2025_03_14 EKLC Sensory Room Addendum 1 - 3-14-2025.pdf
PDF 24 KB Posted
- Attached to
- EKLC Sensory Room RFP
- Solicitation number
- RFP-GIS-250000001652-4
- Issued by
- Genesee County, Michigan
About this file
This document is an Addendum No. 1 issued by Kingscott Architecture, Engineering, and Design for the Genesee Intermediate School District (GISD) located in Flint, Michigan, related to the EKLC Sensory Room Remodel project (A/E #: 3041-10 DF). The addendum, dated March 14, 2025, provides modifications to the original bidding documents, specifically focusing on changes to door types and door schedule remarks on drawing A1.1 for the sensory room plans and information. The addendum instructs all bidders to review the total scope of their responsibilities, including contract work and interfaces with other project components.
The addendum includes two general attachments: a GISD Prevailing Wage Info Sheet and a GISD Prevailing Wage Document. The key modifications involve revising the door types for doors 42A and 42B from existing to new hollow metal (HM) doors, and updating the door schedule remarks legend by revising keynote 2 and adding keynote 4. These changes are intended to provide clarity and additional information for potential bidders preparing their proposals for the sensory room remodel project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Advertisement for Bid.pdf | ||
| Addendum No. 2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3041-10 ADDENDUM NO. 1 1
Date: March 14, 2025
Name of Job: EKLC Sensory Room Remodel
Owner of Job: Genesee Intermediate School District
Location: Flint, Michigan
A/E #: 3041-10 DF
ADDENDUM NO. 1
SPECIAL NOTE:
The Notice to Bidders, Instructions to Bidders, General Conditions of the Contract for Construction, Supplementary Conditions of the Contract for Construction, and all modifications and previously issued Contract
Documentation are a part of this Addendum.
SCOPE OF WORK:
The following items are changes, additions, deletions, clarifications and/or errors and omissions in plans & specifications and shall be considered by each Bidder in making up and submitting their proposal. All items shall be considered a part of the Contract Documents.
NOTICE TO ALL BIDDERS:
All Bidders shall take note of all items covered by this Addendum. Each Bidder shall review the total scope of his responsibilities with respect to his contract work and his interface with the work of others, as well as his required interface with their work.
ATTACHMENTS:
Drawings: A1.1
General Attachments:
GISD Prevailing Wage Info Sheet, GISD Prevailing Wage Document
DRAWINGS:
A1.1 - SENSORY ROOM PLANS & INFO
1. Revise: Door type of 42A and 42B from Existing to New HM.
2. Revise: Door Schedule Remarks Legend Keynote 2.
3. Add: Door Schedule Remarks Legend Keynote 4.
END OF ADDENDUM
File details come from the government source that posted it. Updated .