LAKE LIMESTONE PARK NO. 5 LOADING DOCK AND FISHING PIER PROJECT
Solicitation number
26-1377
Issued by
Texas

About this file

This Addendum No. 1 document, issued by the Brazos River Authority (BRA) on March 12, 2026, provides revised contract specifications for RFB No. 26-1377 regarding the Lake Limestone Park No. 5 Loading Dock and Fishing Pier Project. The project requires design, fabrication, manufacture, furnish, delivery, installation, testing, and placement of a loading dock and fishing pier including superstructures, fixed pier foundation systems, and ancillary improvements such as lighting, electrical work, and ADA accessibility features. The scope includes preparatory work consisting of detailed pier plans with design calculations sealed by a Professional Engineer registered in Texas, supplemental engineering analysis including hydrographic surveys and geotechnical exploration, and compliance documentation with Texas Accessibility Standards and Texas Department of Licensing and Regulation requirements. The project encompasses approximately 220 feet of courtesy dock with a 1,200 square-foot platform and a 300-foot fishing pier as an alternative bid item, both utilizing pile-supported fixed pier design. The construction phase must be completed by August 30, 2026, with the Notice to Proceed marking the official start date following satisfaction of pre-construction conditions including approval of plans, permits, licenses, final construction schedule, and verification of insurance and bonding requirements.

The contract is structured as two lump-sum bid items with comprehensive pricing for design, mobilization, demobilization, foundation installation, deck structure construction, and project closeout. The manufacturer must be selected from approved vendors with minimum ten years' experience in marina structure design and installation, with Wahoo Docks identified as the primary manufacturer option, though substitutions of equal quality, durability, and performance are permitted through formal substitution procedures. Warranty requirements include five-year limited warranties on manufactured products and twenty-year material limited warranties on decking and exterior coatings. Contractor responsibilities include providing a comprehensive Health and Safety Program, establishing a quality control program, maintaining a Critical Path Method schedule updated monthly, preparing and maintaining a pollution prevention plan, and managing all temporary facilities and environmental controls at no additional cost. Partial payments are restricted to completed work installations only, with payment subject to reduction for defects, claims, schedule submission failures, or payroll violations. The project requires compliance with 2021 International Building Code standards, AISC specifications, ASTM requirements, and applicable federal and state regulations, including OSHA safety standards and U.S. Coast Guard maritime regulations for any barges or overwater equipment utilized during construction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum No. 1

Brazos River Authority

March 12, 2026

Addendum No. 1 Lake Limestone Park No. 5 Loading Dock and Fishing Pier Project

RFB No. 26-1377

It is the responsibility of the Respondent to assure and guarantee by acknowledging the receipt of this Addendum in the Bid that the Respondent has received the Addendum in its entirety, and that the Respondent accepts all conditions contained herein.

A revised Exhibit A correcting the drawing XXX reference below.

Sincerely, Victor Venegas Purchasing Agent

EXHIBIT A

BRAZOS RIVER.AUTHORITY

CONTRACT DOCUMENTS AND SPECIFICATIONS FOR

LAKE LIMESTONE PARK NO. 5

LOADING DOCK AND FISHING PIER PROJECT

March 2026

1. General Requirements

1.1. Summary of Work

The scope of services the awarded respondent will be required to follow includes:

a. Furnish all labor, materials, tools, equipment and incidentals necessary to satisfactorily design, fabricate, manufacture, furnish, deliver, install, test, and place into service the components and complete assemblies for a Loading Dock and Fishing Pier including pier superstructures and fixed pier foundation systems, components, features and accessories complete as specified herein and as shown on the drawings.

b. Construct ancillary dock improvements including lighting, electrical improvements, and ADA accessibility features within the dock footprint

c. Provide detailed pier plans and design calculations, properly signed and sealed by a

Professional Engineer registered in the State of Texas including, but not limited to, the following: design of foundation, superstructure, framing, decking, and railing.

d. Provide all necessary supplemental engineering analysis to support the development of a complete set of construction documents including, but not limited to, the following:

i. Hydrographic survey,

ii. Geotechnical exploration, data, analysis, and design parameters,

iii. Design wind and wave loading conditions.

e. Provide all necessary plans, specifications, and services to comply with Texas

Accessibility Standards (“TAS”) and Texas Department of Licensing and Regulation requirements (“TDLR”), including, but not limited to, the following:

i. Providing a complete set of the construction drawings in PDF format.

ii. Modifying plan/project to comply with relevant TAS and TDLR requirements, if necessary.

iii. Providing any other documentation that may be required by TDLR, TABS, or other applicable agencies.

1.2. Work Restrictions

CONTRACTOR shall comply with all instructions, conditions, rules, or other directives that may be provided by OWNER from time to time regarding use of the Site and access to the Site. OWNER will provide direction regarding use of the Site and access to the Site at the preconstruction meeting but reserves the right to modify any such direction at any time.

Except as provided elsewhere in the Contract Documents, or permitted by the OWNER in writing, the

CONTRACTOR shall not access any Project areas not requiring access for CONTRACTOR's Work. The

CONTRACTOR shall limit its Work activities to the project area/limits shown on the Drawings. The

CONTRACTOR shall not access private land without the express written permission of the private landowner. Additional restricted areas may be defined from time to time by the OWNER.

