ADDENDUM NO. 2 DOA 26-7.pdf
PDF 2 MB Posted
- Attached to
- Airport Environmental Consultant Services
- Solicitation number
- RFP 120 DOA 26-7 3
- Issued by
- Palm Beach County, Florida
About this file
This is Addendum No. 2 to a Request for Proposals (RFP) issued by the Palm Beach County Board of County Commissioners, Department of Airports, for Airport Environmental Compliance Consultant Services (Project Number DOA 26-7). The RFP seeks qualified consultants to provide professional services including audits/inspections, assessments, testing, permitting, planning, remediation design, reporting, training, and extension-to-staff services across four Palm Beach County airports: Palm Beach International Airport (PBI), North Palm Beach County General Aviation Airport (F45), Palm Beach County Park Airport (LNA), and Palm Beach County Glades Airport (PHK). Services will be assigned through individual Consultant Services Agreements (CSAs) under a continuing contract structure. The pre-proposal conference was held on July 1, 2026, with 32 attendees from various environmental and engineering firms. Proposals were due on July 22, 2026, at 3:00 p.m. local time, requiring one original, six bound copies, and one electronic PDF copy on flash drive. The selection process includes a shortlist committee meeting tentatively scheduled for July/August 2026, followed by a final selection committee meeting tentatively scheduled for August 2026. Three firms will be awarded contracts under this RFP.
The estimated annual total value of all contracts issued under this RFP is $500,000, though no work is guaranteed. Work will be assigned based on availability and qualifications of the selected firms, and the Department of Airports will ensure all four impact areas (air, water, waste, and wildlife) are covered across the three selected consultants. Proposals will be evaluated on three criteria: ability, knowledge of design criteria, and past performance of the firm and project team (35 points for shortlist, 50 points for final selection); approach to the project and quality of presentation (35 points for shortlist, 20 points for final selection); and volume of previous work awarded by the County over the past four years (10 points for both shortlist and final selection). A Disadvantaged Business Enterprise (DBE) goal of 0% and Small Business Enterprise (SBE) goal of 15% apply to subcontracting. Consultant's Competitive Negotiations Act (CCNA) certification is required prior to proposal submission if required by Florida Statute; firms with pending applications may submit with applications pending. The contract will be funded with federal, state, and/or local funds, with specific DBE goals to be set for each CSA based on funding eligibility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DOA 26-7 RFP Airport Environmental Compliance Consultant Services.pdf | ||
| DOA 26-7 Notice of RFP.pdf | ||
| ADDENDUM NO. 1 DOA 26-7.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DOA 26-7 Addendum No. 2
JULY 8, 2026
BOARD OF COUNTY COMMISSIONERS
PALM BEACH COUNTY, FLORIDA
PALM BEACH COUNTY DEPARTMENT OF AIRPORTS
PROJECT NAME: Airport Environmental Compliance Consultant Services
PROJECT NUMBER: DOA 26-7
DESCRIPTION: Request for Proposals (Qualifications Based Selection Process)
ADDENDUM NUMBER 2
Date of Issue: July 8, 2026
This addendum modifies or interprets the proposal documents by additions, deletions, clarifications, corrections, or other type of modifications. Addenda will become part of the
Contract Documents. Proposers, upon receiving addenda, shall insert same into the Proposal
Documents.
It is required that Addendum Number 2 be signed in the Acknowledgement of Receipt below and attached to the Proposal and become part of the Proposal.
Acknowledgement of Receipt of Proposer
ADDENDUM NO. 2
This addendum includes the following:
1. Questions
Question: Section II, Item 7 (page 3) Training: What type of training is to be expected?
Response: Examples of training may include but are not limited to wildlife, stormwater management, handling hazardous material, etc.
Question: Section II, Item 2 (page 3) Assessments: Conduct what kind of delineations?
Response: Wetland delineations.
Question: How will the task orders be awarded to the three selected firms?
Response: Tasks will be assigned based on availability and qualifications.
Question: There are four “Impact Areas” (air, water, waste & wildlife) followed by subtasks
1–8. Do we have to propose on one or more “Impact Areas”, or can we propose on the subtasks? Please clarify.
Response: The DOA will evaluate the proposals based on what is submitted. We will ensure all areas are covered by the three firms selected.
Question: Is there a budget for this new contract? If so, could you disclose the amount?
Response: Annual total value of all contracts issued under this RFP is estimated to be
$500,000, however, no work is guaranteed.
Question: Does the Department of Airports foresee major projects for the near future for this contract?
Response: Potentially.
Question: Could the slides presented in the pre-bid meeting on 7/1/2026 be shared?
Response: Yes, they are attached to this addendum.
Question: Could you share the list of the pre-bid attendees?
Response: Yes, it is attached to this addendum.
Question: Section III, Criteria for Shortlisting and Final Selection of Firms, Item F
(Subcontracting) states that "A team of subconsultants should not be presented in the
Proposal due to the unknown specific scope of work to be assigned through each CSA.
Subconsultants will be identified during CSA development."
However, the RFP also requires submission of SBD Schedules 1 and 2 and references anticipated SBE utilization. Please clarify whether proposers should identify and include specific subconsultants in their proposal and associated forms, or if proposers should submit the required SBD forms without naming subconsultants and only identify anticipated disciplines/service categories that may be subcontracted during future CSA development.
Response: The proposers should submit the required DBE/SBE forms without naming subconsultants and only identify anticipated disciplines/service categories that may be subcontracted during future CSA development.
Question: Is there an exact list of CCNA certifications required for this RFP evaluation?
Response: No. Please see Florida Statute and Palm Beach County website referenced in the RFP for CCNA requirements.
Question: Although this is a new contract, were these services covered previously under another contract?
Response: The DOA has been using the Civil, Planning, and Facilities contracts as needed with the subconsultants.
Question: How many contracts will be awarded for this RFP?
Response: Three will be awarded.
Question: The RFP says that you do not have to fit every area of the scope, how does that play into the evaluation of proposals if you don’t submit for all areas?
Response: The DOA will evaluate the proposals based on what is submitted. We will ensure all areas are covered by the three firms selected.
Question: What is the timeline for final selection?
Response: It depends on the selection committee’s schedule.
Question: Is it okay to have the CCNA certification application submitted by the time the proposal is submitted, or does it need to be approved prior to submittal?
Response: That is acceptable.
This Addendum includes the following attachments:
Pre-Proposal Conference meeting minutes, PowerPoint, participant list
END OF ADDENDUM NO. 2
Copyright [insert date set by system] by [CH2M HILL Entity] • Company Confidential
Palm Beach County Department of Airports
Planning & Development Division
DOA 26-7 Environmental Compliance Consultant Services
Pre-Proposal Conference Sign-In
Note: Virtual and in-person attendants must use QR code to sign in.
July 1, 2026 at 10:30 am
Planning & Development Division
Request for Proposals
DOA 26-7
Airport Environmental Compliance
Consultant Services at Palm Beach International Airport, North Palm Beach County
General Aviation Airport, Palm Beach County Park Airport & Palm
Beach County Glades Airport
Agenda
Introductions
Brief Overview of Services Desired
DBE/SBE Participation and Federal Requirements
CCNA Certification Requirements
Contents of Submittal
Selection Process and Submittal Date
Questions
Palm Beach County Department of Airports
The Palm Beach County Department of Airports operates and maintains the following airports:
• Palm Beach International Airport (PBI)
• North Palm Beach County General Aviation Airport (F45)
• Palm Beach County Park Airport (LNA)
• Palm Beach County Glades Airport (PHK)
Policy is established by the Board of County Commissioners
Operates as an enterprise fund, no ad valorem tax support
Operations are funded by user fees to airlines, businesses and passengers
Construction is funded by grants, Passenger Facility Charges, revenue bonds, and airport revenues
Department of Airports
North Palm Beach County
General Aviation Airport (F45)
Palm Beach County
Glades Airport (PHK) Palm Beach County
Park Airport (LNA)
Palm Beach International Airport (PBI)
Location of Airports Within Our System
Key
Palm Beach County
Glades
North Palm Beach
County GA
Palm Beach
International
Park
Scope of Services
The Consultant will provide professional services to DOA for each Consultant Services Agreement (CSA) assigned under the continuing contract. The anticipated work may include, but is not limited to:
Audits/Inspections
Assessments
Testing
Permitting
Planning, Remediation
Design
Reporting
Training
Extension-to-staff
DISADVANTAGED BUSINESS ENTERPRISE (DBE)
AND SMALL BUSINESS ENTERPRISE (SBE)
PROPOSAL REQUIREMENTS
DBE and SBE Participation
DBE Subcontracting: DBE Goal of 0%
SBE Subcontracting: SBE Goal of 15%
Required Forms:
Attachment E - OSBD Schedules
OSBD Schedule 1
OSBD Schedule 2
Attachment F – Required Federal Certifications
F-1 Certification Regarding Debarment, Suspension, Ineligibility, and Voluntary Exclusion-Lower Tier
Participation
F-2 Certification Regarding Lobbying
Attachment G - Certifications and DBE Forms
Exhibit 1 – Restrictions on Lobbying Certifications
Exhibit 2 - SAM (System for Award Management)
Exhibit 3 – Federal Tax Liability and Recent Felony Convictions Disclosure
Exhibit 4 – DBE Schedules
Schedule 6(A), Respondent & Subcontractor’s Information
Exhibit 5 – Trade Restrictions Certification
The work assigned under the contract to be awarded under this RFP will be funded with federal, state and/or local funds. A Disadvantaged Business Enterprise participation goal (“DBE Goal”) will be set for each CSA assigned under the Continuing Contract that is eligible for federal or state funding.
By submitting a proposal under this RFP, Consultant certifies, represents, and warrants that it will comply with the
Requirements included in Attachment H - Sample Contract and that it must be familiar with the detailed federal requirements described in this RFP.
Additional questions regarding the DBE/SBE requirements for this specific proposal should be submitted in writing to the Department in accordance with the Request For Proposal.
Additional general information regarding DBE/SBE certification may be obtained by contacting:
Anthony Gregory, Compliance Manager agregory@pbia.org (561) 471 – 7421
CONSULTANT’S COMPETITIVE NEGOTIATIONS ACT
(CCNA) CERTIFICATION
Consultant’s Competitive Negotiations Act (CCNA) Certification
Firms must be Consultant’s Competitive Negotiations Act (CCNA) certified prior to submission of qualifications, if required by Florida Statute
“Firm” means any individual, firm, partnership, corporation, association or other legal entity permitted by law to practice architecture, landscape architecture, engineering or land surveying and mapping in the State.
For information on CCNA certification contact:
Holly B. Knight, P.E.
Palm Beach County Engineering/Roadway Production Division
Telephone (561) 684 – 4150
CONTENTS FOR SUBMITTAL
Proposal Contents – Section VI (D)
1) Letter of Interest/Program Approach/Executive Summary (5 page maximum).
2) Proposal Certification Form (Attachment B).
3) Organizational Chart and Description of Personnel – Illustrate the program approach covered in Section 1, showing the function and duties of team members, including a brief description of key personnel and their assigned roles, as well as their past experience with similar projects. (5 page maximum).
4) Provide current Standard Form 330 to include those personnel within the prime consultant firm who have similar experience. (Length, as required)
5) Five (5) verifiable references for work of a similar nature completed in the last ten (10) years. This can be accomplished in the Standard Form 330
6) Consultant Responsibility Form (Attachment C)
Proposal Contents – Section VI (D) - Continued
7) Conflict of Interest Disclosure Form for each member of the team
(Attachment D)
8) Completed OSBD Schedule 1 and Schedule 2 (Attachment E)
9) Required Federal Certifications (Attachment F)
10) DBE Schedule 6A (Attachment G)
11) Other information that may be appropriate
SELECTION PROCESS AND SUBMITTAL DATE
Selection Process/Criteria
Each proposal will be evaluated based on the criteria contained in Palm
Beach County PPM CW-O-048 and summarized below:
➢Ability, knowledge of design criteria and past performance of firm and the designated project team to satisfy the technical requirements of the project, including the following areas of consideration:
Professional qualifications of proposed project team to perform the work
Demonstrated knowledge of design criteria for similar projects
Demonstrated past performance of the firms and project team in completing similar projects
Selection Process/Criteria (continued)
➢ Approach to the project, understanding of the project, and quality of submittal/ presentation, including meeting time/budget requirements, including the following areas of consideration:
Demonstrated understanding of the project and County’s goals and objectives
Demonstrated innovation in project approach
Demonstrated ideas for cost-effectiveness
Quality and clarity of proposal and/or presentation
Demonstrated ability to meet time and budget constraints
➢ Volume of previous work awarded by the County over the past four years
Proposers should utilize information relative to Fiscal Year 2026 (FY26) as the current year. A “Consultant Fees Considered” summary is provided on the County’s
Engineering – Roadway Production website dated February 3, 2026. It is incumbent for the firm to add the value of any additional fees through the fiscal year that may not be reflected in the document.
Engineering and Public Works - Roadway Production Roadway Publications (pbcgov.org) https://discover.pbcgov.org/engineering/roadwayproduction/Pages/Roadway-Publications.aspx https://discover.pbcgov.org/engineering/roadwayproduction/Pages/Roadway-Publications.aspx https://discover.pbcgov.org/engineering/roadwayproduction/Pages/Roadway-Publications.aspx https://discover.pbcgov.org/engineering/roadwayproduction/Pages/Roadway-Publications.aspx
CRITERIA POINT VALUE
FINAL
SELECTION
SHORT-
LIST
1. Ability, knowledge of design criteria and past performance of firm and the designated project team to satisfy the requirements of the project.
Areas of Consideration in the Evaluation:
Professional qualifications of proposed project team to perform subject work; Demonstrated knowledge of design criteria for similar projects;
Demonstrated past performance of the firm and project team in completing similar projects.
35 50
2. Approach to the project, understanding of the project and quality of the presentation/written response, including meeting time requirements.
Areas of consideration in the evaluation:
Demonstrated understanding of the project and County’s goals and objectives; Demonstrated innovation in project approach; Demonstrated ideas for cost-effectiveness; Quality and clarity of presentation/written response to the public announcement; Demonstrated ability to meet schedule requirements.
35 20
3. Volume of previous work awarded or funded by the County over the past 4 years (The firm with the most work receives the lowest score)
10 10
Selection Process/Preliminary Timeline
Following submittals on July 22, 2026 packages will be reviewed by members of the Shortlist Committee
Shortlist Committee will tentatively convene in July 2026 to “shortlist” a minimum of two more firms than the number to be selected.
Shortlisted firms will receive notification that they have been selected for an interview, consisting of a presentation followed by Q & A
The CCNA A/E Selection Committee will tentatively convene in July 2026 to hear presentations/Q&A and to make final ranking/selection
Most qualified firm(s) will be chosen and submitted to Board of County
Commissioners for final approval
Submittal Date
Submittals are due at the Department of Airports on or before:
Tuesday, July 22, 2026
3:00 pm (local time)
Submit one (1) original six (6) bound copies and one (1) electronic copy in
Portable Document Format (PDF) on a flash drive.
Direct all questions and comments, in writing, to:
rfi@pbia.org
Last day for questions/clarifications is Monday, July 13, 2026 at 3:00 pm
All information related to this Request, as well as all forms to be included in the submittal, can be found on Palm Beach County’s
Self Service Vendor website at:
https://pbcvssp.pbc.gov/vssprd/Advantage4
NOTE: All amendments and/or addenda to this Request for
Proposals will also be posted on this website. It is incumbent upon the interested individuals or firms to ensure they have all of the current information by visiting this website prior to the submittal date.
Important Information
Questions?
DOA 26-7 Pre-proposal Mtg. Minutes (07/01/2026) Page 1 of 2
Pre-proposal Meeting Minutes in Black Italics
DOA 26-7 Airport Environmental Compliance Consultant Services
July 1, 2025 at 10:30 AM Department of Airports Administration Building (Bldg 846)
Palm Beach International Airport (PBI) North Palm Beach County General Aviation Airport (F45)
Palm Beach County Park Airport (LNA) & Palm Beach County Glades Airport (PHK) Main Conference Room
AGENDA
Introductions
The meeting started at 10:30 AM.
The Department of Airports (DOA) started introductions. DOA Staff included:
• Lauren Scott, Deputy Director of Planning and Development
• Brittany Summerlot, Director of Planning
• Anthony Gregory, Compliance Manager
• George Santos, Sr. Project Manager
See attached sign-in sheet for non-DOA attendees.
Services Desired
High-level summary of Palm Beach County Department of Airports was provided with PowerPoint presentation.
Professional services to DOA for each Consultant Services Agreement (CSA) assigned under the continuing contract may include:
• Audits/Inspections
• Assessments
DOA 26-7 Pre-proposal Mtg. Minutes (07/01/2026) Page 2 of 2
• Testing
• Permitting
• Planning, Remediation Design
• Reporting
• Training
• Extension-to-staff
DBE/SBE Participation and Federal Requirements
Review of DBE/SBE Goals, Office of Small Business Development (OSBD) required schedules, required Federal certifications with corresponding forms, and DBE certification and forms were reviewed with the PowerPoint presentation.
CCNA Certification Requirements
Firms must be CCNA certified prior to the submission of qualifications, if required by Florida Statute.
Contents of Submittal
Review of proposal contents sections.
Selection Process
The three selection criteria and scoring for the short-list and final selection committee were reviewed.
• Shortlist Committee Meeting – tentatively planned for July/August 2026
• Selection Committee Meeting – tentatively planned for August 2026 Submittal Date
• Submittals are due Tuesday, July 22, 2026, at 3pm
• Last day for questions is Monday, July 13, 2026, at 3pm
Id Start time Completion time Your name Name of Firm Attendance Email Address Phone Number
1 7/1/2026 10:26 7/1/2026 10:27 Trent Snyder CECOS Environmental Virtual Ts@cecosenvironmental.com 954-571-0290
2 7/1/2026 10:28 7/1/2026 10:28 Carolyn Foster RES Virtual Cfoster@res.us 772-538-4070
3 7/1/2026 10:28 7/1/2026 10:29 Daphne Gurri Gurrimatute In-Person daphneg@gurrimatute.com 7862364069
4 7/1/2026 10:28 7/1/2026 10:29 Wendy Cyriacks CECOS, Inc Virtual wc@cecosenvironmental.com 954-571-0290
5 7/1/2026 10:29 7/1/2026 10:29 Doug Skurski ESA In-Person dskurski@esassoc.com 4076907528
6 7/1/2026 10:29 7/1/2026 10:29 Cody Parham Garver In-Person ctparham@garverusa.com 6786176958
7 7/1/2026 10:28 7/1/2026 10:29 Michael Arnold ESA In-Person Marnold@esassoc.com 4073121294
8 7/1/2026 10:29 7/1/2026 10:29 Kyle Henry EXP In-Person kyle.henry@exp.com 5613299263
9 7/1/2026 10:29 7/1/2026 10:29 Martha Carvallo RS&H In-Person martha.carvallo@rsandh.com 8132639232
10 7/1/2026 10:29 7/1/2026 10:29 Melissa Caruso NOVA Engineering and EnvironmentalIn-Person Mcaruso@usanova.com 412-715-1870
11 7/1/2026 10:29 7/1/2026 10:30 David Castañeda EXP In-Person david.castaneda@exp.com 9543287284
12 7/1/2026 10:29 7/1/2026 10:30 Nathan Parish Michael Baker In-Person Nathan.parish@mbakerintl.com 8134666025
13 7/1/2026 10:29 7/1/2026 10:30 Helena Mendez EXP US SERVICES INC In-Person helena.mendez@exp.com 7865611304
14 7/1/2026 10:29 7/1/2026 10:30 Jose G. Matute Gurrimatute In-Person jmatute@gurrimatute.com 7862363244
