This document is an Addendum No. 2 issued by the Michigan Department of Technology, Management and Budget, State Facilities Administration for the Fibron Trout Pond Crossing project. The addendum announces that the request for bids and the mandatory pre-bid conference scheduled for May 4, 2020, as well as the bid opening date of May 20, 2020, have been indefinitely suspended. The project is anticipated to be re-advertised at a future date once agency funds are re-established. Acknowledgement of the previous Addendum No. 1 issued on March 31, 2020 and this Addendum No. 2 will not be required when the project is re-advertised.
The project is located in Houghton County and Holly Village, Michigan. The contract opportunity is for a culvert installation project. Bidders are instructed to direct all questions to the designated contact, Jeremy Gagnon of U.P. Engineers & Architects, Inc., and to upload bid attachments to the SIGMA VSS system. The addendum provides guidance on electronic bid submission and contact information for the SIGMA help desk.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DCSpec.pdf | ||
| Advertisement.pdf | ||
| Addendum No. 1.pdf | ||
| Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DMB-406 (R 0/17)
STATE OF MICHIGAN Date Issued: April 22, 2020 Department of Technology, Management and Budget Index No(s): 7313 State Facilities Administration File No: 751/18307.TAP 3111 W. St Joseph St. Lansing, MI 48917 Department: Natural Resources P.O. Box 30026 Project Name: Fibron Trout Pond Crossing Lansing, Michigan 48909 Subject: Suspend PreBid Meeting and Bidding Bid Opening Date: May 20, 2020
PRE-BID ADDENDUM NO. 2
TO: All Bidders
SUBJECT: Revision to Bid Documents
INTENT: This Addendum is issued to incorporate the item provided below into the Bidding/Construction Contract
Documents dated March 2020 for the Project named above.
Item 1 – The request and advertisement for bids is hereby indefinitely suspended. The mandatory PreBid Conference to be held on May 4, 2020 and the Bid Openning Date of May 20, 2020 are therefore cancelled at this time. The project is anticipated to be re-advertised at a future date once agency funds are re-established as the SOM Budget allows. Upon readvertisement, acknowledgement of Addendum No. 1 issued March 31, 2020 by UPEA and this Addendum No. 2 for this first bid letting will not be requrired.
Here ends Post-Bid Addendum No. 2.
ACKNOWLEDGEMENT: One copy of this Addendum, properly signed in the space provided below, must be acknowledged and returned for submission of a valid bid. The changes and information shall become part of the contract documents. (Authority: 1984 PA 431)
Firm Name
Bidder’s Signature and Title Date
Sincerely, Tom Pawlowski, Project Director DTMB - State Facilities Administration Design and Construction Division