This document is Addendum No. 1 to Invitation for Bid (IFB) 2027000030 issued by the Colorado Department of Corrections on October 20, 2026, for the SCCF Dementia Unit Improvements project designated as ADA27-001. The addendum consists of 64 pages total and includes a mandatory pre-walk sign-in sheet with agenda, answers to bidder questions, and comprehensive revisions to project specifications and drawings. Bidders are required to acknowledge receipt of this addendum on their bid form. The addendum addresses revisions to six specification sections covering metal fabrications, detention equipment general requirements, detention equipment doors and frames, mechanical submittals, earthwork, and chain link fence and gates, as well as revisions to four drawing sheets affecting enlarged plans, mechanical systems, plumbing systems, and electrical diagrams and schedules.

The addendum does not specify pricing terms, contract duration, award dates, set-asides, funding sources, or other financial details within the scope of this document. The revisions are presented for incorporation into the project manual and construction drawings, with all revised sections and sheets to be reviewed in their entirety by bidding contractors. No incumbent contractor information, specific bid response dates, or contract renewal options are identified in this addendum.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum No. 1 – Colorado Department of Corrections

Date: 10/20/2026 Project: ADA27-001 / SCCF Dementia Unit Improvements

*IMPORTANT* Bidder is reminded that it is a requirement to acknowledge receipt of all addendums, to include this one, on their Bid Form.

This Addendum consists of One (1) cover/narrative pages, and Sixty-three (63) attachment page(s) for a total of Sixty-four (64) page(s).

GENERAL:

1. Attachment No. 1 – Mandatory Pre-Walk Sign-In Sheet and Agenda

2. Attachment No. 2 – Answer to Questions

SPECIFICATIONS:

3. Attachment No.3 – Specifications - REVISIONS TO PROJECT MANUAL

A. SPECIFICATION SECTION 05 50 00 METAL FABRICATIONS

1. Revised, refer to the attached section in its entirety.

B. SPECIFICATION SECTION 11900 DETENTION EQUIPMENT GENERAL

REQUIREMENTS

1. Revised, refer to the attached section in its entirety.

C. SPECIFICATION SECTION 11901 DETENTION EQUIPMENT DOORS & FRAMES

1. Revised, refer to the attached section in its entirety.

D. SPECIFICATION SECTION 23 0100 MECHANICAL SUBMITTALS

1. Revised, refer to the attached section in its entirety.

E. SPECIFICATION SECTION 31 0000 EARTHWORK

1. Revised, refer to the attached section in its entirety.

F. SPECIFICATION SECTION 32 3113 CHAIN LINK FENCE AND GATES

1. Revised, refer to the attached section in its entirety.

DRAWINGS:

4. Attachment No.4 – Drawings - REVISIONS TO DRAWINGS

A. SHEET NUMBER A2.02 ENLARGED PLANS LEVEL ONE

1. Revised, Details, Notes and Schedules as indicated on the attached sheet.

B. SHEET NUMBER M1.01 MECHANICAL NEW WORK PLANS LEVEL ONE

1. Revised, Notes as indicated on the attached sheet.

C. SHEET NUMBER P1.01 PLUMBING NEW WORK PLANS LEVEL ONE

1. Revised, Domestic Water Plans as indicated on the attached sheet.

D. SHEET NUMBER E5.01 ELECTRICAL DIAGRAMS AND SCHEDULES

1. Revised, Schedule as indicated on the attached sheet.