Addendum Number _1.pdf

PDF 106 KB Posted

Attached to
McBrod Roof Replacement
Solicitation number
2026-64
Issued by
Clackamas County, Mission CDP, Oregon

About this file

This is Addendum Number 1 to Invitation to Bid #2026-64 for the McBrod Roof Replacement Project issued by Clackamas County, Oregon on August 18, 2026. The project scope involves installation of a complete thermoplastic polyolefin (TPO) membrane roofing system with recovery board, mechanically fastened to the existing roof structure, including disposal of demolition debris and waste. The addendum amends the contract dates established in the original bid documents, revising the substantial completion date to June 15, 2027 and the final completion date to June 30, 2027, with all work required to be completed by July 1, 2027.

No pricing terms, set asides, incumbent information, funding requirements, or other financial details are specified in this addendum. The document serves solely to clarify and modify the project timeline from the original Invitation to Bid #2026-64 published on August 13, 2026, with all other terms and conditions of the original bid and any subsequent addenda remaining unchanged.

View the file

Other files

File Type Posted
Bid Notice-McBrod Roof Replacement.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID #2026-64

McBrod Roof Replacement Project

ADDENDUM NUMBER #1

August 18, 2026

On August 13, 2026, Clackamas County (“County”) published Invitation to Bid #2026-64 (“BID”). The County has found that it is in its interest to amend the BID through the issuance of this Addendum #1. Except as expressly amended below, all other terms and conditions of the original BID and subsequent Addenda shall remain unchanged.

1. The following changes are made to the sample Public Improvement Contract, Section 4, Contract dates:

SUBSTANTIAL COMPLETION DATE: June 15, 2027 FINAL COMPLETION DATE: June 30, 2027

2. The following changes are made to the Project Information, Plans, Specifications and Drawings, Project Scope: All work must be completed by July 1, 2027.

End of Addendum

File details come from the government source that posted it. Updated .