Addendum No. 1 to RFP S-R33119-00018295: Stockton Oak Contractor Pool

This addendum, issued by Wasco County Soil and Water Conservation District on November 13, 2026, provides clarifications to the solicitation for establishing a contractor pool for fuels reduction and habitat restoration work on the Stockton Oak Project in Oregon's White River Wildlife Area. The addendum addresses three primary requests for clarification regarding treatment methods, licensing requirements, and contractor eligibility. Proposals are due November 30, 2026, at 1:00 PM. Up to eight contractors will be selected into an Agreement-To-Agree with an initial two-year term, renewable to a maximum of six years. The scope of work encompasses mechanical fuels reduction, hand treatments, vegetation management, and additional restoration or fuels reduction activities as identified in future Mini-RFPs. The addendum includes three project area maps (Cut and Pile Units, Hand Thin Units, and Mastication Units) for informational purposes.

The addendum clarifies that targeted livestock grazing and other specialized vegetation management services may be included in future Mini-RFPs on a project-specific basis, though no guarantee is provided. Contractors are not required to hold an Oregon Construction Contractors Board (CCB) license if one is not legally required for their proposed services; however, they must obtain all licenses, registrations, permits, and certifications mandated by federal, state, and local law for the work they propose to perform. The District will evaluate proposals based on relevant project experience in vegetation management, restoration, wildfire mitigation, and similar work, and reserves the right to verify qualifications and regulatory compliance during evaluation and prior to contract award. Selection into the contractor pool does not guarantee work assignments, as individual opportunities will be solicited through future Mini-RFPs with potentially varying evaluation criteria based on specific project needs.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum No. 1

RFP S-R33119-00018295

Stockton Oak Contractor Pool

Issue Date: November 13, 2026

This Addendum is issued to clarify the solicitation documents and becomes part of the Request for Proposals. Proposers are responsible for reviewing and incorporating information contained in this Addendum into their proposals.

1. Requests for Clarification

1. Section 1.1 (p. 4) and Section 5.3 (p. 14): Mini-RFPs may include "additional restoration or fuels reduction treatments identified during implementation." Would the District consider targeted goat grazing as one of those treatments, for example, to reduce brush, blackberry and fine fuels in the oak understory, or as follow-up maintenance after mechanical or hand treatments?

Clarification: Potential future Mini-RFPs may include restoration or fuels reduction activities beyond those specifically identified in the RFP if such treatments are determined by the District and project partners to support project objectives. However, inclusion of any treatment type, including targeted livestock grazing, will be determined on a project specific basis and described in the applicable Mini-RFP. The current project planning anticipates treatments focused primarily on mechanical fuels reduction, hand treatments, and associated vegetation management methods consistent with the Stockton Oak Project objectives. At this time, the District cannot guarantee the targeted grazing services will be included in future Mini-RFP opportunities.

Combined Question

2. Sections 4.2.A, 4.2C and 4.3 (pp. 11-12): Contractors providing specialized vegetation management services, such as targeted grazing or mastication, may not be required under Oregon law to hold an Oregon Construction Contractors Board (CCB) license. Will relevant fuels reduction and vegetation management projects be considered toward the minimum experience requirements, and are contractors eligible for selection to the contractor pool if they do not hold a CCB license when one is not legally required for the services they provide?

Clarification: The District will evaluate proposals based on the criteria identified in Sections 4.2 and

4.3 of the RFP. Relevant project experience may include vegetation management, restoration, wildfire mitigation, fuels reduction, or similar projects that demonstrate the proposer’s qualifications and ability to preform the services contemplated under the Contractor Pool. The Evaluation Committee will assess the relevance and applicability of submitted project experience based on the information provided in each proposal. Contractors are not excluded from consideration solely because they specialize in particular treatment methods, such as targeted grazing or mastication. The District requires proposes to be legally authorized to conduct business in Oregon and to maintain all licenses, registrations, permits, certifications, and insurance required by applicable federal, state, and local laws for the services they propose to perform. Consistent with Section 4.2.A, Oregon Construction Contractors Board (CCB) information is required only when applicable to the services being offered. Proposers are responsible for determining and obtaining any licenses required by law, and the District reserves the right to verify qualifications, licensing status, and regulatory compliance during evaluation and prior to contract award.

Selection into the Contractor Pool does not waive any licensing, permitting, insurance, or regulatory requirements that may apply to future Mini-RFPs or work assignments.

3. Section 1.1 (p. 4) and Section 4.2.A (p. 11): Our understanding is that targeted goat grazing does not require an Oregon Construction Contractors Board (CCB) license. For a grazing-only contractor, would a CCB license still be required to satisfy the "current contractor license for the State of Oregon" requirement for this contractor pool? If so, we are prepared to obtain one before the proposal deadline.

Clarification: The RFP requires proposers to be currently licensed to conduct business in Oregon, be in compliance with applicable state laws, and possess any licenses required by Oregon law for services they propose to perform. In Section 4.2 A, proposers are asked to provide Oregon Construction Contractors Board registration information “if applicable.” The District does not interpret the RFP as requiring a CCB license where Oregon law does not require one for the services being offered. Proposers are responsible for determining and obtaining all licenses, registrations, permits, and certifications required by applicable federal, state, and local laws for work they propose to perform. The District reserves the right to verify licensure and regulatory compliance during proposal evaluation and prior to contract award.

Additional Clarification:

Selection into the Contractor Pool does not guarantee receipt of work assignments. Individual work opportunities will be solicited through future Mini-RFP’s issued to contractors selected for the pool, and evaluation criteria may vary based on the treatment type, project needs, equipment requirements, and technical specifications identified in each Mini-RFP.

2. Project Area Maps The following project area maps are attached to this Addendum and are provided for informational purposes to assist prospective proposers in understanding the general location and extent of anticipated work areas and do not alter the scope of work or evaluation criteria.

Map 1. Cut and Pile Units

Map 2. Hand Thin Units

Map 3. Mastication Units

1. Requests for Clarification
2. Project Area Maps

File details come from the government source that posted it. Updated .