This is Addendum No. 1 to the bid documents for the Baker Family Learning Center Expansion project issued by San Bernardino County's Project and Facilities Management Department. The addendum, dated September 24, 2026, incorporates three key documents into the bid package: a Utility Plan (Sheet 1 of 1), As-Built Irrigation Drawings (Sheets L2 and L3), and an Existing Roof Warranty Certificate. All bidders are required to acknowledge receipt of this addendum by referencing its number and date on the Bid Form. The project involves a 3,514 square foot expansion of the Baker Family Learning Center in Muscoy, California, including three building additions with structural, architectural, mechanical, electrical, plumbing, interior, and site improvements, plus Americans with Disabilities Act upgrades. The sealed bid submission deadline remains September 30, 2026 at 10:00 a.m., with a mandatory pre-bid meeting held on September 17, 2026. The contract term is 300 calendar days from the Notice to Proceed, with liquidated damages assessed at $1,500 per calendar day for delays beyond the contract time.
The project construction estimate ranges from $2.8 million to $3.2 million, with bid security required at ten percent of the base bid submitted as either a certified check or surety bond. The successful bidder must furnish Performance and Payment Bonds, each equal to 100 percent of the contract price, within ten calendar days of award. Structural design incorporates a geotechnical investigation from February 2026 and follows design standards per NDS 2018, AISC 360-16, ASCE 7-22, and IBC 2024. All bidders must hold a valid California State Contractor's Class "B" license and register with the County's ePro electronic procurement system prior to submission. The project is subject to prevailing wage rates established by the California Director of Industrial Relations, with weekly certified payroll submissions required. Compliance with California Air Resources Board regulations is mandatory, with submission of CARB compliance certificates required. All subcontractors must be listed in the bid and registered with the Department of Industrial Relations.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No.:10.10.1632 Page 1 of 1
Project No. 10.10.1632
ADDENDUM NO. 1
TO THE BID DOCUMENTS FOR THE
BAKER FAMILY LEARNING CENTER EXPANSION
AT MUSCOY, CA
The following changes and/or additions shall be made to the plans and/or specifications. All other requirements of the contract documents shall remain the same. The Bidder shall acknowledge receipt of the addendum by inserting its number and date in the Bid Proposal.
Changes to the BID PROPOSAL:
The attached Design Addendum No. 1, dated September 24, 2026, together with the following documents, is incorporated into and made part of the Bid Documents in its entirety:
1. Utility Plan, Sheet 1 of 1
2. As-Built Irrigation Drawings, Sheets L2 and L3
3. Existing Roof Warranty Certificate
All revisions, clarifications, substitutions, and additional contract terms contained therein shall apply. All other requirements of the Bid Documents remain unchanged. Bidders shall acknowledge receipt of this Addendum on the Bid Form.
Sarah Riley, Chief of Project Management Project and Facilities Management Department, Project Management
DS:sp
San Bernardino County Project and Facilities Management Department, Project Management 385 North Arrowhead Avenue, Third Floor San Bernardino, CA 92415-0184 https://pfm.sbcounty.gov/
DATE: 9/25/26
Sarah Riley (Sep 25, 2026 14:43:45 PDT) 09/25/26 https://pfm.sbcounty.gov/ https://pfm.sbcounty.gov/
Draft Addendum Final Audit Report 2026-09-25
Created: 2026-09-25
By: Karina Perez (Karina.Perez@pfm.sbcounty.gov)
Status: Signed
Transaction ID: CBJCHBCAABAAeTbtf0T8fBr6jYjAMyX0thn4bnwzBgx8
"Draft Addendum" History Document created by Karina Perez (Karina.Perez@pfm.sbcounty.gov)
2026-09-25 - 9:38:25 PM GMT
Document emailed to Sarah Riley (sarah.riley@pfm.sbcounty.gov) for signature
2026-09-25 - 9:38:28 PM GMT
Email viewed by Sarah Riley (sarah.riley@pfm.sbcounty.gov)
2026-09-25 - 9:38:47 PM GMT
Document e-signed by Sarah Riley (sarah.riley@pfm.sbcounty.gov) Signature Date: 2026-09-25 - 9:43:45 PM GMT - Time Source: server - Signature Appearance Selected: DRAW
Agreement completed.
2026-09-25 - 9:43:45 PM GMT
| 2026-09-25T21:43:47+0000 | |
| Certified by Adobe Acrobat Sign |
File details come from the government source that posted it. Updated .