The CONTRACTOR shall prevent any construction debris from entering reservoir to avoid damage to features. Methods for protection of existing structures and equipment shall be included in the

CONTRACTOR’s submittals.

Verify on-site utilities and have them marked out by a third-party utility locator service prior to the start of construction. Determine the elevations of existing utilities and underground obstructions indicated as existing to remain in locations to be traversed by new utilities and other work provided herein before new work is laid closer than the nearest manhole or other structure at which an adjustment in grade could be made. Where dig permits are required, obtain permits and notify the

Contracting Officer 30 calendar days prior to any excavation.

Maintain all utility markings for the duration of the contract.

All Contractor employees, including subcontractors, subcontractors' employees, suppliers, and suppliers' employees are required to comply with the Brazos River Authority Security Requirements regarding personnel, vehicle, and equipment security passes and access to the jobsite. Nothing in the contract is to be construed in any way to limit the authority of the Lake Manager to prescribe new, or to enforce existing security regulations governing the admission or exclusion of persons and the conduct of persons while at the facility.

Contractor Vehicles: All vehicles must display a valid state license plate and safety inspection sticker, if applicable, and must be maintained in good repair. The company name must be displayed in a clearly visible manner and size on each Contractor vehicle used in the course of work.

Barges and Overwater Equipment: Any commercial work barge utilized during this project must meet the standards of the Texas Water Safety Act and all applicable U.S. Coast Guard regulations and it must comply with All BRA regulations and other applicable State and Federal regulations.

Overwater Accessibility: Water surface elevation fluctuation may not permit the use of floating barge facilities during all phases of construction. While a contractor may use floating barges to complete the project, the Contractor shall also plan means and methods to continue construction for water surface elevations ranging from 358.00 to 363.50. Days where the water surface elevation is outside this range will be considered as weather delays only where critical path work items requiring floating barge support are impacted.

Work Hours: Unless otherwise indicated, work will be located on a Brazos River Authority facility.

Contractor work hours are between 0700 and 1530 Monday through Friday. Obtain advance approval from the Lake Manager for Contractor personnel to remain on site beyond normal working hours.

Notify the Lake Manager at least 48 hours in advance to obtain approval for access to the jobsite or work outside of normal working hours or on Saturday, Sunday, and Federal Holidays.

Contractor Personnel: Provide the Contracting Officer the name(s) of the supervisory person(s) authorized to act for the Contractor. Provide, and update as required, a list of the key personnel for the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency.

Contractor employees must conduct themselves in a proper, efficient, courteous and businesslike manner. Remove from the site any individual whose continued employment is deemed by the Lake

Manager to be contrary to the public interest or inconsistent with the best interests of National

Security.

1.3. Experience Requirements

Manufacturer Experience: The dock manufacturer shall have a minimum of ten (10) years’ experience in the design, manufacture, and installation of similar marina structures and systems to that proposed in this project. Upon request, the manufacturer shall submit a list of previous installations like that specified by the Authority.

Contractor Experience: The Contractor shall have a minimum of ten (10) years’ experience in the installation of similar marina structures and system to that proposed in this project. Upon request, the

Contractor shall submit a list of previous installations like that specified by the Authority. The

Authority’s decision of qualifications will be final.

1.4. Price and Payment Procedures

Lump-Sum Measurement: Except as otherwise specified, measurement shall be for the entire item, unit of Work, structure, or combination thereof, as listed on the Bid Form. Progress payments for lump sum items will be made in accordance with a well- balanced, detailed, approved schedule of values that apportions the lump sum items. The apportionment for each lump sum item shall show measurable quantities and unit prices allocated to the different features of the Work and major subdivisions thereof. The summation of extensions of quantities and unit prices and related costs shall equal the amount of the lump sum bid for the item on the Bid Form.

Bid Form Items Measurement and Payment: The following is a description of items based on the bid schedule provided in Bid Form. Prices bid in the Bid Form constitute complete pricing for Work on the

Contract including all incidental costs, which Work is as specified in the Contract Documents.

Item 1 – Loading Dock Loading Dock bid item includes all preparatory design work for the proposed loading dock including, personnel, equipment, supplies, and incidentals necessary to prepare the preliminary submittal shop drawings, final submittal drawing package, technical specifications, supplementary data collection, supplementary engineering analysis, design calculations, engineered system coordination and conflict reconciliation, consultation with

Authority staff during design, review and consultation with Contractor, Manufacturer, and

Suppliers, design workshops and progress meetings.

Item 1 also includes all cost for mobilization including preparatory work and operations associated with the proposed loading dock, including, but not limited to: movement of personnel, equipment, supplies, and incidentals to the Work site; establishment of field offices; temporary utilities; power; installation and maintenance of temporary fencing; mobilization of all equipment and facilities including transport, set up, and calibration; furnishing an acceptable CPM schedule, Schedule of Values, SWPPP, water quality plan, and Health and Safety Plan; furnishing certificates of insurance, performance/payment/warranty bonds as required by the Contract Documents;

maintenance of all existing access roads; photographic documentation; survey control; location and protection of existing facilities, including, but not limited to underground utilities and improvements, surface improvements and structures, and all other work and operations that must be performed or for which costs must be incurred before starting the Work.

