This is Addendum No. 3 to RFB-151-25 issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration for Campground Improvements at Kenlake State Park in Benton, Kentucky. The addendum, dated December 23, 2024, adds significant technical specifications and modifications including new sections for medium voltage cables and accessories (Section 26 05 20) and pad-mounted transformers (Section 26 12 02). Major changes include revisions to wastewater lift station specifications allowing for approved equals to Myers pumps, updates to multiple utility drawings (U201-U205), modifications to primary power scope between utility company and electrical contractor, and addition of WiFi infrastructure conduit work.

The technical modifications include detailed requirements for electrical systems, grounding conductors, cable specifications, transformers, and installation requirements. Notable additions include specifications for conduit encasement in limestone areas, requirements for pull boxes at specific intervals, and updates to transformer sizes and riser diagrams. The addendum also adds GE as an approved equal for Packaged Terminal Heat Pumps and includes a new Diffuser and Grille Schedule. The existing lift station must remain operational until the new station is installed and operational, after which all existing power connections must be completely removed back to the source.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-151-25

FOR: Campground Improvements Kenlake State Park Department of Parks Benton, Kentucky

DATE: December 23, 2024

RFB-785-2500000304

ADDENDUM NO. Three (3)

BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING

UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.

Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.

END OF ADDENDUM

Invitation to Bid No. RFB-151-25 For: Campground Improvements Kenlake State Park Department of Parks Benton, Kentucky

Kristi Sharp, Statewide Procurement Manager Division of Engineering and Contract Administration

Campground Renovation Parks – Campgrounds – Multi Park West Kenlake Campground Engineering File No. 670-CB58-CO54-04 C/S Project No. 2326D

RFB 151-25

2024.12.23

Addendum No. 03 _ The original specifications and drawings dated RTA 11/07/24 for the above referenced project are amended as noted in this Addendum.

Receipt of this Addendum shall be acknowledged by inserting its number in the space provided on the Official Bid Document for RFB 151-25

SPECIFICATIONS

1) Section 33 32 19 – Wastewater Lift Station: Revise first sentence of Section 2 as follows:

GRINDER PUMPS and Drawings C6.2 and C6.3: Myers pumps and Myers package lift stations (wet well and controls) included in the specification and drawings are the basis of design for these lift stations. Please note that “approved equals” are allowed for bidding that meet the requirements of the plans and specifications.

2) Section 26 05 20 Medium Voltage Cable and Accessories: Add specification section.

3) Section 26 12 02 Pad-Mounted Transformers: Add specification section.

DRAWINGS

4) Sheet UD101 – Existing lift station located on site shall remain operational until new lift station is installed and operational. Upon lift station becoming operational, all existing power connections to existing lift station shall be removed in their entirety. All conduit, wire, boxes, etc. shall be removed back to the source.

5) Sheet U201 – Replace sheet with revised sheet. Revise drawing scale and update primary power scope of work between utility company and electrical contractor.

6) Sheet U202 – Replace sheet with revised sheet. Add power to campsite as noted. Revise drawing scale and update primary power scope of work between utility company and electrical contractor.

7) Sheet U203 – Replace sheet with revised sheet. Add power to campsite as noted. Revise

8) Sheet U204 – Replace sheet with revised sheet. Add power to campsite as noted. Revise

9) Sheet U205 – Replace sheet with revised sheet. Add power to campsite as noted. Revise

10) Sheet U301 – Replace sheet with revised sheet. Update riser diagram and transformer sizes.

11) Sheet U401 – All primary conduits shall be concrete encased where depth of four (4) feet is not achievable due to limestone conflict according to Geotechnical Report to provide adequate protection of feeders installed within conduits.

12) Sheet U402 – Contractor shall install pull boxes between all primary conduits in excess of 400 feet. Coordinate placement of boxes with existing conditions to avoid conflict.

13) Sheet E102 – Replace sheet with revised sheet. Add scope of work for conduit infrastructure to support future WIFI around the site.

14) Sheet H501 – Replace sheet with revised sheet. Add Diffuser and Grille Schedule. Add “GE” as approved equal for Packaged Terminal Heat Pumps.

Parks – Campgrounds – Multi Park West Account # 670-CB58-CO54-04 Kenlake Campground CS Project NO: 2326D

MEDIUM VOLTAGE CABLES AND ACCESSORIES 26 05 20 - 1

SECTION 26 05 20 - MEDIUM VOLTAGE CABLES AND ACCESSORIES

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. Medium voltage power cable

B. Grounding conductor

C. Separable connectors and splices

D. Terminators

E. Fireproofing

1.2 APPLICABLE PUBLICATIONS: The following publications form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

A. Association of Edison Illuminating Companies (AEIC) Publication:

1. AEIC CS-6 Ethylene Propylene Rubber Insulated Shielded Power Cable Rated 5 Through 35 kV

B. Insulated Cable Engineers Association (ICEA) Publication:

1. ICEA S-68-516 EPR Insulated Wire and Cable

C. Institute of Electrical and Electronics Engineers (IEEE) Publications:

1. IEEE 48 Test Procedures and Requirements for High-Voltage Alternating-Current Cable Terminations

2. IEEE 386 Separable Insulated Connectors

3. IEEE 404 Extruded Dielectric Cable Joints

D. National Fire Protection Association (NFPA) Publication:

1. 70-99 National Electrical Code (NEC)

E. State of California Administrative Code (CAC):

1. Title 24, Part 3, CCR, 2001 California Electrical Code

F. State of California Public Utilities Commission (PUC) Publication:

1. G.O. 128 Rules for Construction of Underground Electric Supply and Communication Systems

MEDIUM VOLTAGE CABLES AND ACCESSORIES 26 05 20 - 2

G. Underwriters Laboratories (UL) Publication:

1. UL 1072 Medium Voltage Power Cables

1.3 SUBMITTALS

A. Submit under provisions of Section 26 05 26.

B. Product Data: Provide for:

1. Medium Voltage Cables (include proposed warranty with Product Data submittal)

2. Separable Connectors (each type)

3. Terminations

4. Cable Lubricant

5. Fireproofing Tape

C. Manufacturer's Instructions:

1. Installation instructions for cable.

2. Installation instructions for each type of splicing kit.

3. Installation instructions for each type of termination kit.

4. Installation instructions for fireproofing tape.

D Factory Test Reports:

1. Medium Voltage Cable: Submit certified report of factory tests performed in accordance with AEIC CS-6, Section E and ICEA S-68-516, Part 3 for approval prior to shipment of cable from the factory. Provide copy of original X-Y corona discharge plot with the certification.

2. Terminations: Manufacturer shall provide test reports certifying compliance with IEEE 48 Class 1 on the same type of cable as specified for this contract.

E. Certification of Cable Splicer/Terminator:

1. Submit medium voltage cable Splicer/Terminator certification of competency and experience 30 days before splices or terminations are made in medium voltage cables. Splicer/Terminator experience during the immediate past 3 years shall include performance in splicing and terminating cables of the type and classification being provided under this Contract.

2. In lieu of a certification of competency, the Contractor may demonstrate the qualification of a proposed cable splicer/terminator through formal training and relevant experience in splicing and termination cables of the type and class under this Contract. A notarized listing of all relevant projects completed by the proposed splicer/terminator during the past three years and all completed formal training must be submitted to demonstrate qualification.

3. Each cable splicer may be required to make an approved dummy splice in the presence of the Trustee's representative in accordance with the manufacturer's instructions. The contractor shall furnish all tools, materials and supplies necessary for the dummy splices.

MEDIUM VOLTAGE CABLES AND ACCESSORIES 26 05 20 - 3

F. Cable Field Test Reports:

1. Submit field test reports on all new cables installed under this project within 30 days of testing.

2. In addition to above requirement, Contractor shall maintain heavy-duty, 3-ring binder at the field office with all cable test reports sorted by feeder number.

These reports shall be available for review by the Engineer or Trustees' representative at all times. The lack of a testing report may be cause for rejection of that portion of Work.

