent to the drive. This material will be removed and a rock toe buttress installed to stabilize the hill above the road. Approximately 600LF of ditchline will be installed along this drive and up to the portal. Drainage controls will be installed on the bench and at the house level. A small block wall will be installed behind one home to stabilize a small slide and handle drainage.
A. STANDARD DOCUMENTS
The AML Standard Details and Technical Specifications are posted on the Division’s website at https://eec.ky.gov/aml
Once on the web page, please click “Contractor Information” tab located on the right side. AML standard technical specification and detail are located under this tab. Contractors are strongly encouraged to review the complete AML website for additional information.
B. ALLOWABLE PRICE LIMIT
The lowest Allowable Price Limit (APL) is listed on the Bid Schedule as part of the bid documents. Unit
Price, Plan Quantity, and Lump Sum are all methods of payment. Significantly low or high values entered by the CONTRACTOR on the Bid Schedule may be considered an unbalanced bid and may have to be justified in writing if such bid is deemed the low responsive bid.
An example would be if a CONTRACTOR assumes there may not be a need for the entire design quantity for Roadway Stone and entered a $10 value for Roadway Stone when the cost at the quarry is significantly higher. Another example would be if the CONTRACTOR enters a value of $30 per linear foot for “SILT BARRIER - BALES & FENCE” to front load payments for work items used near the beginning of the project. The CONTRACTOR is also cautioned that other considerations for rejection may be enforced such as the low bid being higher than the budgeted dollar amount for this project.
C. CONTRACT LENGTH
All work shall be completed within one-hundred eighty (180) calendar days from the effective date of the
Award of Contract. Within the bounds of prudent project performance, it shall be the responsibility of the
CONTRACTOR to plan and implement construction sequences which follow the intent of these
CONTRACT DOCUMENTS, particularly as, reflected in the Drawings and Special Conditions and to protect any portion of the contract which may be completed before others.
https://eec.ky.gov/aml
COR & BID & BMP 2
D. CONTRACTOR’S INFORMATION SHEET
The AML CONTRACTOR/SUBCONTRACTOR INFORMATION FORM sheet must be filled out and submitted with the bid. Failure to submit the AML Contractor/Subcontractor Information Form sheet with the bid will be the basis for declaring the bid “Non-Responsive.”
E. SPECIAL CONDITIONS & PROJECT NOTES
- When applicable, AML is responsible for payment to the Imperiled Bat Conservation Fund
(IBCF). The CONTRACTOR will be responsible for adhering to the boundary for which payment was made and confirming with AML the acreage of trees removed.
- On occasion, a property owner may require a CONTRACTOR to add them on their General
Liability and/or Automobile Insurance as an “Additional Insured.” AML will inform the
CONTRACTOR when this requirement is being made by the property owner. In these cases, the
CONTRACTOR must submit to AML copies of their certificate of insurance documenting the
“Additional Insured” before they will be allowed to mobilize equipment and forces on to said properties. Any fees, rate increases, or other costs incurred by the CONTRACTOR for this requirement, if any, will be considered incidental to mobilization and as such no compensation will be made by AML. The “Additional Insured” must remain on the CONTRACTOR’s policy(s) for the full length of the contract.
F. DAVIS BACON SCALE WAGES
The CONTRACTOR and all SUBCONTRACTORS are required to pay scale wages as defined in the contract documents. If all employment categories that may be used have not been listed and specified in the contract document, then the contractor must make his best determination of what the missing wage rate will be. Subsequently after the bid is awarded, the contractor must request the specific rate from the
Department of Labor. AML will not issue change orders for additional compensation if the wage rate determined by DOL is higher than the rate the contractor used to develop his bid. If wage rates are not included for a specific category, AML suggests that the contractor assume the highest operator or laborer wages that are listed when developing his bid.
G. PERMITS & FEES – AML will be responsible for obtaining any permits that are checked below.
(Check all that apply)
☒KYTC Encroachment Permit
☒KY DOW Water Permits
☒USACE Permit
The CONTRACTOR is responsible for all other permits and/or fees necessary to begin the project. The
CONTRACTOR is advised that on occasion, other permits and/or fees may be required by federal, state, and local government(s). Other types of permits and/or fees are not the responsibility of AML and as such, these will be the complete and total responsibility of the CONTRACTOR to obtain. These must be
COR & BID & BMP 3
obtained before AML will allow mobilization of equipment and forces on to said properties. All costs associated with other permits or fees will be the responsibility of the CONTRACTOR. Please refer to
“General Provisions” in the AML Technical Specifications.
COR & BID & BMP 4
BID ITEM DESCRIPTION
23117AMLBAML AML RECLAMATION PROJECT
PIKE COUNTY, KENTUCKY
NO ITEM DESCRIPTION
1 MOBILIZATION This item consists of the mobilization and demobilization of the
CONTRACTOR’S forces and equipment in accordance with the
“Mobilization/Demobilization” AML Standard Technical Specification. The amount of this bid item is not to exceed 5 percent of the sum of the lump sum bid price.
Measurement: Not Applicable.
Payment: Payment shall be made at increments set in the AML Technical
Specifications totaling the Lump Sum price.
2 UTILITY
RELOCATION /
REPLACEMENT
This consists of furnishing all materials, equipment, and labor necessary to replace utilities damaged by construction or relocate any utilities that are in the construction area in accordance with the “Utility Relocation” AML Standard
Technical Specification. The CONTRACTOR is required to supply the
ENGINEER with all documentation to support cost incurred to qualify for reimbursement.
Special Considerations: None
Major Incidentals: These will be listed in writing by the ENGINEER prior to beginning the work.
Measurement: Not Applicable.
Payment: Payment shall be made for Actual Documented Costs for
“UTILITY RELOCATION/REPLACEMENT” approved by the
ENGINEER. The payment shall be a direct reimbursement for actual documented costs to the CONTRACTOR in accordance with the “General
Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, equipment, materials, and incidentals.
COR & BID & BMP 5
3 LANDSCAPE
ALLOWANCE
This item of work shall consist of furnishing all materials, equipment, and labor necessary to replace damaged landscape structures, plants and trees as depicted on Drawings and as directed by ENGINEER in accordance with the
“Revegetation” AML Standard Technical Specification. The CONTRACTOR is required to supply the ENGINEER with all documentation to support cost incurred to qualify for reimbursement.
Special Considerations: None
Inspector Notes: Conduct a picture inventory of landscape items that may be affected before construction starts and keep an item list of those landscape items that are affected.
Major Incidentals: These will be listed in writing by the ENGINEER prior to beginning the work.
Measurement: Not Applicable
Payment: Payment for Actual Documented Costs “LANDSCAPE
ALLOWANCE” approved IN ADVANCE by the ENGINEER. The payment shall be a direct reimbursement for the removal/replacement of landscape features as approved/directed by the ENGINEER in accordance with the
“General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, equipment, materials, and incidentals.
4 STRUCTURE
REMOVAL/
REPLACEMENT
This item represents the ENGINEER'S best estimate of removal/replacement cost of designated qualifying structural features “in kind” to facilitate normal construction activities as depicted on the Drawings and as directed by the
ENGINEER in accordance with the “Structure Removal / Replacement” AML
Standard Technical Specification. The CONTRACTOR is required to supply the ENGINEER with all documentation to support cost incurred to qualify for reimbursement.
Special Considerations: None
Inspector Notes: Inventory of structures, pictures, and dimensions, before construction starts. Any structures that are removed shall be accompanied by pictures.
Major Incidentals: These will be listed in writing by the ENGINEER prior to beginning the work.
Measurement: None
Payment: Payment shall be made for Actual Documented Costs for
“STRUCTURE REMOVAL/REPLACEMENT” approved IN ADVANCE by the ENGINEER. The payment shall be a direct reimbursement for actual documented costs to the CONTRACTOR in accordance with the “General
COR & BID & BMP 6
5 SITE PREPARATION This item of work shall consist of furnishing all materials, equipment, and labor as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Site Preparation” AML Standard Technical Specification.
Special Considerations: None
Major Incidentals: Clearing, grubbing, windrowing, burning, pipe removal and disposal, pipe cleanout, temporary diversion ditch construction, domestic debris removal and disposal, concrete & bituminous asphalt debris removal and disposal, access improvement/construction, in-kind fence repair/replacement, and temporary stream diversion.
Measurement: Actual Quantities shall be measured with a handheld GPS and rounded up to the next whole 0.5 acre actually cleared and grubbed (excludes slurry and refuse areas.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “SITE PREPARATION” in accordance with the
“General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and other items necessary to complete the work.
6 SITE
PREPARATION-
WASTE AREAS
This item of work shall consist of furnishing all materials, equipment, and labor as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Site Preparation” AML Standard Technical Specification.
Special Considerations: None
Major Incidentals: Clearing, grubbing, windrowing, burning, pipe removal and disposal, pipe cleanout, temporary diversion ditch construction, domestic debris removal and disposal, access improvement/construction, in-kind fence repair/replacement.
Measurement: Actual Quantities shall be measured with a handheld GPS and rounded up to the next whole 0.5 acre actually cleared and grubbed (excludes slurry and refuse areas).
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “SITE PREPARATION- WASTE AREAS” in accordance with the “General Provisions” AML Standard Technical
Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and other items necessary to complete the work.
COR & BID & BMP 7
7 TREE CHIPPING This item of work shall consist of furnishing all materials, equipment, and labor as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Site Preparation” AML Standard Technical Specification.
Special Considerations: None
Major Incidentals: Chipping
Measurement: Actual Quantities shall be measured with a handheld GPS and rounded up to the next whole 0.5 acre actually cleared and chipped.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “TREE CHIPPING” in accordance with the “General
Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and other items necessary to complete the work.
8 DOMESTIC,
INDUSTRIAL, &
MINING DEBRIS
DISPOSAL
This item of work shall consist of furnishing all material, equipment, and labor necessary to remove industrial and mining debris within the project limits as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Industrial Mining Debris Removal” and “Site Preparation” AML
Standard Technical Specifications.
Special Considerations: None
Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) hauled to an appropriate landfill.
Payment: Payment shall be the product of Actual Accepted Quantities and the
Unit Price for “DOMESTIC, INDUSTRIAL, & MINING DEBRIS
DISPOSAL” in accordance with the “General Provisions” AML Standard
Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and incidentals.
COR & BID & BMP 8
9 60-KSI
REINFORCING
STEEL
This item consists of furnishing all materials, equipment, and labor necessary to properly installing 60 KSI reinforcing steel of various diameters and lengths as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Concrete” and “Steel” AML Standard Technical Specifications.
This bid item covers steel used for: reinforcement in concrete ditches (all types), footers, retaining walls, concrete piles & cap reinforcement, anchors, Special Considerations: See AML Technical Specification for overlap Steel
Item 2.2.6.
No splicing shall be permitted for length of steel less than 10 feet in length.
Splicing of lengths between 10 feet and 20 feet is allowed. No lengths less than
4 feet is allowed including the overlap.
For lengths greater than 20 feet splicing is allowed. Minimum length of steel shall be 10 foot including overlap.
Maximum of 10 % payment for overlap steel.
Major Incidentals: Coatings, excess steel, connections, cut-offs, testing, and waste materials
Measurement: Actual Quantities shall be measured as pounds of reinforcing steel placed and accepted by the ENGINEER. Actual Quantities may be obtained by using a CRSI chart that shows lbs/lf for each size bar and multiplying the length of each bar used.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “60-KSI REINFORCING STEEL” in accordance with the “General Provisions” AML Standard Technical Specification. Such payment as specified shall constitute full compensation for all labor, materials, equipment, and incidentals.
10 CONCRETE-
FORMED &
FINISHED
This item consists of furnishing all materials, equipment, and labor necessary to construct concrete field cast items as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Concrete” AML Standard
Technical Specification. This bid item covers concrete used for: concrete ditches (all types), retaining walls (all types), footers, caps, and any other purpose that requires formwork and/or finishing. All formwork, no matter the size/scale or changes are incidental, including increases in heights of walls.
Special Considerations: None
Inspector Notes: Collect manufacturer certificates for each unit.
Major Incidentals: Formwork (including height/width increases), admixtures, finishing, materials testing.
Measurement: Actual Quantities shall be measured as the next whole cubic yard installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price for “CONCRETE- FORMED & FINISHED” in accordance with the “General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and incidentals.
COR & BID & BMP 9
11 FILTER FABRIC This item consist of furnishing all materials, equipment, and labor, necessary to install filter fabric utilized in ditch construction as depicted on the Drawings and as directed by the ENGINEER in accordance with “Filter Fabric” AML
Standard Technical Specification. This includes all types of filter fabric used on a jobsite. The standard details list the type and quantity of fabric for each purpose.
Special Considerations: None
Inspector Notes: Collect manufacturer certificates for each unit.
Major Incidentals: Staples
Measurement: Actual Quantities shall be measured as the next whole square yard installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “FILTER FABRIC” in accordance with the “General
12 GEOGRID This item consist of furnishing all materials, equipment, and labor, necessary to install geogrid, including all labor, materials, and accessories as depicted on the
Drawings and as directed by the ENGINEER in accordance with “Geo-grid”
AML Standard Technical Specification. All geo-grid is bi-axial, except for tails behind Non-reinforced Block Walls- Type I.
