Addendum No. 1.pdf
PDF 109 KB Posted
- Solicitation number
- RFQ - 171 - 200000000202
- Issued by
- Houghton County, Holly Village, Michigan
About this file
This document is an Addendum No. 1 issued by U.P. Engineers & Architects, Inc. for the Fibron Trout Pond Crossing project in Mackinac County, Michigan. The addendum changes the bid opening date to May 20, 2020 at 2:00 p.m. local time and mandates a pre-bid conference and site tour on May 4, 2020 at 12:00 p.m. local time at the intersection of Fibron Creek and H-40 (Trout Lake Rd.) in Mackinac County. The project involves the installation of a culvert. Bidders are required to acknowledge receipt of this addendum and include it with their bid package.
The related state and local contract opportunity is for the 751/18307.TAP Fibron Trout Pond - Culvert Installation project, which is located in Houghton County and Holly Village, Michigan. Bidders are instructed to submit questions via email to Jeremy Gagnon of U.P. Engineers & Architects, Inc. and to upload bid attachments to SIGMA VSS, as hard copies will not be accepted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum No. 2.pdf | ||
| DCSpec.pdf | ||
| Advertisement.pdf | ||
| Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
707 Ashmun Street Sault Ste. Marie, MI 49783
906-635-0511 • 800-867-0511 • Fax: 906-635-0612
Offices also in:
Houghton
Iron Mountain Ishpeming Marinette
U.P. Engineers & Architects, Inc.
www.UPEA.com
[M12-19332]
ADDENDUM NO. 1
TO THE
FIBRON TROUT POND CROSSING
MACKINAC COUNTY
ADDENDUM NO. 1 is issued March 31, 2020 to clarify, modify, and/or change the original plans and specifications issued by UP Engineers and Architects. This ADDENDUM NO. 1 is hereby made part of the Contract Documents for the contract noted below.
File No. Fibron Trout Pond Cossing: 751/18307.TAP, Index No. 7313 GPS Coordinates: Lat 46.214752-Lon -85.159357
Please acknowledge receipt of this ADDENDUM NO. 1 on the appropriate blank on the Bid Form and also include this addendum with the bid package.
Specifications:
1. BID SUMMARY – BID OPENING DATE is changed to May 20, 2020 at 2:00 p.m.
Local Time.
2. SECTION 00010 PRE-BID INFORMATION – Pre-Bid Conference A mandatory pre-bid conference will be held at the Intersection of Fibron Creek & H-40 (aka Trout Lake Rd.), Mackinac County, MI, on May 4, 2020 at 12:00 p.m. Local Time. A tour will be held on the same day, starting at 12:00 p.m. local time. All prospective Bidders are required to attend the tour, if held. Other parties interested in the Work are encouraged to attend the tour. Addenda may be issued, in response to issues raised at the pre-bid conference and tour, or as the Owner and/or Professional may otherwise consider necessary.
END OF ADDENDUM NO. 1