3. Submit reports at project completion with the Operation and Maintenance Manuals.

G. Cable Warranty: Submit manufacturer's cable warranty .

1.4 CONDUCTOR COLOR CODING

A. For power conductors, provide all single conductors and individual conductors of multi-conductor power cables with integral insulation pigmentation of the designated colors, except conductors larger than No. 6 AWG may be provided with color coding by wrapping the conductor at each end and at all accessible locations with vinyl tape.

Where this method of color coding is used, wrap at least six full overlapping turns of tape around the conductor covering an area 1-1/2 to 2 inches wide at a visible location.

B. Phase A, B, and C implies the direction of positive phase rotation.

C. Use the following colors unless directed otherwise by the Trustee or Engineer. Verify color coding with Engineer prior to construction.

System Conductor Color

12,470 Volts Phase A Orange 3-Phase, 3-Wire Phase B Red Phase C Black

PART 2 - PRODUCTS

2.1 MEDIUM VOLTAGE POWER CABLES

A. Cables shall be single conductor, MV-105, insulation levels as noted below, 15kV for use on a grounded system. Conductor size and insulation voltage class shall be as indicated on the drawings. The conductor screen, the EPR insulation and the insulation screen shall be applied triple tandem extrusion process to provide a virtual corona-free cable core.

1. Conductor shall be Class B stranded, concentric or compact round, soft or annealed copper per Part 2 of ICEA S-68-516.

2. Conductor screen shall be extruded semiconducting thermoset compound per ICEA S-68-516. The material shall be compatible with the conductor metal, shall

MEDIUM VOLTAGE CABLES AND ACCESSORIES 26 05 20 - 4

be uniformly and firmly bonded to the overlying insulation and be free stripping from the conductor.

3. The insulation shall be ethylene / propylene rubber conforming to AEIC CS 6 and shall have a minimum average thickness of 175 mils (15kV).

4. The insulation screen shall be extruded black, semi-conducting, thermosetting compound applied directly over the insulation. The material shall be compatible with the insulation and overlying metallic shield. The insulation screen shall be free-stripping from the insulation and comply with Paragraph D.1 of AEIC CS-6.

The insulation screen shall leave no conductive residue on the surface of the insulation after stripping.

5. Metallic shield and jacket shall be 1 copper metallic shielding tape, 5 mils thick applied with a 25% overlap, covered by a polyvinyl chloride (PVC) jacket conforming to ICEA S-68-516, or six solid corrugated copper drain wires, laid parallel to the axis of the conductor, imbedded in a flame resistant, semi-conducting chlorinated polyethylene (CPE) jacket meeting the requirements of ICEA S-68-516 Part 4.1.1.1.

B. Quality Assurance: The manufacturer shall have a minimum of ten years U.S.

production experience in triple extrusion of EPR insulation in medium voltage cable constructions. The cable shall be manufactured and tested by the same manufacturer in accordance with AEIC CS6. Certified qualification data shall be required prior to order placement and certified test reports are to be supplied at time of shipment.

C. Testing Of Completed Cables: Testing shall be done in accordance with the latest edition of ICEA S-68-516 and UL-1072. In addition, each reel of cable shall pass the Partial Discharge Extinction Level Test per ICEA and the Partial Discharge (Corona) Test per AEIC CS6 Section E. Manufacturer shall provide a notarized Certificate of Compliance along with test results (including x-y plots) which demonstrates that the cable furnished strictly complies with this specification.

D. The cable shall be delivered to the job site on reels. Cables shall bear the date of manufacture, size and type imprinted on the cable jacket with other identification.

Cable manufactured more than 12 months before delivery to the job site shall not be used. Cable ends shall be sealed. Cable shall be equipped with a cable pulling eye.

E. Cable Warranty: Manufacturer shall warrant that the cable is free from defects in materials and workmanship for a life of five (5) years from the date of installation when installed, terminated and operated within acceptable industry practices. In the event the cable is found to be defective, the manufacturer shall replace the length of cable free of charge and shall extend the same guarantee on the replacement cable.

F. Approved Manufacturers: The Okonite Co. type "Okoguard-Okoseal," or BICC type "Unishield or Uniblend."

2.2 EQUIPMENT GROUNDING CONDUCTORS

MEDIUM VOLTAGE CABLES AND ACCESSORIES 26 05 20 - 5

A. 600 volt insulated stranded copper conductors sized at 4/0 AWG if not otherwise indicated on the drawings.

2.3 IN-LINE SPLICES

A. None allowed.

2.4 TERMINATIONS

A. Termination kits shall be capable of properly terminating a 15 KV single conductor polymeric-insulated cable. Kits shall meet Class I requirements and be design-proof tested per IEEE 48-1975 and be capable of passing a test sequence per draft and revisions of IEEE 404-1986. Kits as specified shall accommodate any common form of cable shielding/construction without the need for special adaptors or accessories, and shall accommodate a wide range of cable size and, also, be capable of being properly installed on out-of-round or out-of-tolerance cable as per relevant IDEA standards. Kits shall accommodate commercially available connectors.

B. Terminations for single-conductor cable shall consist of cold-shrink stress control and outer non-tracking insulation tubes along with a high relative permittivity sealant for environmental sealing. Outdoor terminations shall include rain shields.

C. Termination kits shall be manufactured by 3M Corporation, Cooper.

D. All loadbreak elbows shall be equipped with peroxide-cured EPDM insulation, copper top connector, tin plated copper loadbreak probe with an ablative arc follower tip, stainless steel reinforced pulling eye, and capacitive test point. Provide amperages as indicated on drawing, Cooper RTE or approved equal.

E. All 200/600A loadbreak adapters shall be EPDM insulation only.

2.5 CABLE LUBRICANT: UL Listed. Lubricants for assisting in the pulling of all jacketed cables shall be those specifically recommended by the cable manufacturer. The lubricant shall not be deleterious to the cable sheath, jacket or outer coverings.

2.6 FIREPROOFING TAPE

A. The tape shall consist of a flexible conformable unsupported intumescent elastomer.

The tape shall be not less than .030 inches thick and be capable of over 100% elongation. The tape shall be noncorrosive to the cable sheath, shall be self-extinguishing, and shall not support combustion. The tape shall not deteriorate when subjected to oil, water, gases, salt water, sewage and fungus. The completed installation of a shall be capable of withstanding a high current (60Hz) fault arc temperature of 13,000°K for 70 cycles.

PART 3 - EXECUTION

MEDIUM VOLTAGE CABLES AND ACCESSORIES 26 05 20 - 6

3.1 INSTALLATION

A. Underground cable installation shall conform to NFPA 70 and all other state and local codes.

3.2 GENERAL

A. Prepare the ducts for pulling in conductors in accordance with the requirements of specifications.

B. Do not exceed cable manufacturer's recommendations for maximum pulling tensions and minimum bending radii. Where pulling compound is used, use only compound compatible with the cable outer jacket and with the raceway involved.

C. Tighten all screws and terminal bolts using torque type wrenches and/or drivers to tighten to the inch-pound requirements of the NEC and UL.

D. Where single conductors and cables in manholes, handholes, vaults, cable trays, and other indicated locations are not wrapped together by some other means such as arc and fireproofing tapes, bundle throughout their exposed length all conductors entering from each conduit with nylon, self-locking, releasable, cable ties placed at intervals not exceeding 18 inches on centers.

E. Splices will not be permitted except where noted without prior written approval of the Engineer.

F. Make all joints and terminations with high voltage kits specified herein and in accordance with manufacturer's instructions. Once started, install splices or terminations as a continuous operation.

G. Provide terminals or connectors acceptable for the type of conductor material used.

3.3 CONDUCTOR ARC AND FIREPROOFING TAPES

A. Use arc and fireproofing tapes on all 15kV single conductors throughout their entire exposed length in all manholes and vaults.

B. Wrap together as a single cable all conductors entering from each conduit.

C. Wrap conductors individually within 36" of a separable connector to allow for disconnection.

D. Follow tape manufacturer's installation instructions. Secure the arc and fireproofing tape at frequent intervals with bands of the specified glass cloth electrical tape. Make each band of at least two wraps of tape directly over each other.

END OF SECTION 26 05 20

Kenlake Campground CS Project No.: 2326D

PAD-MOUNTED TRANSFORMERS 26 12 02 - 1

SECTION 26 12 02 - PAD-MOUNTED TRANSFORMERS

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes Liquid-filled pad-mounted transformers.

B. Field quality-control test reports.

1.2 QUALITY ASSURANCE

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.

B. IEEE C57.12.00 - Standard General Requirements for Liquid-Immersed Distribution, Power, and Regulating Transformers (ANSI).

C. ANSI C57.12.22 - Requirements for Pad-Mounted, Compartmental-Type, Self-Cooled, Three-Phase Distribution Transformers with High Voltage Bushings; 2,500 kVA and Smaller: High Voltage, 34,500 GrdY/19,920 Volts and Below; Low Voltage, 480 Volts and Below - Requirements.

D. ANSI C57.12.26 - Standard for Transformers - Pad-Mounted, Compartmental-Type, Self-Cooled, Three-Phase Distribution Transformers for use with Separable Insulated High Voltage Connectors: High Voltage, 34,500 GrdY/19,920 Volts and Below; 2,500 kVA and Smaller.

E. ANSI C57.12.28 - Switchgear and Transformers, Pad-Mounted Equipment - Enclosure Integrity.

F. IEEE C57.12.90 - Standard Test Code for Liquid-Immersed Distribution Power, and Regulating Transformers and Guide for Short-Circuit Testing of Distribution and Power Transformers (ANSI).

G. ANSI/IEEE 386 - Separable Insulated Connector Systems for Power Distribution Systems Above 600 V.

H. ASTM D877 - Test Method for Dielectric Breakdown Voltage of Insulating Liquids Using Disk Electrodes.

I. Comply with NFPA 70.

1.3 SUBMITTALS

A. Submit shop drawings indicating outline dimensions, connection and support points, weight, specified ratings and materials.

PAD-MOUNTED TRANSFORMERS 26 12 02 - 2

B. Submit product data indicating standard model design tests and options.

C. Submit manufacturer's installation instructions.

1.4 OPERATION AND MAINTENANCE

A. Submit operation and maintenance data.

B. Include procedures for cleaning unit, and replacing components.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Schneider Electric

B. Pauwels Transformer Inc.

C. Cooper Power Systems

D. ABB

E. or approved equal.

2.2 FLUID FILLED PAD-MOUNTED TRANSFORMERS

A. The transformers shall be compartmental type, self-cooled, for mounting on a pad and shall comply with the latest applicable standards.

B. The average temperature rise of the windings, measured by the resistance method, shall be 65° C when the transformer is operated at rated kVA output in a 40° C ambient. The transformer shall be capable of being operated at rated load in a 30° C average, 40° C maximum ambient, as defined by ANSI C57.12.00 without loss of service life expectancy.

C. Coolant and insulating fluid.

1. The dielectric coolant shall be listed less-flammable fluid meeting the requirements of National Electrical Code® Section 450-23 and the requirements of the National Electrical Safety Code (IEEE C2-1997), Section 15. The dielectric coolant shall be readily and completely biodegradable per EPA OPPTS

835.3100. The base fluid shall be 100% derived from edible seed oils with performance enhancing additives. The fluid shall result in zero mortality when tested on trout fry per OECD G.L. 203 and be non-bioaccumulating. The fluid shall be published under US EPA Environmental Technology Verification (ETV) requirements and tested for compatibility with transformer components. The fluid shall be Factory Mutual Approved, UL® Classified Dielectric Medium (UL-EOUV) and UL Classified Transformer Fluid (UL-EOVK) fluid.

PAD-MOUNTED TRANSFORMERS 26 12 02 - 3

D. The high and low voltage compartments shall be located side by side, separated by a steel barrier. When facing the transformer, the low voltage compartments shall be on the right. Terminal compartments shall be full height, air-filled, with individual doors.

The high voltage door fastenings shall not be accessible until the low voltage door has been opened.

E. The following accessories shall be provided as standard on all transformers:

1. Nameplate in low voltage compartment, 1inch upper filter press and filling plug, 1 inch drain valve with sampling device.

2. Drain valve provided on units rated 750 kVA and above.

3. (Lightning arrester mounting provisions in live front units only.) Tap changer, for de-energized operation only, which is externally operable and pad lockable. The front of both compartments shall be removable to allow the transformer to be rolled or skidded into position over conduit stubs. ANSI tank grounding provisions shall be furnished in both compartments.

F. The transformer shall have KVA rating as indicated on the drawings and be self-cooled (OA). Primary voltage 12,470 delta. Secondary voltage 208/120 wye, 4-wire, 60 Hz with two 2-1/2% full capacity above normal and two 2-1/2% below normal taps.

Impedance shall be manufacturer's standard impedance, ±7-1/2%. Basic impulse level of the primary winding shall be as specified in ANSI C57.12.00 for comparable kV class.

G. The transformer shall be of sealed-tank construction or sufficient strength to withstand a pressure of 7 psi without permanent distortion. The cover shall be welded and the fastenings tamper-resistant. The transformer shall remain effectively sealed for a top oil temperature range of -5° C to 105° C. When required, cooling panels will be provided on the back and sides of the tank. Lifting eyes and packing pads will be provided.

H. Coils shall be wound with copper conductors.

I. Core and coil assembly shall be the five-legged wound core type, using high grade, grain-oriented silicon steel laminations carefully annealed after fabrication to restore high magnetic permeability. Magnetic flux is to be kept well below the saturation point.

J. The high voltage terminations: Radial feed dead front, shall be provided with three (3) high voltage bushings in accordance with ANSI C57.12.34 for radial feed configurations. The bushing heights shall be in accordance with ANSI C57.12.34.

K. The low voltage bushings shall be molded epoxy and provided with blade-type spade terminals with NEMA standard hole spacing arranged for vertical take-off. The low voltage neutral shall be an insulated bushing, grounded to the tank by a removable ground strap.

L. Accessories

1. 1 inch drain valve with sampling device.

2. Automatic pressure relief device (self resealing with indicator).

3. Overvoltage Protection:

PAD-MOUNTED TRANSFORMERS 26 12 02 - 4

a. The overvoltage protection scheme provided with the transformer shall protect the high voltage winding externally mounted, Distribution Class M.O.V.E. Dead-front elbow arresters shall be supplied.

4. 12” high base spacer to match footprint of transformer base, factory painted to match transformer.

M. Testing - Tests shall be conducted in accordance with the provisions of ANSI C57.12.90 and shall include, as a minimum, the following tests:

1. Ratio

2. Polarity

3. Phase Rotation

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify existing field conditions

B. Modify pad as required to receive work.

C. Verify field measurements are as instructed by the manufacturer.

D. Verify that required utilities are available, in proper location and ready for use.

E. Beginning of installation means installer accepts conditions.

3.2 INSTALLATION

A. Remove existing transformer and primary conductors. Transport and off-load existing transformer at owner designated location on campus.

B. Re-install existing metering equipment.

C. Install the new transformer in accordance with manufacturer's instructions.

D. Install safety labels to NEMA 260.

E. Contractor shall coordinate with existing field conditions and provided all modifications and addition to the existing facilities as required to connect and support the new transformer

3.3 ADJUSTING

A. Adjust primary taps so that secondary voltage is within 2 % of rated voltage.

END OF SECTION 261202

AeccDbFace (AeccLand130)AeccDbSvFigure (AeccSurvey130)AeccDbGrading (AeccLand130)

AeccDbFace (AeccLand130)AeccDbSvFigure (AeccSurvey130)

1 1

2 2

4 5

6 8

MRM

SITE UTILITY DEMOLITION PLAN

UD101

REVISION HISTORY OF THIS DRAWING

PARKS - CAMPGROUNDS - MULTI PARK WEST

KENLAKE CAMPGROUND

DRAWING NO.10/01/2024

228 E. REYNOLDS RD., SUITE ONE, LEXINGTON, KY 40517 / PH. 859.273.3700 / FAX 859.271.6605

AS-BUILT DATE

DECA LOG #

DESCRIPTION OF REVISIONS DATE

DESCRIPTION OF REVISIONS DATE

DRAWING INFORMATION

A & E FILE NO.

DRAWING DATE

DRAWN BY

CHECKED BY

PHASE

RTA DATE

23629

RTA

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

ACCOUNT NO.

670-CB58-CO54-06

11/07/2024

NORTH

PROJECT

SCALE: 1" = 40'-0"

SITE UTILITY PLAN - KENLAKE STATE PARK (EXISTING CONDITIONS)

IT'S THE LAW

www.kentucky811.com

Kentucky 811 Know what's below.

Call before you dig.

Call 811 or 800-752-6007

BURIED UTILITIES NOTE

BURIED UTILITIES ARE SHOWN AT THEIR APPROXIMATE LOCATION

BASED UPON INFORMATION OBTAINED FROM UTILITY COMPANIES

AND FIELD EVIDENCE. OTHER BURIED UTILITIES MIGHT EXIST ON THE

SUBJECT SITE WHICH ARE NOT SHOWN ON THIS DRAWING. USE

EXTREME CAUTION DURING EXCAVATION PROCEDURES AND

CONTACT KENTUCKY 811 @ 811 OR 1-800-752-6007 FOR EXACT

LOCATION OF BURIED UTILITIES PRIOR TO EXCAVATION OPERATIONS.

NOTICE

SEE CIVIL PLANS FOR SITE GRADING AND ELEVATIONS.

ELECTRICAL

DEMOLITION TAG NOTES

(APPLIES TO THIS DRAWING ONLY)

1 EXISTING OVERHEAD UTILITY LINE SHALL BE REMOVED IN ITS ENTIRETY.

EXISTING CAMPSITE ELECTRIC PEDESTAL SHALL BE REMOVED IN ITS ENTIRETY.

ALL WIRING SHALL BE REMOVED BACK TO THE SOURCE. ALL EXISTING CONDUIT

SHALL BE CUT AND ABANDONED BELOW GRADE.

3 EXISTING UTILITY POLE SHALL BE REMOVED IN ITS ENTIRETY.

EXISTING ELECTRICAL SERVICE TO BUILDING SHALL BE REMOVED. ALL WIRING

SHALL BE REMOVED BACK TO THE SOURCE. ALL EXISTING CONDUIT SHALL BE

CUT AND ABANDONED BELOW GRADE. EXISTING ELECTRICAL PANEL WITHIN

BUILDING SHALL REMAIN FOR RE-USE DURING CONSTRUCTION. REFER TO NEW

WORK DRAWINGS FOR CONTINUATION.

5 EXISTING TELECOM SERVICE TO BUILDING SHALL REMAIN AND SHALL BE

PROTECTED FROM DAMAGE DURING DEMOLITION.

EXISTING ELECTRICAL SERVICE TO BUILDING SHALL BE REMOVED IN ITS

ENTIRETY. ALL WIRING SHALL BE REMOVED BACK TO THE SOURCE. ALL EXISTING

CONDUIT SHALL BE CUT AND ABANDONED BELOW GRADE.

7 EXISTING UTILITY POLE SHALL REMAIN.

EXISTING TELECOM SERVICE ROUTED TO BUILDING SHALL BE REMOVED BACK TO

THE SOURCE. COORDINATE REMOVAL OF SYSTEM WITH LOCAL UTILITY PRIOR TO

REMOVAL.

MRM

ADDENDUM 3.00 12/20/2024

12/20/2024

E PE P

E PE P

EPEP

DP1

EPEP

EPEP

EPEP

EPEP

EPEP

EPEP

EP EP

EP EP

DP3-9,11

UGE

GFI

WP

DP1-17

DP1-1,3

DP1-2,4

DP1-5,7

DP1-6,8

UG

E

UG

E

UG

E

UG

E

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE UGE

UGEUG

E

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE UGE

UGE

UGE

UGE

UGE

UGE

UGE UGE UGE UGE UGE UGE

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UG

E

UGE

UGE

UGE

U G

E U

G E

UGE

UGE

UGE

UG

E

UG

E

UG

E

U G

E U

G E

U G

E U

G E

U G

E

EP EP

DP3-14,16

PARTIAL ENLARGED ELECTRICAL SITE PLAN

U201

REVISION HISTORY OF THIS DRAWING

PARKS - CAMPGROUNDS - MULTI PARK WEST

KENLAKE CAMPGROUND

DRAWING NO.10/01/2024

228 E. REYNOLDS RD., SUITE ONE, LEXINGTON, KY 40517 / PH. 859.273.3700 / FAX 859.271.6605

AS-BUILT DATE

DECA LOG #

DESCRIPTION OF REVISIONS DATE

DESCRIPTION OF REVISIONS DATE

DRAWING INFORMATION

A & E FILE NO.

DRAWING DATE

DRAWN BY

CHECKED BY

PHASE

RTA DATE

23629

RTA

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

ACCOUNT NO.

670-CB58-CO54-06

11/07/2024

NORTH

PROJECT

SCALE: 1" = 20'-0"

SITE UTILITY PLAN - KENLAKE STATE PARK

IT'S THE LAW

www.kentucky811.com

Kentucky 811 Know what's below.

Call before you dig.

Call 811 or 800-752-6007

BURIED UTILITIES NOTE

BURIED UTILITIES ARE SHOWN AT THEIR APPROXIMATE LOCATION

BASED UPON INFORMATION OBTAINED FROM UTILITY COMPANIES

AND FIELD EVIDENCE. OTHER BURIED UTILITIES MIGHT EXIST ON THE

SUBJECT SITE WHICH ARE NOT SHOWN ON THIS DRAWING. USE

EXTREME CAUTION DURING EXCAVATION PROCEDURES AND

CONTACT KENTUCKY 811 @ 811 OR 1-800-752-6007 FOR EXACT

LOCATION OF BURIED UTILITIES PRIOR TO EXCAVATION OPERATIONS.

NOTICE

SEE CIVIL PLANS FOR SITE GRADING AND ELEVATIONS.

ELECTRICAL

CONSTRUCTION TAG NOTES

(APPLIES TO THIS DRAWING ONLY)

INSTALL DISTRIBUTION PANEL ON FREE-STANDING RACK ACCORDING TO 'FREE

STANDING RACK DETAIL'. COORDINATE PLACEMENT OF PANEL WITH EXISTING

CONDITIONS TO AVOID CONFLICT. REFER TO RISER DIAGRAM FOR FURTHER

REQUIREMENTS.

INSTALL RV PEDESTAL EQUAL TO HYPOWER ENERGYMATE ALONGSIDE WATER

AND SANITARY CONNECTIONS. RV PEDESTAL SHALL BE INSTALLED NO CLOSER

THAN SIX (6) FEET FROM NEAREST WATER CONNECTION. REFER TO 'RV

PEDESTAL DETAIL' FOR FURTHER REQUIREMENTS.

ROUTE (1) 3 INCH CONDUIT CONTAINING (3) #250MCM CU CONDUCTORS AND (1) #4

THWN CU GND FROM PANEL BOARD TO RV PEDESTAL TO BE INSTALLED. CONDUIT

SHALL BE ROUTED ALONG EXTERIOR OF CAMPSITES TO AVOID CONFLICT WITHIN

CAMPGROUND. CONTRACTOR SHALL FURNISH AND INSTALL SUITABLE LUGS

WITHIN PEDESTAL FOR TERMINATION OF CABLING. CONDUIT AND WIRE SIZING

INCREASED DUE TO VOLTAGE DROP REQUIREMENTS.

ROUTE (1) 2-1/2 INCH CONDUIT CONTAINING (3) #4/0 THWN CU CONDUCTORS AND

(1) #6 THWN CU GND FROM PANEL BOARD TO RV PEDESTAL TO BE INSTALLED.

CONTRACTOR SHALL FURNISH AND INSTALL SUITABLE LUGS WITHIN PEDESTAL

FOR TERMINATION OF CABLING. CONDUIT SHALL BE ROUTED ALONG EXTERIOR

OF CAMPSITES TO AVOID CONFLICT WITHIN CAMPGROUND. CONDUIT AND WIRE

SIZING INCREASED DUE TO VOLTAGE DROP REQUIREMENTS.

5 RECEPTACLE SHALL BE INSTALLED SURFACE MOUNTED ON FREE STANDING RACK

BELOW PANEL. COORDINATE PLACEMENT OF DEVICE TO AVOID CONFLICT.

ROUTE CONDUIT AND WIRING UNDERGROUND FROM SECONDARY COMPARTMENT

OF TRANSFORMER TO PANEL TO BE INSTALLED. REFER TO RISER DIAGRAM FOR

ALL CONDUIT AND WIRE SIZING REQUIREMENTS.

INSTALL TRANSFORMER PAD ACCORDING TO 'TRANSFORMER PAD' DETAIL.

COORDINATE ALL FINAL REQUIREMENTS WITH EXISTING CONDITIONS TO AVOID

CONFLICT.

8 REFER TO DRAWING U203 FOR CONTINUATION.

ROUTE CONDUIT AND CONDUCTORS UNDERGROUND BETWEEN TRANSFORMERS

TO BE INSTALLED ON SITE. REFER TO RISER DIAGRAM FOR CONDUIT AND

CONDUCTOR REQUIREMENTS.

10 REFER TO DRAWING U202 FOR CONTINUATION.

ROUTE CONDUIT UNDERGROUND FROM DISTRIBUTION PANEL TO EXISTING

GUARD SHACK BUILDING LOCATED ON SITE. COORDINATE ROUTING OF CONDUIT

WITH EXISTING CONDITIONS TO AVOID CONFLICT. REFER TO RISER DIAGRAM FOR

ALL CONDUIT AND WIRING REQUIREMENTS.

12 REFER TO DRAWING U204 FOR CONTINUATION.

ROUTE (1) 1 INCH CONDUIT UNDERGROUND FROM BATHHOUSE MECHANICAL

ROOM TO PROPOSED WIRELESS ACCESS POINT LOCATION AND CAP BELOW

GRADE. END OF CONDUIT SHALL BE WRAPPED WITH TRACER WIRE FOR FUTURE

IDENTIFICATION BY METAL DETECTION.

MRM

MRM

ADDENDUM 1.00 12/11/2024

ADDENDUM 3.00 12/20/2024

ALTERNATE RESTROOM

DP3

EPEP

EPEP

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

EPEP

EP EP

EPEP

EPEP

EP EP

EP EP

DP2

EPEP

EPE P

EPEP

E PE P

EPEP

EPEP

EPEP

EPEP

EPEP

DP2-1,3

DP2-2,4

GFI

WP

DP2-13

DP2-5,7 4

DP2-6,8

DP2-9,11

DP3-1,3

EPEP

DP3-10,12

2DP3-2,4

DP3-5,7

4GFI

WP

DP3-17

DP3-6,8

EP EP

DP3-9,11

UG

E

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGEUGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UG

E

UG

E

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

U G

E

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE UGE

MRM

MRM

PARTIAL ENLARGED ELECTRICAL SITE PLAN

U202

REVISION HISTORY OF THIS DRAWING

PARKS - CAMPGROUNDS - MULTI PARK WEST

KENLAKE CAMPGROUND

DRAWING NO.10/01/2024

228 E. REYNOLDS RD., SUITE ONE, LEXINGTON, KY 40517 / PH. 859.273.3700 / FAX 859.271.6605

AS-BUILT DATE

DECA LOG #

DESCRIPTION OF REVISIONS DATE

DESCRIPTION OF REVISIONS DATE

DRAWING INFORMATION

A & E FILE NO.

DRAWING DATE

DRAWN BY

CHECKED BY

PHASE

RTA DATE

23629

RTA

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

ACCOUNT NO.

670-CB58-CO54-06

11/07/2024

NORTH

PROJECT

SCALE: 1" = 20'-0"

SITE UTILITY PLAN - KENLAKE STATE PARK

IT'S THE LAW

www.kentucky811.com

Kentucky 811 Know what's below.

Call before you dig.

Call 811 or 800-752-6007

BURIED UTILITIES NOTE

BURIED UTILITIES ARE SHOWN AT THEIR APPROXIMATE LOCATION

BASED UPON INFORMATION OBTAINED FROM UTILITY COMPANIES

AND FIELD EVIDENCE. OTHER BURIED UTILITIES MIGHT EXIST ON THE

SUBJECT SITE WHICH ARE NOT SHOWN ON THIS DRAWING. USE

EXTREME CAUTION DURING EXCAVATION PROCEDURES AND

CONTACT KENTUCKY 811 @ 811 OR 1-800-752-6007 FOR EXACT

LOCATION OF BURIED UTILITIES PRIOR TO EXCAVATION OPERATIONS.

NOTICE

SEE CIVIL PLANS FOR SITE GRADING AND ELEVATIONS.

ELECTRICAL

CONSTRUCTION TAG NOTES

(APPLIES TO THIS DRAWING ONLY)

INSTALL DISTRIBUTION PANEL ON FREE-STANDING RACK ACCORDING TO 'FREE

STANDING RACK DETAIL'. COORDINATE PLACEMENT OF PANEL WITH EXISTING

CONDITIONS TO AVOID CONFLICT. REFER TO RISER DIAGRAM FOR FURTHER

REQUIREMENTS.

INSTALL RV PEDESTAL EQUAL TO HYPOWER ENERGYMATE ALONGSIDE WATER

AND SANITARY CONNECTIONS. RV PEDESTAL SHALL BE INSTALLED NO CLOSER

THAN SIX (6) FEET FROM NEAREST WATER CONNECTION. REFER TO 'RV

PEDESTAL DETAIL' FOR FURTHER REQUIREMENTS.

ROUTE (1) 3 INCH CONDUIT CONTAINING (3) #250MCM CU CONDUCTORS AND (1) #4

THWN CU GND FROM PANEL BOARD TO RV PEDESTAL TO BE INSTALLED. CONDUIT

SHALL BE ROUTED ALONG EXTERIOR OF CAMPSITES TO AVOID CONFLICT WITHIN

CAMPGROUND. CONTRACTOR SHALL FURNISH AND INSTALL SUITABLE LUGS

WITHIN PEDESTAL FOR TERMINATION OF CABLING. CONDUIT AND WIRE SIZING

INCREASED DUE TO VOLTAGE DROP REQUIREMENTS.

ROUTE (1) 2-1/2 INCH CONDUIT CONTAINING (3) #4/0 THWN CU CONDUCTORS AND

(1) #6 THWN CU GND FROM PANEL BOARD TO RV PEDESTAL TO BE INSTALLED.

CONTRACTOR SHALL FURNISH AND INSTALL SUITABLE LUGS WITHIN PEDESTAL

FOR TERMINATION OF CABLING. CONDUIT SHALL BE ROUTED ALONG EXTERIOR

OF CAMPSITES TO AVOID CONFLICT WITHIN CAMPGROUND. CONDUIT AND WIRE

SIZING INCREASED DUE TO VOLTAGE DROP REQUIREMENTS.

5 RECEPTACLE SHALL BE INSTALLED SURFACE MOUNTED ON FREE STANDING RACK

BELOW PANEL. COORDINATE PLACEMENT OF DEVICE TO AVOID CONFLICT.

ROUTE CONDUIT AND WIRING UNDERGROUND FROM SECONDARY COMPARTMENT

OF TRANSFORMER TO PANEL TO BE INSTALLED. REFER TO RISER DIAGRAM FOR

ALL CONDUIT AND WIRE SIZING REQUIREMENTS.

INSTALL TRANSFORMER PAD ACCORDING TO 'TRANSFORMER PAD' DETAIL.

COORDINATE ALL FINAL REQUIREMENTS WITH EXISTING CONDITIONS TO AVOID

CONFLICT.

8 REFER TO DRAWING U201 FOR CONTINUATION.

ROUTE CONDUIT AND CONDUCTORS UNDERGROUND BETWEEN TRANSFORMERS

TO BE INSTALLED ON SITE. REFER TO RISER DIAGRAM FOR CONDUIT AND

CONDUCTOR REQUIREMENTS.

CONTRACTOR SHALL RECEIVE LIFT STATION CONTROL PANEL FROM RESPECTIVE

CONTRACTOR AND INSTALL ON FREE-STANDING RACK NEAR LIFT STATION TO BE

INSTALLED. CONTROL PANEL SHALL BE INSTALLED OUTSIDE OF CLASSIFIED AREA

AROUND LIFT STATION. REFER TO 'LIFT STATION DETAIL' FOR CLASSIFIED AREA

BOUNDS.

ROUTE CONDUIT UNDERGROUND FROM LIFT STATION CONTROL PANEL TO LIFT

STATION FOR INTERCONNECTION. COORDINATE ALL CONDUIT AND WIRING

REQUIREMENTS WITH MANUFACTURER REQUIREMENTS. REFER TO 'LIFT STATION

DETAIL' FOR INSTALLATION REQUIREMENTS.

ROUTE (1) 1 1/4 INCH CONDUIT CONTAINING (4) #4 THWN CU CONDUCTORS

UNDERGROUND FROM PANELBOARD TO LIFT STATION CONTROL PANEL TO BE

INSTALLED. COORDINATE ROUTING OF CONDUIT WITH EXISTING CONDITIONS TO

AVOID CONFLICT. CONDUIT AND WIRE SIZES INCREASED DUE TO VOLTAGE DROP

REQUIREMENTS.

ROUTE (1) 2 INCH CONDUIT CONTAINING (3) #1/0 THWN CU CONDUCTORS AND (1)

#6 THWN CU GND UNDERGROUND FROM PANELBOARD TO BRANCH PANEL

INSTALLED WITHIN RESTROOM BUILDING. COORDINATE ROUTING OF CONDUIT

WITH EXISTING CONDITIONS TO AVOID CONFLICT. CONDUIT AND WIRE SIZES

INCREASED DUE TO VOLTAGE DROP REQUIREMENTS.

ROUTE (1) 1 INCH CONDUIT UNDERGROUND FROM BATHHOUSE MECHANICAL

ROOM TO PROPOSED WIRELESS ACCESS POINT LOCATION AND CAP BELOW

GRADE. END OF CONDUIT SHALL BE WRAPPED WITH TRACER WIRE FOR FUTURE

IDENTIFICATION BY METAL DETECTION.

~8

ADDENDUM 3.00 12/20/2024

N O

PAR

KIN

G

AN

YTIM

E

BATH HOUSE

E PE P

E PE P

EPEP

EPEP

EPEP

EPEP

DP7-10,12

DP1-9,11

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UG

E

U G

E

UG

E

U G

E

U G

E

UG

E

U G

E

UG

E

DP7-1,3

UGE

UGE

UGE

UGE

UGE

UGE

UGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGE

DP1-13,15

BB

EPEP

DP7-13,15

PARTIAL ENLARGED ELECTRICAL SITE PLAN

U203

REVISION HISTORY OF THIS DRAWING

PARKS - CAMPGROUNDS - MULTI PARK WEST

KENLAKE CAMPGROUND

DRAWING NO.10/01/2024

228 E. REYNOLDS RD., SUITE ONE, LEXINGTON, KY 40517 / PH. 859.273.3700 / FAX 859.271.6605

AS-BUILT DATE

DECA LOG #

DESCRIPTION OF REVISIONS DATE

DESCRIPTION OF REVISIONS DATE

DRAWING INFORMATION

A & E FILE NO.

DRAWING DATE

DRAWN BY

CHECKED BY

PHASE

RTA DATE

23629

RTA

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

ACCOUNT NO.

670-CB58-CO54-06

11/07/2024

NORTH

PROJECT

SCALE: 1" = 20'-0"

SITE UTILITY PLAN - KENLAKE STATE PARK

IT'S THE LAW

www.kentucky811.com

Kentucky 811 Know what's below.

Call before you dig.

Call 811 or 800-752-6007

BURIED UTILITIES NOTE

BURIED UTILITIES ARE SHOWN AT THEIR APPROXIMATE LOCATION

BASED UPON INFORMATION OBTAINED FROM UTILITY COMPANIES

AND FIELD EVIDENCE. OTHER BURIED UTILITIES MIGHT EXIST ON THE

SUBJECT SITE WHICH ARE NOT SHOWN ON THIS DRAWING. USE

EXTREME CAUTION DURING EXCAVATION PROCEDURES AND

CONTACT KENTUCKY 811 @ 811 OR 1-800-752-6007 FOR EXACT

LOCATION OF BURIED UTILITIES PRIOR TO EXCAVATION OPERATIONS.

NOTICE

SEE CIVIL PLANS FOR SITE GRADING AND ELEVATIONS.

ELECTRICAL

CONSTRUCTION TAG NOTES

(APPLIES TO THIS DRAWING ONLY)

ROUTE CONDUIT UNDERGROUND FROM DISTRIBUTION PANEL TO EXISTING

GUARD SHACK BUILDING LOCATED ON SITE. COORDINATE ROUTING OF CONDUIT

WITH EXISTING CONDITIONS TO AVOID CONFLICT. REFER TO RISER DIAGRAM FOR

ALL CONDUIT AND WIRING REQUIREMENTS.

INSTALL RV PEDESTAL EQUAL TO HYPOWER ENERGYMATE ALONGSIDE WATER

AND SANITARY CONNECTIONS. RV PEDESTAL SHALL BE INSTALLED NO CLOSER

THAN SIX (6) FEET FROM NEAREST WATER CONNECTION. REFER TO 'RV

PEDESTAL DETAIL' FOR FURTHER REQUIREMENTS.

ROUTE CONDUIT UNDERGROUND FROM TRANSFORMER TO BATH HOUSE PANEL

TO BE INSTALLED. REFER TO RISER DIAGRAM FOR ALL CONDUIT AND WIRE SIZING

REQUIREMENTS.

ROUTE (1) 2-1/2 INCH CONDUIT CONTAINING (3) #4/0 THWN CU CONDUCTORS AND

(1) #6 THWN CU GND FROM PANEL BOARD TO RV PEDESTAL TO BE INSTALLED.

CONTRACTOR SHALL FURNISH AND INSTALL SUITABLE LUGS WITHIN PEDESTAL

FOR TERMINATION OF CABLING. CONDUIT SHALL BE ROUTED ALONG EXTERIOR

OF CAMPSITES TO AVOID CONFLICT WITHIN CAMPGROUND. CONDUIT AND WIRE

SIZING INCREASED DUE TO VOLTAGE DROP REQUIREMENTS.

CONTRACTOR SHALL INTERCEPT EXISTING CONDUIT ROUTED INTO INTERIOR OF

GUARD SHACK FOR ROUTING OF FEEDERS TO EXISTING PANEL. CONTRACTOR

SHALL FURNISH AND INSTALL ALL NECESSARY COMPONENTS AS REQUIRED TO

SEPERATE EXISTING GROUNDS AND NEUTRALS IN EXISTING PANEL AS REQUIRED

TO MAINTAIN CODE COMPLIANCE.

ROUTE (1) 1 INCH CONDUIT CONTAINING (4) #6 THWN CU CONDUCTORS FROM

PANEL BOARD TO LIGHT POLE TO BE INSTALLED. CONDUIT AND WIRE SIZING

INCREASED DUE TO VOLTAGE DROP REQUIREMENTS.

CONTRACTOR SHALL RECEIVE LIFT STATION CONTROL PANEL FROM RESPECTIVE

CONTRACTOR AND INSTALL ON FREE-STANDING RACK NEAR LIFT STATION TO BE

INSTALLED. CONTROL PANEL SHALL BE INSTALLED OUTSIDE OF CLASSIFIED AREA

AROUND LIFT STATION. REFER TO 'LIFT STATION DETAIL' FOR CLASSIFIED AREA

BOUNDS.

8 REFER TO DRAWING U201 FOR CONTINUATION.

ROUTE CONDUIT AND CONDUCTORS UNDERGROUND BETWEEN TRANSFORMER

TO BE INSTALLED ON SITE AND EXISTING UTILITY POLE LOCATED ON SITE.

COORDINATE ALL FINAL CONNECTIONS AS POLE WITH EXISTING CONDITIONS TO

TERMINATE CONDUCTORS TO EXISTING CUT OUT INSTALLED ON POLE. REFER TO

RISER DIAGRAM FOR ALL CONDUIT AND CONDUCTOR REQUIREMENTS.

10 REFER TO DRAWING U204 FOR CONTINUATION.

ROUTE CONDUIT UNDERGROUND FROM LIFT STATION CONTROL PANEL TO LIFT

STATION FOR INTERCONNECTION. COORDINATE ALL CONDUIT AND WIRING

REQUIREMENTS WITH MANUFACTURER REQUIREMENTS. REFER TO 'LIFT STATION

DETAIL' FOR INSTALLATION REQUIREMENTS.

ROUTE (1) 1 1/4 INCH CONDUIT CONTAINING (4) #4 THWN CU CONDUCTORS

UNDERGROUND FROM PANELBOARD TO LIFT STATION CONTROL PANEL TO BE

INSTALLED. COORDINATE ROUTING OF CONDUIT WITH EXISTING CONDITIONS TO

AVOID CONFLICT. CONDUIT AND WIRE SIZES INCREASED DUE TO VOLTAGE DROP

REQUIREMENTS.

ROUTE (1) 1 INCH CONDUIT UNDERGROUND FROM BATHHOUSE MECHANICAL

ROOM TO PROPOSED WIRELESS ACCESS POINT LOCATION AND CAP BELOW

GRADE. END OF CONDUIT SHALL BE WRAPPED WITH TRACER WIRE FOR FUTURE

IDENTIFICATION BY METAL DETECTION.

MRM

MRM

ADDENDUM 1.00 12/11/2024

ADDENDUM 3.00 12/20/2024

DP4

EP EP

EP EP

EP EP

EP EP

EP EP

EP EP

EP EP

EPEP

EPEP

DP7

EPEP

EPEP

EPEP

EPEP

EPEP

EPEP

EPEP

DP7-2,4

4 DP7-5,7

DP7-6,8

GFI

WP

DP7-17

DP7-9,11

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

DP4-2,4

DP4-5,7

DP4-6,8

DP4-9,11

DP4-10,12

U G

E

UGE UGE UGE UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

U G

E U

G

EU

G E

U G

E

UGE

UGE

UGE

UGE

UGE 9

EPEP

7 6

GFI

WP

DP4-13

PARTIAL ENLARGED ELECTRICAL SITE PLAN

U204

REVISION HISTORY OF THIS DRAWING

PARKS - CAMPGROUNDS - MULTI PARK WEST

KENLAKE CAMPGROUND

DRAWING NO.10/01/2024

228 E. REYNOLDS RD., SUITE ONE, LEXINGTON, KY 40517 / PH. 859.273.3700 / FAX 859.271.6605

AS-BUILT DATE

DECA LOG #

DESCRIPTION OF REVISIONS DATE

DESCRIPTION OF REVISIONS DATE

DRAWING INFORMATION

A & E FILE NO.

DRAWING DATE

DRAWN BY

CHECKED BY

PHASE

RTA DATE

23629

RTA

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

ACCOUNT NO.

670-CB58-CO54-06

11/07/2024

NORTH

PROJECT

SCALE: 1" = 20'-0"

SITE UTILITY PLAN - KENLAKE STATE PARK

IT'S THE LAW

www.kentucky811.com

Kentucky 811 Know what's below.

Call before you dig.

Call 811 or 800-752-6007

BURIED UTILITIES NOTE

BURIED UTILITIES ARE SHOWN AT THEIR APPROXIMATE LOCATION

BASED UPON INFORMATION OBTAINED FROM UTILITY COMPANIES

AND FIELD EVIDENCE. OTHER BURIED UTILITIES MIGHT EXIST ON THE

SUBJECT SITE WHICH ARE NOT SHOWN ON THIS DRAWING. USE

EXTREME CAUTION DURING EXCAVATION PROCEDURES AND

CONTACT KENTUCKY 811 @ 811 OR 1-800-752-6007 FOR EXACT

LOCATION OF BURIED UTILITIES PRIOR TO EXCAVATION OPERATIONS.

NOTICE

SEE CIVIL PLANS FOR SITE GRADING AND ELEVATIONS.

ELECTRICAL

CONSTRUCTION TAG NOTES

(APPLIES TO THIS DRAWING ONLY)

INSTALL DISTRIBUTION PANEL ON FREE-STANDING RACK ACCORDING TO 'FREE

STANDING RACK DETAIL'. COORDINATE PLACEMENT OF PANEL WITH EXISTING

CONDITIONS TO AVOID CONFLICT. REFER TO RISER DIAGRAM FOR FURTHER

REQUIREMENTS.

INSTALL RV PEDESTAL EQUAL TO HYPOWER ENERGYMATE ALONGSIDE WATER

AND SANITARY CONNECTIONS. RV PEDESTAL SHALL BE INSTALLED NO CLOSER

THAN SIX (6) FEET FROM NEAREST WATER CONNECTION. REFER TO 'RV

PEDESTAL DETAIL' FOR FURTHER REQUIREMENTS.

ROUTE (1) 3 INCH CONDUIT CONTAINING (3) #250MCM CU CONDUCTORS AND (1) #4

THWN CU GND FROM PANEL BOARD TO RV PEDESTAL TO BE INSTALLED. CONDUIT

SHALL BE ROUTED ALONG EXTERIOR OF CAMPSITES TO AVOID CONFLICT WITHIN

CAMPGROUND. CONTRACTOR SHALL FURNISH AND INSTALL SUITABLE LUGS

WITHIN PEDESTAL FOR TERMINATION OF CABLING. CONDUIT AND WIRE SIZING

INCREASED DUE TO VOLTAGE DROP REQUIREMENTS.

ROUTE (1) 2-1/2 INCH CONDUIT CONTAINING (3) #4/0 THWN CU CONDUCTORS AND

(1) #6 THWN CU GND FROM PANEL BOARD TO RV PEDESTAL TO BE INSTALLED.

CONTRACTOR SHALL FURNISH AND INSTALL SUITABLE LUGS WITHIN PEDESTAL

FOR TERMINATION OF CABLING. CONDUIT SHALL BE ROUTED ALONG EXTERIOR

OF CAMPSITES TO AVOID CONFLICT WITHIN CAMPGROUND. CONDUIT AND WIRE

SIZING INCREASED DUE TO VOLTAGE DROP REQUIREMENTS.

5 RECEPTACLE SHALL BE INSTALLED SURFACE MOUNTED ON FREE STANDING RACK

BELOW PANEL. COORDINATE PLACEMENT OF DEVICE TO AVOID CONFLICT.

ROUTE CONDUIT AND WIRING UNDERGROUND FROM SECONDARY COMPARTMENT

OF TRANSFORMER TO PANEL TO BE INSTALLED. REFER TO RISER DIAGRAM FOR

ALL CONDUIT AND WIRE SIZING REQUIREMENTS.

INSTALL TRANSFORMER PAD ACCORDING TO 'TRANSFORMER PAD' DETAIL.

COORDINATE ALL FINAL REQUIREMENTS WITH EXISTING CONDITIONS TO AVOID

CONFLICT.

8 REFER TO DRAWING U203 FOR CONTINUATION.

ROUTE CONDUIT AND CONDUCTORS UNDERGROUND BETWEEN TRANSFORMERS

TO BE INSTALLED ON SITE. REFER TO RISER DIAGRAM FOR CONDUIT AND

CONDUCTOR REQUIREMENTS.

10 REFER TO DRAWING U205 FOR CONTINUATION.

ROUTE CONDUIT UNDERGROUND FROM TRANSFORMER TO BATH HOUSE PANEL

TO BE INSTALLED. REFER TO RISER DIAGRAM FOR ALL CONDUIT AND WIRE SIZING

REQUIREMENTS.

12 REFER TO DRAWING U201 FOR CONTINUATION.

ROUTE (1) 1 INCH CONDUIT UNDERGROUND FROM BATHHOUSE MECHANICAL

ROOM TO PROPOSED WIRELESS ACCESS POINT LOCATION AND CAP BELOW

GRADE. END OF CONDUIT SHALL BE WRAPPED WITH TRACER WIRE FOR FUTURE

IDENTIFICATION BY METAL DETECTION.