Special Considerations: None
Inspector Notes: Collect manufacturer certificates for each unit.
Major Incidentals: Staples
Measurement: Actual Quantities shall be measured as the next whole square yard installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “GEOGRID” in accordance with the “General
13 NO. 57 STONE
BACKFILL
This item shall consists of furnishing all materials, equipment, and labor necessary to place No. 57 stone aggregate as depicted on the Drawings and as directed by the ENGINEER in accordance with “Crushed Aggregate and
Channel Lining” AML Standard Technical Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) installed and accepted by the
ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “NO. 57 STONE BACKFILL” in accordance with the
“General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and
COR & BID & BMP 10
14 NO. 2 STONE
BACKFILL
This item shall consists of furnishing all materials, equipment, and labor necessary to place No. 2 stone aggregate as depicted on the Drawings and as directed by the ENGINEER in accordance with “Crushed Aggregate and
Channel Lining” AML Standard Technical Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) installed and accepted by the
ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “NO. 2 STONE BACKFILL” in accordance with the
“General Provisions” AML Standard Technical Specification. Such payment
15 CLASS II BACKFILL This item consists of furnishing all materials, equipment, and labor necessary to place Class II aggregate as depicted on the Drawings and as directed by the
ENGINEER in accordance with the “Crushed Aggregate and Channel Lining”
AML Standard Technical Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) of each type of aggregate installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “CLASS II BACKFILL" in accordance with the “General constitute full compensation for all labor, materials, equipment, and incidentals.
SILT CONTROL
16 SILT BARRIER–
BALES & FENCE
This item consists of furnishing all materials, equipment, and labor necessary to maintain silt control as depicted on the Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with the “Silt Control” AML
Standard Technical Specification. Hay/straw bales shall be placed with an overlap equal to 0.4 bales per linear foot of silt control fencing. Silt fence shall be trenched and removed at the end of the project. Failure to remove silt control fence (geotextile fabrics) shall result in forfeiture of demobilization.
Special Considerations: None
Major Incidentals: Maintenance, silt fence trenching and removal
Measurement: Actual Quantities shall be measured as the next whole linear foot installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “SILT BARRIER - BALES & FENCE" in accordance with the “General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for materials, equipment, labor, and
COR & BID & BMP 11
EARTHWORK
17 HOE RAM This item consist of furnishing all materials, equipment, and labor necessary to accomplish the required excavation of rock utilizing a hoe ram as depicted on the Drawings and as directed by the ENGINEER in accordance with the
“Equipment” AML Standard Technical Specification.
Special Considerations: None
Major Incidentals: Equipment, operator, fuel, maintenance items
Measurement: Actual Quantities shall be measured as the next whole equipment hour when required to construct ditches and other features approved by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “HOE RAM” in accordance with the “General constitute full compensation for materials, equipment, labor and incidentals.
18 EARTHWORK This item consist of furnishing all materials, equipment, and labor necessary to accomplish the required excavation of material to the lines and grades as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Earthwork” AML Standard Technical Specification.
Special Considerations: None
Major Incidentals: Excavation, transportation, placement, compaction of all excavated materials including rock ditches constructed without hoe ram.
Measurement: No measurements will be made unless the ENGINEER significantly revises the dimensions of the work area(s).
Payment: Payment shall be the product of the Plan Quantity Volume and the
Unit Price bid for “EARTHWORK” in accordance with the “General
Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, and other items necessary to complete the work—this includes all transportation and gradework efforts associated with designated waste areas.
COR & BID & BMP 12
DRAINAGE CONTROL
SURFACE DRAINAGE
19 EROSION
CONTROL
BLANKET-ECB
(BENCHES,
DITCHES, &
SLOPES)
This item consist of furnishing all materials, equipment, and labor necessary to install all types of erosion control blanket (ECB) as depicted on the Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with the “Erosion Control Blanket” AML Standard Technical Specification.
Subgrade preparation shall be incidental. Placement of ECB for slope protection will also be covered by this bid item.
Special Considerations: None
Major Incidentals: Excavation, subgrade preparation
Measurement: Actual Quantities shall be measured as the next whole square yard, including overlaps, installed and approved by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “EROSION CONTROL BLANKET-ECB” in accordance with the “General Provisions” AML Standard Technical
Specification. Such payment shall constitute full compensation full compensation for all labor, materials, equipment, and incidentals.