Item 1 also includes all cost for demobilization including removal of field offices, furnishings, and equipment; removal of equipment and personnel and unused materials from the site, including all related utilities, and traffic controls; restoration of access roads to original condition prior to

Mobilization or better; site restoration and site cleanup. This item also includes project closeout and providing operation and maintenance manuals. Payment will be made at the Contract lump sum price bid for this item.

Item 1 also includes all cost for work and services of an administrative nature, as may be specified in the various Specification Sections, and not referenced in this Measurement and Payment statement of this section. These costs are considered incidental to the entire Work of the Contract and no separate or additional payment will be paid for such.

Item 1 also includes all cost for the loading dock foundation Including the cost of all labor, equipment, material, supplies required to install foundation piles for support of the Loading Dock structure. Includes all testing, coatings, and capping.

Item 1 also includes all cost for the deck structure including the cost of all labor, equipment, material, supplies required to construct the dock structure. Includes pile cap connections, stringer installation, decking, railing, and accessory hardware, testing, coatings, and capping.

Item 2 – Fishing Pier includes all preparatory design work including, personnel, equipment, supplies, and incidentals necessary to prepare the preliminary submittal shop drawings, final submittal drawing package, technical specifications, supplementary data collection, supplementary engineering analysis, design calculations, engineered system coordination and conflict reconciliation, consultation with Authority staff during design, review and consultation with Contractor, Manufacturer, and Suppliers, design workshops and progress meetings.

Item 2 also includes all cost for mobilization including preparatory work and operations associated with the proposed fishing pier, including, but not limited to: movement of personnel, equipment, supplies, and incidentals to the Work site; establishment of field offices; temporary utilities;

power; installation and maintenance of temporary fencing; mobilization of all equipment and facilities including transport, set up, and calibration; furnishing an acceptable CPM schedule, Schedule of Values, SWPPP, water quality plan, and Health and Safety Plan; furnishing certificates of insurance, performance/payment/warranty bonds as required by the Contract Documents;

maintenance of all existing access roads; photographic documentation; survey control; location and protection of existing facilities, including, but not limited to underground utilities and improvements, surface improvements and structures, and all other work and operations that must be performed or for which costs must be incurred before starting the Work.

Item 2 also includes all cost for demobilization including removal of field offices, furnishings, and equipment; removal of equipment and personnel and unused materials from the site, including all related utilities, and traffic controls; restoration of access roads to original condition prior to

Mobilization or better; site restoration and site cleanup. This item also includes project closeout and providing operation and maintenance manuals. Payment will be made at the Contract lump sum price bid for this item.

Item 2 also includes all cost for work and services of an administrative nature, as may be specified in the various Specification Sections, and not referenced in this Measurement and Payment statement of this section. These costs are considered incidental to the entire Work of the Contract and no separate or additional payment will be paid for such.

Item 2 also includes all cost for the foundation including the cost of all labor, equipment, material, supplies required to install foundation piles for support of the fishing pier structure. Includes all testing, coatings, and capping.

Item 2 also includes all cost for the deck structure including the cost of all labor, equipment, material, supplies required to construct the dock structure. Includes pile cap connections, stringer installation, decking, railing, accessory hardware, testing, coatings, and capping.

Partial Payments: No partial payments for products (materials, equipment, apparatus) stored on or off site will be made. Partial payments will only be made for partial or full installation of completed work unless specific written authorization from the OWNER is received in advance.

Contractor Invoicing: Contractor requests for payment must conform and will be processed in accordance with the requirements of the Agreement.

Content of Invoice Package: Requests for payment in accordance with the terms of the contract must consist of the following:

Contractor's Invoice

Contractor's Estimate for Voucher/ Contract Performance Statement

Affidavit to accompany invoice

Updated Schedule of Values

Updated copy of submittal register.

Updated copy of progress schedule.

Conditional release

Final release (for final payment only).

Affidavit: Beginning with the second Application for Payment, each Application shall include an affidavit of CONTRACTOR stating that all previous progress payments received on account of the Work have been applied on account to discharge CONTRACTOR’s legitimate obligations associated with prior Applications for Payment.

Payment Processing: Payment will be made on Contractor's submission of itemized requests and will be subject to reduction for overpayments or increased for underpayments from previous payments. The Brazos River Authority may withhold payment or reduce payments for the following:

a. Defects in material or workmanship.

b. Claims the Brazos River Authority may have against the Contractor under or in connection with this contract.

c. Contractor's failure to submit an updated schedule.

d. Payroll violations.

e. Unless otherwise adjusted, repayment to the Brazos River Authority upon demand for overpayments made to the Contractor.

Budget Management: The Contractor must be responsible for budget management throughout the entire project. It is the intent of the Brazos River Authority to partner with the Contractor to maximize project value while strictly controlling contract modifications and maintaining overall fiscal control.

When required, develop a Budget Management System for each phase of the design.

1.5. Design Presentation and Development

1.5.1. Design Meetings

The Contractor shall make provisions to participate in a preliminary design workshop and subsequent design presentations.

Conceptual Design Workshop: Prior to commencement of design, and within 28 calendar days of award, meet with the Owner’s Representative to present the concept design for discussion and acceptance. The project team will develop a mutual understanding relative to the approved proposal, safety program, environmental permits and requirements, quality control procedures, and design and construction schedule. During the meeting, Contractor must propose and gain acceptance for any critical path work activities requiring advance submittal and approval. The Contractor's key personnel must attend including the Project Manager, Superintendent, Designer of Record (DOR), and major subcontractors.

