Addendum No. 2.pdf

PDF 54 KB Posted

Attached to
EKLC Sensory Room RFP
Solicitation number
RFP-GIS-250000001652-4
Issued by
Genesee County, Michigan

About this file

This document is Addendum No. 2 for the EKLC Sensory Room Remodel project issued by the Genesee Intermediate School District located in Flint, Michigan. The addendum is dated March 18, 2025, with a contract award by date of May 29, 2025, and is associated with architectural and engineering project number 3041-10 DF. The addendum provides updated information and clarifications for potential bidders, noting changes, additions, deletions, and potential errors or omissions in the original project plans and specifications.

The addendum includes an attachment for Prevailing Wage Rates for State Funded Projects and requires all bidders to carefully review the total scope of their contract responsibilities, including potential interfaces with other work. Bidders are instructed to incorporate all items in the addendum into their proposal submissions, with the understanding that all modifications are considered part of the Contract Documents. The project appears to be a sensory room remodel, though specific details about the room's scope, design, or specific requirements are not provided in this addendum.

View the file

Other files

File Type Posted
2025_03_14 EKLC Sensory Room Addendum 1 - 3-14-2025.pdf PDF
Advertisement for Bid.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ORS#: ORS-002068 | CA#: CA-0184 | Date Issued: 02/28/2025 | Contract Award By Date: 05/29/2025 Page 1 of 184

Date: March 18, 2025

Name of Job: EKLC Sensory Room Remodel

Owner of Job: Genesee Intermediate School District

Location: Flint, Michigan

A/E #: 3041-10 DF

ADDENDUM NO. 2

SPECIAL NOTE:

The Notice to Bidders, Instructions to Bidders, General Conditions of the Contract for Construction, Supplementary Conditions of the Contract for Construction, and all modifications and previously issued Contract

Documentation are a part of this Addendum.

SCOPE OF WORK:

The following items are changes, additions, deletions, clarifications and/or errors and omissions in plans & specifications and shall be considered by each Bidder in making up and submitting their proposal. All items shall be considered a part of the Contract Documents.

NOTICE TO ALL BIDDERS:

All Bidders shall take note of all items covered by this Addendum. Each Bidder shall review the total scope of his responsibilities with respect to his contract work and his interface with the work of others, as well as his required interface with their work.

ATTACHMENTS:

Prevailing Wage Rates for State Funded Projects Official Rate Schedule is attached.

END OF ADDENDUM

File details come from the government source that posted it. Updated .