20 CLASS II / III –
(DITCHES,
ANCHORS, DRAINS,
& BUTTRESSES)
This item consist of furnishing all materials, equipment, and labor necessary to install Class II and Class III rock as depicted on the Drawings, AML Standard
Details, and as directed by the ENGINEER in accordance with “Crushed
Aggregate and Channel Lining” and “Ditches” AML Standard Technical
Specifications. Subgrade preparation shall be incidental. For channels with acid mine drainage DAML will use the current Limestone Sample Results published by the KY Department of Agriculture to determine an effective weight when material is from a source with < 85% calcium carbonate.
Special Considerations: None
Inspector Notes: Collect supplier tickets.
Major Incidentals: Excavation, subgrade preparation
Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) installed and accepted by the
ENGINEER. Material for treating AMD and not meeting the 85% minimum is adjusted by multiplying the weight ticket tons by the ratio of the report %
CaCO3 (as Calcium %) to the 85% minimum, rounded to the nearest ton.
Material exceeding the 85% minimum is not adjusted.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “CLASS II/III” in accordance with the “General constitute full compensation for all labor, materials, equipment, and incidentals.
COR & BID & BMP 13
21 CONCRETE BLOCK-
TIED MAT
This item consist of furnishing all materials, equipment, and labor necessary to construct flexible concrete channel lining ditches as depicted on the Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with
“Concrete Block Mat- Tied” and “Ditches” AML Standard Technical
Specifications.
Special Considerations: None
Inspector Notes: Collect manufacturer certificates for each unit.
Major Incidentals: Subgrade preparation, initial concrete anchor (excavation
& concrete), staples/anchor rebar, geo-grid tie sections.
Measurement: Actual Quantities shall be measured as the next whole square foot installed and approved by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “CONCRETE BLOCK- TIED MAT” in accordance with the “General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation full compensation for all labor, materials, equipment, and incidentals.
SUBSURFACE DRAINS
22 RETAINING WALL
SUBDRAIN
This item of work shall consist of furnishing all materials, equipment, and labor necessary to install subsurface drains as depicted on the Drawings, AML
Standard Details, and as directed by the ENGINEER in accordance with the
“Crushed Aggregate and Channel Lining”, “Filter Fabric”, and “Subsurface
Drains” AML Standard Technical Specifications.
Special Considerations: None
Major Incidentals: Pipe, filter fabric, aggregate backfill
Measurement: Actual Quantities shall be measured as the next whole linear foot installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “RETAINING WALL SUBDRAIN” in accordance with the “General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, equipment, materials, COR & BID & BMP 14
23 SUBDRAIN This item of work shall consist of furnishing all materials, equipment, and labor necessary to install subsurface drains as depicted on the Drawings, AML
Standard Details, and as directed by the ENGINEER in accordance with the
“Crushed Aggregate and Channel Lining”, “Filter Fabric”, and “Subsurface
Drains” AML Standard Technical Specifications.
Special Considerations: None
Major Incidentals: Excavation to depth of 3’, pipe, filter fabric, aggregate backfill to depth of 3’.
Measurement: Actual Quantities shall be measured as the next whole linear foot installed and accepted by the ENGINEER. Subdrains requiring more than the incidental quantity of rock will be paid from the No. 2 Stone bid item or
Roadway Stone if a No. 2 Stone bid item is not listed. All excavation is incidental to the earthwork.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “SUBDRAIN” in accordance with the “General
HDPE PIPE-
STANDARD
This item consists of furnishing all materials, equipment, and labor, necessary to install standard, non-steel reinforced HDPE pipe as depicted on the
Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with the “Crushed Aggregate and Channel Lining”, “Grout
Products”, and “Pipe” AML Standard Technical Specifications.
Special Considerations: None
Inspector Notes: Collect manufacturer certificates for each unit.
Major Incidentals: Excavation, bedding, aggregate backfill to 1’ over top of pipe, steel plates for access maintenance.
Measurement: Actual Quantities shall be measured as the next whole linear foot installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “HDPE PIPE-STANDARD” in accordance with the
“General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, equipment, materials, and
COR & BID & BMP 15
DWPP PIPE This item consists of furnishing all materials, equipment, and labor, necessary to install the dual wall polypropylene pipe as depicted on the Drawings, AML
Standard Details, and as directed by the ENGINEER in accordance with the
“Crushed Aggregate and Channel Lining”, “Grout Products”, and “Pipe” AML
Standard Technical Specifications.