Design Development Presentation: The Contractor must lead subsequent meetings to develop an understanding of the project design that the accepted technical proposal represents with the Brazos River

Authority users and maintainers of the facility. The purpose of the Design Development Meetings is to confirm the appropriateness of the project design and develop acceptable alternatives if changes are needed. The Contractor must anticipate that Brazos River Authority Users represented at the meeting will provide additional functional information. Incorporate functional design changes into the project design as required to meet the needs of the Users. At the end of the meeting the Contractor must provide either assurance that the updated design can be built within the budget or identify potential cost modification items and establish a follow-up meeting to finalize a design that will include trade-offs to bring the project within the budget. The following Contractor key personnel must attend the Design Development

Presentation: Project Manager, Superintendent, Designer of Record, Design Staff responsible for each engineering discipline providing signed and sealed engineering products, and major subcontractors.

1.5.2. Design Submittal Procedures

This section includes requirements for contractor-originated design documents and design submittals.

Provide design drawings and design specifications, reports and submittal register in accordance with

Brazos River Authority design procedures.

Design submittal evaluation will be based on conformance to the project description, functional and performance requirements, and prescriptive requirements listed in the RFB.

Provide professional registration and design signing and stamping requirements per requirements of the

State of Texas. The final design submittal must be professionally signed and sealed by the DOR and forwarded to the Project Engineer prior to the start of construction. Separated final design packages will only be considered for Authority review during the Conceptual Design Workshop.

Authority review or approval of any portion of the interim or final design does not relieve the Contractor from responsibility for errors or omissions with respect thereto.

Submit the documents identified in the Design Deliverable Submittal List at least 14 days prior to a scheduled design workshop or development presentation.

DESIGN DELIVERABLE SUBMITTAL LIST

Conceptual Design Workshop

Scope and schedule of supplementary geotechnical, survey, and other engineering analysis

11x17 Conceptual Drawings

Draft Specifications

Finish Product Documentation / Material Sample Alternatives

Design Development Presentation No. 1

Supplementary engineering data and reports

Draft Final 11x17 Drawings

Draft Final Specifications

Finish Product Documentation / Material Sample Alternatives

Final Design (signed and sealed)

Final supplementary engineering data and reports

Final 11x17 Drawings

Final Specifications

Design Calculations

Design Calculation Requirements:

All supplementary engineering data shall be able to be provided upon request to the BRA. The DOR shall be able to present an ordered account of how the project design conforms to the project requirements incorporated in this RFB as well as any additional engineering data, analysis, and guidelines incorporated by the DOR to meet standard of practice for the design of the project.

Drawing Requirements:

The following is a partial listing of drawings required for submittal:

1. Loading Dock and Fishing Pier Plans:

• shoreline and location,

• dock dimensions,

• walkway dimensions, and

• location of all dock appurtenances (bumpers, fenders, rub-rails, and dock cleats).

2. Loading Dock and Fishing Pier Elevations

3. Structural Plan

• Design Loading Conditions

• Foundation Plan

• Foundation Details

• Structure framing plan

• Structure Details

Specification Requirements:

Provide a Contractor-originated design specification that in conjunction with the drawings, demonstrates compliance with requirements of the RFB. The specified products, materials, systems, and equipment that are approved by the DOR; submitted to the Brazos River Authority by the Contractor; and reviewed by the Technical Services Division must be used to construct the project. Prescriptive specification sections contained in this RFB must become a part of the Contractor-originated specification without modification. The Contractor must prepare design specifications that include a specification for each product, material, or system on the project. Provide project specifications to include the following:

Provide the specification cover sheet with the professional seal and signature of the lead licensed architect or engineer of the project design team. Indicate the Contractor's company name and address on the specification coversheet.

Table of contents for entire specification.

Individual specification sections for each product, material, and system required by the RFP.

If proprietary information is provided or required, include a coversheet, highlighted and annotated

Catalog Cuts, Manufacturer's Product Data, Tests, Certificates, Manufacturer’s information and letters for each product, material, or system that is being proprietarily specified.

Coordinated submittal register for all products, materials and systems with each design submittal.

Provide a cumulative register that identifies the design and construction submittals required by each design package along with previous design submittals. The DOR must assist in developing the submittal register by determining which submittal items are required to be approved by the DOR. Complete all fields in the final submittal register to obtain Authority approval of the final design.

Identification of Manufacturer's Product Data Used as Specifications: Provide complete and legible catalog cut sheets, product data, installation instructions, operation and maintenance instructions, warranty, and certifications for products and equipment for which final material and equipment choices have been made. Indicate, by prominent notation, each product that is being submitted including optional manufacturer's features and indicate where the product data shows compliance with the RFB.

Attach this product data to the end of the applicable specification section that specifies the material.

Specification Software: Submit the final specification source files in either MS Word with a Submittal

Register generated in Excel.

1.5.3. Product Substitution Procedures

Summary:

This section specifies administrative and procedural requirements for requesting product substitutions during the bidding and construction phases.

Definitions:

A. Substitution Request – Bid Phase: A request submitted prior to the bid date to use a product or system not named in the Contract Documents.

B. Substitution Request – Construction Phase: A request submitted after contract award to use a product or system in place of a specified item.

C. Approved Equal: A product or system that, in the opinion of the Brazos River Authority, is equivalent in quality, performance, and characteristics to the specified product.

Submittals:

A. Substitution requests during bid phase shall be submitted as RFB questions to the Purchasing

Department via BidNet Direct.

B. Include the following information:

1. Product identification, including manufacturer’s name, model number, and specifications.

2. Detailed comparison of proposed substitution with specified product.

3. Performance and test data.

4. Manufacturer’s installation instructions and warranty.

5. List of similar installations with references.

6. Statement of impact on construction schedule and coordination.

7. Cost implications, if any (add/deduct/neutral).

Substitution Conditions:

A. Substitution requests will be considered under the following conditions:

1. During bidding, if submitted at least 21 days prior to bid date.

2. During construction, only when:

• Specified products are unavailable.

• Product has been discontinued.

• Substitution is required due to regulatory changes.

• Substitution offers significant benefit to the Owner without compromising quality or schedule.

B. Substitutions will not be considered if:

1. They are submitted without complete documentation.

2. They are proposed solely for contractor convenience or cost savings.

3. They require extensive redesign or coordination.

Quality Assurance:

A. The Brazos River Authority reserves the right to determine the acceptability of proposed substitutions.

B. Approved substitutions shall not relieve the Contractor from responsibility for performance, coordination, or warranty obligations.

1.5.4. Design Acceptance and Notice to Proceed with Construction

Upon satisfaction of all pre-construction conditions and acceptance of the design plans the Owner shall issue a written Notice to Proceed (NTP) to the CONTRACTOR. The NTP shall authorize the Contractor to commence construction activities on the Project Site. The NTP shall specify the effective date on which the Contractor is authorized to begin construction activities. This date shall be considered the official start date of the construction phase of the Project.

The issuance of the NTP is contingent upon the completion of the following pre-construction conditions:

• Approval of all required plans, permits, and licenses.

• Submission and approval of the final construction schedule.

• Verification of insurance and bonding requirements.

• Completion of any other conditions specified in the Contract Documents.

Any delay in the issuance of the NTP due to the Contractor’s failure to meet the pre-construction conditions shall not constitute grounds for an extension of the Contract Time. The Contractor shall be responsible for any costs or damages resulting from such delays.

1.6. Construction Phase Requirements

1.6.1. Construction Submittals and Procedures

This section includes requirements for contractor-originated construction submittals.

Construction submittals identified below in general form are to be DOR approved in addition to any other submittals identified by the DOR in the development of the submittal register. The Authority shall be provided an opportunity to review all construction submittals listed in the submittal register; however, this shall not obligate the Authority to review, comment, or approve the submittals and does not relieve the Contractor of any responsibility to correct errors or omissions.

DOR Approval required for:

(1) Earthwork and paving materials and geotechnical submittals

(2) Test pile and production pile installation data

(3) All components of the foundation system

(4) All components of the dock structural elements, hardware, fasteners, railing, paint, and finish materials.

(5) Material Supplier Certifications

In addition to the construction product submittals provided to the DOR, provide the following submittals to the Authority and provide an opportunity to review:

(1) Submittal Register

(2) Baseline Design and Construction Schedule

(3) Monthly Schedule Update

(4) Health and Safety Plan

(5) Environmental Protection Plan

(6) Notice to Proceed with Construction Activities

(7) Accident reports – per incident

(8) Interim special inspection reports

(9) Structural observation reports

(10) Final report of IBC Special Inspections

(11) Record Drawings

(12) Operation and Maintenance Information

1.7. Project Schedule

Submit critical path method schedules that are consistent in all respects with time, staging, and work sequencing of the Contract. Submit your baseline schedule within 15 days of contract approval. Within 5 business days of baseline schedule submittal meet with the Authority to discuss the baseline schedule.

With each monthly invoice, submit an update schedule with required support data that includes the status of work completed to date and the work yet to be performed as planned. Perform critical path work activities in the sequence indicated on the current accepted schedule. Notify the Authority in advance of performance of non-critical work activities that comply with Contract requirements but are out-of-sequence with the current accepted schedule. Performance of such work shall not impact the critical path work activities. The Engineer's review and acceptance of schedules neither voids any Contract part nor your responsibility for submitting complete and accurate information. Errors or omissions on schedules do not void your responsibility for completing all work within the time specified for completion of the work. If any aspect of the schedule has an error or omission after a schedule has been accepted, correct it on the next update schedule.

The Construction Phase for all authorized base bid and approved alternate bid items including punch list completion, final acceptance, and final application for payment shall be completed by August 30, 2026.

1.8. Health, Safety, and Emergency Response

Upon request by BRA, CONTRACTOR shall provide a copy of their corporate Health & Safety Program

(HASP) prior to initiating any work activities associated with their contracted services agreement.

Respondent shall identify safety specialist(s) responsible for implementation and accountability of

Respondent’s HASP. Respondent’s safety specialists shall be responsible to ensure BRA health and safety specialists are consulted and advised of all health and safety applications prior to, during and following any work activities associated with Respondent’s contracted service agreement. At the pre-construction conference, CONTRACTOR shall submit a Site Safety and Health Plan (SSHP).

1.9. Quality Requirements

The CONTRACTOR shall always have in effect a QC Program, which clearly establishes the authority and responsibility of those responsible for the QC Program. Personnel performing quality functions shall have sufficient and well-defined responsibility and authority to enforce quality requirements, to identify, initiate, recommend, and provide solutions to quality problems, and to verify the effectiveness of the solutions. CONTRACTOR shall be responsible to perform all quality assurance and quality control checks in their facilities and in their sub-contractor’s facilities.

The CONTRACTOR shall identify all applicable quality requirements imposed by these Contract Documents in purchase order documents to its Suppliers and Subcontractors and shall ensure compliance thereto.

The CONTRACTOR is responsible for all quality control for this Contract, except for performing those quality assurance tests or inspections specifically identified as being performed by others. Inspections and tests performed by the DOR, 3rd Party Testing Agency, and/or OWNER do not relieve the CONTRACTOR from the responsibility of meeting the specified requirements.

1.10. Regulatory Requirements

Comply with the applicable federal, state, and local rules, laws, and regulations whether or not such rules, laws, and regulations are specifically identified in the Contract Documents. Comply with all applicable

U.S. Department of Labor safety regulations, including those stipulated in 29 CFR 1910 and 29 CFR 1926.

Comply with the applicable rules and regulations of other regulatory bodies having jurisdiction over the

Work of this Contract. Unless specifically indicated otherwise, pay all applicable patent and other fees, royalties, and taxes pertaining to the Work of this Contract. Unless specifically indicated otherwise, procure and pay for all permits and licenses applicable to the Work of this Contract.

1.11. Temporary Facilities

Temporary services, utilities, connections, piping, heating, cooling, access, or other facilities or services are to be provided at no increase in the Contract Price.

Notify the Owner at least 2 days in advance of work that may affect property and utility owners.

The CONTRACTOR is solely responsible for temporary facilities and controls removal and restoration of the affected area when the temporary facilities and controls are no longer needed.

The CONTRACTOR shall provide all labor, materials, equipment, and incidentals necessary to construct temporary facilities to provide and maintain control over environmental conditions at the job site, including the removal of temporary facilities when no longer needed.

CONTRACTOR shall provide all temporary utilities required for the Project except as otherwise allowed under these Contract Documents. Make all arrangements with utility service companies for temporary services and obtain required permits and approvals for temporary utilities. Pay all utility service costs, including cost of electricity, water, fuel, and other utility services required for the Work. Continuously maintain adequate utilities for all purposes during the Project, until removal of temporary utilities and temporary facilities. At minimum, provide and maintain temporary utilities through Substantial

Completion. Maintain, including cleaning, temporary utilities and continuously provide consumables as required. Temporary utilities and temporary facilities shall be adequate for personnel using the Site and requirements of Project. Provide temporary utilities and temporary facilities in compliance with Laws and

Regulations and, when applicable, requirements of utility owners.

Submit the following to the ENGINEER for approval

• Construction Staging Layout.

• Pollution Prevention Plan.

• Crane Lift Plans (if required).

• Vessel specifications and Work Plan (if required).

Provide self-contained, single occupant, combination toilet and urinal units of chemical, aerated recirculation, or combustion type. Provide self-contained hand wash sinks with provision for potable water storage. The sanitary facilities shall be ready for use within thirty (30) calendar days of Notice to-

Proceed or within one (1) calendar day of mobilization, whichever comes first. The sanitary facilities shall be sufficiently secured from high winds to prevent movement. Keep toilet facilities equipped, clean, and sanitary at all times.

The CONTRACTOR is responsible for providing temporary electrical service required for the Work. Provide temporary outlets with circuit breaker protection and ground fault protection. CONTRACTOR shall coordinate temporary electrical service with the electrical service provider, Navasota Valley Electrical Co-

Op. CONTRACTOR shall be responsible for metering and paying for its power usage at the staging area.

All temporary electric facilities installed shall meet National Electric Code (NEC) Article 590 requirements.

Provide OSHA approved portable power equipment and extension cords, temporary wires, outlets and on/off controls. All temporary electric facilities installed shall meet National Electric Code (NEC) Article

590 requirements.

Provide temporary fire protection, including portable fire extinguishers rated not less than 2A or 5B in accordance with NFPA 10, Standard for Portable Fire Extinguishers, for each temporary building and for every 3,000 square feet of floor area under construction. Comply with NFPA 241, Safeguarding Building

Construction, Alternation, and Demolition Operations, and requirements of fire marshals and authorities having jurisdiction at the Site.

The CONTRACTOR is responsible for ensuring that the public is protected from the construction operations. Signs, fences and other measures shall be used as necessary depending on site conditions.

Temporary gates and fences shall be installed wherever it is necessary to operate construction equipment through existing fences. Gates shall be kept closed except when construction equipment and the

CONTRACTOR’s employees are passing through.

The use of a temporary boat and/or barge by the CONTRACTOR is a means and methods construction activity at no additional cost to the Project. If the CONTRACTOR wishes to utilize a boat and/or barge, the

CONTRACTOR shall submit for review vessel specifications, work plan, requested put-in and take-out schedule, requested staging plan(s) and temporary anchoring plans. Use of boats and/or barges are subject to review, OWNER requirements including operational restrictions of the dam, and emergency conditions. The CONTRACTOR is responsible for complying with OSHA requirements including but not limited to OSHA 1926.605 – Marine Operations and Equipment.

Repair damage caused by the installation or use of temporary work. Restore permanent facilities, turf/grass areas, and ground surface areas used during the Contract period to their original or otherwise specified condition. Upon completion of the Contract, remove the temporary facilities and controls from the Site, except those designated to remain. Remove temporary utilities, equipment, facilities, and materials prior to submitting the Final Application for Payment.

1.12. Temporary Environmental Controls

The CONTRACTOR is responsible for preparing, maintaining, executing and updating a pollution prevention plan for this contract that covers all construction and construction-related activities of the project at the Site at no additional cost to the Project. At all times, observe and comply with all Laws and

Regulations which in any manner relate to pollution control. Prevent the contamination of soil, water, or atmosphere by the discharge of noxious substances and/or contaminants from construction operations.

Provide adequate measures to prevent the creation of noxious airborne pollutants. Prevent dispersal of pollutants into the atmosphere. The CONTRACTOR shall not dump or otherwise discharge noxious or harmful fluids, substances, and/or contaminants into drains or sewers, nor allow noxious liquids, substances, and/or contaminants to contaminate public waterways in any manner. Provide equipment and personnel and perform emergency measures necessary to contain any spillage. Contain chemicals in protective areas and do not dump on soil, in the lake or in any waterway. Dispose of such materials at off-site locations in an acceptable manner. If contamination of the soil does occur, promptly notify the

ENGINEER and OWNER and appropriate regulatory agencies, excavate contaminated soil and dispose at an off-site location properly licensed or permitted to handle such soil. Provide documentation to the

ENGINEER and appropriate regulatory agencies which states the nature and strength of the contaminant, method of disposal, and the location of the disposal site. Fill resulting excavations with suitable backfill and compact to the density of the surrounding undisturbed soil. Activities performed pursuant to this section shall be conducted in accordance with any and all Laws and Regulations.

The CONTRACTOR shall prepare and submit Pollution Prevention Plan which includes at minimum the following or as specified by regulatory authority:

• CONTRACTOR name and contact information.

• Site map and project description.

• Potential sources of pollutants from construction activities.

• Their corresponding BMP’s that will be implemented.

• Plan for monitoring the site and maintaining BMP’s.

• Plan for lawful disposal of sediment and pollutants.

• Permits and/or jurisdictional authorizations (if required).

1.13. Product Delivery, Storage, and Handling

The CONTRACTOR shall be responsible for timely delivery to the project site of all items (including spare parts) procured by the CONTRACTOR. The CONTRACTOR shall keep a system in place to continuously track shipments of all delivery items from the time it leaves the place of origin until it arrives at the Site.

CONTRACTOR shall transport and handle items in accordance with manufacturer's instructions. All items shall be delivered to the site in undamaged condition, in manufacturer's original sealed containers or other packing systems, complete with instructions for handling, storing, unpacking, protecting and installing. All items delivered to the site shall be unloaded and placed in a manner which will not hamper the CONTRACTOR's normal construction operation or those of subcontractors and other contractors and will not interfere with the flow of necessary traffic. CONTRACTOR shall provide necessary equipment and personnel to unload all items delivered to the site. CONTRACTOR shall promptly inspect shipment to assure that products comply with requirements, quantities are correct and items are undamaged. For items furnished by others (i.e. OWNER, other contractors), perform inspection in the presence of the

ENGINEER. Notify ENGINEER verbally, and in writing, of any problems. C. CONTRACTOR shall store and protect products in accordance with the manufacturer's instructions, with seals and labels intact and legible. Storage instruction shall be studied by the CONTRACTOR and reviewed with the ENGINEER by him/her. Instruction shall be carefully followed and a written record of this kept by the CONTRACTOR.

CONTRACTOR shall arrange storage to permit access for inspection.”

The CONTRACTOR shall assume and be liable for the entire risk involving damage or loss while equipment is in transit, and shall be responsible for filing all claims with its insurance carrier for damaged and lost equipment and shall promptly replace or repair any damaged or lost equipment, without awaiting the finalization of insurance claims. At all times, the CONTRACTOR shall be responsible for all risk of loss in accordance with the Contract Documents.

1.14. Construction Waste and Disposal

Make arrangements to legally dispose of the refuse, rubbish, scrap materials, and debris caused by operations offsite. Dispose of waste products, trash, debris, and similar materials not required for the performance of the Work. Remove surplus materials, falsework, and other temporary structures.

1.15. Warranty

The Contractor shall execute and deliver to the Owner, before final acceptance, a written Warranty stating that all labor and materials (including dockage and all associated work) furnished by the contractor are in accordance with the contract plans and specifications, authorized alterations and additions thereto; and that, should any defect develop during the contract warranty period as hereinafter defined, due to improper materials, workmanship, or design, those defects be corrected by the Contractor without expense to the Owner.

Required Warranties:

Manufactured Products - Five Year Limited Warranty

Decking - Twenty-year Material Limited

Exterior Coatings - Twenty-Year Manufacturer’s Limited Warranty

1.16. Closeout

Maintain a Record Set of the Contract Drawings; Specifications; Shop Drawings; and the Baseline, Recovery, and Update Construction Schedules at the Site specifically dedicated to indicating and recording the actual construction performed under the Contract. Maintain Field test records, Inspection certificates, Manufacturer’s certificates, Manufacturer’s instructions for assembly, installation, and adjustment of their products provided under this Contract, Quality control documents, and Survey notes.

