This Addendum No. 2 is a Questions and Answers document issued by the Florida Fish and Wildlife Conservation Commission (FWC) regarding the Babcock Ranch Preserve Road Work solicitation (FWC 26/27-30). The addendum addresses eight questions submitted by prospective bidders regarding project requirements, specifications, and implementation procedures. Key clarifications include confirmation that subcontractor references may satisfy one of the three required references under the Collective Experience provision; specifications for contractor licensing and insurance requirements per Chapter 287, Florida Statutes and Chapter 60A, Florida Administrative Code; clarification that DOT B02 material certification may be provided after award and before the Notice to Proceed; confirmation that the capped grading and spreading mileage is 1.29 miles with a total project scope not exceeding 5,280 tons; confirmation that JR Federal Solutions was permitted to sign in late at the mandatory pre-bid conference; and specifications regarding contractor responsibility for road damage caused by project equipment. The bid deadline remains 2:30 PM ET on Monday, October 12, 2026, with an anticipated award date of October 15, 2026.
The addendum clarifies operational parameters for the project, including that the awarded contractor is responsible for grading and rehabbing access roads only if damage was caused by the contractor's equipment or trucks; that the Muse side entrance may be used for stockpiling with the contractor assuming liability for any road damage; and that FWC cannot guarantee pre-grading of roads from Bermont Road to Brown's Farm Grade Road prior to project commencement. All prospective bidders must comply with protest procedures outlined in Section 120.57(3), Florida Statutes and Chapter 28-110, Florida Administrative Code, with formal protests to be filed with the FWC Purchasing Office at 1875 Orange Avenue East, Tallahassee, Florida 32311-6160. The addendum was issued October 6, 2026 by FWC Procurement Manager Xavier Wilson.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum No. 1.pdf | ||
| Addendum No. 3.pdf | ||
| FWC 26-27-30 Final Draft.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Fish and Wildlife Conservation Commission
Commissioners
Rodney Barreto
Chairman
Coral Gables
Steven Hudson
Vice Chairman
Fort Lauderdale
Preston Farrior
Tampa
Joshua Kellam
Palm Beach Gardens
Gary Lester
Oxford
Albert Maury
Coral Gables
Sonya Rood
St. Augustine
Office of the
Executive Director
Roger A. Young
Executive Director
Charles “Rett” Boyd
Assistant Executive Director
George Warthen
Chief Conservation Officer
Jessica Crawford
Chief of Staff
850-487-3796
850-921-5786 FAX
Managing fish and wildlife resources for their long-term well-being and the benefit of people.
620 South Meridian Street
Tallahassee, Florida
32399-1600
Voice: 850-488-4676
Hearing/speech-impaired:
800-955-8771 (T)
800-955-8770 (V)
MyFWC.com
DATE: OCTOBER 6, 2026
ADDENDUM NO.: 2
BID NO.: FWC 26/27-30
BID TITLE: BABCOCK RANCH PRESERVE ROAD WORK
UPDATE: QUESTIONS & ANSWERS
The enclosed addendum has been issued for consideration in the preparation of your response to the Florida Fish and Wildlife Conservation Commission’s (FWC) Solicitation
No. FWC 26/27-30, “Babcock Ranch Preserve Road Work”.
All responses to the subject solicitation must be received no later than 2:30 PM (ET) on
Monday, October 12, 2026.
A response received after the exact time specified will not be considered. Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes (F.S.), or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes.
Written notices, formal requests and proceedings must conform with the requirements set forth in Chapter 28-110, Florida Administrative Code (F.A.C.). Protests must be filed with the Purchasing Office, Fish and Wildlife Conservation Commission, 1875 Orange
Avenue East, Tallahassee, Florida 32311-6160 within the time prescribed in Section
120.57(3), F.S. and Chapter 28-110, F.A.C.
Sincerely, Xavier Wilson
FWC Procurement Manager
FWC SOLICITATION ADDENDUM 2
BEGIN ADDENDUM
QUESTION #1
Page 19 requires three references and limits references involving personnel previously unaffiliated with the bidder. If J&R proposes an experienced subcontractor to perform the road work, may that subcontractor’s completed projects satisfy any of the three required references? Please clarify whether the collective-experience provision applies to proposed subcontractor personnel or only to the bidder’s employees.
ANSWER #1
Yes. A proposed subcontractor’s completed project may be considered under the Collective Experience provision, provided the subcontractor personnel associated with that referenced project are proposed to perform the applicable work under this project. No more than one (1) of the required references may be based on such unaffiliated/collective experience and must be identified under Reference 4 – Collective Experience. The remaining required references must demonstrate similar work performed by the Bidder.
QUESTION #2
Please identify any specific contractor license classification required of the prime or performing subcontractor, along with the required commercial general liability and automobile liability limits.
ANSWER #2
General Liability Insurance
During the term of this Purchase Order, the Contractor, at its sole expense, shall maintain insurance coverage of such types and with such terms and limits as may be reasonably associated with the Purchase Order.
The Contractor shall be licensed as necessary to perform under this Purchase Order as may be required by law, rule, or regulation; and shall provide evidence of such compliance to the Commission upon request. By acceptance of this Purchase Order, the Contractor warrants that it has the capability in all respects to fully perform the Purchase Order requirements and the integrity and reliability that will assure good-faith performance as a responsible Bidder, and that the Contractor shall comport with Chapter 287, F.S., Chapter 60A, F.A.C., and all other applicable rules and laws.
QUESTION #3
Must the supplying pit’s current DOT B02 material certification and test results accompany the bid, or may they be provided after award and before the Notice to Proceed?
ANSWER #3
It may be provided after award and before the Notice to Proceed.
QUESTION #4
Please confirm the mileage to be capped is1.27 per the ITB. When field measuring from the map provided it comes out closer to 2.9 miles.
FWC SOLICITATION ADDENDUM 3
ANSWER #4
The mileage to be graded and spread is capped at 1.29 miles. The total project, including 1.29 miles of graded and spread materials plus the stockpile is estimated to be no greater than 5,280 tons of DOT B02 with the specifications provided. This distance for the mileage includes the start of the project at the intersection of
Brown’s Farms Grade and Tram Grade and then continues along Tram Grade to where it intersects at the Cutoff.
After all specifications have been met, all materials may go to the stockpile described along Oil Well Road.
QUESTION #5
Please confirm sign in sheet showing contractor “JR Federal Solutions” was not present at 10:00 but was allowed to sign in late.
ANSWER #5
It is confirmed that JR Federal Solutions was allowed to sign in late.
QUESTION #6
Will the awarded contractor be responsible to grade/rehab all the roads being used to access the project after completing the capping?
ANSWER #6
The awarded contractor will only be responsible to grade/rehab the roads being used to access the project if the contractor has caused damage to those roads from their equipment/dump trucks for this project.
QUESTION #7
Can we use the entrance via Muse side entrance for the stock piling?
ANSWER #7
The Muse side entrance may be utilized for the stock piling; however, the contractor will be responsible for any damages to that road caused by trucks and equipment from the contractor.
QUESTION #8
Will FWC grade the road starting at Bermont Road & Brown's Farm Grade Road and continuing up to Project 1 prior to us starting project?
ANSWER #8
FWC cannot guarantee the road will have gravel spread and graded starting at Bermont Road to the end Brown’s
Farm Grade prior to starting the project.
END ADDENDUM
| Question #1 |
| Answer #1 |
| Question #2 |
| Answer #2 |
| Question #3 |
| Answer #3 |
| Question #4 |
| Answer #4 |
| Question #5 |
| Answer #5 |
| Question #6 |
| Answer #6 |
| Question #7 |
| Answer #7 |
| Question #8 |
| Answer #8 |
File details come from the government source that posted it. Updated .