Special Considerations: None
Inspector Notes: Collect manufacturer certificates for each unit.
Major Incidentals: Excavation, bedding, aggregate backfill to 1’ over top of pipe, steel plates for access maintenance.
Measurement: Actual Quantities shall be measured as the next whole linear foot installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “DWPP PIPE” in accordance with the “General
27 DROP BOX-
CONCRETE
This item consists of furnishing all materials, equipment, and labor, necessary to construct concrete drop boxes as depicted on the Drawings, AML Standard
Details, and as directed by the ENGINEER in accordance with the “Drop /
Junction Boxes” AML Standard Technical Specifications up to a depth of 8’.
Special Considerations: None
Major Incidentals: Concrete, steel reinforcement, grout, formwork, aggregate backfill
Measurement: Actual Quantities shall be measured as “EACH” unit installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities installed and the Unit Price for “DROP BOX-CONCRETE” in accordance with the “General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all labor, materials, equipment, COR & BID & BMP 16
28 CONCRETE
HEADWALL- PIPES
≤36” DIA.
This item consists of furnishing all materials, equipment, and labor, necessary to construct the headwalls as depicted on the Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with the “Concrete
Headwalls” AML Standard Technical Specification. Units cast in the field require fiber, pre-cast units require manufacturer certification that concrete meets or exceeds required strength.
Special Considerations: None
Inspector Notes: For pre-cast units collect manufacturer certificate (includes strength of concrete used).
Major Incidentals: Concrete, steel reinforcement, fiber, grout, formwork, dissipaters, backfill
Measurement: Actual Quantities shall be measured as “EACH” unit installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities installed and the Unit Price for “CONCRETE HEADWALL- PIPES ≤36”
DIA.” in accordance with the “General Provisions” AML Standard Technical
29 CULVERT DEBRIS
BARRIER
This item consists of furnishing all materials, equipment, and labor, necessary to construct culvert debris barriers, cast in place, as depicted on the AML
Standard Details, and as directed by the ENGINEER.
Special Considerations: None
Major Incidentals: Formwork, concrete, steel reinforcement, grout, cast in place dissipaters
Measurement: Actual Quantities shall be measured as “EACH” unit installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities installed and the Unit Price for “CULVERT DEBRIS BARRIER” in accordance with the “General Provisions” AML Standard Technical
COR & BID & BMP 17
DRILLING & WALL STRUCTURES
30 NON-REINFORCED
CONCRETE BLOCK
WALL- TYPE I
This item consists of furnishing all materials, equipment, and labor necessary to construct a pre-cast concrete block wall as depicted on the Drawings, AML
Standard Details, and as directed by the ENGINEER in accordance with the
“Non-Reinforced Concrete Block Walls” AML Standard Technical
Specification.
Special Considerations: None
Inspector Notes: Collect manufacturer certificates for each unit.
Major Incidentals: Blocks, pins, adhesive, subgrade preparation
Measurement: Actual Quantities shall be measured as the next whole square foot installed and approved by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities installed and the Unit Price for “NON-REINFORCED CONCRETE BLOCK
WALL- TYPE I” in accordance with the “General Provisions” AML Standard all labor, materials, equipment, and incidentals.
SUBSIDENCE, PORTAL CLOSURES, & HIGHWALLS
31 PORTAL CLOSURE This item consists of furnishing all materials, equipment, and labor necessary to close mine portals as depicted on the Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with the “Portal Closure” AML
Standard Technical Specification.
Special Considerations: None
Major Incidentals: Earthwork, excavation, cement, block, pipe, steel, concrete
Measurement: Actual Quantities shall be measured as “EACH” closure completed and accepted by ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “PORTAL CLOSURE” in accordance with the “General
Provisions” AML Standard Technical Specification. Such payments shall
COR & BID & BMP 18
REVEGETATION
32 SEEDBED
PREPARATION
This item shall consist of furnishing all materials, equipment, and labor for the purpose of revegetation of the disturbed areas as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Revegetation” AML
Standard Technical Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured to the next whole full acre approved by and accepted by the ENGINEER.
Payment: Payment for revegetation shall the product of the Actual Accepted
Quantities and the respective Unit Price bid for "SEEDBED
PREPARATION” in accordance with the “General Provisions” AML
Standard Technical Specification. Such payment shall constitute full compensation for all materials, labor, equipment, and incidentals.