MRM

MRM

ADDENDUM 3.00 12/20/2024

ALTERNATE RESTROOM

DP6

U G

E U

G E

U G

E

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE UGE

U G

E U

G E

U G

E

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

U G

E U

G E

U G

E

UGE

UGE

UGE

UGE

UGE

UG

E

UG

E

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

U

G E

U G

E U

G E

DP5

UG

E

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UG

E

UG

E

EPEP

EPEP

EPEP

EPEP

EPEP

EPEP

EPEP

EPEP

EPEP

EP EP

EPEPDP5-10,12

DP6-1,3

DP5-5,7

DP5-6,8

DP5-9,11

DP4-1,3

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE UGE

UGE

UGE

UGE

UGE

UGE

UGE UGE UGE UGE UGE UGE

UGE

U G

E U

G

E UG

E

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E U

G E

U G

E

UGEUGEUGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UG

E

UG

E

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGE

UGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGE

GFI

WP 5

DP6-17

GFI

WP

DP5-13

EPEP

DP6-2,4

PARTIAL ENLARGED ELECTRICAL SITE PLAN

U205

REVISION HISTORY OF THIS DRAWING

PARKS - CAMPGROUNDS - MULTI PARK WEST

KENLAKE CAMPGROUND

DRAWING NO.10/01/2024

228 E. REYNOLDS RD., SUITE ONE, LEXINGTON, KY 40517 / PH. 859.273.3700 / FAX 859.271.6605

AS-BUILT DATE

DECA LOG #

DESCRIPTION OF REVISIONS DATE

DESCRIPTION OF REVISIONS DATE

DRAWING INFORMATION

A & E FILE NO.

DRAWING DATE

DRAWN BY

CHECKED BY

PHASE

RTA DATE

23629

RTA

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

ACCOUNT NO.

670-CB58-CO54-06

11/07/2024

NORTH

PROJECT

SCALE: 1" = 20'-0"

SITE UTILITY PLAN - KENLAKE STATE PARK

IT'S THE LAW

www.kentucky811.com

Kentucky 811 Know what's below.

Call before you dig.

Call 811 or 800-752-6007

BURIED UTILITIES NOTE

BURIED UTILITIES ARE SHOWN AT THEIR APPROXIMATE LOCATION

BASED UPON INFORMATION OBTAINED FROM UTILITY COMPANIES

AND FIELD EVIDENCE. OTHER BURIED UTILITIES MIGHT EXIST ON THE

SUBJECT SITE WHICH ARE NOT SHOWN ON THIS DRAWING. USE

EXTREME CAUTION DURING EXCAVATION PROCEDURES AND

CONTACT KENTUCKY 811 @ 811 OR 1-800-752-6007 FOR EXACT

LOCATION OF BURIED UTILITIES PRIOR TO EXCAVATION OPERATIONS.

NOTICE

SEE CIVIL PLANS FOR SITE GRADING AND ELEVATIONS.

ELECTRICAL

CONSTRUCTION TAG NOTES

(APPLIES TO THIS DRAWING ONLY)

INSTALL DISTRIBUTION PANEL ON FREE-STANDING RACK ACCORDING TO 'FREE

STANDING RACK DETAIL'. COORDINATE PLACEMENT OF PANEL WITH EXISTING

CONDITIONS TO AVOID CONFLICT. REFER TO RISER DIAGRAM FOR FURTHER

REQUIREMENTS.

INSTALL RV PEDESTAL EQUAL TO HYPOWER ENERGYMATE ALONGSIDE WATER

AND SANITARY CONNECTIONS. RV PEDESTAL SHALL BE INSTALLED NO CLOSER

THAN SIX (6) FEET FROM NEAREST WATER CONNECTION. REFER TO 'RV

PEDESTAL DETAIL' FOR FURTHER REQUIREMENTS.

ROUTE (1) 3 INCH CONDUIT CONTAINING (3) #250MCM CU CONDUCTORS AND (1) #4

THWN CU GND FROM PANEL BOARD TO RV PEDESTAL TO BE INSTALLED. CONDUIT

SHALL BE ROUTED ALONG EXTERIOR OF CAMPSITES TO AVOID CONFLICT WITHIN

CAMPGROUND. CONTRACTOR SHALL FURNISH AND INSTALL SUITABLE LUGS

WITHIN PEDESTAL FOR TERMINATION OF CABLING. CONDUIT AND WIRE SIZING

INCREASED DUE TO VOLTAGE DROP REQUIREMENTS.

ROUTE (1) 2-1/2 INCH CONDUIT CONTAINING (3) #4/0 THWN CU CONDUCTORS AND

(1) #6 THWN CU GND FROM PANEL BOARD TO RV PEDESTAL TO BE INSTALLED.

CONTRACTOR SHALL FURNISH AND INSTALL SUITABLE LUGS WITHIN PEDESTAL

FOR TERMINATION OF CABLING. CONDUIT SHALL BE ROUTED ALONG EXTERIOR

OF CAMPSITES TO AVOID CONFLICT WITHIN CAMPGROUND. CONDUIT AND WIRE

SIZING INCREASED DUE TO VOLTAGE DROP REQUIREMENTS.

5 RECEPTACLE SHALL BE INSTALLED SURFACE MOUNTED ON FREE STANDING RACK

BELOW PANEL. COORDINATE PLACEMENT OF DEVICE TO AVOID CONFLICT.

ROUTE CONDUIT AND WIRING UNDERGROUND FROM SECONDARY COMPARTMENT

OF TRANSFORMER TO PANEL TO BE INSTALLED. REFER TO RISER DIAGRAM FOR

ALL CONDUIT AND WIRE SIZING REQUIREMENTS.

INSTALL TRANSFORMER PAD ACCORDING TO 'TRANSFORMER PAD' DETAIL.

COORDINATE ALL FINAL REQUIREMENTS WITH EXISTING CONDITIONS TO AVOID

CONFLICT.

8 REFER TO DRAWING U204 FOR CONTINUATION.

ROUTE CONDUIT AND CONDUCTORS UNDERGROUND BETWEEN TRANSFORMERS

TO BE INSTALLED ON SITE. REFER TO RISER DIAGRAM FOR CONDUIT AND

CONDUCTOR REQUIREMENTS.

ROUTE (1) 2 INCH CONDUIT CONTAINING (4) #1 THWN CU CONDUCTORS

UNDERGROUND FROM PANELBOARD TO BRANCH PANEL INSTALLED WITHIN

CABIN. COORDINATE ROUTING OF CONDUIT WITH EXISTING CONDITIONS TO

AVOID CONFLICT. CONDUIT AND WIRE SIZES INCREASED DUE TO VOLTAGE DROP

REQUIREMENTS.

ROUTE (1) 1 1/2 INCH CONDUIT CONTAINING (4) #4 THWN CU CONDUCTORS

UNDERGROUND FROM PANELBOARD TO BRANCH PANEL INSTALLED WITHIN

CABIN. COORDINATE ROUTING OF CONDUIT WITH EXISTING CONDITIONS TO

AVOID CONFLICT. CONDUIT AND WIRE SIZES INCREASED DUE TO VOLTAGE DROP

REQUIREMENTS.

ROUTE (1) 2 INCH CONDUIT CONTAINING (4) #4 THWN CU CONDUCTORS

UNDERGROUND FROM PANELBOARD TO BRANCH PANEL INSTALLED WITHIN

CABIN. COORDINATE ROUTING OF CONDUIT WITH EXISTING CONDITIONS TO

AVOID CONFLICT. CONDUIT AND WIRE SIZES INCREASED DUE TO VOLTAGE DROP

REQUIREMENTS.

CONTRACTOR SHALL RECEIVE LIFT STATION CONTROL PANEL FROM RESPECTIVE

CONTRACTOR AND INSTALL ON FREE-STANDING RACK NEAR LIFT STATION TO BE

INSTALLED. CONTROL PANEL SHALL BE INSTALLED OUTSIDE OF CLASSIFIED AREA

AROUND LIFT STATION. REFER TO 'LIFT STATION DETAIL' FOR CLASSIFIED AREA

BOUNDS.

ROUTE CONDUIT UNDERGROUND FROM…