15 7/1/2026 10:29 7/1/2026 10:30 Marcos Souza EXP U.S. Services Inc. In-Person marcos.souza@exp.com 9549998292
16 7/1/2026 10:29 7/1/2026 10:30 Hilary Maull, PE AVCON, INC In-Person hmaull@avconinc.com 4075991122
17 7/1/2026 10:29 7/1/2026 10:30 Jim Halley HDR In-Person Jim.halley@hdrinc.com 954-439-8048
18 7/1/2026 10:29 7/1/2026 10:30 Brian Russell Michael Baker International In-Person brussell@mbakerintl.com 9044127104
19 7/1/2026 10:29 7/1/2026 10:30 Matthew Simon HMMH Virtual msimon@hmmh.com 339-240-2771
20 7/1/2026 10:29 7/1/2026 10:30 Samantha Burns Earthology LLC In-Person Samantha.burns@earthology.info 5617670669
21 7/1/2026 10:29 7/1/2026 10:30 Reinaldo Diaz South Florida Engineering and Consulting LLCIn-Person rdiaz@sfec.us (561) 707-2897
22 7/1/2026 10:29 7/1/2026 10:30 Mitch Guirard Geosyntec Consultants In-Person Mitchell.Guirard@geosyntec.com 561-886-3209
23 7/1/2026 10:29 7/1/2026 10:30 Courtney Arena HDR In-Person courtney.arena@hdrinc.com 9546499450
24 7/1/2026 10:29 7/1/2026 10:30 Miriam De Santiago Partner Engineering and Science, Inc.In-Person mdesantiago@partneresi.com 561-437-8016
25 7/1/2026 10:30 7/1/2026 10:31 Kathryn Eisnor RES Florida Consulting LLC Virtual Keisnor@res.us 954-464-4564
26 7/1/2026 10:29 7/1/2026 10:31 Patrick Mitchell EcoLytix environment labs In-Person Info@ecolytixlabs.com 3104872302
27 7/1/2026 10:41 7/1/2026 10:41 George Santos Palm Beach County Department of Airports In-Person gsantos@pbia.org 561-681-5121
28 7/1/2026 10:41 7/1/2026 10:41 Gladys sera Sera engineered In-Person Gladys@seraengineered.com 5612834614
29 7/1/2026 10:41 7/1/2026 10:41 Nash Thummadi Apex Companies, LLC In-Person nash.thummadi@apexcos.com 9546812091
30 7/1/2026 10:41 7/1/2026 10:42 Jennifer Wallens Dudek Virtual Jwallens@dudek.com 772-563-8462
31 7/1/2026 10:41 7/1/2026 10:42 Erik Neugaard ECS In-Person eneugaard@ecslimited.com 786-815-9563
32 7/1/2026 11:24 7/1/2026 11:25 Kari Cardiel Gurri Matute PA Virtual kcardiel@gurrimatute.com 3056610069
DOA 26-7 Environmental Compliance Consultant Services - Pre-Proposal Meeting - Participant List
| ADDENDUM NO. 2 DOA 26-7 |
| DOA 26-7 Pre-Proposal PPT |
| Slide 1 |
| Slide 2: July 1, 2026 at 10:30 am |
| Slide 3: Agenda |
| Slide 4: Palm Beach County Department of Airports |
| Slide 5: Palm Beach County Department of Airports |
| Slide 6: Location of Airports Within Our System |
| Slide 7: Scope of Services |
| Slide 8: |
| Slide 9: DBE and SBE Participation |
| Slide 10: Questions |
| Slide 11: |
| Slide 12: Consultant’s Competitive Negotiations Act (CCNA) Certification |
| Slide 13: |
| Slide 14: Proposal Contents – Section VI (D) |
| Slide 15: Proposal Contents – Section VI (D) - Continued |
| Slide 16: |
| Slide 17: Selection Process/Criteria |
| Slide 18: Selection Process/Criteria (continued) |
| Slide 19: Selection Process/Criteria (continued) |
| Slide 20: Selection Process/Criteria (continued) |
| Slide 21: Selection Process/Preliminary Timeline |
| Slide 22: Submittal Date |
| Slide 23: Important Information |
| Slide 24: Questions? |
| DOA 26-7 Pre-proposal Meeting Minutes |
| Pre-Proposal Meeting_Participants_DOA 26-7 |