33 AGRICULTURAL
LIMESTONE
These items shall consist of furnishing all materials, equipment, and labor for the purpose of revegetation of the disturbed areas as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Revegetation”
AML Standard Technical Specification. DAML will use the current Limestone
Sample Results published by the KY Department of Agriculture to determine a
Relative Neutralizing Value (RNV) for weight adjustment.
Special Considerations: None
Inspector Notes: Collect supplier tickets.
Major Incidentals: Application and incorporation
Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) of appropriately sized 85% calcium carbonate (min.) aggregate installed and accepted by the ENGINEER. Material not meeting the minimum sizing and/or calcium carbonate content will be adjusted by multiplying the weight ticket tons supplied by the ratio of the RNV to the minimum RNV rounded to the nearest ton. Material meeting or exceeding all the minimum values is not adjusted.
Payment: Payment for revegetation shall the product of the Actual Accepted
Quantities and the respective Unit Price bid for "AGRICULTURAL
LIMESTONE” in accordance with the “General Provisions” AML Standard all materials, labor, equipment, and incidentals.
COR & BID & BMP 19
34 FERTILIZER
and as directed by the ENGINEER in accordance with the “Revegetation”
AML Standard Technical Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured to the next whole half ton approved by and accepted by the ENGINEER.
Payment: Payment for revegetation shall the product of the Actual Accepted
Quantities and the respective Unit Price bid for "FERTILIZER” in accordance with the “General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all materials, labor, equipment, 35 SEED and as directed by the ENGINEER in accordance with the “Revegetation”
AML Standard Technical Specification. Seed mixture will be listed on the
Drawings, Project Description, and/or Special Conditions.
Special Considerations: None
Inspector Notes: Collect manufacturer certificates for each unit.
Major Incidentals:
Measurement: Actual Quantities shall be measured to the next whole pound of pure live seed approved by and accepted by the ENGINEER.
Payment: Payment for revegetation shall the product of the Actual Accepted
Quantities and the respective Unit Price bid for "SEED” in accordance with the
“General Provisions” AML Standard Technical Specification. Such payment shall constitute full compensation for all materials, labor, equipment, and
36 MULCH- STRAW &
HAY
and as directed by the ENGINEER in accordance with the “Revegetation”
AML Standard Technical Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured to the next half acre approved by and accepted by the ENGINEER.
Payment: Payment for revegetation shall the product of the Actual Accepted
Quantities and the respective Unit Price bid for "MULCH- STRAW & HAY” in accordance with the “General Provisions” AML Standard Technical
Specification. Such payment shall constitute full compensation for all materials, labor, equipment, and incidentals.
COR & BID & BMP 20
37 COVER CROP
and as directed by the ENGINEER in accordance with the “Revegetation”
AML Standard Technical Specification. Cover crop will be winter wheat in the fall and winter and German Foxtail Millet in the spring and summer months.
Special Considerations: None
Measurement: Actual Quantities shall be measured to the next whole bushel approved by and accepted by the ENGINEER.
Payment: Payment for revegetation shall the product of the Actual Accepted
Quantities and the respective Unit Price bid for “COVER CROP” in accordance with the “General Provisions” AML Standard Technical
Specification. Such payment shall constitute full compensation for all materials, labor, equipment, and incidentals.
38 RESIDENTIAL
SEEDING
This item shall consist of furnishing all materials, equipment, and labor for the purpose of revegetation of the disturbed areas as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Revegetation” AML
Standard Technical Specification.
Special Considerations: None
Major Incidentals: Seedbed preparation, agriculture limestone, fertilizer, seed, and mulch
Measurement: Actual Quantities shall be measurement as the next tenth of an acre seeded as approved by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “RESIDENTIAL SEEDING” in accordance with the
“General Provisions” AML Standard Technical Specification. Such payment
ACCESS REPAIR & SAFETY
39 DENSE GRADE
AGGREGATE
This item shall consist of furnishing all materials, equipment, and labor necessary to place, and compact dense grade aggregate (DGA) as depicted on the Drawings and as directed by the ENGINEER in accordance with “Crushed
Aggregate and Channel Lining” AML Standard Technical Specification.
Special Considerations: This item is for temporary paved roadway repairs and base preparation prior to bituminous repair. DGA for pipe backfill is incidental to the pipe.
Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) of aggregate installed and accepted by the
ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and
Unit Price bid for "DENSE GRADE AGGREGATE FOR ROADWAYS” in accordance with the “General Provisions” AML Standard Technical equipment, materials, and incidentals.
COR & BID & BMP 21
40 ROADWAY STONE This item shall consist furnishing all materials, equipment, and labor necessary to place and compact as necessary the various gradations of stone as depicted on the Drawings and as directed by the ENGINEER in accordance with the
“Crushed Aggregate and Channel Lining” AML Standard Technical
Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) of each type of channel lining, and/or aggregate installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and the Unit Price bid for “ROADWAY STONE” in accordance with the “General
41 BITUMINOUS
REPAIR
This item shall consist of furnishing all materials, equipment, and labor necessary to repair bituminous surfaces damaged by construction activities as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Bituminous Repair” AML Standard Technical Specification.
Removal and disposal of old materials are covered under the site preparation bid item.
Special Considerations: None
Major Incidentals: DGA, subgrade preparations, materials, placement
Measurement: Actual Quantities shall be measured based on weigh tickets supplied to the ENGINEER as ton(s) of bituminous placed and accepted by the
ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and
Unit Price bid for “BITUMINOUS REPAIR” in accordance with the “General
42 FLOWABLE FILL This item shall consist of furnishing all materials, equipment, and labor for the purpose of backfilling culverts across roadways and at headwalls as depicted on the Drawings and as directed by the ENGINEER in accordance with the “Grout
Products” AML Standard Technical Specification.
Special Considerations: None
Major Incidentals: Steel plates for traffic.
Measurement: Actual quantities shall be measured as the next whole cubic yard installed and accepted by the ENGINEER.
Payment: Payment shall be the product of the Actual Accepted Quantities and
Unit Price bid for “FLOWABLE FILL” in accordance with the “General
COR & BID & BMP 22
43 CHAIN LINK FENCE This item shall consist of furnishing all materials, equipment, and labor necessary to construct a chain-link safety fence as depicted on the Drawings, AML Standard Details, and as directed by the ENGINEER in accordance with the “Fence” AML Standard Technical Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured to the next whole linear feet of fence installed and accepted by the ENGINEER.
Payment: Payment shall be the product of Actual Accepted Quantities and the
Unit Price bid for “CHAIN LINK FENCE” in accordance with the “General
44 WOVEN WIRE
FENCE
This item shall consist of furnishing all materials, equipment, and labor necessary to construct a woven wire fence as depicted on the Drawings, AML
Standard Details, and as directed by the ENGINEER in accordance with the
“Fence” AML Standard Technical Specification.
Special Considerations: None
Measurement: Actual Quantities shall be measured to the next whole linear feet of fence installed and accepted by the ENGINEER.
Payment: Payment shall be the product of Actual Accepted Quantities and the
Unit Price bid for “WOVEN WIRE FENCE” in accordance with the “General
COR & BID & BMP 23
Erosion and Sediment Control
Best Management Practices (BMP) Plan
COR & BID & BMP 24
January 2017
COR & BID & BMP 25
OVERVIEW
This Best Management Practices (BMP) plan is a guide for Kentucky Division of Abandoned
Mine Lands (DAML) projects. It contains information regarding preventing, reducing and controlling erosion, sediment, and pollutant runoff from Abandoned Mine Land (AML)
Reclamation and Acid Mine Drainage (AMD) Abatement project construction sites. The information in this BMP will aid DAML staff and contractors in selecting, installing, and maintaining erosion prevention and sediment control measures during the different stages of construction. This BMP plan, in accordance with DAML Technical Specifications and Standard
Drawings, is intended to protect Kentucky’s streams from potential water quality impacts resulting from DAML projects.
This general BMP document is to outline the various pollution prevention measures used on
AML Reclamation or AMD Abatement Projects. The primary sources of pollutants are solids mobilized during storm events and precipitants from mineralized mine drainage. Other sources of pollutants include oil/fuel/grease from servicing and operating construction equipment, concrete washout water, sanitary wastes, and trash/debris.
EROSION PREVENTION AND SEDIMENT CONTROL MEASURES
Plans for Reclamation and AMD abatement construction projects will include erosion control measures on the planview sheets when possible, and will depict Disturbed Drainage Areas
(DDAs) and related information. The construction notes and project description may describe other control measures. The Contractor and Engineer may select an additional BMP for the project as the project changes and construction progresses. Projects that do not have DDAs annotated in the plans will employ the same concepts selecting and implementing this general
BMP plan.
Address disturbed areas or sources of sediments by the most effective means in the specific work area. Direct non-storm water discharges to sediment basins/traps or to a filter fence enclosure in a flat…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .