This document is Addendum No. 2 issued by the State of Maryland Department of General Services for Project No. M-500-190-004, the Demolition at the Havre de Grace Military Reservation. The addendum clarifies, adds, deletes, corrects, and changes the bid documents. It includes responses to bidder questions, an allowance for hazardous materials remediation of $100,000, and an extension of the bid due date to September 9, 2019 at 2:00 PM. The project involves the demolition and removal of the existing Original Armory and Original USP & FO Warehouse buildings and related utilities and structures, to accommodate future vehicle parking areas at the 75.88-acre Havre de Grace Military Reservation site in Harford County, Maryland.

The addendum specifies the scope of the security fencing to be provided, confirms the extent of utility demolition required, and provides information related to required permits and fees. It also clarifies the contractor's responsibilities for hazardous materials remediation, sediment and erosion control plan approval, and geotechnical testing and compaction requirements. The addendum also removes certain demolition items from the scope of work.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 2

September 3, 2019

STATE OF MARYLAND

DEPARTMENT OF GENERAL SERVICES

Ellington Churchill, Jr., Secretary

Project No. M-500-190-004

Demolition

Havre de Grace Military Reservation

This Addendum will clarify, add to, delete from, correct and/or change the bid documents for the project referenced above to the extent indicated. This Addendum is hereby made a part of the bid documents on which the contract will be based. By submitting a bid for this solicitation you acknowledge receipt of this addendum. All questions must be in writing and addressed to the Procurement Officer, Michael Cavanaugh.

This addendum includes the following:

• Responses to bidder questions (attached)

• Allowance

• Bid due date extension

Allowance

Schedule of Allowances:

1) The bidder shall include in its base bid the following allowance for HAZMAT survey findings and remediation:

A. Allowance amount $100.000.00 for hazmat remediation.

Bid Due Date

The bid due date is extended to September 9, 2019 at 2:00 PM.

All other terms, conditions and specifications remain unchanged

- END OF ADDENDUM NO. 2 -

Issued by:

State of Maryland

Department of General Services Office of Procurement & Logistics

301 West Preston Street Room M-8

Baltimore, Maryland 21201

Michael Cavanaugh Michael Cavanaugh Procurement Officer

1. In the “Project Manual” dated August 2019, under Base Bid 1 It states to “Demolish, Remove and dispose of existing site improvements. – Please confirm this only refers to the existing security fence.

Site Improvements include: Security fencing only

2. Please provide a more defined scope for the security fence. Please identify limits of where it is to be new etc.

Security Fencing: A security type fence consisting of a six foot (6’) high, nine (9) gauge, chain-link-type metal (zinc coated steel) fabric with a six inch (6”) high, three (3) strand, four (4) point barbed wire 45 degree anti-climber is to be provided to enclose the areas stipulated on the project drawings.

A number seven (#7) tension wire should be used at the top and bottom of the fabric instead of a support pipe or rail. Fabric at the perimeter fence shall be securely fastened to the fence post.

Hardware used to secure the perimeter fence shall be located on the inside of the perimeter. Bolts securing the fence fabric shall be peened to prevent removal of the nuts.

SEE ATTACHED SKETCH

3. In the “Project Manual” dated August 2019, under Base Bid 2 it states to “Demolish, remove and dispose of and disconnect, re-route, cap or seal existing site utility services and related structures as required” – This is at conflict with comments made at the first walkthrough. Please confirm extent of utility demo required under this contract.

Cut & cap SEWER beyond footprint of structures (if a “dead end”). Cut & cap WATER back to Main.

4. Please confirm if permits or fees should be expected from public utility companies, local, state or federal regulatory agencies as noted in the “Project Manual” dated August 2019. If the contractor is to include costs for this please identify an allowance amount.

Assume a MDE permit would be the only requirement.

5. If the base bid is to include demo of all utilities please define the scope for each utility we encounter. The only drawing provided does not seem to identify all the utilities on site & provides no information on what is required for each utility.

BG&E services are the responsibility of the Owner, See ques. # 3 for W&S.

6. In the “Project Manual” dated August 2019, under Base Bid 4 it states “to include remediation / removal and proper disposal of hazardous materials”. – If this is to be base bid the hazmat report must be made available prior to bid time. Pricing cannot be included without that report. Since the quantity of hazmat material is not identified we recommend unit rates be added to the bid form.

See Addenda item for allowance.

7. In the “Project Manual” dated August 2019, under Base Bid 6 it states “Provide Sediment and Erosion Control plan for approval by the Maryland Department of the Environment (MDE)” – Please confirm that the contract duration would not begin until MDE provides approval as the project clearly cannot start without it (and it is well known that MDE review times can vary widely depending on the reviewer.)

Contract time includes MDE Submittal and Approval.

8. In the “Project Manual” dated August 2019 under 1.2.7 Fill Materials it states the compacted structural fill must support the weight of vehicle parking in the future. Will the Government provide geotechnical testing for confirmation or is this the responsibility of the contractor?

This is the responsibility of the Contractor.

9. If compaction testing is the responsibility of the contractor please identify what type of vehicle weight it must be designed to support.

Standard commercial vehicle parking

10. In the “Project Manual” dated August 2019 under 1.3.1 Scope of Work it states to remove foundation walls and footings. – Please provide depths of foundations and sizes of footings.

Depths of foundations and size of footings are unknown.

11. In the “Project Manual” dated August 2019 under 1.3.1 Scope of Work it states to remove Pavements and curbs. – This is at conflict with other portions of this manual.

Please provide locations for pavement and curb removal. This could impact the overall MDE plan for the site.

Demolition is limited to the building structures, surrounding paving, sidewalks, curb & gutters to remain.

12. In the “Project Manual” dated August 2019 under 1.3.1 Scope of Work it states to remove manholes and covers. – Please provide locations for manholes and covers removal.

Scope of work paragraph 1.3.1 A 4 thru 10 deleted from scope.

13. In the “Project Manual” dated August 2019 under 1.3.1 Scope of Work it stated to remove curb inlets and catch basins. – Please provide locations for curb and catch basin removal.

14. In the “Project Manual” dated August 2019 under 1.3.1 Scope of Work it states to remove Underground Storage Tanks & Underground Petroleum products Piping. – Please provide locations and sizes of underground storage tanks with piping. Will; this be part of the Hazmat report?

15. The “Project Manual” clearly requires a drawing to be submitted depicting the contractors proposed plan to protect the existing to remain structures & a drawing for MDE permit approval. Will there be any other drawings required other than these?

Structural, MEP & Civil

16. If there are no other drawings and specifications required what is the basis for the Governments approval of contractors submittals.

Product data & Shop drawings will be reviewed by the Gov.

17. Demolition is inherently noisy. Please remove item 1.3.7 A.2 in the “Project Manual” – OR- define what excessive noise is.

MDE has transferred noise enforcement authority to local jurisdictions. Refer to MDE noise control program standards for construction activity.

I XFMR /' ,.

"):t" _____ _§'.'�AL-__ i I

�;------------=-=== �r�---==--===-��-S���---=�--==--�- ---------LIV.aw:�-------- _________ F L ' N r

T --q_M.H.B , --------;q--r� 2 a a D� 0 N / A y �fnt4ebw -------�'--- w ---

, ' E . I ' Jooth

--- -----400w 400W

3B

V-XFMR

S-1

A y

W-1

L A N E

45'-3P 45'-3P i i

HAVRE DE GRACE ARMORY - SITE PLAN

EXISTING WORK

I I

4( mark.w.freedy.civ Line mark.w.freedy.civ Line mark.w.freedy.civ Line mark.w.freedy.civ Typewritten Text New Fence mark.w.freedy.civ Typewritten Text New Fence mark.w.freedy.civ Highlight mark.w.freedy.civ Typewritten Text LIMITS of DEMOLITION mark.w.freedy.civ Highlight mark.w.freedy.civ Highlight mark.w.freedy.civ Highlight mark.w.freedy.civ Highlight mark.w.freedy.civ Highlight mark.w.freedy.civ Highlight mark.w.freedy.civ Highlight mark.w.freedy.civ Highlight mark.w.freedy.civ Highlight mark.w.freedy.civ Highlight mark.w.freedy.civ Highlight

I I I I

PAINT GARAGE AREA

ROOM

I I I I

I I I

Iii! 1ii! Fla

BUILDING S-1

SECOND FLOOR PLAN

THIRD FLOOR PLAN

TOOL

ROOM

I

Iii!

I

I

I

H

H

STORAGE

2,351 S.F.

0 0

I

I I I I I

TO BE CLOSED

DUE TO LEAD

28,297 S.F.

I I I I I

BUILDING W-1

H H

H H

STORAGE

I 0,445 S.F.

0 0 0 0 0 0 0 0

I

I I

I I

H

H

0 0 0 0

I

I

0 0

VAULT

503 S.F.

HAVRE DE GRACE MILITARY RESERVATION -

BUILDING S-1 / W-1 FLOOR PLAN

HEADQUATERS MARYLAND ARMY NATIONAL GUARD

FIFTH REGIMENT ARMORY

29th DIVISION STREET

BALTIMORE, MD 21201-2288

Project Name and Address s;,, 000

24B35

HAVRE DE GRACE MILITARY RES.1---------1

301 OLD BAY LANE

HAVRE DE GRACE, MD 21078

(410) 278-8450

5-25-16

Sco;i/16": 1'-0"

LIMITS of DEMOLITION

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

TO BE CLOSED DUE TO LEAD

AutoCAD SHX Text

FEMALE BATH

AutoCAD SHX Text

MENS BATH

AutoCAD SHX Text

VAULT

AutoCAD SHX Text 250 S.F.

AutoCAD SHX Text 2,351 S.F.

AutoCAD SHX Text 10,445 S.F.

AutoCAD SHX Text 28,297 S.F.

AutoCAD SHX Text 503 S.F.

AutoCAD SHX Text 141 S.F.

AutoCAD SHX Text 71 S.F.

AutoCAD SHX Text

GARAGE AREA

AutoCAD SHX Text

PAINT ROOM

AutoCAD SHX Text

TOOL ROOM

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text O F F I C E

AutoCAD SHX Text

MENS ROOM

AutoCAD SHX Text L O C K E R

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text Scale

AutoCAD SHX Text Site Code

AutoCAD SHX Text Date

AutoCAD SHX Text Sheet

AutoCAD SHX Text Project Name and Address

AutoCAD SHX Text Firm Name and Address mark.w.freedy.civ Cross-Out mark.w.freedy.civ Polygon

#533657 35, _ 4p

--uc ___ _ mark.w.freedy.civ Polygon mark.w.freedy.civ Polygon mark.w.freedy.civ Polygon mark.w.freedy.civ Polygon mark.w.freedy.civ Typewritten Text LIMITS of DEMOLITION mark.w.freedy.civ Polygon mark.w.freedy.civ Polygon mark.w.freedy.civ Polygon mark.w.freedy.civ Polygon mark.w.freedy.civ Typewritten Text LIMITS of DEMOLITION

HAVRE DE GRACE - BUILDING S-1_W-1 FLOOR PLAN.pdf
Sheets and Views
Building S-1_W-1

File details come from the government source that posted it. Updated .