Prior to final payment, CONTRACTOR shall deliver to the OWNER and receive acceptance by the OWNER of the following items:

• Project Record Documents

• CONTRACTOR’s written guarantee of materials and workmanship.

• All subcontractor and vendor waivers and releases of liens

• All guarantees, warranties, and submittals, as specified.

• Receipts for extra materials and/or spare parts delivered to OWNER.

• Final payment request.

• All required indemnifications.

• All other required closeout documents.

The Final Application for Payment request shall include adjustments to the Contract

Amount for:

• Approved Change Orders

• Allowances not previously adjusted by Change Order

• Unit prices

• Deductions for defective Work that have been accepted

• Penalties and bonuses

• Deductions for liquidated damages

• Deductions for reinspection payments

• Other adjustments

2. Statement of Work

2.1. Project Description

Lake Limestone Park No. 5 is owned and operated by the Brazos River Authority (BRA). The park is part of Lake Limestone Reservoir which was constructed in 1978. The park includes numerous fixed pier docks providing access to launching boats, fishing, and swimming. The primary courtesy Loading Dock for launching boats has sustained substantial damage over the course of its design life and is due for replacement. A separate fishing dock structure is also proposed as a potential alternative bid item.

The Lake Limestone Park No. 5 Loading Dock and Fishing Pier Project consists of construction of an approximately 220-foot-long courtesy dock adjacent to the existing boat ramp. The courtesy dock will be of pile-supported fixed pier design with a 1,200 square foot platform at the end. A 300-foot-long fishing pier is also proposed as an additional alternative bid item. The fishing pier will also be pile-supported fixed pier design.

2.2. Site Analysis

2.2.1. Design Data

Geotechnical Data

Geotechnical report prepared by Terracon is provided in Appendix A

Elevation Data

1. All elevations are in NGVD 29 Datum

2. Water elevation data is available for download in csv format at:

https://www.waterdatafortexas.org/reservoirs/individual/limestone

3. Water elevation data Key Project Elevations

a. Courtesy Loading Dock Deck Finished Surface Per Final Dock Design

b. Courtesy Dock Lowest Structural Member Per Final Dock Design

c. Fishing Dock Deck Finished Surface Per Final Dock Design

d. Fishing Dock Lowest Structural Member Per Final Dock Design

4. Water Levels

a. Typical Spillway Operating Water Level Range El. 362.8 feet to El.363.5 feet (Pool Level routinely drops below)

b. Maximum Normal Storage Water Elevation El. 363.0 feet

c. Emergency Spillway Crest: El. 369.6 feet

d. Flood of Record El. 364.39 feet

e. 100% PMF Elevation (all 5 gates open, 316,000 cfs) El. 376.3 feet

f. Mean Water Surface (Oct-1994 – May-2024) El. 361.44 feet

g. Standard Deviation (Oct-1994 – May-2024) El. 1.95 feet

h. Estimated Ramp end elevation: El. 360.4 feet

i. Minimum water surface permissible for boat launching: El. 361.45 feet

5. Lake Bottom Elevation data obtained through field measurements is provided in Appendix B.

Accuracy is to the level implied by the method.

2.3. Project Objectives

2.3.1. General Dimensions

Minimum dock dimensions are provided on Drawing SD1, SD2, and SD3. Stated Dimensions may be reduced to accommodate pile foundation penetrations, but in no case shall the minimum clear deck distance be less than 4 feet between piles. Minimum clear travel width should be not less than 5 ft (60 inches) between cleats, bull rails, rings or other mooring hardware mounted along the edges of a boarding float. All mooring hardware should be mounted not more than 6 inches within the boarding float edges.

Finished deck surface and structural member elevations are not specified in this RFB. Due to water level fluctuations, the entire courtesy dock structure will not always provide complete accessibility to the water for its full length. The loading dock elevations shall be finalized during the dock design submittal phase and set based on the following criteria.

a. Accessibility is provided for at least two boats down to the minimum water surface permissible for boat launching.

b. Using historical data, set the main dock elevation to maximize number of days where the dock surface is less than or equal to 3 feet above the water surface.

c. Sections of the dock where the finished deck surface minus water surface is greater than 3 feet shall be considered inaccessible.

d. Main dock elevation shall not be higher than the adjacent bulkhead.

2.3.2. Guard Rails

Guardrails or other safety provisions shall be provided along the edges where the vertical drop to the normal pool exceeds 6 feet. Edges having a primary function other than walks or access ways, such as docking frontage and swimming access shall not require guardrails. Guardrails shall be a minimum of 42 inches high and shall prevent the passage of a 21-inch sphere except where required otherwise required.

Edge protection shall be provided as required by other rules.

2.3.3. Loading Design

Every structure shall be of sufficient strength to support the imposed dead, live, snow, wind, wave, impact and seismic loads that may reasonably be expected to occur during the service life of the structure without exceeding the prescribed stresses for the various materials described elsewhere in this RFB. Adequate consideration shall be made for forces imposed by earth, water, docking and mooring.

Vertical Loads

Dead loads shall consist of the entire weight of the structure, including utilities, gangways, dock boxes, superstructure and other accessories and appurtenances.

Deck surface and structural frame live load shall be equal to 60 PSF applied to the full surface area of the deck.

For design purposes, a 250 lb LPL shall be applied at any point on the boarding…

This is the start of the file's text. The full file is on GovTribe.