Addendum ONE_APA 2024 RW 10-28 Seal Coat.pdf
PDF 200 KB Posted
- Solicitation number
- 2024 Seal Coat and Restripe
- Issued by
- Arapahoe County, Eagle Town, Colorado
About this file
Addendum Number One for the 2024 Runway 10/28 Seal Coat and Marking Removal and Remark Airfield project is issued by the Arapahoe County Public Airport Authority for Centennial Airport in Englewood, Colorado. The addendum provides clarifications and updates to the original bid documents, including an updated electronic proposal form and modifications to the pavement marking plan. Key changes include specifying that Runway 10/28 will receive two coats of paint (initial and final), with 52,700 square feet of initial markings, and detailing the removal and remarking process for runway markings. The document confirms that initial markings will only be on Runway 10/28, with no edge markings, and that the initial and final markings will follow the same specifications.
The bid items include mobilization, traffic control, rapid cure asphalt seal coat (with and without aggregate), marking removal, initial and final pavement markings, and black pavement marking. Quantities range from 1 unit for mobilization and traffic control to 285,500 square feet for final pavement marking. The project requires the contractor to provide their own water meter, has a designated area for disposing of gray water and solids from water blasting, and has a clean water source on-site. Builder's Risk Insurance is not required for this project. The work on Runway 10/28 and Taxiway C connectors must be completed prior to May 25, 2024, with bids due by 10:00 a.m. on February 28, 2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CENTENNIAL AIRPORT
2024 RUNWAY 10/28 SEAL COAT AND MARKING REMOVAL AND REMARK AIRFIELD
ADDENDUM NUMBER ONE
CENTENNIAL AIRPORT
2024 RUNWAY 10/28 SEAL COAT AND MARKING REMOVAL AND REMARK AIRFIELD
ADDENDUM NUMBER ONE
February 21, 2024
GENERAL
1. An updated electronic proposal form has been included in this Addendum Number One. Please only use this form for bidding.
CONTRACT DRAWINGS
1. UPDATE DRAWING CT101: PAVEMENT MARKING PLAN
UPDATE Note 2 to read:
“ALL RUNWAY MARKINGS WITHIN THE SEAL COAT LIMITS WILL BE REMOVED
PRIOR TO SEAL COAT OPERATIONS. TAXIWAY MARKINGS AND RUNWAY BLAST
PAD MARKINGS SHALL REMAIN. CONTRACTOR SHALL MASK ALL TAXIWAY
MARKINGS WITHIN SEAL COAT LIMITS EXCEPT FOR TAXIWAY CENTERLINE
MARKINGS AND RUNWAY BLAST PAD MARKINGS PRIOR TO THE START OF
CONSTRUCTION. THIS WILL BE CONSIDERED INCIDENTAL TO THE PROJECT.
RUNWAY MARKINGS REMOVED SHALL BE REMARKED AS INITIAL. AFTER
MARKINGS ARE REMOVED, THE PAVEMENT SHALL BE SEALED WITH THE
OVERALL SEAL COAT OPERATIONS PRIOR TO INITIAL MARKING. RUNWAY
MARKINGS, TAXIWAY CENTERLINE, AND BLAST PAD MARKINGS WILL BE PAID
FOR AS INITIAL MARKING AND FINAL MARKING.”
CONTRACTOR QUESTIONS
1. Question: I have a question in regards to the initial marking quantities. Is Runway 10/28 receiving two coats of paint?
Response: Runway 10/28 will receive two coats of paint (initial and final). The bid quantity for initial paint has been updated to 52,700 SF under this Addendum #1.
2. Question: Can you provide me with some detail on the 52,700 SF of initial markings?
Response: Initial markings will be all markings that have been removed or sealed over. Update made to sheet CT101 to clarify. See update above.
3. Question: Will there be initial markings in other areas than Runway 10/28?
Response: No.
4. Question: Are you wanting runway edge lines on Runway 10/28?
Response: No, there are no edge markings on Runway 10/28 (see marking plans and detail 5, CT503).
5. Question: Will the Initial Markings follow the same spec as the Final?
CENTENNIAL AIRPORT
2024 RUNWAY 10/28 SEAL COAT AND MARKING REMOVAL AND REMARK AIRFIELD
ADDENDUM NUMBER ONE
Response: Yes.
6. Question: Will Builder's Risk Insurance be required for this year's project?
Response: No.
7. Question: Is there a place on site that we can dispose of the gray water?
8. Is there a riprap pile or spot to dispose of the solids from the water blasting operation?
9. Is there a clean water source on site?
Response: Yes, see locations on GC001.
10. Will we be required to get a water meter permit from the city?
Response: Yes, Contractor to provide their own water meter.
Total Pages of Addendum Number One with Enclosures – 3 pages including the updated Addendum #1 Proposal Form attached.
Your acknowledgment that these clarifications/revisions have been incorporated must be noted in the PROPOSAL submitted with your bid.
END OF ADDENDUM NUMBER ONE
No. Bid Item Description Unit Quantity Unit Price Amount 1 C‐105‐1 Mobilization LS 1 2 C‐105‐1 Traffic Control LS 1 3 P‐608R‐8.1 Rapid Cure Asphalt Seal Coat with Aggregate SY 29,350 4 P‐608R‐8.2 Rapid Cure Asphalt Seal Coat without Aggregate SY 17,550 5 P‐620‐5.1 Marking Removal SF 30,850 6 P‐620‐5.2 Initial Pavement Marking SF 52,700 7 P‐620‐5.3 Final Pavement Marking SF 285,500 8 P‐620‐5.4 Black Pavement Marking SF 7,800
Total:
Bidder's Firm Name Signature Date
Centennial Airport 2024 Runway 10/28 Seal Coat and Marking Removal and Remark Airfield
Proposal Form
**If there is no work shown in the bidding schedule above, the work shall be considered as a subsidiary obligation of the Contractor and will not be measured or paid for, unless prior approval is given by the Airport**
Addendum Number One February 21, 2022