ADDENDUM_NO1__7-24-261 (1).pdf

PDF 181 KB Posted

Attached to
7-20260724115618 MDOT
Solicitation number
3170036324
Issued by
Mississippi

About this file

This is an Addendum Number 1, dated July 23, 2026, issued by the Mississippi Department of Transportation (MDOT) for the Monument Street Bridge Replacement Project, identified as Project No. STP-7262-00(007)/109279-701000. The addendum modifies the original bid documents and contract requirements for this bridge replacement initiative. Bidders are required to acknowledge receipt of this addendum in their bid submissions, and all terms and conditions outlined in the addendum become part of the binding contract upon award. The addendum serves to clarify specifications, adjust requirements, or address questions that arose during the bidding period to ensure all potential contractors have uniform and updated information for proposal preparation.

The addendum contains specific modifications to the original project documents that supersede conflicting provisions in the base bid package. All contractors submitting bids must formally acknowledge receipt and acceptance of Addendum Number 1 as a condition of bid validity. Failure to acknowledge the addendum may result in bid rejection. The modifications detailed within establish uniform requirements for all bidders and ensure compliance with the updated project specifications and conditions established by MDOT as of the addendum issuance date.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .