This is an addendum to bid documents issued by the San Bernardino County Project and Facilities Management Department for the Baker Family Learning Center Expansion in Muscoy, California (Project No. 10.10.1632). Addendum No. 3, dated January 10, 2026 and certified October 1, 2026, provides corrected PDF-scale drawings for reference purposes only, including Mechanical, Plumbing, Electrical, Fire Alarm Layout, Fire Sprinkler Layout, Technology, and Landscape drawings. Bidders are required to acknowledge receipt of this addendum by inserting its number and date in their bid proposal and must refer to the original approved stamped bid drawings for project scope and content. All other requirements of the contract documents remain unchanged, and bidders are explicitly instructed not to scale drawings for construction purposes.

The addendum clarifies that the attached drawings serve as supplementary reference materials with corrected PDF scaling to assist bidders in understanding the project's technical requirements. Bidders must still rely on the original approved stamped drawings to determine the full scope of work and must submit acknowledgment of receipt of Addendum No. 3 as part of their sealed bid submission. This addendum does not modify pricing terms, bonding requirements, prevailing wage mandates, or other contractual conditions established in the original bid documents.

View the file

Other files

File Type Posted
ATT-PFMD-20260930-11.2-Specifications Book--Baker Family Learning Center Expansion.pdf PDF
Addendum 1 - Roofing Warranty.pdf PDF
ATT-PFMD-20260930-11-Soils Report--Baker Family Learning Center Expansion.pdf PDF
Addendum 1 - L2 Sheet.pdf PDF
ATT-PFMD-20260930-04-Contractor Certification-CARB Compliance--Baker Family Learning Center Expansion.pdf PDF
Addendum No. 2 - Baker Family Learning Center Expansion.pdf PDF
ATT-PFMD-20260930-11.1-Structural Calculations-Baker Family Learning Center Expansion.pdf PDF
ATT-PFMD-20260930-12-Plans--Baker Family Learning Center Expansion - E-M-P-FA-T-L drawings for scale only.pdf PDF
ATT-PFMD-20260930-09-General Conditions--Baker Family Learning Center Expansion.pdf PDF
ATT-PFMD-20260930-08-Prevailing Wage--Baker Family Learning Center Expansion.pdf PDF
ATT-PFMD-20260930-02-Non-Collusion Declaration--Baker Family Learning Center Expansion.pdf PDF
Addendum 1 - Utility Plan.pdf PDF
ATT-PFMD-20260930-12-Plans--Baker Family Learning Center Expansion.pdf PDF
ATT-PFMD-20260930-05-Sample Standard Contract--Baker Family Learning Center Expansion.pdf PDF
Addendum 1 - Architect Narrative.pdf PDF
ATT-PFMD-20260930-01-Bid Advertisement-Baker Family Learning Center Expansion.pdf PDF
ATT-PFMD-20260930-07-Sample Bond Forms--Baker Family Learning Center Expansion.pdf PDF
Addendum 1 - L3 Sheet.pdf PDF
ATT-PFMD-20260930-10-Special Conditions-Baker Family Learning Center Expansion.pdf PDF
Addendum 1 Narrative.pdf PDF
ATT-PFMD-20260930-03-Non-Collusion Declaration Subcontractor--Baker Family Learning Center Expansion.pdf PDF
ATT-PFMD-20260930-06-Contractors Affidavit and Final Release--Baker Family Learning Center Expansion.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No.: 10.10.1632 Page 1 of 2

Project No. 10.10.1632

ADDENDUM NO. 3

TO THE BID DOCUMENTS FOR THE

BAKER FAMILY LEARNING CENTER EXPANSION

AT

MUSCOY, CA

The following changes and/or additions shall be made to the plans and/or specifications. All other requirements of the contract documents shall remain the same. The Bidder shall acknowledge receipt of the addendum by inserting its number and date in the Bid Proposal.

Additional information to Bid Proposal:

The attached Mechanical, Plumbing, Electrical, Fire Alarm Layout, Fire Sprinkler Layout, Technology and Landscape drawings are provided at corrected PDF scale for reference. Refer to original approved stamped bid drawings for project scope and content. Note: Per contract documents - do not scale drawings for construction.

End of Addendum No. 3

Sarah Riley, Chief of Project Management Project and Facilities Management Department, Project Management

DS:sp

Project No.: 10.10.1632 Page 2 of 2

San Bernardino County Project and Facilities Management Department, Project Management 385 North Arrowhead Avenue, Third Floor San Bernardino, CA 92415-0184 https://pfm.sbcounty.gov/

DATE: 9/28/26

Sarah Riley (Oct 1, 2026 13:42:53 PDT)

01/10/2026 https://pfm.sbcounty.gov/ https://pfm.sbcounty.gov/

2026-10-01T20:44:03+0000
Certified by Adobe Acrobat Sign

File details come from the government source that posted it. Updated .