Addendum_No._2:_01010_-_Summary_of_Work-_removed.pdf

PDF 72 KB Posted

Attached to
INVITATION TO BID: Highland Village Stormwater Improvements Project (Phase 1)
Solicitation number
ITB-2026-050
Issued by
Miami-Dade County, Florida

About this file

This addendum document pertains to the Highland Village Stormwater Improvements Project (Phase 1) solicitation issued by the City of North Miami Beach, Florida. The project encompasses the installation of inline backflow prevention devices upstream of existing storm outfalls adjacent to NE 25th Avenue, including excavation, demolition of existing infrastructure, installation of HDPE storm sewer pipes and sleeves of varying sizes, removal and relocation of a 2-inch water service line, relocation of an existing 8-inch watermain, and replacement of damaged sod, sidewalk, and pavement. The contractor must furnish all materials, labor, and equipment for complete and functional installation. The solicitation has been issued multiple times with revised bid submission deadlines: November 10, 2026 at 5:00 p.m., November 24, 2026 at 5:00 p.m., and December 3, 2026 at 5:00 p.m., all via the City's eProcurement Portal. A mandatory pre-bid conference and site visit were scheduled for October 14, 2026 at 11:00 a.m. at Highland Village Community Center, with questions due by October 28, 2026 at 5:00 p.m.

Bidders must hold a valid Florida General Contractor's license and demonstrate completion of at least three similar projects in Florida within the preceding two years, with a minimum of two projects in Miami-Dade or Broward County. All construction personnel must obtain OSHA 10-hour Construction Safety certification. Bid security of 5 percent of the bid amount is required, with performance and payment bonds each at 100 percent of contract price due within ten days of award. The project is federally-assisted and subject to Davis-Bacon prevailing wage requirements and Section 3 compliance obligations. Living wage requirements apply if the total contract value exceeds $50,000. Work hours are restricted to 7:00 a.m. to 6:00 p.m., Monday through Friday, unless the Project Manager approves overtime with 72 hours advance notice. Liquidated damages of $2,500 per calendar day apply for contractor-caused delays. Award will be made to the lowest responsive, responsible bidder. The contractor is responsible for dewatering, traffic control, field utility verification, and coordination with utility owners including FPL, AT&T, Comcast, Crown Castle, and TECO Peoples Gas, as well as obtaining NPDES and other required permits.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF NORTH MIAMI BEACH

HIGHLAND VILLAGE STORMWATER

IMPROVEMENTS PHASE 1

CITY PROJECT NO. STRM-2022 PHASE1

01010-1

SECTION 01010

SUMMARY OF WORK

PART 1 – GENERAL

1.01 SCOPE OF WORK

A. This Section describes the project in general and provides an overview of the extent of the work to be performed under this Contract. Detailed requirements and extent of work is stated in the applicable Specification sections and shown on the Plans. The Contractor shall, except as otherwise specifically stated herein or in any applicable parts of the Contract Documents, provide and pay for all labor, materials, equipment, tools, construction equipment, and other facilities and services necessary for proper execution, testing, and completion of the work under this Contract.

1.02 SPECIFICATIONS

A. The Specifications included in these Contract Documents establish the minimum performance and quality requirements for materials and equipment with the minimum standards for quality of the workmanship and appearance. Generally, there has been no attempt to separate the Specification sections into groups for the work of separate subcontractors, or for work to be performed by the various trades. Should there be any question as to the interpretation of any particular Specification section or part of Specification section, such question should be directed to the City prior to the submittal of a proposal for the work under this Contract.

B. The work shown on the Plans is intended to be comprehensive and descriptive, not an exact and complete representation of the actual finished work. Installed work shall include fittings, joints, supports, nuts, bolts, and all other accessories required to provide complete and satisfactory systems as specified, even though some items may not be specifically shown on the Plans.

C. It is the intent of the City to obtain a complete functional, satisfactory and legally operable installation under this project, and any items of labor, equipment or materials which may be reasonably assumed as necessary to accomplish this end shall be supplied whether or not they are specifically shown on the Plans or stated herein. The Contractor shall provide all materials for the project unless they are specifically called out in these specifications as being supplied by the City. The Contractor shall also supply all other labor, material or equipment required to preclude damage to or loss of functionality of any existing facility or system.

D. No request for additional compensation or Contract time (except for a non-compensable item extension at the sole discretion of the Engineer, whose decision shall be final) resulting from encountering utilities or structures not shown, or differing in location or elevation from that shown, will be considered. The Contractor shall explore sufficiently ahead of the Work to allow time for any necessary adjustments without delay to the progress of the installation. Cost due to delays occasioned by encountering utilities or structures which could have or should have been discovered by timely exploration ahead of the work shall rest solely with the Contractor.

E. Where applicable and necessary, the Contractor shall refer to NMB WATER STANDARD

DOCUMENTS.

1.03 REASONABLY IMPLIED PARTS OF THE WORK SHALL BE DONE THOUGH ABSENT FROM

SPECIFICATIONS

CITY OF NORTH MIAMI BEACH

HIGHLAND VILLAGE STORMWATER

IMPROVEMENTS PHASE 1

CITY PROJECT NO. STRM-2022 PHASE1

01010-2

A. Any part of the work which is not mentioned in the Specifications but is shown on the Plans, or any part not shown on the Plans but described in the Specifications, or any part not shown on the Plans nor described in the Specifications, but which is necessary or normally required as a part of such work, or is necessary or required to make each installation satisfactorily and legally operable, shall be performed by the Contractor as incidental work without extra cost to the City, as if fully described in the Specifications and shown on the Plans, and the expense thereof shall be included in the applicable unit prices or lump sum bid for the work.

1.04 DESCRIPTION OF WORK

A. The project consists of furnishing all materials, labor, and equipment necessary to install backflow prevention devices upstream of the existing outfalls located adjacent to NE 25th Avenue, including, but not limited to, excavation, demolition; installation of proposed drainage structures; connection to existing storm drain system HDPE Storm Sewer (sizes vary), sleeves (sizes vary) and inline backflow prevention device; replacement of any sod, sidewalk, pavement damaged during construction, and other appurtenant and miscellaneous items for a complete, satisfactory and functional installation.

B. It is the intent of the City to obtain a complete and working installation under this Project and any items of labor, equipment or materials which may reasonably be assumed as necessary to accomplish this end shall be supplied whether or not they are specifically shown on the Plans or stated herein.

PART 2 – PRODUCTS (NOT USED)

PART 3 – EXECUTION (NOT USED)

– END OF SECTION –

Deleted: ; remove and relocate as required: existing 2” water services; relocate existing 8” watermain;